Download as pdf
Download as pdf
You are on page 1of 6
saped Qie LGGos Cale te AS a MEDGULF CONSTRUCTION COMPANY W.L.L. DOCUMENT TRANSMITTAL Project/Contract Ret WORK ORDER NO. LTCIC/EPN/3909/18 EPC SERVICES FOR REINSTATING CATHODIC PROTECTION Transmittal No: 597-38-MG-TEB-T-033 IN G2 and QG3-4 TANKS: Dat 4 February, 2020 FORWARDED TO CODES 1. | Approved Design/Manufacture / Construction may proceed 2. | Approved Design/Manufacture/Construction may Kind Attn: Mr-Yathish Adruguli Proceed Subject to incorporation of Comments as Noted on Documents f 3. | Not Approved: Incorporate Comments and Submit a Revised Drawings/Documents 4 ce 4. | Reviewed wih Comment BiLFINGER 5. | For Approval 8. For Information 7. For Construction Qatargas Operating Company Liited 3. | ForRetention PO Box No : 22668, Doha, State of Qatar 9. Sign & return to Medguit 10. Otnors (see Remarks) DOC./DRWG. No. suT | rev. | ary DESCRIPTION CODES .0000.St-CAL-o02 137 | a | 1. | Reportfor Shel Strength Adequacy & Temporary 240 ‘Support Design for Tank 88-TBSOt 7 Repot for Shel Strength Adequacy & Temporary P.0900-ST-CAL-0003 137 | ® | 1 | Support Design fr Tank 58-T8602 210 Remarks: “Please incorporate the attached QG comments (QG TN no. QG-MG-EPM-3909-18-0117) and resubmit with next CC: Site Office (Medguit) SIGNATURE NAME & DESIGNATION DATE >) S. Siddiquee 4 February, 2020 OE seat k Project Manager my PLEASE SIGN & RETURN THE ATTACHED COPY Reoavers Signature Designation Date RK/S87-88-MG-TEB-T-033 Medgulf Const Co. P.O. 3603, Doha, Qatar. Te 4431516, Fax 4493586 Page I of 1 Qatargas Operating Company Limited Engineering & Projects ieee Document Outgoing Transmittal eG ousor sna. QG-MG-EPHSHE8.18.0417 ose | sre wi seis Ponder nO Prt nie EPC Semen FR mo] ewocme:| — garane anh CR16-01017 Contractor Reference No. 597-28-T0-TN-0139 Paget off Contract No, | LTCICREPS90978 (.0800) Company: | MEDGULF tention to | ~ eee Document Final Status sw | Document Number Document Title rv. 2 [2 [eel gt) | 8 Bld ge) a2 PEE g8| 2 | 28 P.DG0O-ST-CAL-00OZ apart for Sol Sena Adeauaay & Tenaarary 1 A 1 ‘Support Design for Tank 58-T8601 a oo ajo PLOGOO-ST-CALVOOT Report or Shel Stenaih Adequaoy & Temporary [A 2 ‘Support Design for Tank 58-8602 Omwoaod0aoo0dg 3 gajonaaoao 4 oOoadoaoaa0 8 Oaaqaaoada 6 oonmnodcmUunoOdUmDDULcO 7 o)o|o0 olojo 8 og gjgooaaoda Sa 7 MEDGULE Approved by: (QG Project Engineer) Received by: (Contractor) eee signature Signature: [Bepl_Astion| tw. ex se = Designation: Sr.Project Engineer Designation: cv a] Date: 4-Feb-20 Date: [een HST TEC And, aa Frans [rie Arshad Naloth From: Baha Eldin Abdul Rahim Sent 28/lan/2020 11:02 AM To: Portal System; Arshad Naloth Subject: RE: (Auto] Review & Approval for Incoming Transmittal No.: $97-38-TC-TN-0139zip Dear Arshad, The subject document is approved as noted (code B) below 1+ Attachment 3. Anchor bolts and Base plate Design: 1 Input data: Please confirm that the actual concrete pavement depth is not less than 200 mm. 2- Shell design adequacy check shall be reviewed by Mechanical discipline Engineer. Regards Baha From: Portal System Sent: 23/Jan/2020 9:59 AM. To: Baha Eldin Abdul Rahim ; Satrio Anugroho Ce: Said Beldjoudi Subject: [Auto] Review & Approval for Incoming Transmittal No.: 597-38-TC-TN-0139.2ip Project Document Gonirol & Coordination >Documents Review & Approval Project Title: EPC Service Of Re-Instating Cathodic Protection In @G2 AND QG3/4 Tanks Below Document has been assigned for your REURIMNEBIENET. Please provide your response on or before the View | Et | View Documents Review & Approval | View $97-38-TC-TN.0139 zip Name 507-38-T0-TN-0199.2ip Due Date: osso2r2020 Contract No.: