Phase Count - ActivCount - Count - Count - DismCount - SubmitCount - Submit ATP


Phase 1 116 106 105 51 113 79
Phase 2 126 100 90 56 92 58
Phase 3 18 11 10 7 10 7
Total Result 260 217 205 114 215 144
Phase - multiple -

NetGear Count - Activity ID


0 9
0.5 16
1 151
PMR 1
Cancel 42
NY RFS 4
TO FSO 20
Total Result 243

Row Labels Netgear Status


0 38
0.5 24
1 113
Reject 1
PMR 4
Cancel 38
NY RFS 9
TO FSO 17
Grand Total 244

Row Labels Netgear Status


0 35
0.5 24
1 116
Reject 1
PMR 4
Cancel 38
NY RFS 9
TO FSO 17
Grand Total 244

Row Labels Netgear Status


0 33
0.5 24
1 118
Reject 1
PMR 1
Cancel 42
NY RFS 6
TO FSO 18
Grand Total 243
Row Labels Netgear Status
0 26
0.5 21
1 127
Reject 1
PMR 2
Cancel 42
NY RFS 6
TO FSO 18
Grand Total 243

Row Labels Netgear Status


0 24
0.5 23
1 127
Reject 1
PMR 2
Cancel 42
NY RFS 6
TO FSO 18
Grand Total 243

Row Labels Netgear Status


0 21
0.5 21
1 132
Reject 1
PMR 2
Cancel 42
NY RFS 6
TO FSO 18
Grand Total 243

Row Labels Netgear Status


0 19
0.5 23
1 132
Reject 1
PMR 2
Cancel 42
NY RFS 6
TO FSO 18
Grand Total 243
Row Labels Netgear Status
0 18
0.5 23
1 133
Reject 1
PMR 2
Cancel 42
NY RFS 6
TO FSO 18
Grand Total 243

Row Labels Netgear Status


0 16
0.5 22
1 137
Reject 1
PMR 2
Cancel 42
NY RFS 5
TO FSO 18
Grand Total 243
Phase - multiple -

Count - Activity ID Area2


Remark ATP MAKASSAR SULSEL SULUT Total Result
Assignment Cancel 1 12 29 42
CPL Submited 2 2
Reject 2 9 1 12
NEED ON SITE 2 10 12
Endorse 3 29 32
Endorse By MOM 8 75 21 104
Endorsed by FSO 15 15
NY RFS 1 1
Interference 3 3
Obstacle 1 1
Partial Accept (RLDW) 5 5
Partial Accept (FATP) 3 1 4
TO FSO 5 5
ATP ACCEPT 1 1
Total Result 17 150 72 239

Count of Activity ID Area


Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 12 29 42
CPL Submited 1 1
Reject 3 31 3 37
NEED ON SITE 2 16 18
Endorse 2 19 21
Endorse By MOM 8 49 21 78
Wait Review ISAT 1 1
NY RFS 6 6
Interference 1 1
Partial Accept (ABD) 8 8
Partial Accept (RLDW) 2 2
Partial Accept (FATP) 3 1 4
Partial Accept (RLDW & FATP) 1 1
Return to ASP (Doc & RLDW) 1 2 3
Return to ASP (RLDW) 1 1
Return to ASP (Netgear) 1 1
TO FSO 18 18
Grand Total 17 154 72 243
Count of Activity ID Area
Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 12 29 42
CPL Submited 1 1
Reject 3 31 3 37
NEED ON SITE 2 16 18
Endorse 2 19 21
Endorse By MOM 8 49 21 78
Wait Review ISAT 1 1
NY RFS 6 6
Interference 1 1
Partial Accept (ABD) 8 8
Partial Accept (RLDW) 2 2
Partial Accept (FATP) 3 1 4
Partial Accept (RLDW & FATP) 1 1
Return to ASP (Doc & RLDW) 1 2 3
Return to ASP (RLDW) 1 1
Return to ASP (Netgear) 1 1
TO FSO 18 18
Grand Total 17 154 72 243

Count of Activity ID Area


Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 12 29 42
Reject 3 31 3 37
NEED ON SITE 2 16 18
Endorse 2 19 21
Endorse By MOM 8 49 21 78
NY RFS 6 6
Interference 1 1
Partial Accept (ABD) 10 10
Partial Accept (RLDW) 2 2
Partial Accept (FATP) 3 1 4
Partial Accept (RLDW & FATP) 2 2
Return to ASP (Doc & RLDW) 1 2 3
Return to ASP (Netgear) 1 1
TO FSO 18 18
Grand Total 17 154 72 243

Count of Activity ID Area


Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 12 29 42
Submited 2 2
CPL Submited 5 5
Reject 3 26 3 32
NEED ON SITE 2 14 16
Endorse 2 19 21
Endorse By MOM 8 49 21 78
NY RFS 6 6
Interference 1 1
Partial Accept (ABD) 10 10
Partial Accept (RLDW) 2 2
Partial Accept (FATP) 3 1 4
Partial Accept (RLDW & FATP) 2 2
Return to ASP (Doc & RLDW) 1 2 3
Return to ASP (Netgear) 1 1
TO FSO 18 18
Grand Total 17 154 72 243

Count of Activity ID Area


Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 12 29 42
Submited 2 2
ATP Accepted 1 1
Reject 3 23 3 29
NEED ON SITE 2 13 15
Endorse 2 19 21
Endorse By MOM 8 57 21 86
NY RFS 6 6
Interference 1 1
Partial Accept (ABD) 10 10
Partial Accept (RLDW) 2 2
Partial Accept (FATP) 3 1 4
Partial Accept (RLDW & FATP) 2 2
Return to ASP (Doc & RLDW) 1 2 3
Return to ASP (Netgear) 1 1
TO FSO 18 18
Grand Total 17 154 72 243

Count of Activity ID Area


Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 12 29 42
Submited 2 2
Reject 3 23 3 29
NEED ON SITE 2 13 15
Endorse 2 19 21
Endorse By MOM 8 58 21 87
NY RFS 6 6
Interference 1 1
Partial Accept (ABD) 10 10
Partial Accept (RLDW) 2 2
Partial Accept (FATP) 3 1 4
Partial Accept (RLDW & FATP) 2 2
Return to ASP (Doc & RLDW) 1 2 3
Return to ASP (Netgear) 1 1
TO FSO 18 18
Grand Total 17 154 72 243

Count of Activity ID Area


Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 12 29 42
Submited 2 2
CPL Submited 1 1
Reject 3 23 3 29
NEED ON SITE 2 13 15
Endorse 2 19 21
Endorse By MOM 8 58 21 87
NY RFS 6 6
Interference 1 1
Partial Accept (ABD) 10 10
Partial Accept (RLDW) 2 2
Partial Accept (FATP) 3 1 4
Partial Accept (RLDW & FATP) 2 2
Return to ASP (Doc & RLDW) 1 1 2
Return to ASP (Netgear) 1 1
TO FSO 18 18
Grand Total 17 154 72 243

Count of Activity ID Area


Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 12 29 42
CPL Submited 1 1
Reject 3 22 3 28
NEED ON SITE 2 13 15
Endorse 2 23 25
Endorse By MOM 8 61 21 90
NY RFS 6 6
Interference 1 1
Partial Accept (ABD) 2 2
Partial Accept (RLDW) 6 6
Partial Accept (FATP) 3 1 4
Partial Accept (RLDW & FATP) 2 2
Return to ASP (Doc & RLDW) 1 1 2
Return to ASP (Netgear) 1 1
TO FSO 18 18
Grand Total 17 154 72 243

Count of Activity ID Area


Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 12 29 42
CPL Submited 1 1
ATP Accepted 1 1
Reject 2 21 3 26
NEED ON SITE 2 13 15
Endorse 2 23 25
Endorse By MOM 8 61 21 90
Endorsed by FSO 15 15
NY RFS 6 6
Interference 1 1
Partial Accept (ABD) 1 2 3
Partial Accept (RLDW) 6 6
Partial Accept (FATP) 3 1 4
Partial Accept (RLDW & FATP) 2 2
Return to ASP (Doc & RLDW) 1 1 2
Return to ASP (Netgear) 1 1
TO FSO 3 3
Grand Total 17 154 72 243

Count of Activity ID Area


Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 12 29 42
CPL Submited 5 5
Reject 2 17 3 22
NEED ON SITE 2 14 16
Endorse 2 24 26
Endorse By MOM 8 63 21 92
Endorsed by FSO 15 15
NY RFS 5 5
Interference 1 1
Partial Accept (ABD) 1 1
Partial Accept (RLDW) 6 6
Partial Accept (FATP) 3 1 4
Partial Accept (RLDW & FATP) 2 2
Return to ASP (Doc & RLDW) 1 1 2
Return to ASP (Netgear) 1 1
TO FSO 3 3
Grand Total 17 154 72 243
Phase - multiple -

RLDW Count - Activity ID


Done 145
NY 32
TO FSO 20
NY RFS 4
Cancel 42
Total Result 243
Ass ID Activity ID Area Area Phase

153239 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP053 Watampone SULSEL Phase 2

153263 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP079 Sengkang SULSEL Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_67 Watampone SULSEL Phase 1


169290

160806 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_285 MAKASSAR MAKASSAR Phase 2

153346 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_122 Watampone SULSEL Phase 2

157088 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_098 Maros SULSEL Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_28 Watampone Phase 1


169261 SULSEL

ET_2018_Overlay_MW_Intermediate_SLPP_15 Sengkang SULSEL Phase 1


169267

ET_2018_Overlay_MW_Intermediate_SLPP_02 Selayar SULSEL Phase 1


169276

157103 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_346 Bulukumba SULSEL Phase 2

ET_2018_Overlay_MW_New Site_SLPP_063 Jeneponto SULSEL Phase 1

169203

ET_2018_Overlay_MW_Intermediate_Balloci_2 Pangkajene SULSEL Phase 1


169141

160811 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_293 MAKASSAR SULSEL Phase 2

ET_2018_AccNetwPhase2_SLPP_16 Kotamubago SULUT Phase 1


132643

ET_2018_Overlay_MW_New Site_SLPP_034 Jeneponto SULSEL Phase 1


169204

ET_2018_Overlay_MW_Intermediate_SLPP_22 Watangsoppeng SULSEL Phase 1


169264

153307 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP127 GORONTALO SULUT Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_16 Sengkang SULSEL Phase 1


169265

ET_2018_Overlay_MW_New Site_SLPP_053 Watampone SULSEL Phase 1


169130

160812 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_294 MAKASSAR SULSEL Phase 2

135272 ET_2018_Overlay_MW_New Site_SLPP_113 Jeneponto SULSEL Phase 1

ET_2018_AccNetwPhase2_SLPP_44 Bantaeng SULSEL Phase 1


132669

153242 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP056 Sengkang SULSEL Phase 2

153289 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP105 GORONTALO SULUT Phase 2

132647 ET_2018_AccNetwPhase2_SLPP_20 Kotamubago SULUT Phase 1

ET_2018_Overlay_MW_New Site_SLPP_056 Sinjai SULSEL Phase 1


169202
153306 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP126 GORONTALO SULUT Phase 2
169273 ET_2018_Overlay_MW_Intermediate_SLPP_11 Pangkajene SULSEL Phase 1

SULSEL Phase 1

169167 ET_2018_Overlay_MW_New Site_SLPP_035 Jeneponto

157099 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_270 Bantaeng SULSEL Phase 2

153288 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP104 GORONTALO SULUT Phase 2

169260 ET_2018_Overlay_MW_Intermediate_SLPP_30 Pangkajene SULSEL Phase 1


132645 ET_2018_AccNetwPhase2_SLPP_18 Kotamubago SULUT Phase 1

ET_2018_Overlay_MW_New Site_SLPP_051 Sengkang SULSEL Phase 1

169138

ET_2018_AccNetwPhase2_SLPP_39 Kotamubago SULUT Phase 1


131015
130934 ET_2018_Overlay_MW_New Site_SLPP_068 Pangkajene SULSEL Phase 1

ET_2018_AccNetwPhase2_SLPP_35 Todoaling SULUT Phase 1


132662

153351 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_128 Watangsoppeng SULSEL Phase 2

132642 ET_2018_AccNetwPhase2_SLPP_14 Kotamubago SULUT Phase 1

Amurang SULUT Phase 1


132632 ET_2018_AccNetwPhase2_SLPP_04

157104 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_347 Bulukumba SULSEL Phase 2

ET_2018_Overlay_MW_New Site_SLPP_092 Sungguminasa SULSEL Phase 1


169143

154181 Maros SULSEL Phase 2


ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP051

ET_2018_Overlay_MW_Intermediate_SLPP_24 Watampone SULSEL Phase 1


169263

157065 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_023 MAKASSAR MAKASSAR Phase 2

154904 Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_173 MANADO SULUT

ET_2018_Overlay_MW_Intermediate_SLPP_01 Selayar SULSEL Phase 1


169243

ET_2018_AccNetwPhase2_SLPP_40 Selayar SULSEL Phase 1


133027
SULSEL Phase 1

169159 ET_2018_Overlay_MW_New Site_SLPP_059 Bulukumba

ET_2018_Overlay_MW_New Site_SLPP_031 Bulukumba SULSEL Phase 1


169205

162270 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273 MAKASSAR MAKASSAR Phase 2

160809 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_291 MAKASSAR MAKASSAR Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_09 Watampone SULSEL Phase 1


169272

160808 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_290 MAKASSAR MAKASSAR Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_05 Selayar SULSEL Phase 1


169270

153391 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_181 GORONTALO SULUT Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_50 Bantaeng SULSEL Phase 1


