ENG487: HVAC Systems

Marking Rubrick for Lab 1: Cooling Tower

Note:

 Attendance is COMPULSORY. Non-attendees will be awarded a zero mark, unless


there is a legitimate reason.
 This practical constitutes to 15% of your overall mark for this unit.
 The final report will be graded according to the criteria below.
 Each student is required to submit their own individual report. Reports will undergo
plagiarism checks.

Mark (%)
Conducting the experiment and attendance 5
Report format, structure and clarity 5
Introduction, aims, background and scope 10
Theoretical analysis 25
Experimental analysis 25
T1
T2
T3
T4
T5
Discussion 20
Conclusion and recommendation 10

Total 100