Professional Documents
Culture Documents
DM Plant Operation Sop
DM Plant Operation Sop
DM Plant Operation Sop
START intermediate water pump after level in the intermediate water tank is ½.
Exhaust valve
After rinse
Exhaust valve
After rinse open mixed bed outlet, close rinse drain valve and maintain supply to de-
mineralizing water tank .
2. Ensure the area is clean , lubrication oil is adequate , pressure gauge working and
water tank contains sufficient liquid, keeping pump inlet valve open an outlet closed.
Exhaust valve
START-UP OPERATIONS:-
OPEN raw water main valve
Exhaust valve
Exhaust valve