169296
131469 ET_2018_Overlay_MW_New Site_SLPP_067 Pangkajene SULSEL Phase 1
130958 ET_2018_Overlay_MW_New Site_SLPP_139 Maros SULSEL Phase 1

ET_2018_Overlay_MW_New Site_SLPP_100 Sungguminasa SULSEL Phase 1


131476
169278 ET_2018_Overlay_MW_Intermediate_SLPP_52 Sungguminasa SULSEL Phase 1
169303 ET_2018_Overlay_MW_Intermediate_SLPP_40 Bulukumba SULSEL Phase 1

153214 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP022 Bulukumba SULSEL Phase 2

132646 ET_2018_AccNetwPhase2_SLPP_19 Kotamubago SULUT Phase 1

ET_2018_AccNetwPhase2_SLPP_05 Kotamubago SULUT Phase 1


132633

Amurang SULUT Phase 1


132634 ET_2018_AccNetwPhase2_SLPP_06

ET_2018_AccNetwPhase2_SLPP_45 Jeneponto SULSEL Phase 1


132670

160800 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP007 GORONTALO SULSEL Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_64 Watampone SULSEL Phase 1


169292

ET_2018_Overlay_MW_Intermediate_SLPP_65 Watampone SULSEL Phase 1


169291
ET_2018_AccNetwPhase2_SLPP_31 Minasa Utara SULUT Phase 1
132658
ET_2018_AccNetwPhase2_SLPP_02 Amurang SULUT Phase 1
132630

153286 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP102 GORONTALO SULUT Phase 2

ET_2018_Overlay_MW_New Site_SLPP_052 Watampone SULSEL Phase 1


169137

ET_2018_Overlay_MW_New Site_SLPP_018 Phase 1

169175 MAKASSAR MAKASSAR


160819 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_306 MAKASSAR Phase 2
MAKASSAR

ET_2018_Overlay_MW_New Site_SLPP_061 Bantaeng SULSEL Phase 1

169201

154907 Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_310 MANADO SULUT

160818 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_302 MAKASSAR MAKASSAR Phase 2

132650 ET_2018_AccNetwPhase2_SLPP_23 Kotamubago SULUT Phase 1

ET_2018_Overlay_MW_New Site_SLPP_050 Phase 1


169160 Sengkang SULSEL
130954 ET_2018_Overlay_MW_New Site_SLPP_134 Maros SULSEL Phase 1

ET_2018_AccNetwPhase2_SLPP_37 Todoaling SULUT Phase 1


132664

ET_2018_Overlay_MW_Intermediate_SLPP_61 Sengkang SULSEL Phase 1

169302

153213 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP021 Bulukumba SULSEL Phase 2

ET_2018_Overlay_MW_New Site_SLPP_143 MAKASSAR MAKASSAR Phase 1

169145

ET_2018_Overlay_MW_Intermediate_Balloci_3 Pangkajene SULSEL Phase 1


169208

153305 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP125 GORONTALO SULUT Phase 2

169297 ET_2018_Overlay_MW_Intermediate_SLPP_69 Sinjai SULSEL Phase 1

Todoaling SULUT Phase 1


132657 ET_2018_AccNetwPhase2_SLPP_30
ET_2018_AccNetwPhase2_SLPP_07 Amurang SULUT Phase 1

164526 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP035 Maros SULSEL Phase 2

ET_2018_AccNetwPhase2_SLPP_10 Kotamubago SULUT Phase 1


ET_2018_AccNetwPhase2_SLPP_12 Kotamubago SULUT Phase 1

ET_2018_Overlay_MW_New Site_SLPP_055 Watampone SULSEL Phase 1

169233
169189 ET_2018_Overlay_MW_New Site_SLPP_072 Takalar SULSEL Phase 1
ET_2018_Overlay_MW_New Site_SLPP_081 Sungguminasa SULSEL Phase 1
169139
ET_2018_AccNetwPhase2_SLPP_24 Kotamubago SULUT Phase 1
ET_2018_AccNetwPhase2_SLPP_26 Kotamubago SULUT Phase 1
ET_2018_AccNetwPhase2_SLPP_27 Manado SULUT Phase 1

ET_2018_Overlay_MW_New Site_SLPP_089 Takalar SULSEL Phase 1


169232

Sungguminasa SULSEL Phase 1


132631 ET_2018_AccNetwPhase2_SLPP_03
ET_2018_AccNetwPhase2_SLPP_36 Amurang SULUT Phase 1

153323 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_078 Bulukumba SULUT Phase 2

ET_2018_AccNetwPhase2_SLPP_38 Bintauna SULUT Phase 1

ET_2018_AccNetwPhase2_SLPP_42 Tomohon SULUT Phase 1

ET_2018_Overlay_MW_Intermediate_SLPP_68 Watampone SULSEL Phase 1


169289
132636 ET_2018_AccNetwPhase2_SLPP_08 Amurang SULUT Phase 1

ET_2018_AccNetwPhase2_SLPP_54 Kotamubago SULUT Phase 1


132679
132644 ET_2018_AccNetwPhase2_SLPP_17 Kotamubago SULUT Phase 1
132648 ET_2018_AccNetwPhase2_SLPP_21 Kotamubago SULUT Phase 1
169293 ET_2018_Overlay_MW_Intermediate_SLPP_56 Pangkajene SULSEL Phase 1

ET_2018_Overlay_MW_New Site_SLPP_129 Sungguminasa SULSEL Phase 1


169231

ET_2018_Overlay_MW_Intermediate_SLPP_03 Selayar SULSEL Phase 1


169271

ET_2018_Overlay_MW_New Site_SLPP_099 SULSEL Phase 1


169161 Selayar

ET_2018_Overlay_MW_Intermediate_SLPP_62 Watangsoppeng SULSEL Phase 1


169295

ET_2018_Overlay_MW_New Site_SLPP_024 Sengkang SULSEL Phase 1


169206
130957 ET_2018_Overlay_MW_New Site_SLPP_138 Maros SULSEL Phase 1

153382 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_160 GORONTALO SULUT Phase 2

153343 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_119 Watangsoppeng SULSEL Phase 2

153250 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP065 Palopo SULSEL Phase 2

ET_2018_4G_Overlay_SLPP_AddOnAndCAp_061 PALU SULSEL Phase 2


ET_2018_4G_Overlay_SLPP_AddOnAndCAp_323 MANADO SULUT Phase 2

162275 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_339 SULUT Phase 2


MANADO

153246 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP061 Watangsoppeng SULSEL Phase 2

ET_2018_4G_Overlay_SLPP_AddOnAndCAp_033 MANADO SULUT Phase 2

ET_2018_4G_Overlay_SLPP_AddOnAndCAp_050 Phase 2
MANADO SULUT

ET_2018_Overlay_MW_New Site_SLPP_094 Sungguminasa SULSEL Phase 1


169142

161267 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_051 Phase 2


MANADO SULUT

153319 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_064 Bulukumba SULSEL Phase 2

153378 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_156 GORONTALO SULUT Phase 2

ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP123 GORONTALO SULUT Phase 2


ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP124 GORONTALO SULUT Phase 2

154905 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_242 Sengkang SULSEL Phase 2

154182 Watampone SULSEL Phase 2


ET_2018_4G_Overlay_SLPP_AddOnAndCAp_266

153318 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_063 Selayar SULSEL Phase 2

ET_2018_Overlay_MW_New Site_SLPP_080 Sungguminasa SULSEL Phase 1


169140
Bulukumba SULSEL Phase 1
132637 ET_2018_AccNetwPhase2_SLPP_09
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_123 Watampone SULSEL Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_04 Selayar SULSEL Phase 1


169275

153340 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_115 Sidrap SULSEL Phase 2

160802 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP107 GORONTALO SULUT Phase 2

161122 ET_2018_Overlay_MW_New Site_SLPP_042 MAKASSAR MAKASSAR Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_66 Watampone Phase 1


169288 SULSEL

157063 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_005 SULUT Phase 2


MANADO
169277 ET_2018_Overlay_MW_Intermediate_SLPP_51 Sungguminasa SULSEL Phase 1

157087 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_095 MAKASSAR MAKASSAR Phase 2

132655 ET_2018_AccNetwPhase2_SLPP_28 Barru SULSEL Phase 1


131472 ET_2018_Overlay_MW_New Site_SLPP_074 Sungguminasa SULSEL Phase 1

161279 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_188 Takalar SULSEL Phase 2

ET_2018_4G_Overlay_SLPP_AddOnAndCAp_274 MANADO SULUT Phase 2


ET_2018_4G_Overlay_SLPP_AddOnAndCAp_039 MANADO SULUT Phase 2

169522 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_206 Sungguminasa SULSEL Phase 2

ET_2018_Overlay_MW_New Site_SLPP_101 Sungguminasa SULSEL Phase 1


169144
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_208 Sungguminasa SULSEL Phase 2

161294 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_279 Selayar SULSEL Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_32 Sengkang SULSEL Phase 1


169262

153322 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_074 Selayar SULSEL Phase 2

ET_2018_4G_Overlay_SLPP_AddOnAndCAp_177 GORONTALO SULUT Phase 2


ET_2018_4G_Overlay_SLPP_AddOnAndCAp_179 MAKASSAR SULUT Phase 2

ET_2018_Overlay_MW_New Site_SLPP_084 MAKASSAR MAKASSAR Phase 1


169209
ET_H2_2018_Expansion_TRMSwapUpg_SLPP_17 Kotamobagu SULUT Phase 2
ET_H2_2018_Expansion_TRMSwapUpg_SLPP_09 Kotamobagu SULUT Phase 2

157066 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_024 Sungguminasa SULSEL Phase 2

ET_H2_2018_Expansion_TRMSwapUpg_SLPP_20 Phase 2
Kotamobagu SULUT
162282 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_363 Takalar SULSEL Phase 2

ET_2018_4G_Overlay_SLPP_AddOnAndCAp_309 Amurang SULUT Phase 2

154906 Takalar SULSEL Phase 2


ET_2018_4G_Overlay_SLPP_AddOnAndCAp_307
169234 ET_2018_Overlay_MW_New Site_SLPP_066 Pangkajene SULSEL Phase 1

153238 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP050 Maros SULSEL Phase 2

ET_2018_4G_Overlay_SLPP_AddOnAndCAp_099 Malili SULSEL Phase 2

161305 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_364 MAKASSAR MAKASSAR Phase 2

153267 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP083 Sidrap SULSEL Phase 2

GORONTALO SULUT Phase 2


ET_2018_4G_Overlay_SLPP_AddOnAndCAp_211

Phase 1
133303 ET_2018_AccNetwPhase2_SLPP_15 Pangkajene SULSEL

153416 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_265 Selayar SULSEL Phase 2

153417 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_267 Sidrap SULSEL Phase 2

153345 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_121 Watampone SULSEL Phase 2

153420 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_287 Sungguminasa SULSEL Phase 2

ET_2018_4G_Overlay_SLPP_AddOnAndCAp_230 Tomohon SULUT Phase 2

162271 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_289 Bulukumba SULSEL Phase 2

ET_2018_Overlay_MW_New Site_SLPP_075 Sungguminasa SULSEL Phase 1


169210

ET_2018_Overlay_MW_New Site_SLPP_016 Phase 1

169170 Sungguminasa SULSEL


ET_H2_2018_Expansion_TRMSwapUpg_SLPP_11 Kotamobagu SULUT Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_222 GORONTALO SULUT Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_296 MAKASSAR MAKASSAR Phase 2

ET_2018_Overlay_MW_New Site_SLPP_011 MAKASSAR MAKASSAR Phase 1


169171

ET_2018_Overlay_MW_Intermediate_SLPP_08 Watampone Phase 1


169274 SULSEL

ET_2018_Overlay_MW_Intermediate_SLPP_63 Watangsoppeng Phase 1


169294 SULSEL

153383 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_161 GORONTALO SULUT Phase 2

161274 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_163 Sungguminasa SULSEL Phase 2

154902 Enrekang SULSEL Phase 2


ET_2018_4G_Overlay_SLPP_AddOnAndCAp_138
153237 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP049 Watangsoppeng SULSEL Phase 2

153344 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_120 Watangsoppeng SULSEL Phase 2


ET_2018_Overlay_MW_Intermediate_SLPP_17 Sengkang SULSEL Phase 1
169266

153408 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_240 Pinrang SULSEL Phase 2

157070 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_028 MAKASSAR MAKASSAR Phase 2

153380 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_158 GORONTALO SULUT Phase 2

ET_2018_AccNetwPhase2_SLPP_33 Minasa Utara SULUT Phase 1


132660

154893 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP097 Pinrang SULSEL Phase 2

Watampone SULSEL Phase 1


169168 ET_2018_Overlay_MW_New Site_SLPP_027

161060 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP128 Selayar SULSEL Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_33 Sengkang SULSEL Phase 1


169259

162281 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_362 Takalar SULSEL Phase 2

ET_2018_4G_Overlay_SLPP_AddOnAndCAp_210 GORONTALO SULUT Phase 2

ET_2018_Overlay_MW_New Site_SLPP_017 Phase 1


169169 MAKASSAR MAKASSAR
169207 ET_2018_Overlay_MW_New Site_SLPP_079 Sungguminasa SULSEL Phase 1
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP103 GORONTALO SULUT Phase 2

ET_2018_AccNetwPhase2_SLPP_13 Kotamubago SULUT Phase 1

132641
130963 ET_2018_Overlay_MW_Intermediate_Balloci_1 Pangkajene SULSEL Phase 1

157054 ET_2018_4G_Overlay_SLPP_AddOnAndCap_324 Palopo SULSEL Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_23 Watampone SULSEL Phase 1


