This document provides a checklist for analyzing and designing normal foundations for an effluent treatment plant and hazardous waste handling facilities project. It includes items such as the founding depth, plinth and tie beam requirements, footing dimensions and loads, pile spacing, cut-off levels, and conformance with geotechnical recommendations for settlement, groundwater, stability, and pile capacities. Reinforcement detailing and internal coordination requirements are also checked.
This document provides a checklist for analyzing and designing normal foundations for an effluent treatment plant and hazardous waste handling facilities project. It includes items such as the founding depth, plinth and tie beam requirements, footing dimensions and loads, pile spacing, cut-off levels, and conformance with geotechnical recommendations for settlement, groundwater, stability, and pile capacities. Reinforcement detailing and internal coordination requirements are also checked.
This document provides a checklist for analyzing and designing normal foundations for an effluent treatment plant and hazardous waste handling facilities project. It includes items such as the founding depth, plinth and tie beam requirements, footing dimensions and loads, pile spacing, cut-off levels, and conformance with geotechnical recommendations for settlement, groundwater, stability, and pile capacities. Reinforcement detailing and internal coordination requirements are also checked.
This document provides a checklist for analyzing and designing normal foundations for an effluent treatment plant and hazardous waste handling facilities project. It includes items such as the founding depth, plinth and tie beam requirements, footing dimensions and loads, pile spacing, cut-off levels, and conformance with geotechnical recommendations for settlement, groundwater, stability, and pile capacities. Reinforcement detailing and internal coordination requirements are also checked.
Document Title: Pile Load Calculations of OWS Tank SR. Tick Mark CHECK/ CONTROL POINTS NO. as per Legend 1 Founding level/ depth of foundation with respect to HPP/ FGL/ NGL/ EGL/ FFL Ok (strike out whichever is not applicable). 2 Requirement & Level of plinth/ tie beams. Ok 3 Type, Shape & Dimensions of footing. Ok 4 Adequacy of loading for foundation. Ok 5 Correctness of the design forces as per analysis. Ok 6 Selection of critical loading cases/ combinations. Ok 7 Long/ short column effect for pedestal. N/A 8 Size of pedestal: N/A a) type of anchor bolts N/A b) bolt spacing (with respect to clearance between the bolts) N/A c) edge distance of anchor bolts N/A d) depth of embedment of anchor bolts N/A 9 Location co-ordinates & Orientation with respect to North direction. Ok 10 Conformance to Geotechnical recommendations: Ok a) check for SBC at founding depth (w.r.t. settlement/ shear) N/A b) consideration of ground water table. Ok c) check for FOS against overturning, sliding N/A d) increase in SBC (limited to 25% for wind or seismic/ 100% for blast) N/A e) spacing of piles (within group & inter-group) Ok f) pile cut-off level Ok g) load check conforming to pile capacity Ok h) increase in pile capacities (limited to 50% for vertical & Ok 25% for lateral for wind/ seismic/ 50% for blast) 11 Projection of foundation outside battery limit is co-ordinated with Civil N/A Department for under-ground piping, etc. 12 Ductile detailing requirements for reinforcement, wherever applicable. Ok 13 Internal co-ordination with all concerned departments. Ok