Professional Documents
Culture Documents
Engineering Department: Piper Aircraft Inc
Engineering Department: Piper Aircraft Inc
Engineering Department: Piper Aircraft Inc
Code:
ENGINEERING DEPARTMENT
ENGINEERING ORDER
TITLE
AIRCRAFT _______________.
Página 1 de 7
Engineering order REVISION:
Name of the Company: Date elaborated
Aircraft:.
Prepared by: REVISION by
Code:
CONTENTS
TITLE
PLANNING INFORMATION
a) SB EFFECTIVITY
b) CONCURRENT REQUIREMENTS
c) REASON
d) DESCRIPTION
e) COMPLIANCE
f) APPROVAL
g) ESTIMATED MANPOWER
Página 2 de 7
Engineering order REVISION:
Name of the Company: Date elaborated
Aircraft:.
Prepared by: REVISION by
Code:
Página 3 de 7
Engineering order REVISION:
Name of the Company: Date elaborated
Aircraft:.
Prepared by: REVISION by
Code:
Inspection: Affected:
Routine Procedure: Action: Date: DD/MM/YY
Modification: Final action:
Repair: Repetitive:
Minor: As Required:
Major:
. Applicability:
APPROVAL
SKILLS: MANPOWER:
Página 4 de 7
Engineering order REVISION:
Name of the Company: Date elaborated
Aircraft:.
Prepared by: REVISION by
Code:
NOTE:
MATERIAL TO BE PROCURED
Página 5 de 7
Engineering order REVISION:
Name of the Company: Date elaborated
Aircraft:.
Prepared by: REVISION by
Code:
ACCOMPLISHMENT INSTRUCTIONS
TECHNICIAN INSPECTOR
NOTE
TECHNICIAN INSPECTOR
TECHNICIAN INSPECTOR
TECHNICIAN INSPECTOR
Página 6 de 7
Engineering order REVISION:
Name of the Company: Date elaborated
Aircraft:.
Prepared by: REVISION by
Code:
RECOMMENDATIONS
Página 7 de 7