169237

153891 ET_2018_4GOverlay_MWFor_FO_Mitigation_5 Selayar SULSEL Phase 2

162283 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_365 Sungguminasa SULSEL Phase 2

153381 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_159 GORONTALO SULUT Phase 2

153321 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_073 Selayar SULSEL Phase 2

169132 ET_2018_Overlay_MW_New Site_SLPP_133 Maros SULSEL Phase 1

161296 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_301 Watampone SULSEL Phase 2

153384 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_169 Takalar SULSEL Phase 2

ET_2018_Overlay_MW_Intermediate_SLPP_46 Bulukumba SULSEL Phase 1


169239

153329 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_096 Pinrang SULSEL Phase 2

164524 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP020 Bulukumba SULSEL Phase 2


164525 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP024 Bulukumba SULSEL Phase 2

ET_2018_Overlay_MW_New Site_SLPP_141 MAKASSAR SULSEL Phase 1


169131

164527 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP057 Watampone SULSEL Phase 2

161275 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_168 Sungguminasa SULSEL Phase 2

169522 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_206 Takalar SULSEL Phase 2

174931 JENEPONTO SULSEL Phase 3


ET_2019_SLPP_Catapult_Intermediate_34

174932 BANTAENG SULSEL Phase 3


ET_2019_SLPP_Catapult_Intermediate_35

174934 ET_2019_SLPP_Catapult_Intermediate_38 Bulukumba SULSEL Phase 3

173211 ET_2018_4G_Overlay_SLPP_AddOnAndCap_244 Phase 2


Sengkang SULSEL

173210 ET_2018_4G_Overlay_SLPP_AddOnAndCap_243 Phase 2


Sengkang SULSEL

174936 ET_2019_SLPP_Catapult_Intermediate_42 Phase 3


JENEPONTO SULSEL
174945 ET_2019_SLPP_CapMgmtDec2018_SupportRAN_2 Watampone SULSEL Phase 3
174951 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_09 Bulukumba SULSEL Phase 2
174952 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_10 Bulukumba SULSEL Phase 2
174953 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_11 Bulukumba SULSEL Phase 2

174956 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_14 Phase 3


BANTAENG SULSEL
174967 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_39 JENEPONTO SULSEL Phase 2
174969 ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_05 SELAYAR SULSEL Phase 2
174971 ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_14 WATAMPONE SULSEL Phase 2
174972 ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_15 WATAMPONE SULSEL Phase 2
174975 ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_20 JENEPONTO SULSEL Phase 2
ET_2019_SLPP_New Site_Coverage_145 GORONTALO SULUT Phase 2
ET_2019_SLPP_New Site_Coverage_188 GORONTALO SULUT Phase 2

174914 Bulukumba SULSEL Phase 3


ET_2019_SLPP_Catapult_Intermediate_16
174951 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_09 BULUKUMBA SULSEL Phase 3
174952 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_10 BULUKUMBA SULSEL Phase 3
174953 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_11 BULUKUMBA SULSEL Phase 3
174955 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_13 BULUKUMBA SULSEL Phase 3

174957 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_15 Phase 3


JENEPONTO SULSEL
174967 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_39 JENEPONTO SULSEL Phase 3
174975 ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_20 JENEPONTO SULSEL Phase 3

175352 ET_2019_SLPP_New Site_Coverage_001 Phase 3


BULUKUMBA SULSEL
176587 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_05 MAKASSAR MAKASSAR Phase 3

176588 ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_02 Phase 3


MAKASSAR MAKASSAR

176582 ET_2019_SLPP_New Site_Coverage_002 Phase 3


BANTAENG SULSEL

ET_2018_AccNetwPhase2_SLPP_32 Manado SULUT Phase 1


132659

Sidrap Phase 2
154158 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP106 SULSEL
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_155 GORONTALO SULUT Phase 2
153377

169000 ET_2018_4G_Overlay_SLPP_AddOnAndCap_241 Sengkang SULSEL Phase 2

Phase 3
184256 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_06 / ET_2019_SL
Selayar SULSEL

ET_2019_SLPP_CapMgmtDec2018_SupportRAN_2 Watampone Phase 3


183746 SULSEL

ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_05 Phase 3
183747 MAKASSAR MAKASSAR

ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_39 Phase 3
183748 JENEPONTO SULSEL

ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_05 Phase 3
183749 SELAYAR SULSEL

ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_14 Phase 3
183750 Watampone SULSEL

ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_15 Phase 3

183751 Watampone SULSEL

ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_20 Phase 3
183752 JENEPONTO SULSEL

Phase 3
184300 ET_2018_4G_Overlay_SLPP_AddOnAndCap_123 SELAYAR SULSEL

185613 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_20 MAKASSAR MAKASSAR Phase 3


186667 ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_06 MAKASSAR MAKASSAR Phase 3

186749 Phase 3

ET_2018_4G_Overlay_SLPP_AddOnAndCap_103 Pinrang SULSEL

186750 Phase 3
ET_2018_4G_Overlay_SLPP_AddOnAndCap_183 SELAYAR SULSEL

186751 Phase 3
ET_2018_4G_Overlay_SLPP_AddOnAndCap_328 MAKASSAR MAKASSAR

185892 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_32 Phase 3


MAKASSAR MAKASSAR
187984 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_015 BANTAENG SULSEL Phase 3

Phase 3
187985 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_329 MAKASSAR MAKASSAR

Phase 3
188171 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_358 Watampone SULSEL
188306 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_18 MAKASSAR MAKASSAR Phase 3

188307 Phase 3

ET_2019_SLPP_MonthlyCapFeb_Congestion_3 Takalar SULSEL

188308 Phase 3
ET_2019_SLPP_TransCapMWInter_TriggerRAN_07 MAJENE SULSEL

188309 Phase 3
ET_2019_SLPP_TransCapMWInter_TriggerRAN_15 MASAMBA SULSEL
188310 Phase 3

ET_2019_SLPP_TransCapMWInter_TriggerRAN_16 MASAMBA SULSEL

188596 ET_2018_4G_Overlay_SLPP_AddOnAndCap_334 Phase 3

MAKASSAR MAKASSAR
189678 ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_16 Watampone SULSEL Phase 3

Phase 3

189682 ET_2019_SLPP_TransCapMWInter_DecongMay_2 MAKASSAR MAKASSAR

190862 Phase 3

ET_2019_SLPP_MonthlyCapJan_SupportRanAdd_2 Pinrang SULSEL

190863 ET_2019_SLPP_MonthlyCapFeb_SupportRan_2 Barru SULSEL Phase 3

190864 Phase 3
ET_2019_SLPP_MonthlyCapFeb_SupportRan_3 Barru SULSEL

190865 Phase 3

ET_2019_SLPP_MonthlyCapFeb_SupportRan_4 Barru SULSEL


190867 ET_2019_SLPP_TransCapMWInter_TriggerRAN_18 BANTAENG SULSEL Phase 3

190870 Phase 3

ET_2019_SLPP_TransCapMWInter_TriggerRAN_22 Takalar SULSEL

190871 Phase 3
ET_2019_SLPP_TransCapMWInter_TriggerRAN_23 Takalar SULSEL
191014 ET_2018_4G_Overlay_SLPP_AddOnAndCap_296 Sungguminasa Phase 3
SULSEL

191015 Sungguminasa Phase 3


ET_2019_SLPP_New Site_Coverage_112 SULSEL

195038 ET_2019_SLPP_TransCapMWInter_TriggerRAN_01 MAKASSAR MAKASSAR Phase 3

Phase 3

195039 ET_2019_SLPP_TransCapMWInter_TriggerRAN_02 Selayar SULSEL

Phase 3

195040 ET_2019_SLPP_TransCapMWInter_TriggerRAN_03 Selayar SULSEL

195041 ET_2019_SLPP_TransCapMWInter_TriggerRAN_05 Polewali SULSEL Phase 3


195042 ET_2019_SLPP_TransCapMWInter_TriggerRAN_09 MAJENE SULSEL Phase 3
195043 ET_2019_SLPP_TransCapMWInter_TriggerRAN_14 Mamuju SULSEL Phase 3
201159 ET_2019_SLPP_TransCapMWInter_TriggerRAN_12 Mamuju SULSEL Phase 3
201160 ET_2019_SLPP_TransCapMWInter_TriggerRAN_13 Mamuju SULSEL Phase 3
Link route Link ID Site NE

