Professional Documents
Culture Documents
Act of The State Commission To Put Into Permanent Operational Use
Act of The State Commission To Put Into Permanent Operational Use
ONE
Two
2.1 Authorized permission No. for 1,22 km Road construction en route Intersection west of
School number 118, Khoroo 8, Khan-Uul District to hilltop for permanent operational use;
2.2 The construction was made in accordance with the Drawing and deemed possible to be used for
Road purposes for Khan-Uul district governor office and put to permanent operational use (production,
service, residential) on 20 November, 2015;
2.3 Commission requires:
Contractor to:
Transferring the original Commission Act to Put Into Operational Use and other relevant documents to
Archive and document copies to the user entity within 14 days.
Client to:
A) In accordance with user rules of construction, the Client shall diversify the private documents;
B) In accordance with user rules of construction, the Client shall maintain the construction in
continuous basis to ensure normal use.
2.4 Commission act contains 3 pages, meeting minutes contain 3 pages, commission assignment
achievement list contains 6 pages, construction documents, document lists are attached.
1,22 km Road construction en route Intersection west of School number 118, Khoroo 8, Khan-Uul
District to hilltop
COMMISSION:
Translation from Mongolian
Members:
1,22 km Road construction en route Intersection west of School number 118, Khoroo 8, Khan-Uul
District to hilltop
Subcontractor: [Stamp]
Director at “New Plan” LLC /Signature/ Dorjdagva J.
[Stamp]
Engineer at “Optic link” LLC /Signature/ Otgonbayar D.
Client:
Deputy Director at City Road Authority /Signature/ Bum-Erdene B.