The document is a budget plan for a company's investments in 2012. It allocates funding for various construction and infrastructure projects including:
1. Building 2 staff houses for mill/maskep workers totaling 420,000.
2. Purchasing office equipment like printers and desktop computers totaling 18,000.
3. Constructing a loading ramp and cages for a total of 2,340,000.
4. Renovating a sterilizer and associated equipment for 4,170,000.
The budget totals 17,992,750 to cover investments in buildings, equipment, processing machinery and workshop facilities.
The document is a budget plan for a company's investments in 2012. It allocates funding for various construction and infrastructure projects including:
1. Building 2 staff houses for mill/maskep workers totaling 420,000.
2. Purchasing office equipment like printers and desktop computers totaling 18,000.
3. Constructing a loading ramp and cages for a total of 2,340,000.
4. Renovating a sterilizer and associated equipment for 4,170,000.
The budget totals 17,992,750 to cover investments in buildings, equipment, processing machinery and workshop facilities.
The document is a budget plan for a company's investments in 2012. It allocates funding for various construction and infrastructure projects including:
1. Building 2 staff houses for mill/maskep workers totaling 420,000.
2. Purchasing office equipment like printers and desktop computers totaling 18,000.
3. Constructing a loading ramp and cages for a total of 2,340,000.
4. Renovating a sterilizer and associated equipment for 4,170,000.
The budget totals 17,992,750 to cover investments in buildings, equipment, processing machinery and workshop facilities.
Satuan Jumlah Jumlah No. Uraian Merk Model / Type Fisik By. 1 thn Keterangan Rekg Rp. 1 Tahun Rp. I BANGUNAN PERUMAHAN 1 Rumah Asisten 300,000 2 420,000 Rumah Asst CF 2011 Sub Total 2 420,000 Rumah staf 2 unit utk Mill/Maskep II Furniture & Inventaris 1 Printer Canon IQ 4000 2,500 2 5,000 2 Desktop Komputer c/w LCD 20 " Pentium core 5 6,500 2 13,000 HDD 600 GB,memory 4 GB c/w UPS Sub Total 18,000 Printer 2 unit & Desktop Komputer 2 unit UPS 1 unit III LOADING RAMP 1 Loading Ramp Hopper 4 bay 8 pintu 450,000 1 450,000 Hydrolic pack c/w accessories sdh ada 2 Canopi L. Ramp uk 55m x 25 mx 6 m Kerangka Baja 1,050,000 1 1,050,000 3 Cages 7500 kgs 70,000 12 840,000 Model berlubang pada bagian bawah Sub Total 2,340,000 Loading Ramp Hopper 1 unit Aproand loading Ramp 1 unit Cages 12 unit IV STERILIZER 1 Sterilizer dia 2700 mm x 28400 mm, Horizontal 3,200,000 1 3,200,000 Renc. Thn 2012 sterilizer akan diperbaiki. Plat carbon w151 tebal 16 mm,liner tebal 6 mm SS 304, Pipe blow down SS 304,pintu full liner, Automatic programing system 2 Winch Capstan motor 30 hp 22 kw putaran 24,1 rpm Siemens Horizontal 125,000 2 250,000 3 Bolard Vertical 30,000 3 90,000 4 Rail Track 1 lot panjang 110 m 180,000 1 180,000 5 Reposisi winch capstan & modifikasi bolard 150,000 1 150,000 6 Pondasi Sterilizer 300,000 1 300,000 Sub Total 4,170,000 Sterilizer 1 unit Winch Capstan 2 unit Bolard 3 unit Rail Track 1 unit V THRESSING 1 Empty Bunch Press c/w oil tank,vibro,pompa 920,000 1 920,000 elektromotor,struktur,panel Sub Total 920,000 Empty Bunch Press 1 unit VI DEPERICARPER 1 Nut elevator kapasitas 45 ton tbs 210,000 1 210,000 Sebelumnya tdk ada Sub Total 210,000 Nut Elevator 1 unit VII Klarification 1 Vacum Drier kap 60 ton tbs c/w pompa 175,000 1 175,000 Stand by unit utk mengoktimalkan operasional. 2 Pipanisasi Decanter c/w sand cyclone 565,000 1 565,000 Pipa semua pakai SS 304 lengkap auto valve + sand cyclone 3 Decanter kap 60 t/jam tbs 1,170,000 CF 2011 Sub Total 1,910,000 VIII Water Treatment 1 Chemical pump Grundfoz unit 25,000 1 25,000 Stand by unit utk mengoktimalkan operasional. Sub Total 25,000 Chemical Pump 1 unit IX Boiler 1 Boiler tekanan 21 Bar (saturated steam 27 ton /jam) Takuma N750 7,100,000 1 7,100,000 Stand by unit utk mengoktimalkan operasional. 2 c/w Pondasi 275,000 1 275,000 3 Extension Fuel Coveyor unit 300,000 1 300,000 Sub Total 7,675,000 Boiler 1 unit Extension 1 unit X POWER HOUSE 1 Genset 400 kw,513 kva 3 phasa Caterpilar C15 750,000 - 2 c/w Pondasi 10,000 - Sub Total - XI Work Shop 1 Trafo Las 400 Ampere 3 phasa (AC) Cemont Unit 20,000 1 20,000 2 Trafo Step Up / Step Down 1000 / 400 Volt / 200 KVA 75,000 2 150,000 Utk Perumahan Staff / Mess 2 Water Pump Kew KS SE3 15,000 1 15,000 3 Catrol (Contrek ) Nagasaki 15 Ton 5,000 1 5,000 4 Mesin Compressor 225 - 330 bar,power 4 kw;5,5 hp 100Ltr/menit Bauer S 30 95,000 1 95,000 Mesin Compressor utk Pengisian Tabung Oxsigen 5 High Pressure Pump Gremfoz 4,000 1 4,000 6 Piping threading machine uk 1/2-3'', c/w motor 1 hp 15,750 1 15,750 Sub Total 304,750 Trafo 1 unit water Pump 1 unit Catrol 1 unit Mesin Compress GRAND TOTAL INVESTASI 17,992,750