AMALI - ULOE 28WTP025

ATAPANGE - PENEKI 28SKG017

CAMMING - ROAD_TO_CAMMING 28WTP010

JALAN_SULAWESI - BANDANG 28UPD035

LAPPARIAJA - LALEBATA 28WTP004

KARIANGO - SUDIANG 28MRS007

ULOE - POMPANUA 28WTP024

ANABANUA - TANRUTEDONG 28SKG002

APPATANA - NODAL_BARANG_BARANG 28SLY015

BAKAE_TB - PONRE 28BLK033

BALANG_TOA - JENEPONTO 28JNP027

BALOCCI - NODAL_BALOCCI 28PKJ014

BANUA_HOTEL_NW - MONGINSIDI 28UPD134

BINTAUNA - PAMOMONTOA 26KTG023

BARAYA_MT - TANETEA 28JNP008

BATU_BATU - AMPARITA 28WTG005

BATUDAA - LIMBOTO 27ISM021

BELAWA - ANABANUA 28SKG005

BUKAKA_BONE - WATAMPONE 28WTP017

BETE_BETE_PL - KERUNG_KERUNG 28UPD137

BINAMU - JENEPONTO 28JNP011

BIRINGBULU - MALAKAJI 28BTN016

BOLACUPPAE - PENEKI 28SKG022

BONEBOLANG - LIMBOTO 27SWW005

DUDEPO_BARAT_MT - LINAWAN 26KTG016

BONGKI_SINJAI - SINJAI 28SIN001


BONGOMEME - ISIMU 27ISM020
BONTOBONTO - LABAKKANG 28PKJ009

BONTOMANAI - PALLENGU

28JNP016

BONTOMATENE - BANTAENG 28BTN018

BULADU - LIMBOTO
28PIN018
BULU_TELLUE - TONASA_OFFICE 28PKJ013
KOTABUNAN - TUTUYAN 26KTG024

BULUPABBULU - NEW_SENGKANG 28SKG012

LANUD / RD_TO_TUTUYAN - NODAL_LANUD / N_LANUD_1 26KTG007 / 26KTG037

BUNGORO - PANGKEP 28PKJ001

LEILEM_PL - SONDAR 26TDO012

CABBENGE - WATANSOPPENG 28WTG002

LINAWAN/ RD_TO_PINOLOSIAN - MOLIBAGU 26KTG036

LIWUTUNG - TOMBATU 26AMR019

CAILE_PL - PONRE 28BLK034

CAMAT_BAROMBONG - PALANGGA 28SNS052

CAMBA-ROAD_TO_LAPPARIAJA 28MRS006

MARE - TONRA 28WTP014

CILALANG_AG - SUNGGUMINASA 28UPD163

DELASALLE - PANIKI 26MDO029

NODAL_BARANG_BARANG - NODAL_LAMBANGIA 28SLY017

NODAL_LAMBANGIA - BANDARA_SELAYAR 28SLY018


ELA_ELA - BULUKUMBA

28BLK014

GANTARANG - PONRE 28BLK010

GTC_TG_BUNGA - TANJUNG_BUNGA 28UPD040

GUNUNG_MERAPI - KERUNG_KERUNG 28UPD046

PALAKKA - WATAMPONE 28WTP026

HOTEL_SEDONA - MONGINSIDI 28UPD020

PAMATATA - ROAD_BATANGMATA 28SLY004

ISIMU - LIMBOTO 27ISM003

PANOANG - PONRE 28BTN002

JLNURI_TONASA - PANGKEP 28PKJ012


JLPOROS_BANDARA - SUDIANG 28MRS027

JULUBORI - PALANGGA 28SNS047

KANREAPIA - ROAD_TO_MALINO 28SNS008


PELABUHAN_BIRA - BULUKUMBA 28BLK002

KASSI_KAJANG - ROAD KASSI 28BLK007

PINOLOSIAN - LINAWAN 26KTG026

POIGAR / RD_TO_TOMBATU - GN_SOKO 26KTG025 / 26AMR026

RATAHAN - LIWUTUNG 26AMR004

KASSI_TB - RD_TO_TANETEA_SM 28JNP024

KWANDANG - ANGGREK_GORONTALO 27ISM004

LALEBATA - TAKALALA 28WTP006

LAPPARIAJA - LALEBATA 28WTP004

LEMBEAN - KAUDITAN 26MNU006

LOPANA_PL - TUMPAAN 26AMR035

M_TELAGA_BIRU - PAYANGA 27COW002

MACEGE - WATAMPONE 28WTP020

S_WAHIDIN_SDR - GL_TAMALANREA

28UPD209
MAKASSAR_MALL_PL - MAKASSAR_TRADE 28UPD041

MALLILINGI - BANTAENG 28BTN007

MAPANGET - PANIKI 26MDO027

MENARA_MAKASSAR - GRAHA_ISAT_MKS 28UPD018

MOLIBAGU - MATAYANGAN 26KTG006

SITAMPAE - NEW_SENGKANG
28SKG011
MUTIARA_MANDAI_INDAH_MT - BATANGASE 28MRS024

SONDAR - TARERAN 26TDO004

NEW_SENGKANG - SIDENRENG 28SKG024

NEW_TANUNTUNG - PALANGISANG 28BLK009

SULTANABDULLAH_RAYA - TALLO 28UPD289

NODAL_BALOCCI / BALOCCI - TONASA1 / N_BALOCCI 28PKJ014

OMBULO_XL - LIMBOTO 27ISM005

BONTOBULAENG - PALATTAE 28SIN005

TALAWAAN_PL - PANIKI
26TDO035
MODOINDING - MOKOBANG 26AMR002

PABRIK_SEMEN_BOSOWA - MAROS 28MRS004

BUMBUNGON - PONOMPIAAN 26KTG046


DULODUO - IBOLIAN 26KTG004

TANEETERIATTANG_TIMUR - WATAMPONE 28WTP018

PADDINGING / SABINTANG_PL - TAKALAR / GALESONG_SELATAN_AG / PATANI28TKA020


PAKATTO_CADDI - PAKKATO 28SNS018

ATINGGOLA - BOROKO_BB 27ISM024


NODAL_LANUD - DANAU_MOOAT
TAAS - TAX_OFFICE 26MDO025

PAKKABA - PALANGGA 28TKA027

PAKKATO - LIMBUNG
28SNS004
MOTOLING - TARERAN 26AMR005

PALANGISANG - TANA_BERU 28BLK019

BITUNG - GN. WAKAWEINBEIN 26BIT001

26TMH014

PALATTAE - CAMMING 28WTP005

TOMBATU - RD_TO_TOMBATU 26AMR006

PAMOMONTOA - BATUMEJA 26KTG012

TRANS_PATOA - MT-DUDEPO_BARAT_MT 26KTG017


TUTUYAN - RD_TO_TUTUYAN 26KTG028
PANGKEP - MAROS 28PKJ002

PARANG_BENOA - PALANGGA 28SNS061

PARIANGAN - LEMBANGIA_SELAYAR 28SLY016

PASSANDERANG - SELAYAR
28SLY009

WATANSOPPENG - NEW_SENGKANG 28WTG001

WEWANGREWU - NEW_SENGKANG 28SKG013

PATTENE_RAYA - MAMBUE 28MRS022

PAYANGA - LIMBOTO 27ISM006

WATANSOPPENG - NEW_SENGKANG 28WTG001

PERUM_PEPABRI_PL - BATUPUTIH 28PLO014

TONDO - TAWAELI 24PAL004


TOLONDADU_TB - MOLIBAGU 26KTG015

TIKALA_TB - TAX_OFFICE 26MDO020

TETEWATU - CABBENGE 28WTG017

TATELU - LAIKIT 26MNU004

TATELI - ITC_MANADO 26TDO005

PERUMKODIM_TAENG - SUNGGUMINASA 28SNS019

PINELENG - BATUKOTA 26TDO006

TANA_BERU - BULUKUMBA 28BLK004

PLBH_GORONTALO - WONGKADITI 27GTO003

TILAMUTA - HUIDU_TOLOAYU 27BOA001


PG_GORONTALO - PAGUYAMAN 27COW003

NEW_SENGKANG - PENEKI 28SKG024

RD_TO_LAPPARIAJA-MALLAWA 20WTP030

SELAYAR - BATANGMATA 28SLY001

RINDAM_PAKATTO - PAKKATO 28SNS051

ROAD TO ERIS & KOMBI / PELABUHAN_BIRA - BITUNG / BATANGMATA


26TDO027 / 28BLK002
ROAD TO CAMMING - LAPPARIAJA - LAPPARIAJA 28WTP027

ROAD_BATANGMATA - BATANGMATA 28SLY019

RAPPANG - SIDENRENG 28SDR005

QUALITY_GORONTALO - GORONTALO 27GTO002

PONGTIKU_IB - KERUNG_KERUNG 28UPD221

ROAD_TO_CAMMING - LAPPARIAJA 28WTP027

PINOLOSIAN - LINAWAN 26KTG026

ROAD_TO_MALINO - MALINO 28SNS029

PETTARANI_PL - KERUNG_KERUNG 28UPD160

ROAD_TO_RALLA - RALLA 28BAR021


ROMANG_LASA - PALEKKO 28SNS017

PATANI_PL - GALESONG_SELATAN_AG / TAKALAR 28TKA014

PASSI_TIMUR_PL - KOTAMOBAGU 26KTG054


PASSI_SM - KOTAMOBAGU 26KTG031

PALEKKO2_AG - TAKALAR 28SNS034

ROMANGPOLONG - PACCINONGNGANG 28SNS015

PAKKATO - PALANGGA 28SNS004

ONTO_PL - BATANGMATA 28SLY021

SABANG_PARU - NEW_SENGKANG 28SKG018

NODAL BARANG-BARANG - LEMBANGIA_SELAYAR 28SLY017

SIDONDO - KOTAPULU_DOLO 24BWA023


SAATU - POSO 24PSO018

SABINTANG_PL / PADDINGING - PATANI_PL / GALESONG_SELATAN_AG 28TKA020

MOTOBOI_KECIL_XL-KOTAMOBAGU 26KTG008
MONGKOINIT_SM-HUIDU_OMPU 26KTG021

MONCONG_BALANG_AG - SUNGGUMINASA 28SNS041

MOLIBAGU - MATAYANGAN 26KTG006


SANROBONE_PL - GALESONG_SELATAN_AG 28TKA013

MATANI_TB - TUMPAAN 26AMR042

MASAMATURU_PL - PALEKKO2_AG
28TKA017
SAPANANG - LABAKKANG 28PKJ016

MALLAWA - LAPPARIAJA 28MRS001

MALILI - WOTU 28MLI004

SAPPABULO - MALLENGKERI 28UPD064

MADDENRA - RAPPANG 28SDR019

HUIDU_TOLOAYU-HATTA 27BOA003

SEGERI - LABAKKANG
28PKJ005

LEMBANGIA_SELAYAR - BANDARA_SELAYAR 28SLY023

LANCIRANG - SIDENRENG 28SDR016

LALEBATA - TAKALALA 28WTP006

SEMAYA_BILI_BILI_AG - PAKKATO 28SNS045

KINILOW - TAX_OFFICE 26TMH002

KALUMEME_TB - PONRE 28BLK032

SENGKA_GOWA - PALEKKO 28SNS055

SMKN1_PATTALASSANG - PATTALASANG2

28SNS062
INOBONTO-HUIDU_OMPU 26KTG009
HUIDU_BANGGA (BB)-BAROKO (BB) 27ISM008
HOTEL_SINGGASANA_MAKASSAR_ST - MONGINSIDI 28UPD180

STMIK_HANDAYA - TODDOPULI
28UPD216

TACCIPI - WATAMPONE 28WTP009

TAKALALA - WATANSOPPENG 28WTG003

GORONTALO - LIMBOTO 27GTO001

GALESONG_SELATAN_AG - LIMBUNG 28SNS031

ENREKANG - BONNE 28ENR001


DONRI_DONRI - BATU_BATU 28WTG004

TAKALALA - WATANSOPPENG 28WTG003


TANA_SITOLO - BELAWA 28SKG019

CEMPA_PASAR - SIDENRENG 28PIN005

TANJUNG_BUNGA - SUNGGUMINASA 28UPD010

TAPA - PAYANGA 27SWW004

TATELU - LAIKIT 26MNU004

BUNGI - PEKKABATA
28PIN018

TELLU_SIATINGE - ULOE
28WTP036

BUKI_SELAYAR - BATANGMATA 28SLY008

TEMPE - SENGKANG / NEW_SENGKANG 28SKG023

BONTOMARANNU_PL - GALESONG_SELATAN_AG 28TKA012

BONONGOL-HUIDU_TOLOAYU 27ISM025
TENTARA_PELAJAR - BANDANG
28UPD218
TINGGIMAE - PALANGGA 28SNS048
BONE_PANTAI - TPA_POHE 27SWW013

TOLONDADU_TB - MOLIBAGU 26KTG015

TONASA1 - PANGKEP 28PKJ008

BATUPUTIH - PALOPO 28PLO002

TONRA / MARE - BOJO / CINA 28WTP015 / 28WTP014

BATANGMATA - PELABUHAN_BIRA 28SLY002

BAREMBENG_AG - LIMBUNG 28SNS043

TPA_POHE - WONGKADITI 27GTO016

BANDARA_SELAYAR - BATANGMATA 28SLY003

TURIKALE_RAYA_MT - MAROS 28MRS031

BAJOE - WATAMPONE 28WTP003

BAJENG2_AG - PALEKKO2_AG 28TKA016

UJUNG_BULU1_TB - PONRE 28BLK031

ARASSIE - SIDENRENG 28PIN006

BONTOTIRO - TANA_BERU 28BLK018


UJUNG_BULU2_XL - UJUNG_BULU1_TB 28BLK036

VILLA_MUTIARA - BULUROKENG 28UPD225

BENGO - LALEBATA 28WTP012

PALEKKO2_AG - PALEKKO 28SNS034

LENGKESE / BUNGI - GALESONG_SELATAN_AG / PEKABATA 28TKA001

RUMBIA_TB - BONTOMATENE
28JNP021

BONTOSUNGGU_TB - BANTAENG 28BTN022

MAKKANINONG_PL - PONRE 28BLK038

WIRAE - SIWA
28SKG003

PENEKI- WIRAE
28SKG021

TOGO_TOGO - BANTAENG
28JNP002
POMPANUA - NEW_SENGKANG 28WTP008
PUNCAK_BIRA_SM - PELABUHAN_BIRA 28BLK022
TANETE - BULUKUMBA 28BLK003
ARA - PELABUHAN_BIRA 28BLK024

DESA_PINO - TOGO_TOGO
28BTN017
KARAMAKA_AG - PALLENGU 28JNP026
BANDARA_SELAYAR - BATANGMATA
ROAD_TO_CAMMING - LAPPARIAJA
CAMMING - ROAD_TO_CAMMING
RD_TO_TANETEA_SM - PALLENGU
BUA_ISM - LIMBOTO 27ISM041
LANGGE_SWW - TAPA 27SWW017

PLAMPANG - TANA_BERU 28BLK020


PUNCAK_BIRA_SM - PELABUHAN_BIRA 28BLK022
TANETE - BULUKUMBA 28BLK003
ARA - PELABUHAN_BIRA 28BLK024
ROAD_KASSI - TANABERU - TANA_BERU 28BLK025

TAROANG_TB - TOGO_TOGO
28JNP023
KARAMAKA_AG - PALLENGU 28JNP026
RD_TO_TANETEA_SM - PALLENGU

SALASSAE_BLK - PLAMPANG
28BLK045
PULAU_BARANGLOMPO - GTC_TG_BUNGA 28UPD061

GTC_TG_BUNGA - TANJUNG_BUNGA 28UPD040

BONTO_LOJONG_BTN - LOKA 28BTN028

WASIAN - TATELU 26MDO028

WATTANG_PULU - ARASSIE
28SDR003
WONGKADITI - TAPA 27GTO015

28SKG024
NEW_SENGKANG - SIDENRENG

ROAD_BATANGMATA - PUNCAK_BIRA_SM 28SLY019

POMPANUA - NEW_SENGKANG
28WTP008

PULAU_BARANGLOMPO - GTC_TG_BUNGA
28UPD061

KARAMAKA_AG - PALLENGU
28JNP026

BANDARA_SELAYAR - BATANGMATA
28SLY003

ROAD_TO_CAMMING - LAPPARIAJA
28WTP027

CAMMING - ROAD_TO_CAMMING

28WTP010

RD_TO_TANETEA_SM - PALLENGU
28JNP018

ROAD_BATANGMATA - BATANGMATA 28SLY019

SUDIANG_DUA_PL - SUDIANG 28UPD122


ROAD_TO_MALINO - KIMA 28SNS029

LEMBANG_PINRANG_PL - PEKKABATA 28PIN027

PALABUNGEN - BATANGMATA 28SLY022

RS_GRESTELINA_MC - DPRD_KOTA_MAKASSAR 28UPD135

PUCAK_PL - KARIANGO 28MRS014


BELOPARANG - BANTAENG 28BTN021

BTP_DUA_PL - BTP
28UPD113

BAREBBO - TANNETTERIATTANG_PL 28WTP031


BULUROKENG_PERMAI_PL - SUDIANG 28UPD116

DESA_BATU_BATU_TB - BAROMBONG_PL 28TKA009

RD_TO_SOMBA - MAJENE 29MAJ015

BONE_BONE - RAMPOANG 28MAS003


SUKAMAJU - BONE_BONE 28MAS004

WESABBE - BTP 28UPD121


BAREBBO - TANNETTERIATTANG_PL 28WTP031

DPRD_KOTA_MAKASSAR - KERUNG_KERUNG 28UPD058

BUNGI - PEKKABATA 28PIN018

BARRU - MANGKOSO 28BAR001

PEKKAE - BARRU 28BAR004

RALLA - PEKKAE 28BAR007


BISSAPPU - BANTAENG 28BTN008

PAPPA_TAKALAR - LENGKESE 28TKA033

TOPEJAWA - LENGKESE 28TKA022


MANGKA_BOMBONG_SNS - PACCINONGNGANG
28SNS081

ASOKA_BATANGKALUKU_SNS - SUNGGUMINASA 28SNS080

TANJUNG_BUNGA - SUNGGUMINASA 28UPD010

SELAYAR - BATANGMATA 28SLY001

BENTENG_SELATAN_ST - SELAYAR 28SLY007

LABUANG_MAJENE - POLEWALI 29PLW004


RD TO MALUNDAK - SOMBA 29MAJ014
TASIU - MAMUJU 29MAM015
BOTENG - TAPPALANG 29MAM021
MAMUJU - BOTENG 29MAM001
Link Name Site NE Link ID Site FE Link Name Site FE

