SAUDI ARAMCO ID/PIEU -3- July-2018 - REV. 2018.04.00 (Standards Cutoff -April 30, 2018) Rev. 2018.04.

00 30-Apr-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
High Voltage Power Cable, Termination Torque Testing SATR-P-3213 3-Jul-18 ELECT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

A. TEST PROCEDURE FOR TORQUE TESTING

Installation inspection shall be performed by the project approved Quality


Schedule Q
A1 Control Inspector (QCI) and witness point shall be coordinated with the
Sec. 5.1
Contractor and Company.
The high voltage power cable connections shall be torque tested with Schedule Q
A2 certified and calibrated torque-type screw driver or beam-type torque Att. IV
wrench or ratchet-type torque wrench. Sec. 7.1
Mark the head of the bolt with a colored marker pen after it has been
SAES-P-104
A3 torqued to manufacturer's recommended value.
Sec. 3.2
(NEC 110.14 and FPN)

Check the maximum torque values listed for plated and lubricated bolts
(SILICON BRONZE or CADMIUM PLATED), check the bolt diameter and Schedule Q
A4
thread for the right rating of torque values to be applied in accordance with Sec. 1.3
NETA ATS, Table 100.12.1.

Check torque tester sit at proper range of each size of bolt.


a) Use testing guide lines table of Pre-Commissioning Form P-000. Schedule Q
A5
b) NETA tables for bus connections. Sec. 1.3
c) Manufacturer's recommendation.

The calibrated torque wrench shall be adjusted to the recommended


SAES-P-104
A6 torque value.
Sec. 3.2
(NEC 110.3 B and Manufacturer's Instructions)

The torque wrench shall be applied in the tightening direction to 10% of


the bolts, but not less than two bolts, selected at random, in each SAES-P-104
A7
connection. Sec. 3.2
(NEC 110.3 B and Manufacturer's Instructions)

If any nut or bolt head is turned by the application of the job inspection
torque wrench, this shall be applied to all the bolts in the connection; and
SAES-P-104
A8 all bolts, whose nut or head is turned by the job inspection torque, shall be
Sec. 3.2
tightened and re-inspected.
(NEC 110.3 B and Manufacturer's Instructions)

All bolts that have passed the torque testing shall be marked in
SAES-P-104
A9 accordance with the proponent's recommendation.
Sec. 3.2
(NEC 110.14 and FPN)
Torquing is to be carried out ONLY on de-energized cable. Cable shall be
Schedule Q
A10 tested for their de-energized state before starting test on them.
Sec. 1.3
(NETA ATS, Sec. 5.1.4)
Test Records and Receipt documents are to be carefully presented in
Schedule Q
A11 original.
Sec. 1.3
(NETA ATS, Sec. 5.4.3)

B. TEST EQUIPMENT CRITERIA

Schedule Q
B1 Test shall be performed using a calibrated torque-wrench. Att. IV
Sec. 7.1

Saudi Aramco: Company General Use


Schedule Q
B2 The test equipment calibration cycle shall not exceed twelve months. Att. IV
Sec. 7.1

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -3- July-2018 - REV. 2018.04.00 (Standards Cutoff -April 30, 2018) Rev. 2018.04.00 30-Apr-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
High Voltage Power Cable, Termination Torque Testing SATR-P-3213 3-Jul-18 ELECT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

Test Equipment Manufacturer: Serial Number:

Scale Range and accuracy: Calibration date:

Calibration Company and Technician: Calibration Expiration Date:

C. TEST RESULTS

Manufacturer Recommended
Connection # Size and Grade of Bolt Applied Torque Pass Fail Re-Test Date
Torque Value

D. CONCLUSIONS

Bolt- torque levels shall be in accordance with NETA ATS, Table 100.12.1 Schedule Q
D1
unless otherwise specified by the manufacturer. Sec. 1.3
If no nut or bolt head is turned by the application of the job inspection Schedule Q
D2 torque to 10% of the bolts, the connection shall be accepted as properly Att. IV
tightened. Sec. 7.1
Test results are acceptable and in accordance with Saudi Aramco
Schedule Q
D3 Engineering Standards and contractual requirements.
Sec. 1.3
(NETA ATS, Sec. 5.4.1.5)

REFERENCE DOCUMENTS:
1. Schedule G -- Material, Tools and Equipment (MP-LSTK & LSPB Pro Forma, Contract Specific)
2. Schedule Q -- Quality Requirements (MP LSTK & LSPB Pro Forma, Contract Specific)
3. Acceptance Testing Specifications for Electric Power Distribution Equipment and Systems- NETA (2009)
4. NFPA 70 National Electrical Code (NEC), 2014 Edition
5. SAES-P-104 Wiring Methods and Materials, 01 January 2018
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -3- July-2018 - REV. 2018.04.00 (Standards Cutoff -April 30, 2018) Rev. 2018.04.00 30-Apr-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
High Voltage Power Cable, Termination Torque Testing SATR-P-3213 3-Jul-18 ELECT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the manufacturer
indicates compliance with appropriate standards or performance in a specified manner.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -3- July-2018 - REV. 2018.04.00 (Standards Cutoff -April 30, 2018) Rev. 2018.04.00 30-Apr-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
High Voltage Power Cable, Termination Torque Testing SATR-P-3213 3-Jul-18 ELECT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Name, Title, Department,
Name, Initials and Date:
Company, Initials and Date:

QC Inspector PID Representative


Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED