Question 1. Write short notes on the following:

(a) Schedule of Rates.


(b) Revised estimate.
(c) Supplementary estimate.
(d) Abstract of estimate.

Question 2. Write down the process of preparing detailed estimate?

Question 3. Analyze the rates of the following:

(a) Lime concrete in foundation with 40 mm gauge Brick Ballast unit 1 cu m. Take- 10
cum.
(b) Lime concrete in foundation or floor with 40 mm gauge stone ballast, white lime and
sand. (Proportion 1:2:4) unit 1 cum. Take- 10 cu m.
(c) I class brick work foundation and plinth with 20 × 10 × 10 cm (nominal size). Bricks
with cement sand mortar 1:6-unit 1 cu m. Take -10 cu m
(d) Cement concrete 1:5:10 in foundation or floor with brick ballast 40 mm (112 ). Thick
gauge – unit 1 cu m. Take-10 cu m.
(e) Cement concrete 1:2:4 – unit 1 cu m. Take – 10 cu m.

Note: Completed assignment may be submitted online latest by 10/4/2020.