The document summarizes waste generation calculations for a residential building with 664 flats and 5 members per family. It estimates that 1675kg of total refuse is generated daily, with 670kg as wet garbage and 1005kg as dry garbage. Based on a density of 240kg/cubic meter and collecting waste for 2 days, the collection room would need space for 20 waste containers of 0.75m diameter and 1.3m height each to store the waste generated in 2 days.
The document summarizes waste generation calculations for a residential building with 664 flats and 5 members per family. It estimates that 1675kg of total refuse is generated daily, with 670kg as wet garbage and 1005kg as dry garbage. Based on a density of 240kg/cubic meter and collecting waste for 2 days, the collection room would need space for 20 waste containers of 0.75m diameter and 1.3m height each to store the waste generated in 2 days.
The document summarizes waste generation calculations for a residential building with 664 flats and 5 members per family. It estimates that 1675kg of total refuse is generated daily, with 670kg as wet garbage and 1005kg as dry garbage. Based on a density of 240kg/cubic meter and collecting waste for 2 days, the collection room would need space for 20 waste containers of 0.75m diameter and 1.3m height each to store the waste generated in 2 days.