Maintenance Planning for Marine Units

(MM526)
Sheet No. (1)
Student Name: …………………………………………………….. Reg. No.: ………………………..

Please select the correct answer,


1. Maintenance is a group of ………….. taken to prevent a device or
component from failing or to repair normal equipment degradation

(a) actions (b) steps (c)activities

2. The ………… … operation of a component is time-based


function
(a) practical (b) actual (c) theoretical

3. The graph of the failure rate for a component population versus


time, it is likely take the “………” shape
(a) Flat (b) Bell (c) Bathtub

4. Total Productive Maintenance (TPM) objective is the


maximization of the production equipment’s ……………...
(a) global (b) total efficiency (c) efficiency
efficiency

5. One of the advantages of predictive maintenance is that the


………………of equipment operation.
(a) optimization (b) safety (c) performance

6. Past studies have estimated that a properly functioning predictive


maintenance program can provide a savings of ………..over a

Page 1 of 5
program utilizing preventive maintenance alone.
(a) 8% to 10% (b) 8% to 12% (c) 10% to 12

7. The registered tonnages of the vessel …………. be included in


the ship's particulars.
(a) must (b) should (c) may

8. The vessel's call sign consist of …………..


(a) letters (b) letters and numbers (c) numbers

9. The ……….. certificate may be issued by an attending Surveyor


upon satisfactory completion of a survey in order to permit the ship
to trade.
(a) intermediate (b) full-term (c) interim

10.The Registration Certificate, of any Marine Unit, is issued by the


……………….
(a) Flag (b) P&I Club (c) Class

11.The Cargo Ship Safety Construction Certificate is issued by


…………. on behalf of the …………..
(b) Class/Flag (c) Flag/Class
(a) Class/Owners

12.The vessel's call sign consist of …………..


(a) letters (b) letters and numbers (c) numbers

13.The ……….. certificate may be issued by an attending Surveyor


upon satisfactory completion of a survey in order to permit the ship
to trade.
(a) intermediate (b) full-term (c) interim

14.The Minimum Safe Manning Certificate includes the


………………………………………………………………………
(a) number of crew (b) total number of crew (c) detailed
members members number for
crew members

15.The Classification Society refers to a non-governmental body that


promotes the safety and protection of the environment of
……………….
(a) ships (b) Offshore structures (c) Ships/
Offshore
Structure
Page 2 of 5
16.Flag Administration refers to that governmental authority under
which a country exercises regulatory control over the vessels which
is registered under ………….
(a) the flag (b) other countries flag (c) both

17.The main objective of the SOLAS convention is to specify


…………. for the construction, equipment and operation of ships
which are compatible with their safety.
(a) standards (b) maximum standards (c) minimum
standards
18.The International Convention on Standards of Training,
Certification and Watch keeping for Seafarers (STCW) sets
standards for the training, certification and watch keeping for
seafarers working onboard ships engaged on ……….. voyages.

(b) National (c) Local


(a) International

19.COLREGs’ sole objective is to set out the ………. for vessels


engaged in voyages on the high seas.
(a) rules of the road (b) standards of the road (c) instructions
for the
road

20.The International Convention of Load Lines, 1966, which needs


to be complied by for all vessels exceeding of ……. meters of
length.
(b) 20 (c) 22
(a) 24

21.…… during a five year period a Classed boat should be dry-


docked so the shell plating, shafting, propellers and rudders can be
closely examined.
(b) Three Times (c) Once
(a) Twice

22. DPA should be …….. in verifying an efficient flow of


maintenance-related information

(a) familiar (b) experienced (c) effective

23. The non-conformity is ………….. a deficiency n the

Page 3 of 5
implementation of a system or code.

(a) only (b) not only (c) solely

24.The maintenance procedure(s) ………… include any additional


requirements established by the company.
(a) should (b) should not (c) will

25.The ……….. of the ship is an important factor, when developing or


improving maintenance procedure(s).
(a) price (b) value (c) age

26.A systematic approach to maintenance will include the clear


definition of ………. requirements and mechanisms.
(a) activity (b) procedure (c) reporting

27. ………. criteria for inspection includes pass/fail and tolerances.


(a) Procedure (b) Acceptance (c) Practical

28.The calibration of the measuring and testing equipment to the


appropriate ……………..
(a) standards (b) procedures (c) work
instructions

29.Among the types of inspection and test that may be employed,


visual, temperature and ………..
(a) water pressure (b) water ingress (c) water tightness

30.Superintendents’ visits and inspection reports are classified as


………… records.
(a) unvaluable (b) external (c) internal

31.The testing and maintenance of ……… equipment should be part


of the company’s maintenance plan.
(a) stand-by (b) major (c) minor

32.The technical operational management staff needs to have the


correct experience.
(a) appropriate (b) correct (c) moderate

33.…………. compliance with the regulations should be assured


through regular reviews and auditing

Page 4 of 5
(a) Continuing (b) The (c) Adequate

34.The scheduled resourcing reviews should be carried out ………..


(a) annually (b) monthly (c) regularly

35.The required skills can be identified via thorough …….. to break


the job down to its component tasks.
(a) test (b) inspection (c) analysis

36.Planning, scheduling & coordination provide significant benefits


to management by ………… problem areas.
(a) identifying (b) solving (c) collecting

37.The duration and labor-hour estimates for each task is one of the
components the ……… Job Package.
(a) Planned (b) procedure (c) actual

38.Among the Planned Job Package is the Job Planning Sheet with
……………….. tasks.
(a) variable (b) sequenced (c) all