LToICEPMIRSOSIIS Project Engineer: ‘Said Beidioudt Reviewers: ‘aha Elen Abdul Rabin: Sato Anuaroho Information: Last modified at 23/01/2020 09:59 AM by Arshad Naloth +4 This is an automatically generated email from Qatargas System*** Arshad Naloth Satrio Anugroho 03/Feb/2020 8:06 AM Arshad Naloth Seid Beldjoudi; Baha Eldin Abdul Rahim RE: [Auto] Review & Approval for Incoming Transmittal No. 597-38-TC-TN-0139zip Attachments: 597-38-TC-TN-0139.docx Arshad, I missed another calculation for other tank 58-T8602 in this same transmittal -0139, Attached is the revised CRS to include general comment for another calculation Regards, satrio From: Satrio Anugroho Sent: 02/Feb/2020 3:03 PM To: Arshad Naloth Ce: Said Beldjoudi ; Baha Eldin Abdul Rahim Subject: RE: (Auto] Review & Approval for Incoming Transmittal No.: 597-38-TC-TN-0139.zip Arshad, Please find my comments in the attached CRS for tank 58-T8601 calculation. Regards, Satrio Anugroho Lead Mechanical Engineer 2F-065, Zekreet Office XK50, QG South T:4974-4473-7894 / Mi: #974-6615-8075 From: Portal System Sent: 23/Jan/2020 9:59 AM To: Baha Eldin Abdul Rahim ; Satrio Anugroho Cec: Said Beldjoudi Subject: [Auto] Review & Approval for Incoming Transmittal No.: 597-38-TC-TN-0139.2ip Project Document Control & Coordination >Documents Review & Approval Project Title: EPC Service Of Re-Instating Cathodic Protection In QG2 AND QG3/4 Tanks Below Document has been assigned for your HEUEWEIENAERRIR]. Please provide your response on or before the View | Edit | View Documents Review & Approval | View 597-38-TC-TN-0139.zi0 | | Nam 597-38-TC-TN-0139.zip | Due Date: 04/02/2020 Contract No LTGIGIERMi3909/18 Project Engine a jl 4, bs Qatargas Company Limited QATARGAS Engineering & Projects Document internal Transmittal: Goesseieies Contractor Transmittal No. | §87-38-TC-TN-0139 ‘Guacenr BENORMAL oni7 01273 rrjeee | EPO Seve OF Reisaig Caos Protestonin a2 AND emocno:| om7-00552 264 Tanks oRI6.01017 Contract No. | LTCICEPM3908118 (P:0800) Received Date: | 23-Jan-20 Company: | MEDGULF Due Date: 4-F 0:20 Attached Documents SN Document Number Document Title Rev. Remarks F.0800-ST-CA(-0002 Report for Shell Strength Adequacy & Temporary Support. A 1 Design for Tank 58-T860% .0800-ST-CAL-0008 Report for shell strength Adequacy & Temporary Support] A 2 Design for Tank 58-T8602 3 4 5 6 7 8 Document Review Status Received Reumed $ 3 | 2 | ge | fe z Discipline Name Date Due Date Date = z q zg i q 3 a « ee f:)ab bo oG 2/8 ge gf 8 & = = Wacharical | Seto Ar wren | sma | arom | oareb20 | SA r ori aah ein podulRehim | BD Ae 20 rielrle . Shree | sasclousl | madonz0 | aFeb20 rielele - PLEASE RETURN ON TIME to Document Controller, Arshad Naloth (Ext. 36217 ~ HQ 25-510) *** COMMENT PAGE AT THE BACK *** jlé yes Qatargas Company Limited QATARGAS Engineering & Projects farce elles Document Internal Transmittal: Contractor Transmittal No, | $97-98-TC-TN-0139 ‘Gurcent NORMAL ; ontro1a78 prc | EPO See OF Renting Cath Prt in O62 AND emocno:| orivnane cRi6-01017 Contract No, | LTCICIEPMVsso9/8 (.0800) Received Date: | 28an-20 Company: | meDoue Due Date: 4Feb-20 Reviewer Comments SN Document Number Company comments Page no. 40 Lifting Lug Stength Caleuation 1 P.080o-st-cat-oo02 | Please cofiritthis calculation sfrliting lugs used to tthe Sell Opening. Add ‘4 clea ndeatin, a his document for Strength Calculation for Tank Temporary Suppot ; prosoost-cat-ooar | 20 WRC 107/837 Cale spat Please check and confi the calculation as some values are exceed, 11.0 Resommendaton and Conclusion 3 P.08005T-cA.-1002 | 6) this cacammendation sto Keep (not to be taken out complete the anchor bots | 38

You might also like