Equipement Size Unit Cost ($) M Factor Metal Factor Total Cost ($)
Equipement Size Unit Cost ($) M Factor Metal Factor Total Cost ($)
Booster K-100
Compressor 243 788,92 2.03 1 494 891,51* 989 783,02
recip K-101 200.96 2
Compressor Kw
recip k-102
Compressor 241 854,04 490 963,72* 981 927,44
recip k-103 124,79 2
Total 200.96 Kw 243 788,92 2.15 1 524146.17*2 1048292.34
Compressor
Motor
Cmpressor 124,79 Kw 241 854,04 2.15 1 490 963,72* 981927.44
motor M-103 2
Pumpe P-100 793.61 L/s 5 646,17 1.17 3.3 18 632,37*2 37 264,74
Pumpe Motor 1 Kw 2584 3.3 1.7 8527.2 8527.2
Vessel V-100 480.64 Kg 42 168,67 4.16 1.3 175 421,69 175 421,69
Total $ 4860454.04