Rencana Pondasi & Footplat

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

30

25
15

30
KERAMIK 40 CM x 40 CM
SPESI 1pc : 4ps
URUGAN PASIR 10 CM

TRASRAM 1pc:1pp DAPUR


-0.05
SLOOF 20/25 -0.05
TAMAN
KERAMIK40*40 -0.20
-0.20

0,0
,05 SPESI 1pc:3pp
PASIR URUG
0,15

0,30

10
TANAH

PAS. BATU KALI 1pc:2pp:3kr

-1.30

1,10
ANSTAMPING
1,30
PASIR URUG
-1,40
10 80 10 TANAH URUG
100

A A
TUL.POKOK 8 Ø 12
SKALA 1: 20
BEUGEL Ø8 - 100
-2.50
FOOTPLAT 140 x 140
-2.60

-2.80
LANTAI KERJA 10 CM
-2.90
PASIR URUG 10 CM
-3.00
140
KERAMIK 40X40

SPESI 1pc : 4ps


TERAS
-0.05 BETON RABAT
-0.05 TAMAN
-0.20

55
-0.20
-0.25

PAS. BATU KALI 1pc : 5ps


140
30

-0.75
-0.85 PASIR URUG

30
55

SKALA 1: 20
55 30 55
140

DETAIL POT. A-A


SKALA 1: 20

You might also like