AMALI 28WTP024 ULOE

ATAPANGE 28SKG021 PENEKI

CAMMING 28WTP027 ROAD_TO_CAMMING

JALAN_SULAWESI 28UPD021 BANDANG

LAPPARIAJA 28WTP006 LALEBATA

KARIANGO 28UPD015 SUDIANG

ULOE 28WTP008 POMPANUA

ANABANUA 28SDR002 TANRUTEDONG

APPATANA 28SLY017 NODAL_BARANG_BARANG

BAKAE_TB 28BLK006 PONRE

BALANG_TOA 28JNP001 JENEPONTO

BALOCCI 28RPT001 NODAL_BALOCCI

BANUA_HOTEL_NW 28UPD014 MONGINSIDI

BINTAUNA 26KTG012 PAMOMONTOA

BARAYA_MT 28JNP005 TANETEA

BATU_BATU 28SDR004 AMPARITA

BATUDAA 27ISM001 LIMBOTO

BELAWA 28SKG002 ANABANUA

BUKAKA_BONE 28WTP001 WATAMPONE

BETE_BETE_PL 28UPD016 KERUNG_KERUNG

BINAMU 28JNP001 JENEPONTO

BIRINGBULU 28BTN003 MALAKAJI

BOLACUPPAE 28SKG021 PENEKI

BONEBOLANG 27ISM001 LIMBOTO

DUDEPO_BARAT_MT 26KTG036 LINAWAN

BONGKI_SINJAI 28SIN003 SINJAI


BONGOMEME 27ISM003 ISIMU
BONTOBONTO 28PKJ003 LABAKKANG

BONTOMANAI 28JNP003 PALLENGU

BONTOMATENE 28BTN001 BANTAENG

BULADU 27ISM001 LIMBOTO

BULU_TELLUE 28PKJ004 TONASA_OFFICE


KOTABUNAN 26KTG011 TUTUYAN

BULUPABBULU 28SKG024 NEW_SENGKANG

LANUD / RD_TO_TUTUYAN 28RPT002 / 26KTG018 NODAL_LANUD / N_LANUD_1

BUNGORO 28PKJ002 PANGKEP

LEILEM_PL 26TDO004 SONDAR

CABBENGE 28WTG001 WATANSOPPENG

LINAWAN/ RD_TO_PINOLOSIAN 26KTG006 MOLIBAGU

LIWUTUNG 26AMR006 TOMBATU

CAILE_PL 28BLK006 PONRE

CAMAT_BAROMBONG 28SNS003 PALANGGA

CAMBA 20WTP030 ROAD_TO_LAPPARIAJA

MARE 28WTP015 TONRA

CILALANG_AG 28SNS009 SUNGGUMINASA

DELASALLE 26MNU001 PANIKI

NODAL_BARANG_BARANG 28NOD001 NODAL_LAMBANGIA

NODAL_LAMBANGIA 28SLY003 BANDARA_SELAYAR


ELA_ELA 28BLK001 BULUKUMBA

GANTARANG 28BLK006 PONRE

GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA

GUNUNG_MERAPI 28UPD016 KERUNG_KERUNG

PALAKKA 28WTP001 WATAMPONE

HOTEL_SEDONA 28UPD014 MONGINSIDI

PAMATATA 28SLY019 ROAD_BATANGMATA

ISIMU 27ISM001 LIMBOTO

PANOANG 28BLK006 PONRE

JLNURI_TONASA 28PKJ002 PANGKEP


JLPOROS_BANDARA 28UPD015 SUDIANG

JULUBORI 28SNS003 PALANGGA

KANREAPIA 28SNS029 ROAD_TO_MALINO


PELABUHAN_BIRA 28BLK001 BULUKUMBA

KASSI_KAJANG 28BLK025 ROAD_KASSI

PINOLOSIAN 26KTG036 LINAWAN

POIGAR / RD_TO_TOMBATU 26AMR008 GN_SOKO

RATAHAN 26AMR019 LIWUTUNG

KASSI_TB 28JNP018 RD_TO_TANETEA_SM

KWANDANG 27ISM018 ANGGREK_GORONTALO

LALEBATA 28WTG003 TAKALALA

LAPPARIAJA 28WTP006 LALEBATA

LEMBEAN 26MNU003 KAUDITAN

LOPANA_PL 26AMR003 TUMPAAN

M_TELAGA_BIRU 27ISM006 PAYANGA

MACEGE 28WTP001 WATAMPONE

S_WAHIDIN_SDR 28UPD008 GL_TAMALANREA


MAKASSAR_MALL_PL 28UPD034 MAKASSAR_TRADE

MALLILINGI 28BTN001 BANTAENG

MAPANGET 26MNU001 PANIKI

MENARA_MAKASSAR 28UPD099 GRAHA_ISAT_MKS

MOLIBAGU 26KTG041 MATAYANGAN

SITAMPAE 28SKG024 NEW_SENGKANG


MUTIARA_MANDAI_INDAH_MT 28MRS010 BATANGASE

SONDAR 26TDO009 TARERAN

NEW_SENGKANG 28SDR001 SIDENRENG

NEW_TANUNTUNG 28BLK019 PALANGISANG

SULTANABDULLAH_RAYA 28UPD009 TALLO

BALOCCI 28PKJ023 N_BALOCCI

OMBULO_XL 27ISM001 LIMBOTO

BONTOBULAENG 28WTP005 PALATTAE

TALAWAAN_PL PANIKI
26MNU001
MODOINDING 26AMR021 MOKOBANG

PABRIK_SEMEN_BOSOWA 28MRS009 MAROS

BUMBUNGON 26KTG001 PONOMPIAAN


DULODUO 26KTG005 IBOLIAN

TANEETERIATTANG_TIMUR 28WTP001 WATAMPONE

PADDINGING 28TKA003 / 28SNS031 TAKALAR / GALESONG_SELATAN_AG


PAKATTO_CADDI 28SNS004 PAKKATO

ATINGGOLA 26KTG044 BOROKO_BB


NODAL_LANUD 26KTG030 DANAU_MOOAT
TAAS 26MDO003 TAX_OFFICE

PAKKABA 28SNS003 PALANGGA

PAKKATO LIMBUNG
28SNS005
MOTOLING 26TDO009 TARERAN

PALANGISANG 28BLK004 TANA_BERU

BITUNG 26TDO024 GN. WAKAWEINBEIN

TOMOHON2 26TMH013 GN_WAWO

PALATTAE 28WTP010 CAMMING

TOMBATU 26AMR026 RD_TO_TOMBATU

PAMOMONTOA 26KTG011 BATUMEJA

TRANS_PATOA 26KTG016 MT-DUDEPO_BARAT_MT


TUTUYAN 26KTG037 RD_TO_TUTUYAN
PANGKEP 28MRS009 MAROS

PARANG_BENOA 28SNS003 PALANGGA

PARIANGAN 28SLY018 LEMBANGIA_SELAYAR

PASSANDERANG 28SLY001 SELAYAR

WATANSOPPENG 28SKG024 NEW_SENGKANG

WEWANGREWU 28SKG024 NEW_SENGKANG

PATTENE_RAYA 28PKJ011 MAMBUE

PAYANGA 27ISM001 LIMBOTO

WATANSOPPENG 28SKG024 NEW_SENGKANG

PERUM_PEPABRI_PL 28PLO002 BATUPUTIH

TONDO 24PAL002 TAWAELI


TOLONDADU_TB 26KTG006 MOLIBAGU

TIKALA_TB 26MDO003 TAX_OFFICE

TETEWATU 28WTG002 CABBENGE

TATELU 26MNU023 LAIKIT

TATELI 26MDO032 ITC_MANADO

PERUMKODIM_TAENG 28SNS009 SUNGGUMINASA

PINELENG 26MDO005 BATUKOTA

TANA_BERU 28BLK001 BULUKUMBA

PLBH_GORONTALO 27GTO015 WONGKADITI

TILAMUTA 27BOA003 HUIDU_TOLOAYU


PG_GORONTALO 27ISM007 PAGUYAMAN

NEW_SENGKANG
28SKG021 PENEKI

ROAD_TO_LAPPARIAJA 28MRS001 MALLAWA

SELAYAR 28SLY002 BATANGMATA

RINDAM_PAKATTO 28SNS004 PAKKATO

ROAD TO ERIS & KOMBI / PELABUHAN_BIRA BITUNG / BATANGMATA


26BIT001 / 28SLY002
ROAD TO CAMMING - LAPPARIAJA 28WTP004 LAPPARIAJA

ROAD_BATANGMATA 28SLY002 BATANGMATA

RAPPANG 28SDR001 SIDENRENG

QUALITY_GORONTALO 27GTO001 GORONTALO

PONGTIKU_IB 28UPD016 KERUNG_KERUNG

ROAD_TO_CAMMING 28WTP004 LAPPARIAJA

PINOLOSIAN 26KTG036 LINAWAN

ROAD_TO_MALINO 28SNS001 MALINO

PETTARANI_PL 28UPD016 KERUNG_KERUNG

ROAD_TO_RALLA 28BAR007 RALLA


ROMANG_LASA 28SNS006 PALEKKO

PATANI_PL 28TKA003 / 28SNS031 TAKALAR / GALESONG_SELATAN_AG

PASSI_TIMUR_PL 26KTG002 KOTAMOBAGU


PASSI_SM 26KTG002 KOTAMOBAGU

PALEKKO2_AG 28SNS006 PALEKKO

ROMANGPOLONG 28SNS012 PACCINONGNGANG

PAKKATO 28SNS003 PALANGGA

ONTO_PL 28SLY002 BATANGMATA

SABANG_PARU 28SKG024 NEW_SENGKANG

NODAL BARANG-BARANG 28SLY023 LEMBANGIA_SELAYAR

SIDONDO 24PAL008 KOTAPULU_DOLO


SAATU 24PSO001 POSO

PADDINGING 28SNS031 GALESONG_SELATAN_AG

MOTOBOI_KECIL_XL 26KTG002 KOTAMOBAGU


MONGKOINIT_SM 26KTG010 HUIDU_OMPU

MONCONG_BALANG_AG 28SNS009 SUNGGUMINASA

MOLIBAGU 26KTG041 MATAYANGAN


SANROBONE_PL 28SNS031 GALESONG_SELATAN_AG

MATANI_TB 26AMR003 TUMPAAN

MASAMATURU_PL 28SNS034 PALEKKO2_AG


SAPANANG 28PKJ003 LABAKKANG

MALLAWA 28WTP004 LAPPARIAJA

MALILI 28MLI005 WOTU

SAPPABULO 28UPD024 MALLENGKERI

MADDENRA 28SDR005 RAPPANG

HUIDU_TOLOAYU 27ISM019 HATTA

SEGERI 28PKJ003 LABAKKANG

LEMBANGIA_SELAYAR 28SLY003 BANDARA_SELAYAR

LANCIRANG 28SDR001 SIDENRENG

LALEBATA 28WTG003 TAKALALA

SEMAYA_BILI_BILI_AG 28SNS004 PAKKATO

KINILOW 26MDO003 TAX_OFFICE

KALUMEME_TB 28BLK006 PONRE

SENGKA_GOWA 28SNS006 PALEKKO

SMKN1_PATTALASSANG 28SNS035 PATTALASANG2


INOBONTO 26KTG010 HUIDU_OMPU
HUIDU_BANGGA (BB) 26KTG044 BAROKO (BB)
HOTEL_SINGGASANA_MAKASSAR_ST 28UPD014 MONGINSIDI

STMIK_HANDAYA 28UPD026 TODDOPULI

TACCIPI 28WTP001 WATAMPONE

TAKALALA 28WTG001 WATANSOPPENG

GORONTALO 27ISM001 LIMBOTO

GALESONG_SELATAN_AG 28SNS005 LIMBUNG

ENREKANG 28PIN003 BONNE


DONRI_DONRI 28WTG005 BATU_BATU

TAKALALA 28WTG001 WATANSOPPENG


TANA_SITOLO 28SKG005 BELAWA

CEMPA_PASAR 28SDR001 SIDENRENG

TANJUNG_BUNGA 28SNS009 SUNGGUMINASA

TAPA 27ISM006 PAYANGA

TATELU 26MNU023 LAIKIT

BUNGI 28PIN004 PEKKABATA

TELLU_SIATINGE 28WTP024 ULOE

BUKI_SELAYAR 28SLY002 BATANGMATA

TEMPE 28SKG001 / 28SKG024 SENGKANG / NEW SENGKAN

BONTOMARANNU_PL 28SNS031 GALESONG_SELATAN_AG

BONONGOL 27BOA003 HUIDU TOLOAYU

TENTARA_PELAJAR 28UPD021 BANDANG


TINGGIMAE 28SNS003 PALANGGA
BONE_PANTAI 27GTO016 TPA_POHE

TOLONDADU_TB 26KTG006 MOLIBAGU

TONASA1 28PKJ002 PANGKEP

BATUPUTIH 28PLO001 PALOPO

TONRA / MARE 28WTP007 / 28WTP023 BOJO / CINA

BATANGMATA 28BLK002 PELABUHAN_BIRA

BAREMBENG_AG 28SNS005 LIMBUNG

TPA_POHE 27GTO015 WONGKADITI

BANDARA_SELAYAR 28SLY002 BATANGMATA

TURIKALE_RAYA_MT 28MRS009 MAROS

BAJOE 28WTP001 WATAMPONE

BAJENG2_AG 28SNS034 PALEKKO2_AG

UJUNG_BULU1_TB 28BLK006 PONRE

ARASSIE 28SDR001 SIDENRENG

BONTOTIRO 28BLK004 TANA_BERU


UJUNG_BULU2_XL 28BLK031 UJUNG_BULU1_TB

VILLA_MUTIARA 28UPD027 BULUROKENG

BENGO 28WTP006 LALEBATA

PALEKKO2_AG 28SNS006 PALEKKO

LENGKESE 28SNS031 GALESONG_SELATAN_AG

RUMBIA_TB
28BTN018 BONTOMATENE

BONTOSUNGGU_TB
28BTN001 BANTAENG

MAKKANINONG_PL
28BLK006 PONRE

WIRAE 28SKG006 SIWA

PENEKI 28SKG003 WIRAE

TOGO_TOGO 28BTN001 BANTAENG


POMPANUA 28SKG024 NEW_SENGKANG
PUNCAK_BIRA_SM 28BLK002 PELABUHAN_BIRA
TANETE 28BLK001 BULUKUMBA
ARA 28BLK002 PELABUHAN_BIRA

