The solution for your

Operational
Risk Management
needs
STAGE 1
BUSINESS CRITERIA ANALYSIS
Part 1 – Section 3

405 MWp SOLAR PLANT AT SAKAKA

18002-EC-EDE-0014-00
Prepared by: Franck DAVID
Reviewed by: Tony WILSON
Approved by: John ALDRED

Copy 1 Date: 05 Jul 2017


Distribution

Name: Mahindra Susten

Amendments Date

Report 0001 05 Jul 2017

2 of 7
Contents

1. EXECUTIVE SUMMARY .................................................................................................................... 4


2. INTRODUCTION ............................................................................................................................... 5
3. ANNEX A – BUSINESS CRITERIA ANALYSIS FORMS .......................................................................... 6

3 of 7
1. EXECUTIVE SUMMARY

The Facility Operator, ACWA Power, supplied KDOCS with a completed Business Criteria Analysis as
stipulated within SEC-01 Appendix B. This documentation identified the Facility Security
Classification as having an interger rating of 3.

This information was used within the Security Risk Analysis process, contained at Section 1 of this
submission and informed the recommendations and the proposed layout of the facility.

4 of 7
2. INTRODUCTION

There is a defined requirement for a Business Criteria Analysis to be conducted, by the Facility
Operator (FO) at the start of the HCIS approval process The determinations made, by the FO, inform
all subsequent items within the Stage 1 Submission.HCIS directs that,

“Each facility under the jurisdiction of HCIS shall have a FSC assigned based on the BCA”.1

The intent of the BCA is to identify the FSC, using a modular,logical framework that assesses the
overall facility into one of the five categories, as determined by HCIS.

Facility Name Facility Security Classification


405 MW SOLAR PLANT - SAKAKA Classification 3

5 of 7
3. ANNEX A – BUSINESS CRITERIA ANALYSIS FORMS

Class 1 Business Criteria Analysis Facility Owner Response


Serious impact to offsite &
onsite population due to
NO There is no toxic or flammable release in the PV plant
large scale toxic or flammable
release
Major environmental impact
onsite and/or offsite areas
NO The plant is producing power utilizing renewable energy

Very large capital investment


The company is owned 100% by the PIF therefore the project does not resemble a big investment
NO
in the owner’s portfolio
Very long term business
interruption with large scale
disruption to the national NO The plant is a pilot plant therefore no impact will happen if an interruption accure
economy or loss of critical
data

Critical infrastructure,
regardless of capital
NO There is no critical infrastructure
investment or availability of
alternates
Other critical national
infrastructure is dependent
on this facility's output, NO The plant is a pilot plant therefore no critical national infrastructure is dependent on the facility
products or services

The plant is a pilot plant therefore the production is not considered within (but additional to) the
Loss of function/ capacity
national grid annual production.
cannot be made up by other NO
For clarity this pilot plant production enters the National Grid at POI….(area of National Grid), and
existing facilities
has no effect on that operating area
Directly and seriously impacts
hydrocarbon exports NO There is no impact on hydrocarbon exports

Class 2 Business Criteria Analysis Facility Owner Response

Serious impact on onsite


personnel & possibility of NO No serious impact on onsite personnel or offsite population
offsite injuries or casualties
Very large environmental
impact onsite
and/or offsite areas NO No environmental impact

Medium capital investment


The company is owned 100% by the PIF therefore the project does not resemble a big investment in
NO
the owner’s portfolio

Long term business


NO The plant is a pilot plant therefore no impact will happen if an interruption occurs
interruption
Loss of function/ capacity can
be compensated for short The plant is a pilot plant therefore the production is not considered within (but additional to) the national
periods by other existing grid annual production.
NO
facilities For clarity this pilot plant production enters the National Grid at POI….(area of National Grid), and has no
effect on that operating area

6 of 7
Directly impacts hydrocarbon
exports but will not
significantly reduce them NO There is no impact on hydrocarbon exports

Class 3 Business Criteria Analysis Facility Owner Response


Possibility of offsite injuries or
casualties with no offsite YES injuries could happen onsite but not offsite
impact
Environmental impact onsite
and/or minor impact in offsite NO No environmental impact as in the PV plant we harvest the sun energy to produce clean electricity
areas
The company is owned 100% by the PIF therefore the project does not resemble a big investment in
Small capital investment YES
the owner’s portfolio
Medium term business
interruption NO The plant is a pilot plant therefore no impact will happen if an interruption occurs

Loss of function/ capacity can


be compenseted for an The plant is a pilot plant therefore the production is not considered within the national grid annual
YES
extended periods by other production
existing facilities
No Direct impact
NO There is no impact on hydrocarbon exports
hydrocarbon exports

Class 4 Business Criteria Analysis Facility Owner Response

Possibility of localized onsite


injuries or casualties with no YES injuries could happen onsite but not offsite
offsite impact
Minor environmental to
immediate incident area NO No environmental impact as in the PV plant we harvest the sun energy to produce clean electricity

Short term business


interruption NO The plant is a pilot plant therefore no impact will happen if an interruption occurs

Class 5 Business Criteria Analysis Facility Owner Response


Possibility of minor onsite
injuries or casualties with no YES injuries could happen onsite but not offsite
offsite impact
No environmental impact No environmental impact as in the PV plant we harvest the sun energy to produce clean
YES electricity

Very Short term business


interruption YES The plant is a pilot plant therefore no major impact will happen if an interruption occurs

Facility is located within


secondary industrial areas of NO The location is not in an industrial area
the kingdom
Does not directly support a
Class 1. Class 2 or a Class 3 YES The plant does not directly support any classified facility as it is a pilot plant
facility