296400 296800 297200

PETA RENCANA PENAMBANGAN TRIWULAN IV


TAHUN 2020

PT. ENERGI BUMI TAPIN


Desa Baramban-Kecamatan Piani
9663550

9663550
Kabupaten Tapin-Kalimantan Selatan

SKALA 1 : 1.500
UTM 50 S
TOP SOIL AREA
Area ± 0,4 HA
Top Elevation 44 mdpl 0 50 150 250 m

LEGENDA

DISPOSAL AREA

TOP SOIL AREA


9663150

9663150
STOCKROOM AREA

PIT AREA 5,1 HA

KOLAM PENGENDAPAN

JALAN TAMBANG

PIT Tahun 2020 Triwulan IV POS SECURITY


DISPOSAL AREA
OB Volume :296.624 BCM Area ± 2,8 HA
Coal Expose :58.011 MTon Top Elevation 67 mdpl KANTOR & WORKSHOP
SR :5,11 Capacity 788.000 Bcm
Luas :2,3 Ha
IUP PT. EBT DENGAN LUAS 196,10 HA
Mining Depth :48 m
Elevation :-20 mdpl

SEAMB, B1
9662750

9662750
INDEKS PETA

Lokasi
Penambangan
DEPARTEMENT ENGINEERING

STOCKROOM Date :
Area ± 0,5 HA
Drawn by : BM
Level 34-40 m
(Kapasitas 150.000 MT) Approved by : PT. EBT

Project File : EBT-2020

296400 296800 297200 Paper Size : A0