Professional Documents
Culture Documents
SD Manual Bundling Process
SD Manual Bundling Process
Rev.1
Page 1 of 6
Purpose Document the Service Delivery steps for the Bundling Area
Materials Checkpoints
Instructions
Below will
Controlled popofup,
copies this pick relevant
document DC. using G;\Corp\Management Systems
are accessed
All printed or electronically transferred copies of this document are uncontrolled.
Document #:
Rev.1
Page 3 of 6
In the pop up, add your Plant (N450 for LVL, N451 for ONT) and always ‘MS1’ in the
MRP controller field.
EXECUTE
EXECUTE
If you see a similar view to the below, you need to identify your specific order.
IF. . . THEN . . .
Non-serialized SKU If SKU is non-serialized (Recon only), you will need to add COO.
(During releasing order to TCode: YLX02
ops)
Enter relevant Plant & and SKU.
EXECUTE
CHANGE LOG
Department
Revision Date Revision Description DCC
Representative
1 Release to system JJT