DESA_PINO 28JNP002 TOGO_TOGO


KARAMAKA_AG 28JNP003 TOGO_TOGO

BUA_ISM 27ISM001 LIMBOTO


LANGGE_SWW 27SWW004 TAPA

PLAMPANG
28BLK004 TANA_BERU
PUNCAK_BIRA_SM 28BLK002 PELABUHAN_BIRA
TANETE 28BLK001 BULUKUMBA
ARA 28BLK002 PELABUHAN_BIRA
ROAD_KASSI - TANABERU 28BLK004 TANA_BERU

TAROANG_TB 28JNP002 TOGO_TOGO


KARAMAKA_AG 28JNP003 TOGO_TOGO

SALASSAE_BLK 28BLK020 PLAMPANG


PULAU_BARANGLOMPO 28UPD040 GTC_TG_BUNGA

GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA

BONTO_LOJONG_BTN 28BTN005 LOKA

WASIAN 26MNU004 TATELU

WATTANG_PULU 28PIN006 ARASSIE


WONGKADITI 27SWW004 TAPA

NEW_SENGKANG 28SDR001 SIDENRENG

ROAD_BATANGMATA 28BLK022 PUNCAK_BIRA_SM

28SKG024 NEW_SENGKANG
POMPANUA

PULAU_BARANGLOMPO 28UPD040 GTC_TG_BUNGA

KARAMAKA_AG 28JNP003 PALLENGU

BANDARA_SELAYAR 28SLY002 BATANGMATA

ROAD TO CAMMING 28WTP004 LAPPARIAJA

CAMMING 28WTP027 ROAD TO CAMMING

RD_TO_TANETEA_SM 28JNP003 PALLENGU

ROAD_BATANGMATA 28SLY002 BATANGMATA

SUDIANG_DUA_PL 28UPD015 SUDIANG


ROAD_TO_MALINO 28UPD007 KIMA

LEMBANG_PINRANG_PL 28PIN004 PEKKABATA

28SLY002 BATANGMATA
PALABUNGEN

RS_GRESTELINA_MC 28UPD058 DPRD_KOTA_MAKASSAR

28MRS007 KARIANGO
PUCAK_PL
BELOPARANG 28BTN001 BANTAENG

BTP_DUA_PL 28UPD030 BTP

BAREBBO 28WTP033 TANNETTERIATTANG_PL


BULUROKENG_PERMAI_PL 28UPD015 SUDIANG

DESA_BATU_BATU_TB 28UPD110 BAROMBONG_PL

RD_TO_SOMBA 29MAJ001 MAJENE

BONE_BONE 28MAS018 RAMPOANG


SUKAMAJU 28MAS003 BONE_BONE

WESABBE 28UPD030 BTP


BAREBBO 28WTP033 TANNETTERIATTANG_PL

28UPD016

DPRD_KOTA_MAKASSAR KERUNG_KERUNG

BUNGI 28PIN004 PEKKABATA

BARRU 28BAR002 MANGKOSO

PEKKAE 28BAR001 BARRU

RALLA 28BAR004 PEKKAE


BISSAPPU 28BTN001 BANTAENG

28TKA001 LENGKESE

PAPPA_TAKALAR

28TKA001 LENGKESE
TOPEJAWA
28SNS012 PACCINONGNGANG
MANGKA_BOMBONG_SNS

28SNS009 SUNGGUMINASA
ASOKA_BATANGKALUKU_SNS

TANJUNG_BUNGA 28SNS009 SUNGGUMINASA

SELAYAR 28SLY002 BATANGMATA

BENTENG_SELATAN_ST 28SLY001 SELAYAR

LABUANG_MAJENE 29PLW001 POLEWALI


RD TO MALUNDAK 29MAJ013 SOMBA
TASIU 29MAM001 MAMUJU
BOTENG 29MAM014 TAPPALANG
MAMUJU 29MAM021 BOTENG
SOW Final Config ASP ITC MOS

Swap Upgrade 7E6651-TNHP-200Mbps-1.8SP-NP MITRASEL 18-Dec-18

Swap Upgrade 7E6651-ML6KHP-200Mbps-1.8SP-NP MITRASEL 2-Dec-18

Swap Upg 7ETNHP-3x200Mbps-1.2DP-RLB3+0 MITRASEL 23-Aug-18

Swap Upgrade to 200Mbps 23E6651-6691-200Mbps-0.6SP-NP MITRASEL 24-Jan-19

Add Paralel link 200Mbps without antenna 7ETNHP-4x200Mbps-1.2DP-RLB4+0 MITRASEL 6-Feb-19

Swap Upgrade to 400Mbps. Change RAU to 8 8E6691HP-6692-2x200Mbps-1.2DP-RLB2+0 MITRASEL 6-Feb-19

Swap Upg 7ETN-200Mbps-1.8DP-NP MITRASEL 25-May-18

Swap Upg 7ETN-200Mbps-1.8DP-NP MITRASEL 10-May-18

Swap Upg 11ECN-TN-300Mbps-1.2SP-NP MITRASEL 19-May-18

Swap upgrade to 200Mbps 15E6651-TN-200Mbps-1.2SP-NP MITRASEL 19-Jan-19

New Link 23ECN-TN-200Mbps-1.2SP-NP MITRASEL 25-May-18

New Link 15ETN-200Mbps-1.2DP-NP MITRASEL 21-Oct-18

Swap Upgrade to 200Mbps 23E6651-TN-200Mbps-0.6SP-NP MITRASEL 24-Jan-19

Swap Upg 7ETN-200Mpbs-1.8DP-NP MITRASEL 16-Jun-18

New Link 11ECN-TN-300Mbps-1.2SP-NP MITRASEL 26-May-18

Swap Upg 7ETNHP-200Mbps-1.8DP-NP MITRASEL 5-Jun-18

Swap Upgrade 11E6651-ML6K-290Mbps-1.2SP-NP MITRASEL 27-Dec-18

Swap Upg 7ETNHP-200Mbps-1.8DP-NP MITRASEL 3-Jun-18

New Link 23ECN-TN-200Mbps-0.6SP-NP MITRASEL 5-Jun-18

Swap Upgrade to 200Mbps 23E6651-TN-200Mbps-0.6SP-NP MITRASEL 23-Jan-19

New Link 23ECN-TN-200Mbps-1.2SP-NP MITRASEL 29-Jun-18

Swap Upg 8ETN-200Mpbs-1.2DP-NP MITRASEL 23-Aug-18

Swap Upgrade 7E6651-ML6K-200Mbps-1.8SP-NP MITRASEL 2-Dec-18

Swap Upgrade 7E6651-ML6KHP-200Mbps-1.8SP-NP MITRASEL 11-Dec-18

Swap Upg 7ETNHP-200Mpbs-1.8DP-NP MITRASEL 18-Oct-18

New Link 23ECN-TN-200Mbps-1.2SP-NP MITRASEL 26-May-18


Swap Upgrade 11E6651-ML6K-290Mbps-1.2SP-NP MITRASEL 27-Dec-18
Swap Upg 11ECN-TN-300Mbps-1.2SP-NP MITRASEL 8-May-18

MITRASEL 10-Oct-18

New Link 11ECN-TN-300Mbps-1.2SP-NP

Swap Upgrade to 200Mbps 11E6691-6692-290Mbps-1.2DP-NP MITRASEL 16-Jan-19

Swap Upgrade 7E6651-ML6K-200Mbps-1.8SP-NP MITRASEL 11-Dec-18

Swap Upg 11ECN-TN-300Mbps-1.2SP-NP MITRASEL 9-May-18


Swap Upg 11ETN-300Mpbs-1.2DP-NP MITRASEL 27-Jun-18

New Link 23ECN-TN-200Mbps-0.6SP-NP MITRASEL 4-May-18

Swap Upg 7ETN-200Mpbs-1.8DP-NP MITRASEL 4-Jun-18

New Link 23HPECN-TN-200Mbps-0.6SP-NP MITRASEL 11-May-18

Swap Upg 15HPECN-TN-200Mpbs-1.2SP-NP MITRASEL 16-Sep-18

Swap upgrade to 200Mbps 8E6691HP-TN-200Mbps-1.2DP-NP MITRASEL 21-Dec-18

Swap Upg 11ETN-4x300Mpbs-1.2DP-RLB4+0 MITRASEL 23-Oct-18

Swap Upg MITRASEL 4-Jun-18


11ETN-2x300Mpbs-1.2DP-RLB2+0

Swap upgrade to 200Mbps 15E6651-TN-200Mbps-1.2SP-NP MITRASEL 19-Jan-19

New Link 23HPECN-TN-200Mbps-0.6SP-NP MITRASEL 13-May-18

Swap Upgrade to 290Mbps MITRASEL 27-Dec-18


11E6651-ML6K-290Mbps-1.2SP-NP

Swap Upg 7ECN-TNHP-200Mbps-1.8SP-NP MITRASEL 25-May-18

Add Paralel link 290Mbps without antenna 11ETN-3x290Mbps-1.2DP-RLB3+0 MITRASEL 10-Jan-19

Swap Upgrade to 290Mbps MITRASEL 20-Jan-19


11E6651-TN-290Mbps-1.2DP-NP

Swap Upg 7ETN-200Mbps-2.4DP-NP MITRASEL 10-Jun-18

Swap Upg 13ETN-200Mpbs-1.2SP-NP MITRASEL 6-Jun-18


MITRASEL 21-Jul-18

New Link 23HPECN-TN-200Mbps-0.6SP-NP

New Link 7ECN-TN-200Mbps-1.8SP-NP MITRASEL 5-Jun-18

Swap Upgrade to 200Mbps 23E6691HP-TN-200Mbps-0.6DP-NP MITRASEL 13-Feb-19

Swap Upgrade to 200Mbps 23E6651-TN-200Mbps-0.6SP-NP MITRASEL 23-Jan-19

Swap Upg 7ECN-TN-200Mbps-1.8SP-NP MITRASEL 31-May-18

Swap Upgrade to 800Mbps 23E6692-6692-4x200Mbps-0.6DP-RLB4+0 MITRASEL 24-Jan-19

Swap Upg 15ECN-TN-200Mbps-1.2SP-NP MITRASEL 6-Jun-18

Swap upgrade to 200Mbps 7E6691-ML6K-200Mbps-1.8DP-NP MITRASEL 27-Dec-18

Swap Upg 7ETNHP-3x200Mbps-1.2DP-RLB3+0 MITRASEL 15-Aug-18

New Link 7ECN-TN-200Mbps-1.8SP-NP MITRASEL 27-Jun-18


New Link 23HPECN-TN-200Mbps-0.6SP-NP MITRASEL 13-May-18

New Link 11ECN-TN-300Mbps-1.2SP-NP MITRASEL 28-Jun-18

Swap Upg 15ETN-2x200Mbps-1.2DP-RLB2+0 MITRASEL 6-Aug-18


Swap Upg 7ETNHP-4x200Mbps-2.4DP-SD MITRASEL 31-Aug-18

Swap Upgrade 11E6651-ML6K-290Mbps-1.2SP-NP MITRASEL 26-Nov-18

Swap Upg 11ECN-TN-300Mpbs-1.2SP-NP MITRASEL 11-Jul-18

Swap Upg 7HPECN-TN-200Mpbs-1.8SP-NP MITRASEL 31-Aug

Swap Upg MITRASEL 4-Jun-18


7ECN-TN-200Mpbs-1.2SP-NP

Swap Upg 23ETNHP-200Mpbs-0.6DP-NP MITRASEL 7-Sep-18

Swap Upgrade 7E6651-ML6KHP-200Mbps-1.8SP-NP MITRASEL 23-Jan-19

Swap Upg 7ETNHP-3x200Mbps-1.8DP-RLB3+0 MITRASEL 10-Oct-18

Swap Upg 7ETNHP-3x200Mbps-1.2DP-RLB3+0 MITRASEL 27-Jun-18

Swap Upg 15HPECN-TN-200Mpbs-1.2SP-NP MITRASEL 28-Jun-18

Swap Upg 23ECN-TN-200Mpbs-0.6SP-NP MITRASEL 3-Aug-18

Swap Upgrade 13E6651-ML6K-200Mbps-1.2SP-NP MITRASEL 11-Dec-18

New Link 23HPECN-TN-200Mbps-0.6SP-NP MITRASEL 10-May-18

23ECN-TN-200Mbps-0.6SP-NP MITRASEL 8-Sep-18

New Link
Swap Upgrade to 200Mbps 23E6651-TN-200Mbps-0.6SP-NP MITRASEL 1-Feb-19

New Link 23ECN-TN-200Mbps-1.2SP-NP MITRASEL 29-May-18

Swap Upgrade to 200Mbps MITRASEL 20-Jan-19


23E6651-TN-200Mbps-1.2SP-NP

Swap Upgrade to 200Mbps 23E6651-TN-200Mbps-0.6SP-NP MITRASEL 26-Jan-19

Swap Upg 7ETN-3x200Mpbs-1.8DP-RLB3+0 MITRASEL 27-Sep-18

MITRASEL 3-Aug-18
New Link 23ECN-TN-200Mbps-1.2SP-NP
New Link 23ECN-TN-200Mbps-1.2SP-NP MITRASEL 23-May-18

