MEDGULF CONSTRUCTION COMPANY W.L.L.
DOCUMENT TRANSMITTAL
Project/Contract Ret
WORK ORDER NO. LTCIC/EPN/3909/18
EPC SERVICES FOR REINSTATING CATHODIC PROTECTION
Transmittal No: 597-38-MG-TEB-T-033
IN G2 and QG3-4 TANKS: Dat 4 February, 2020
FORWARDED TO CODES
1. | Approved Design/Manufacture / Construction may
proceed
2. | Approved Design/Manufacture/Construction may
Kind Attn: Mr-Yathish Adruguli Proceed Subject to incorporation of
Comments as Noted on Documents
f 3. | Not Approved: Incorporate Comments and Submit
a Revised Drawings/Documents
4 ce 4. | Reviewed wih Comment
BiLFINGER 5. | For Approval
8. For Information
7. For Construction
Qatargas Operating Company Liited 3. | ForRetention
PO Box No : 22668,
Doha, State of Qatar 9. Sign & return to Medguit
10. Otnors (see Remarks)
DOC./DRWG. No. suT | rev. | ary DESCRIPTION CODES
.0000.St-CAL-o02 137 | a | 1. | Reportfor Shel Strength Adequacy & Temporary 240
‘Support Design for Tank 88-TBSOt
7 Repot for Shel Strength Adequacy & Temporary
P.0900-ST-CAL-0003 137 | ® | 1 | Support Design fr Tank 58-T8602 210
Remarks:
“Please incorporate the attached QG comments (QG TN no. QG-MG-EPM-3909-18-0117) and resubmit with next
CC: Site Office (Medguit)
SIGNATURE NAME & DESIGNATION DATE
>) S. Siddiquee
4 February, 2020
OE seat k Project Manager my
PLEASE SIGN & RETURN THE ATTACHED COPY
Reoavers Signature Designation Date
RK/S87-88-MG-TEB-T-033 Medgulf Const Co. P.O. 3603, Doha, Qatar. Te 4431516, Fax 4493586 Page I of 1Qatargas Operating Company Limited
Engineering & Projects
ieee
Document Outgoing Transmittal
eG ousor sna. QG-MG-EPHSHE8.18.0417 ose | sre
wi seis Ponder nO
Prt nie EPC Semen FR mo] ewocme:| — garane
anh CR16-01017
Contractor Reference No.
597-28-T0-TN-0139
Paget off
Contract No, | LTCICREPS90978 (.0800)
Company: | MEDGULF
tention to | ~
eee
Document Final Status
sw | Document Number Document Title rv. 2 [2 [eel gt) | 8
Bld ge) a2
PEE
g8| 2 | 28
P.DG0O-ST-CAL-00OZ apart for Sol Sena Adeauaay & Tenaarary 1 A
1 ‘Support Design for Tank 58-T8601 a oo ajo
PLOGOO-ST-CALVOOT Report or Shel Stenaih Adequaoy & Temporary [A
2 ‘Support Design for Tank 58-8602 Omwoaod0aoo0dg
3 gajonaaoao
4 oOoadoaoaa0
8 Oaaqaaoada
6 oonmnodcmUunoOdUmDDULcO
7 o)o|o0 olojo
8 og gjgooaaoda
Sa
7 MEDGULE
Approved by: (QG Project Engineer) Received by: (Contractor) eee
signature Signature: [Bepl_Astion| tw.
ex
se =
Designation: Sr.Project Engineer Designation: cv a]
Date: 4-Feb-20 Date: [een
HST
TEC And,
aa
Frans
[rieArshad Naloth
From: Baha Eldin Abdul Rahim
Sent 28/lan/2020 11:02 AM
To: Portal System; Arshad Naloth
Subject: RE: (Auto] Review & Approval for Incoming Transmittal No.: $97-38-TC-TN-0139zip
Dear Arshad,
The subject document is approved as noted (code B) below
1+ Attachment 3. Anchor bolts and Base plate Design: 1 Input data: Please confirm that the actual concrete
pavement depth is not less than 200 mm.
2- Shell design adequacy check shall be reviewed by Mechanical discipline Engineer.
Regards
Baha
From: Portal System
Sent: 23/Jan/2020 9:59 AM.
