Business Management:
How do I get data to manage my business that will enable
proactive fleet management decisions?
Rebuild/Resale/Disposal:
Which do we analyze? What is the most cost effective lifecycle plan for my asset[s]?
How often we analyze?
Productivity
Payload
Cycle Time
Usage
Availability
Utilization
▪ Exploration ▪ Extraction
▪ Project Evaluation (Feasibility Study) ▪ Drill + Blast + Load + Haul
▪ Development & Construction ▪ Processing
▪ Production or Exploitation ▪ Smelting
• Understand in what phase the mining ▪ Closure & Reclamation ▪ Refinement
operation / project is.
• Consider all factors for acquisition
• Determine key driver for purchase
• Define best options – best solutions
• Balance O&O Costs over Productivity
Lower cost
Increase
productivity
Continua…..
Planned
Scheduled
Downtime Detection Unscheduled Periodic
Repairs
Component
Reasons Routines Repairs Services Replacement
(Major & Minor)
(PCR)
• Vital to minimize/prevent • Who’s in control? • Fixed frequency • Planning window to keep • Frequency determined by
unscheduled stops • Must be minimized • Well known routine condition of machine at component life targets and
• Normally performed in • Negative influence on defined level health
parallel with other MTBS, MTTR and • Frequency determined by • Window used for restoring
maintenance activities Availability planning machine to standard
• Starting point of a new
component life cycle
Ability to
Ability to build MTBS, MTTR &
maintain the
Impact On a preventive Maintenance Availability Costs ($)
maintenance
plan Plan Cost ($)
plan
With What
Tools
Who will Do it
People Functions &
Responsibilities Model
Reliable delivery of required Performance as sold from What are the areas that
or budgeted hours to meet the fleet. Meeting these both impact and drive the
your production targets / production targets. cost to the customer to
goals. Payload / Speed on move material.
Physical / Mechanical grade TCO
Availability Material / Tons Component life
Utilization moved / BCM’s Ore Production hours
MTBS through the crusher Fleet utilization
MTTR Cost / Ton Maintenance Ratio
Strip to Production
Ratio
Yard/Meters Drilled
100
80
Total cost / total hours
60
C*
40
20
0
0 1 2 3 4 L* 5 6 7 8 9
Total hours Continua…..
• Selection:
What do I need to efficiently get the job done?
• Business Management:
How do I get data to manage my business that will enable proactive fleet
management decisions?
• Rebuild/Resale/Disposal:
What is the most cost effective lifecycle plan for my asset[s]?
UNITY:
• MANAGEMENT OF OPERATIONAL ENVIRONMENT
REFERENCE MATERIAL:
• AEXQ0686, SURFACE MINING PRIMARY LOADING TOOL – GUIDE
• https://mining.cat.com