Swap Upg 13ETNHP-200Mpbs-1.2DP-NP MITRASEL 7-Sep-18

Swap Upg 7ETNHP-3x200Mbps-2.4DP-SD MITRASEL 3-Nov-18

Swap Upgrade 7E6651-ML6K-200Mbps-1.8SP-NP MITRASEL 26-Nov-18

New Link 23HPECN-TN-200Mbps-0.6SP-NP MITRASEL 11-May-18

New Link 23HPECN-TNHP-200Mbps-0.6SP-NP MITRASEL 21-Oct-18

Swap Upgrade 11E6651-ML6K-290Mbps-1.2SP-NP MITRASEL 27-Dec-18

Swap Upg 7ETNHP-3x200Mbps-1.8DP-RLB3+0 MITRASEL

Swap Upg MITRASEL 3-Aug-18


15ECN-TN-200Mpbs-0.6SP-NP
Swap Upg 13ETN-4x200Mpbs-0.6DP-RLB4+0 MITRASEL

Swap Upgrade. Change RAU to 8GHz. 8E6651-TNHP-200Mbps-1.2SP-NP MITRASEL 1-Mar-19

Swap Upg 13ETN-4x200Mpbs-1.2DP-RLB4+0 MITRASEL


Swap Upg 11ETN-4x300Mpbs-1.2DP-RLB4+0 MITRASEL

New Link 13ECN-TN-200Mbps-1.2SP-NP MITRASEL 21-Jul-18

New Link 11ECN-TN-300Mbps-1.2SP-NP / 23ECN-TN-200Mbps-1.2SP-NP MITRASEL 28-Jun-18


New Link 23HPECN-TN-200Mbps-0.6SP-NP MITRASEL 15-May-18

Swap Upg 7ETN-200Mpbs-1.8SP-1+1 SD MITRASEL


Swap Upg 23ETN-200Mpbs-0.6DP-NP MITRASEL
Swap Upg 23ETN-3x200Mpbs-0.6DP-RLB3+0 MITRASEL

New Link 15ECN-TN-200Mbps-1.2SP-NP MITRASEL 17-Jul-18

Swap Upg MITRASEL 18-Dec


7ETNHP-2x200Mpbs-1.8DP-RLB2+0
Swap Upg 7ETNHP-2x200Mpbs-3DP-RLB2x(1+1) SD MITRASEL

Swap Upgrade to 400Mbps 7E6691-TN-2x200Mbps-1.8DP-RLB2+0 MITRASEL 8-Mar-19

Swap Upg 7ETN-2x200Mpbs-2.4DP-RLB2+0 MITRASEL

Swap Upg 23ETN-200Mpbs-0.6DP-NP MITRASEL

Swap Upg 7ETNHP-3x200Mbps-1.8DP-RLB3+0 MITRASEL 10-Oct-18

Swap Upg 7ETN-2x200Mpbs-1.8DP-RLB2+0 MITRASEL 4-Jun-18

Swap Upg 7ETNHP-200Mpbs-2.4DP-NP MITRASEL 7-Jun-18

Swap Upg 13HPECN-TN-200Mpbs-1.2SP-NP MITRASEL 29-Jul-18


Swap Upg 13ETN-2x200Mpbs-0.6DP-RLB2+0 MITRASEL 27-Jun-18
Swap Upg 7ETNHP-3x200Mbps-1.8DP-RLB3+0 MITRASEL 18-Sep-18

New Link 13ECN-TN-200Mbps-1.2SP-NP MITRASEL 17-Jul-18

Swap Upg 11ECN-TN-300Mbps-1.2SP-NP MITRASEL 19-May-18

MITRASEL 10-Aug-18
New Link 15ECN-TN-200Mbps-1.2SP-NP

Swap Upg 7ETNHP-3x200Mbps-2.4DP-RLB3+0 MITRASEL 2-Jun-18

New Link 7ECN-TN-200Mbps-1.8SP-NP MITRASEL 2-Jun-18

New Link 23ECN-TN-200Mbps-1.2SP-NP MITRASEL 24-May-18

Swap upgrade to 200Mbps 15EML6K-200Mbps-1.2DP-NP MITRASEL 20-Dec-18

Add Paralel link 200Mbps without antenna 7ETNHP-4x200Mbps-2.4DP-RLB4+0 MITRASEL 13-Mar-19

Swap Upgrade 15E6651-ML6K-200Mbps-1.2SP-NP MITRASEL 21-Dec-18

Swap Upgrade to 400Mbps 7E6691HP-ML6k-2x200Mbps-1.2DP-RLB2+0 MITRASEL


Swap upgrade to 400Mbps 15E6651-TN-2x200Mbps-1.2DP-RLB2+0 MITRASEL

Swap upgrade to 200Mbps 23E6651-TNHP-200Mbps-0.6SP-NP MITRASEL 28-Jan-19

Swap Upgrade 7E6651-ML6KHP-200Mbps-1.2SP-NP MITRASEL 3-Dec-18

Swap Antenna to 1.2m + Add Paralel link 20 13E6691-6691-3x200Mpbs-1.2DP-RLB3+0 MITRASEL 18-Feb-19

Swap Upgrade to 400Mbps. Change RAU to 8 8E6651HP-ML6K-2x200Mbps-1.2DP-RLB2+0 MITRASEL 13-Jan-19

New Link 23HPECN-TN-200Mbps-0.6SP-NP MITRASEL 11-May-18

Swap Upgrade to 800Mbps 15E6692-6692-4x200Mbps-1.2DP-RLB4+0 MITRASEL 18-Feb-19

Add Paralel link 200Mbps without antenna 7ETNHP-4x200Mbps-1.8DP-SD MITRASEL 7-Mar-19

Swap upgrade to 200Mbps 23E6651HP-TN-200Mbps-0.6DP-NP MITRASEL 20-Dec-18

Swap Upgrade 15E6651-ML6K-200Mbps-1.2SP-NP MITRASEL 12-Dec-18


Swap Upgrade 7E6651-ML6KHP-200Mbps-1.2SP-NP MITRASEL 12-Dec-18

Swap Upgrade to 800Mbps MITRASEL 25-Jun-19


7E6692-ML6K-4x200Mbps-2.4DP-RLB4+0

Swap Upgrade to 200Mbps MITRASEL 27-Dec-18


13E6691-6691-200Mbps-1.2DP-NP

Swap Upgrade to 400Mbps 7E6692HP-6692-2x200Mbps-1.8DP-RLB2+0 MITRASEL 29-Dec-18

New Link 23HPECN-TN-200Mbps-0.6SP-NP MITRASEL 15-May-18

Swap Upg MITRASEL 25-Jul-18


7ETNHP-2x200Mpbs-3DP-RLB2x(1+1) SD
Swap Upgrade to 600Mbps 7E6691HP-TN-3x200Mbps-1.2DP-RLB3+0 MITRASEL

Swap Upg 7ETN-200Mbps-1.8DP-NP MITRASEL 1-Sep-18

Add Paralel link 200Mbps without antenna 7ETN-4x200Mbps-1.8DP-RLB4+0 MITRASEL 20-Feb-19

Swap Upgrade. ML6K mapping from link WAT 23E6651-ML6K-200Mbps-0.6SP-NP MITRASEL 21-Jan-19

New Link, MMU form Ex-Jabo 23ECN-TN-200Mbps-0.6SP-NP MITRASEL 18-Jan-19

Swap Upg 7ETNHP-3x200Mbps-1.2DP-RLB3+0 MITRASEL 27-Jun-18

Add Paralel link 290Mbps without antenna 11ECN-TN-2x290Mpbs-1.2SP-RLB2+0 MITRASEL 17-Jan-19

Swap Upg 11ETN-2x300Mbps-1.2DP-RLB2+0 MITRASEL 15-Aug-18

Swap upgrade to 400Mbps 23E6651-TN-2x200Mbps-0.6SP-RLB2+0 MITRASEL 19-Jan-19

Swap Upg 23ETN-2x200Mpbs-0.6DP-RLB2+0 MITRASEL 2-Aug-18


New Link 15ECN-TN-200Mbps-1.2SP-NP MITRASEL 27-Aug-18

Swap Upgrade to 600Mbps 13E6692-66692-3x200Mbps-1.2DP-RLB3+0 MITRASEL 30-Aug-19

Swap Upgrade to 200Mbps 13E6651-6692-200Mbps-1.2SP-NP MITRASEL


Swap Upgrade to 400Mbps 15E6651-TN-2x200Mbps-1.2DP-RLB2+0 MITRASEL

Swap Upgrade to 600Mbps 7ETNHP-3x200Mbps-1.2DP-RLB3+0 MITRASEL

New Link 23ECN-TN-200Mbps-0.6SP-NP MITRASEL 13-May-18

Swap Upgrade to 800Mbps 7ETN-4x200Mbps-1.8DP-RLB4+0 MITRASEL

Swap Upgrade to 200Mbps 11E6651-6692-290Mbps-1.2SP-NP MITRASEL 7-Feb-19

Swap Upg 7ECN-TN-200Mbps-1.8SP-NP MITRASEL 2-Jun-18

Add Paralel link 200Mbps without antenna + 7E6691-ML6K-2x200Mbps-2.4DP-RLB2+0 MITRASEL 9-Mar-19

Swap Upgrade to 200Mbps 15E6691-ML6K-200Mbps-1.2DP-NP MITRASEL


Swap upgrade to 200Mbps 7E6691-ML6K-200Mbps-1.8DP-NP MITRASEL

New Link 11ECN-TN-300Mbps-1.2SP-NP MITRASEL 29-Jun-18

Swap Upgrade to 2x200 Mbps and dismantle ex


23ECN-TN-2x200Mbps-1.2DP-RLB2+0 MITRASEL 4-Dec-18
Swap Upgrade to 2x290 Mbps and dismantle ex
11ECN-TN-2x300Mbps-1.2DP-RLB2+0 MITRASEL 4-Dec-18

Swap Upgrade to 600Mbps. Change RAU to 8 8E6691HP-6692-3x200Mbps-1.2DP-RLB3+0 MITRASEL 10-Jan-19

Add Paralel link 200Mbps without antenna 7ETN-4x200Mbps-1.8DP-RLB4+0 MITRASEL


9-Mar-19
Swap upgrade to 200Mbps 15E6651-ML6K-200Mbps-1.2SP-NP MITRASEL 20-Feb-19

Swap Upgrade to 200Mbps 23E6691-TN-200Mbps-1.2DP-NP MITRASEL 10-Feb-19

Swap Upgrade to 200Mbps MITRASEL 4-Feb-19


23E6651-TN-200Mbps-1.2SP-NP
New Link 11ECN-TN-290Mbps-1.2SP-NP MITRASEL 11-Jul-18

Swap Upgrade 7E6651-TN-200Mbps-2.4SP-NP MITRASEL 28-Nov-18

Swap upgrade to 200Mbps 7E6691HP-ML6K-200Mbps-2.4DP-SD MITRASEL

Swap upgrade to 200Mbps 23E6651-ML6KHP-200Mbps-0.6SP-NP MITRASEL 1-Feb-19

Swap Upgrade 7E6651-TNHP-200Mbps-1.2SP-NP MITRASEL 12-Dec-18

MITRASEL
8E6692HP-ML6K-4x200Mbps-1.8DP-RLB4+0

MITRASEL 7-Jun-18
Swap Upg 7ETNHP-200Mpbs-1.8SP-NP

Swap Upgrade to 800Mbps 11E6692-ML6K-2x290Mbps-1.2DP-RLB2+0 MITRASEL 20-Jan-19

Swap Upgrade to 400Mbps 8E6691HP-6692-2x200Mbps-1.8DP-RLB2+0 MITRASEL 1-Mar-19

Add Paralel link 200Mbps without antenna 7ETNHP-4x200Mbps-1.8DP-RLB4+0 MITRASEL 6-Feb-19

Swap Upgrade to 200Mbps 15E6651-TN-200Mbps-1.2SP-NP MITRASEL 17-Dec-18

Swap Upgrade to 800Mbps 8E6692-ML6K-4x200Mbps-1.8DP-RLB4+0 MITRASEL

Swap Upgrade to 200Mbps 11E6651-TN-290Mbps-1.2SP-NP MITRASEL 22-Feb-19

New Link 11ECN-TN-300Mbps-1.2SP-NP MITRASEL 28-May-18

13ECN-TN-200Mbps-1.2SP-NP MITRASEL 27-Sep-18

New Link
Swap Upgrade to 290 Mbps and dismantle exis11ECN-TN-300Mbps-1.2SP-NP MITRASEL 4-Dec-18
Swap Upgrade to 800Mbps 7E6692HP-ML6K-4x200Mbps-2.4DP-RLB4+0 MITRASEL
Swap Upgrade to 200Mbps 23E6651-TN-200Mbps-0.6SP-NP MITRASEL

23HPECN-TN-200Mbps-0.6SP-NP MITRASEL 12-Sep-18


New Link

Swap Upg 7ECN-TNHP-200Mbps-1.8SP-NP MITRASEL 10-May-18

Swap Upg 7ETN-3x200Mbps-1.8DP-RLB3+0 MITRASEL 13-Sep-18

Swap Upgrade to 400Mbps 7E6691-ML6K-2x200Mbps-1.8DP-RLB2+0 MITRASEL 7-Feb-19

Swap Upgrade to 800Mbps. Change RAU to 8 8E6692-TN-4x200Mbps-1.8DP-RLB4+0 MITRASEL 7-Feb-19

