implementing a new method of well completion that is ready to produce oil and gas without
using a rig. The new method applied by PHM engineers is to assemble a special tool, the
Hydraulie Workover Unit (HWU).
Hydraulic Workover is the most cost efficient method to repair all types of wells both
onshore and offshore. The Hydraulic Workover Unit (HWU) is a versatile, cost saving and
safe tool to perform sand cleanouts, change-out completions and to repair casing leaks. By
fixing wells quickly and very cost efficient.