To: Baha Eldin Abdul Rahim ; Satrio Anugroho
Ce: Said Beldjoudi
Subject: [Auto] Review & Approval for Incoming Transmittal No.: 597-38-TC-TN-0139.2ip
Project Document Gonirol & Coordination >Documents Review & Approval
Project Title: EPC Service Of Re-Instating Cathodic Protection In @G2 AND QG3/4 Tanks
Below Document has been assigned for your REURIMNEBIENET. Please provide your response on or before the
View | Et | View Documents Review & Approval | View $97-38-TC-TN.0139 zip
Name 507-38-T0-TN-0199.2ip
Due Date: osso2r2020
Contract No.: LToICEPMIRSOSIIS
Project Engineer: ‘Said Beidioudt
Reviewers: ‘aha Elen Abdul Rabin: Sato Anuaroho
Information:
Last modified at 23/01/2020 09:59 AM by Arshad Naloth
+4 This is an automatically generated email from Qatargas System***Arshad Naloth
Satrio Anugroho
03/Feb/2020 8:06 AM
Arshad Naloth
Seid Beldjoudi; Baha Eldin Abdul Rahim
RE: [Auto] Review & Approval for Incoming Transmittal No. 597-38-TC-TN-0139zip
Attachments: 597-38-TC-TN-0139.docx
Arshad,
I missed another calculation for other tank 58-T8602 in this same transmittal -0139,
Attached is the revised CRS to include general comment for another calculation
Regards,
satrio
From: Satrio Anugroho
Sent: 02/Feb/2020 3:03 PM
To: Arshad Naloth
Ce: Said Beldjoudi ; Baha Eldin Abdul Rahim
Subject: RE: (Auto] Review & Approval for Incoming Transmittal No.: 597-38-TC-TN-0139.zip
Arshad,
Please find my comments in the attached CRS for tank 58-T8601 calculation.
Regards,
Satrio Anugroho
Lead Mechanical Engineer
2F-065, Zekreet Office XK50, QG South
T:4974-4473-7894 / Mi: #974-6615-8075
From: Portal System
Sent: 23/Jan/2020 9:59 AM
To: Baha Eldin Abdul Rahim ; Satrio Anugroho
Cec: Said Beldjoudi
Subject: [Auto] Review & Approval for Incoming Transmittal No.: 597-38-TC-TN-0139.2ip
Project Document Control & Coordination >Documents Review & Approval
Project Title: EPC Service Of Re-Instating Cathodic Protection In QG2 AND QG3/4 Tanks
Below Document has been assigned for your HEUEWEIENAERRIR]. Please provide your response on or before the
View | Edit | View Documents Review & Approval | View 597-38-TC-TN-0139.zi0 | |
Nam 597-38-TC-TN-0139.zip |
Due Date: 04/02/2020
Contract No LTGIGIERMi3909/18
Project Enginea jl 4, bs Qatargas Company Limited
QATARGAS Engineering & Projects
Document internal Transmittal:
Goesseieies
Contractor Transmittal No. | §87-38-TC-TN-0139 ‘Guacenr BENORMAL
oni7 01273
rrjeee | EPO Seve OF Reisaig Caos Protestonin a2 AND emocno:| om7-00552
264 Tanks oRI6.01017
Contract No. | LTCICEPM3908118 (P:0800) Received Date: | 23-Jan-20
Company: | MEDGULF Due Date: 4-F 0:20
Attached Documents
SN Document Number Document Title Rev. Remarks
F.0800-ST-CA(-0002 Report for Shell Strength Adequacy & Temporary Support. A
1 Design for Tank 58-T860%
.0800-ST-CAL-0008 Report for shell strength Adequacy & Temporary Support] A
2 Design for Tank 58-T8602
3
4
5
6
7
8
Document Review Status
Received Reumed $ 3 | 2 | ge | fe z
Discipline Name Date Due Date Date = z q zg i q 3 a
« ee f:)ab bo oG
2/8 ge gf 8 &
= =
Wacharical | Seto Ar
wren | sma | arom | oareb20 | SA r
ori aah ein
podulRehim | BD Ae 20 rielrle .
Shree | sasclousl | madonz0 | aFeb20 rielele -
PLEASE RETURN ON TIME to Document Controller, Arshad Naloth (Ext. 36217 ~ HQ 25-510)
*** COMMENT PAGE AT THE BACK ***jlé yes Qatargas Company Limited
QATARGAS
Engineering & Projects
farce elles
Document Internal Transmittal:
Contractor Transmittal No, | $97-98-TC-TN-0139 ‘Gurcent NORMAL
; ontro1a78
prc | EPO See OF Renting Cath Prt in O62 AND emocno:| orivnane
cRi6-01017
Contract No, | LTCICIEPMVsso9/8 (.0800) Received Date: | 28an-20
Company: | meDoue Due Date: 4Feb-20
Reviewer Comments
SN Document Number Company comments Page no.
40 Lifting Lug Stength Caleuation
1 P.080o-st-cat-oo02 | Please cofiritthis calculation sfrliting lugs used to tthe Sell Opening. Add ‘4
clea ndeatin, a his document for Strength Calculation for Tank Temporary
Suppot
; prosoost-cat-ooar | 20 WRC 107/837 Cale spat
Please check and confi the calculation as some values are exceed,
11.0 Resommendaton and Conclusion
3 P.08005T-cA.-1002 | 6) this cacammendation sto Keep (not to be taken out complete the anchor bots | 38