ITP For Cable Pulling, Termination, Jointing and Conduit

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ITP No.

KP-00+++-CQ712-G0012
Inspection and Test Plan Rev. No. 1
for Cable Pulling,Termination,Jointing and Conduit
Page 1 of 2

Inspection Status
No. Item Name Inspection & Test Activity Inspection & Test Description Application Document/Code/Spec. No. Document Submittal Remarks
Subcon 3rd Party POSCO
GAMA Owner
tractor /AI E&C

1 GENERAL

KP-00B__-EE432-G6018Rev 01 MV Cable List


KP-00+++-CY712-G0014Rev 0_Method
KP-00+++-CQ712-G0012_F01
Statement for Electrical Works (Cable
Electrical Works (Cable
Review of Technical Documents Pulling,Termination and Jointing)
1.1 Document Review Document Review P R R R Pulling,Termination,Jointing and
(Drawings, Specs, Method statements etc.) KP-00+++-CY712-
Conduit) Inspection Checklist 1-
G0014Rev A_Method Statement for Electrical
2-3-4
Works ( Conduit Works (Embedded or Surface
Type))

KP-00B__-EE432-G6018Rev 01 MV Cable List


KP-00+++-CY712-G0014Rev 0_Method
KP-00+++-CQ712-G0012_F01
Statement for Electrical Works (Cable
Material Certification Review Electrical Works (Cable
Pulling,Termination and Jointing)
1.2 Material Inspection Visual&Dimension Inspection and Visual&Dimension P W W V Pulling,Termination,Jointing and Material Certificate Submission
KP-00+++-CY712-
Inspection Conduit) Inspection Checklist 1-
G0014Rev A_Method Statement for Electrical
2-3-4
Works ( Conduit Works (Embedded or Surface
Type))

2 Cable Conduit Installation

KP-00B__-EE432-G6018Rev 01 MV Cable List


KP-00+++-CY712-G0014Rev 0_Method
KP-00+++-CQ712-G0012_F01
Statement for Electrical Works (Cable
Electrical Works (Cable
Cable conduit route and box installation check for later Pulling,Termination and Jointing)
2.1 Visual Inspection Visual Inspection P W W S Pulling,Termination,Jointing and
cable pulling works KP-00+++-CY712-
Conduit) Inspection Checklist 1-
G0014Rev A_Method Statement for Electrical
2-3-4
Works ( Conduit Works (Embedded or Surface
Type))

3 Power and Control Cable Installation

KP-00B__-EE432-G6018Rev 01 MV Cable List KP-00+++-CQ712-G0012_F01


KP-00+++-CY712-G0014Rev A_Method Electrical Works (Cable
3.1 Cable route readiness check for cable installation Visual Inspection Visual Inspection Statement for Electrical Works (Cable P W W S Pulling,Termination,Jointing and
Pulling,Termination and Jointing) Conduit) Inspection Checklist 1-
2-3-4

KP-00B__-EE432-G6018Rev 01 MV Cable List KP-00+++-CQ712-G0012_F01


KP-00+++-CY712-G0014Rev A_Method Electrical Works (Cable
3.2 Cable installation check Visual and Dimensional Inspection Visual inspection Statement for Electrical Works (Cable P W W S Pulling,Termination,Jointing and
Pulling,Termination and Jointing) Conduit) Inspection Checklist 1-
2-3-4

4 Cable Tests

KP-00B__-EE432-G6018Rev 01 MV Cable List


KP-00+++-CQ712-G0012_F01
KP-00+++-CY712-G0014Rev A_Method
Electrical Works (Cable
Statement for Electrical Works (Cable
4.1 Insulation resistance checks Controlling Test Results Controlling Test Results P W W S Pulling,Termination,Jointing and Test Report Submission
Pulling,Termination and Jointing) Cable
Conduit) Inspection Checklist 1-
Manufacturer Technical Documentations
2-3-4
ITP No. KP-00+++-CQ712-G0012
Inspection and Test Plan Rev. No. 1
for Cable Pulling,Termination,Jointing and Conduit
Page 1 of 2

Inspection Status
No. Item Name Inspection & Test Activity Inspection & Test Description Application Document/Code/Spec. No. Document Submittal Remarks
Subcon 3rd Party POSCO
GAMA Owner
tractor /AI E&C

KP-00B__-EE432-G6018Rev 01 MV Cable List KP-00+++-CQ712-G0012_F01


KP-00+++-CY712-G0014Rev A_Method Electrical Works (Cable
4.2 Point to point and Continuity check Controlling Test Results Controlling Test Results Statement for Electrical Works (Cable P W W S Pulling,Termination,Jointing and
Pulling,Termination and Jointing) Conduit) Inspection Checklist 1-
2-3-4

KP-00B__-EE432-G6018Rev 01 MV Cable List


KP-00+++-CQ712-G0012_F01
KP-00+++-CY712-G0014Rev A_Method
Electrical Works (Cable
Statement for Electrical Works (Cable
4.3 High pot test Controlling Test Results Controlling Test Results P W H S Pulling,Termination,Jointing and Test Report Submission
Pulling,Termination and Jointing) Cable
Conduit) Inspection Checklist 1-
Manufacturer Technical Documentations
2-3-4

KP-00B__-EE432-G6018Rev 01 MV Cable List


KP-00+++-CQ712-G0012_F01
KP-00+++-CY712-G0014Rev A_Method
Electrical Works (Cable
Statement for Electrical Works (Cable
4.4 Termination Point Bolt Torque Test Controlling Test Results Controlling Test Results P W H S Pulling,Termination,Jointing and
Pulling,Termination and Jointing) Cable
Conduit) Inspection Checklist 1-
Manufacturer Technical Documentations
2-3-4

Notes) #1 P Perform
H Hold Point
W Witness Point
Legend
S Spot Witness
V Surveillance
R Report Review
Doc. No: KP-00+++-CQ712-G0012 , Rev.1