----- Original Message -----

From: Ramasubramanian
To: sam99@eim.ae
Date: Sun, 30 Dec 2007 16:31:50 +0400
Subject: RE: Q&A 6

Dear Doctor,

Request you to clarify the below given.

On what basis valuation of variations on a D&B project will be done?

Rgds

A.Ramasubramanian.

----- Original Message -----


From: thirimadura ariyaratna
To: sam99@emirates.net.ae
Date: Sun, 30 Dec 2007 23:40:41 -0800 (PST)
Subject: QS - Questions
Dear Dr. Sam,
 
Wish you Happy and Prosperous New Year.
 
Thanks for all your e-mails for the Q & A's and I also have a question regarding the Metal Structures as
below;
 
(A) In the BOQ description says Steelwork supporting structures including structure design,shop
drawings,manufacture of structure, povision of bolt template, anchor bolts, supports, bracings, complete as
shown on plan drawings and CESSM3 reference is       class M.
 
(B) In the General notes drawing says any structures located less than 9.0 m from edge of carrage way shall
be barrier protected but it is not included in the above BOQ description and pricing preamble.
 
(C) Contractor has claimed seperate item for the barrier as a variation ( CESSM3 ref; class X ) but my
opinion is it is included in the above BOQ description because structure complete as shown on
plan drawings, please clarify.
 
Thanks and Regards,
.
T. Ariyaratna.

----- Original Message -----


From: Nafeesa.Sayad@jci.com
To: sam99@eim.ae
Date: Wed, 02 Jan 2008 09:16:22 +0400
Subject: Q & A
Dear Dr. Sam.

Happy New year to you.

I had a question.

Can an a notice sent via an e-mail be considered a formal notice .

Thanks & Regards

Nafeesa Sayad

You might also like