Br. No. 982-1 PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

982/1

1800Dia

ITARASI A1 P1 P2 A2
12200 18300 12200

Work Completed
Work In Progress

Precast Scope Casted Issues


18.3 PSC 2 0 A1, A2 design not avbl
12.2 PSC Slab 8 1 Shoring Design not avbl
12.2 FPS 2 0 12.2 footpath slab design not avbl
12.2 B. Retainer 4 0

You might also like