Translation from Mongolian

ACT OF THE STATE COMMISSION TO PUT STATE FUNDED “PHASE 1 - FIRST 17 KM OF


100 KM ROAD MAINTENANCE AND REHABILITATION EN ROUTE JARGALTKHAAN -
CHINGGIS CITY” INTO PERMANENT OPERATIONAL USE

24 November, 2017 No. 07/15/17 Ulaanbaatar City

ONE. Introduction

The state Commission, set up with 16 members, in accordance with the Mongolian government
resolution No. 357 dated on 4 November, 2019 by the State Secretary of Ministry of Road and Transport
Development, according to the state Resolution No. 19/359, inspected this road structure for two days
starting on 1 November, 2017. Upon inspection, the state commission checked out the execution of the
project of status level 3 Phase 1 - First 17 km of 100 km road maintenance and rehabilitation en route
Jargaltkhaan - Chinggis City, quality and related acts and documents on site.

Two. General Information

2.1 Authorized permission No. for road maintenance and rehabilitation work: 06/06/2017 on 15 May
2017 by the Policy implementation office of Ministry of Road and Transport Development;

2.2 Drawing No. for road maintenance and rehabilitation work: 02/17 by “MCPCJR” LLC;

2.3 Client: Ministry of Road and Transport Development, Address: Sukhbaatar district, Chinggis
Avenue-11, Government Building 13, Ulaanbaatar, Tel: 976-62263179, Fax: (976-11) 312315, E-mail:
info@mrtd.gov.mn;

2.4 Name of the consulting engineer for road maintenance and rehabilitation work: “Center for Road
and Transport Development” government owned agency, Location: Bayangol District, 20th khoroo, its
own building, Ulaanbaatar, Tel: 70003706, 70007636, E-mail: info@rtdc.gov.mn;

2.5 Name of the contractor for road maintenance and rehabilitation work: “Naranbulag khan” LLC
State Certification No.: 901110601, Special Permit No.: B16/038, Address: Khan Uul District, 3rd khoroo,
Industry zone 17071, Workers street - 96, Ulaanbaatar, Tel: 99990825, 88887009, E-mail:
info@naranbulag-khan.mn;

2.6 Name of the Joint Venture Partner for road maintenance and rehabilitation work: “Anand Road”
LLC, Certification No.: 9011081039, Special Permit No.: B16/020, Address: Chingeltei District, 6th
khoroo, Ikh Toiruu 68/1, Logos Building - 823, Ulaanbaatar Tel: 70130001, E-mail: info@anandroad.mn;

2.7 Name of legal entity that developed the project planning and drawing for road maintenance and
rehabilitation work: “MCPCJR” LLC, Certification No.: 9011062050, Special Permit No.: 14/701, Address:
Bayanzurkh District, 7th khoroo, Dorj B. street 5-1, Tel: 976-11-463175, E-mail: mcpcjb@gmail.com;

2.8 Name of legal entity that is authorized to own this road construction: “Khargui” government owned
company, Address: Kherlen soum, its own building, Khentii Province, Tel: 99990624, 99048432, E-mail:
xargui_azza1932@yahoo.com;
Three. Resolution
Translation from Mongolian

3.1 This construction project of status level 3 Phase 1 - First 17 km of 100 km road maintenance and
rehabilitation en route Jargaltkhaan - Chinggis City, that has been built on Mongolian territory has 10
meters width of embankment, 7 meters width of pavement, 3 meters width of gravel shoulder, asphalt
pavement of 6 cm, CTB layer of 18 cm, subbase layer of 20 cm, reinforced by geonet for CH8+240-
CH20+100. The commission inspected the quality of the structure, relevant documents and
CONCLUDED:

The State Commission accepted and authorizes this road construction project, that has been
accepted to be built by state fund with 100% acceptance rate, under the name Phase 1 - First 17 km of
100 km road maintenance and rehabilitation en route Jargaltkhaan - Chinggis City in consideration with
the construction completion has been constructed according to drawings, technical specifications, and in
accordance with any relevant legislations.

3.2 In consideration of putting the structure for permanent operation, the commission assigns:

a) The commission assigns to the contractor to transfer the commission’s original act on operation
of the structure and its related original documents to the record office and the remaining copies to
the utilizing organization within 14 days;
b) According to the Laws of Road of Mongolia, starting on the date technical consultant authorizes
the road into operation, from the start of the Defect Notification Period until it ends, the utilizing
organization shall report any defects of the road;

3.3 For Contractor:


a) To attend the final ceremony of Defect Notification Period;
b) Make notes about the road maintenance for the structure;
c) To work in accordance with the Laws of Mongolia during this period.

3.4 4 pages of the commission's act, 7 pages of meeting record note, and ... pages of list of the
structure documents are attached.

Four: Authorization

4.1 Resolution made by members of the commission’s act to put into operation for Phase 1 - First 17
km of 100 km road maintenance and rehabilitation en route Jargaltkhaan - Chinggis City State funded
project:

Director of the commission:


Deputy head of internal audit, valuation and analysis /Signature/ Gombosuren T.

Secretary of the commission:


State inspector, specialist of internal audit,
Valuation and analysis of Road and Transportation /Signature/ Enerelsaikhan Kh.

State inspector, head specialist of internal audit, [Stamp]


Valuation and analysis of Road and Transportation /Signature/ Batjargal Ts.

Head of investment, road construction for planning


Translation from Mongolian

And regulating office at Khentii province Governor’s [Stamp]


office /Signature/ Naranbayar B.

State Inspector at Metropolitan Professional [Stamp]


Inspection Department of Khentii Province /Signature/ Batbayar S.

Chair of Traffic safety department for Khentii [Stamp]


Province, Police Major /Signature/ Munkh-Erdene Kh.

State inspector for First-Response team in [Stamp]


disaster prevention under Governor’s office /Signature/ Batkhuyag P.
for Khentii Province

Deputy director of road construction at


“Center for Road and Transport Development”
Government owned agency /Signature/ Gan-Erdene M.

Resolution made by members of the commission’s act to put into operation for Phase 1 - First 17 km of
100 km road maintenance and rehabilitation en route Jargaltkhaan - Chinggis City State funded project:

[Stamp]
CAD operator at “MCPCJR” LLC /Signature/ Munkh-Erdene G.

Governor of Murun soum, Khentii [Stamp]


Province /Signature/ Battsooj Ts.

Nature inspector for Murun soum, [Stamp]


Khentii Province /Signature/ Bayartsetseg G.

Governor of Jargaltkhaan soum, [Stamp]


Khentii Province /Signature/ Tsogt-Ochir B.

Nature inspector for Jargaltkhaan [Stamp]


soum, Khentii Province /Signature/ Bayartsetseg G.

Executive Director at “Khargui” [Stamp]


Government owned company /Signature/ Altanzaya Ch.

Director at “Naranbulag Khan” LLC [Stamp]


/Signature/ Baldandorj D.

[Stamp]
Executive Director at “Anand Road” LLC /Signature/ Erdene B.

Administrator of Archive in Ministry of Road


and Transport Development /Signature/ Delgermaa D.