Swap Upgrade to 400Mbps MITRASEL 18-Dec-18


7E6691HP-ML6K-2x200Mbps-1.8DP-RLB2+0
Swap Upgrade 7E6651-TN-200Mbps-1.8SP-NP MITRASEL 3-Dec-18

Add Paralel link 200Mbps without antenna 7ETN-4x200Mbps-1.8DP-RLB4+0 MITRASEL 6-Feb-19


Swap Upg 7ECN-TN-200Mbps-1.8SP-NP MITRASEL 3-Jun-18

Swap Upgrade to 800mbps 7E6692HP-ML6K-4x200Mbps-2.4/1.8DP-SD MITRASEL 17-Dec-18

Swap Upgrade to 2x290Mbps 11ETN-2x290Mbps-1.2DP-RLB2+0 MITRASEL 10-Jan-19

Swap upgrade to 290Mbps 11EML6K-TN-290Mbps-1.2DP-NP MITRASEL 26-Dec-18

Swap Upg 13ETN-2x200Mpbs-0.6DP-RLB2+0 MITRASEL 27-Aug-18

Swap Upgrade to 200Mbps MITRASEL 9-Jan-19


7E6651-ML6K-200Mbps-1.8SP-NP

MITRASEL 12-Sep-18
New Link 11ECN-TN-300Mbps-1.2SP-NP

New Link And AMM 6691 from ET_2018_4G_ 15E6651-ML6K-200Mbps-1.2SP-NP MITRASEL 18-Jan-19

Swap Upg 23ECN-TN-200Mbps-1.2SP-NP MITRASEL 4-May-18

Swap upgrade to 200Mbps 15E6651-ML6K-200Mbps-1.2SP-NP MITRASEL 13-Feb-19

Swap Upgrade to 800Mbps 7E6692-ML6K-4x200Mbps-2.4DP-RLB4+0 MITRASEL

23ECN-TN-200Mbps-0.6SP-NP MITRASEL 12-Sep-18


New Link
New Link 23ECN-TN-200Mbps-1.2SP-NP MITRASEL 28-Jun-18
Swap Upgrade 7E6651-ML6K-200Mbps-2.4SP-NP MITRASEL

Swap Upg 15ECN-TN-200Mpbs-0.6SP-NP MITRASEL 3-Jun-18

Swap Upg 7ETN-2x200Mbps-1.8DP-RLB2+0 MITRASEL 6-Jun-18

Swap Upgrade to 400Mbps 15E6651-ML6K-2x200Mbps-1.2DP-RLB2+0 MITRASEL 28-Dec-18

Swap Upg 7ETNHP-200Mbps-1.8DP-NP MITRASEL 15-May-18

Add Paralel link 200Mbps without antenna 7E6692-TNHP-4x200Mpbs-3.0DP-RLB4x(1+1) SD MITRASEL 27-Jan-19

Swap upgrade to 300Mbps 11E6651-TN-290Mbps-1.2SP-NP MITRASEL 13-Feb-19

Swap upgrade to 290Mbps 11E6691-ML6K-200Mbps-1.2DP-NP MITRASEL 26-Dec-18

Swap upgrade to 600Mbps 7E6692-6692-3x200Mbps-2.4DP-RLB3+0 MITRASEL 9-Mar-19

New Link 23HPECN-TN-200Mbps-0.6SP-NP MITRASEL 26-Jun-18

Swap Upgrade to 200Mbps 13E6691-TN-200Mbps-1.2DP-NP MITRASEL 1-Feb-19

Swap Upgrade to 400Mbps 13E6651-TN-2x200Mbps-1.2DP-RLB2+0 MITRASEL 7-Feb-19

Swap Upg 11ETN-2x300Mbps-1.2DP-RLB2+0 MITRASEL 3-Jun-18

Swap Upgrade to 600Mbps 7E6692-TN-3x200Mbps-1.8DP-RLB3+0 MITRASEL 1-Mar-19

Swap Upgrade. Change RAU to 8GHz. 8E6651-TNHP-200Mbps-1.2SP-NP MITRASEL 22-Feb-19


Swap Upgrade 11E6651-TN-290Mbps-1.2SP-NP MITRASEL 8-Mar-19

New Link 23ECN-TN-200Mbps-0.6SP-NP MITRASEL 26-Jun-18

Swap Upgrade 11E6651-TN-290Mbps-1.2SP-NP MITRASEL 18-Feb-19

Swap Upgrade to 600Mbps 15ETN-3x200Mbps-1.2DP-RLB3+0 MITRASEL 13-Mar-19

Swap Upgrade to 600Mbps 7ETNHP-3x200Mbps-1.2DP-RLB3+0 MITRASEL 9-Mar-19

MITRASEL 10-May
Swap Upgrade 15E6651-ML6K-200Mbps-1.2SP-NP

MITRASEL 12-May
Swap Upgrade 23E6651-ML6K-200Mbps-0.6SP-NP

MITRASEL 3-Jul-19
Swap Upgrade 13E6651-TN-200Mbps-1.2SP-NP

MITRASEL 24-Apr-19
Swap Upgrade to 800Mbps 7E6692HP-ML6K-4x200Mbps-2.4DP-RLB4+0

MITRASEL 2-May-19
Swap Upgrade to 800Mbps 7E6692HP-ML6K-4x200Mbps-2.4DP-RLB4+0

Swap upgrade to 800Mbps 8EHP-ML6K-4x200Mbps-1.8DP-RLB4+0 MITRASEL 22-Jun-19

Add Paralel link 200Mbps without antenna 7/8ETNHP-2x200Mbps-1.8DP-RLB2+0 MITRASEL


Swap Upgrade to 200Mbps 15E6651-ML6K-200Mbps-1.2SP-NP MITRASEL
Swap Upgrade to 400Mbps 8ETNHP-ML6K-2x200Mbps-2.4DP-RLB2+0 MITRASEL
Swap Upgrade to 290Mbps 11E6651-ML6K-290Mbps-1.2SP-NP MITRASEL

Swap Upgrade to 290Mbps 11E6651-ML6K-290Mbps-1.2SP-NP MITRASEL 18-Jun

Swap Upgrade to 290Mbps 11E6651-TN-290Mbps-1.2SP-NP MITRASEL


Add Paralel Link 200Mbps without antenna 7E6692-6692-4x200Mbps-2.4DP-RLB4+0 MITRASEL
Add Paralel Link 200Mbps without antenna 7EHP-TN-4x200Mbps-1.2DP-RLB4+0 MITRASEL
Add Paralel Link 200Mbps without antenna 7ETNHP-4x200Mbps-1.2DP-RLB4+0 MITRASEL
Add Paralel Link 290Mbps without antenna 11ETN-2x290Mbps-1.2DP-RLB2+0 MITRASEL
New Link 8E6651HP-ML6K-200Mbps-1.2SP-NP MITRASEL
New Link 11E6651-ML6K-200Mbps-1.2SP-NP MITRASEL

MITRASEL 21-May
Add Paralel link 200Mbps without antenna 7E6691-TN-2x200Mbps-2.4DP-RLB2+0
Swap Upgrade to 200Mbps 15E6651-ML6K-200Mbps-1.2SP-NP MITRASEL
Swap Upgrade to 400Mbps 8ETNHP-ML6K-2x200Mbps-2.4DP-RLB2+0 MITRASEL
Swap Upgrade to 290Mbps 11E6651-ML6K-290Mbps-1.2SP-NP MITRASEL
Swap Upgrade to 200Mbps 8EHP-ML6K-200Mbps-1.8DP-NP MITRASEL

Swap Upgrade to 200Mbps 15E6651-ML6K-200Mbps-1.2SP-NP MITRASEL 27-May-19

Swap Upgrade to 290Mbps 11E6651-TN-290Mbps-1.2SP-NP MITRASEL


Add Paralel Link 290Mbps without antenna 11ETN-2x290Mbps-1.2DP-RLB2+0 MITRASEL

New Link 13E6651-ML6K-200Mbps-1.2SP-NP MITRASEL 22-May

Swap Upgrade to 400Mbps 8E6651HP-ML6K-2x200Mbps-1.8SP-RLB2+0 MITRASEL 13-Jun-19

Add Paralel Link 200Mbps without antenna 23E6691HP-TN-2x200Mbps-0.6DP-RLB2+0 MITRASEL 27-May

New Link 11E6651HP-ML6K-290Mbps-0.6SP-NP MITRASEL 27-May-19

Swap Upg 13ETN-2x200Mpbs-0.6DP-RLB2+0 MITRASEL 27-Aug-18

Swap Upgrade to 200Mbps MITRASEL 7-Feb-19


7E6651-TN-200Mbps-1.8SP-NP
Swap upgrade to 200Mbps 15EML6K-TN-200Mbps-1.2DP-NP MITRASEL 20-Dec-18

Add Paralel link 200Mbps 7E6692HP-ML6K-4x200Mbps-2.4DP-SD MITRASEL Done

Swap Upgrade 8EHP-ML6K-4x200Mbps-2.4/1.8DP-RLB4+0 SD MITRASEL 27-Jul-19

Add Paralel link 200Mbps without antenna 7/8ETNHP-2x200Mbps-1.8DP-RLB2+0 MITRASEL 3-Sep-19

Swap Upgrade to 400Mbps 8E6651HP-ML6K-2x200Mbps-1.8SP-RLB2+0 MITRASEL 18-Jun-19

Swap Upgrade to 290Mbps 11E6651-TN-290Mbps-1.2SP-NP MITRASEL 3-Sep-19

Add Paralel Link 200Mbps without antenna 7E6692-6692-4x200Mbps-2.4DP-RLB4+0 MITRASEL 29-Aug-19

Add Paralel Link 200Mbps without antenna 7EHP-TN-4x200Mbps-1.2DP-RLB4+0 MITRASEL 3-Sep-19

Add Paralel Link 200Mbps without antenna 7ETNHP-4x200Mbps-1.2DP-RLB4+0 MITRASEL 3-Sep-19

Add Paralel Link 290Mbps without antenna 11ETN-2x290Mbps-1.2DP-RLB2+0 MITRASEL 3-Sep-19

Add Polar 8ETNHP-3x200Mbps-1.8DP-RLB4+0 Add Parallel Link 600Mbps without antenMITRASEL 27-Jul-19

Swap Upgrade to 200Mbps 23E6651-ML6K-200Mbps-0.6SP-NP MITRASEL 2-Sep-19


Swap IDU + Add Paralel Link 200Mbps withou 7EHP-ML6K-3x200Mpbs-3DP-RLB3x(1+1) SD MITRASEL

Swap upgrade to 200Mbps 13E6692-ML6K-200Mbps-1.2DP-NP MITRASEL 4-Dec-19

Swap Upgrade to 200Mbps. Donor ant 3.0D 8E6691-ML6K-200Mbps-3.0DP-NP MITRASEL

Swap upgrade to 400Mbps 23E6651-ML6K-2x200Mbps-0.6DP-RLB2+0 MITRASEL 19-Oct-19

Swap Upgrade to 290Mbps 11E6651-ML6K-290Mbps-1.2SP-NP MITRASEL 11-Sep-19


Swap Upgrade to 400Mbps 13E6691-TN-2x200Mbps-1.2DP-RLB2+0 MITRASEL

Swap upgrade to 200Mbps 23E6651-TN-200Mbps-0.6SP-NP MITRASEL 9-Oct-19

Swap Upgrade 23E6651-TNHP-200Mbps-0.6SP-NP MITRASEL 15-Oct-19


Swap Upgrade to 200Mbps 23E6651HP-ML6K-200Mbps-0.6SP-NP MITRASEL

Add paralel link 200Mbps without antenna 15E6651-TN-2x200Mbps-1.2SP-RLB2+0

MITRASEL 30-Oct-19

Add paralel link 2x290Mbps without antenna 11E-ML6K-4x290Mbps-1.2DP-RLB4+0


MITRASEL 15-Oct-19

Add paralel link 290Mbps without antenna 11E-ML6K-2x200Mbps-1.2DP-RLB2+0


MITRASEL 14-Oct-19
Add paralel link 290Mbps without antenna 11E-ML6K-2x200Mbps-1.2DP-RLB2+0

MITRASEL 14-Oct-19

Swap upgrade to 400Mbps 23E6651-TNHP-2x200Mbps-0.6DP-RLB2+0 MITRASEL 19-Oct-19


Add Paralel Link 200Mbps without antenna 23E6651-TNHP-2x200Mbps-0.6SP-RLB2+0 MITRASEL

Swap Upgrade to 4x290Mbps 11EML6K-TNHP-4x290Mbps-0.6DP-RLB4+0 MITRASEL 30-Oct-19

Swap IDU + Add Paralel link 200Mbps without7EML6KHP-4x200Mbps-1.2DP-RLB4+0 MITRASEL 19-Nov-19

Add Paralel Link 200Mbps without antenna

7ETNHP-ML6K-4x200Mbps-1.8DP-RLB4+0 MITRASEL 19-Nov-19

Swap IDU + Add Paralel Link 2x290Mbps with 11E-ML6K-TN-4x290Mbps-1.2DP-RLB4+0 MITRASEL 25-Nov-19

Swap IDU + Add Paralel Link 3x290Mbps with 7E-ML6K-4x200Mbps-1.8DP-RLB4+0 MITRASEL 25-Nov-19
Swap IDU + Add paralel link 200Mbps without7E6654HP-TN-2x200Mbps-1.2SP-RLB2+0 MITRASEL

Swap IDU + Add paralel link 200Mbps without15E6654-ML6K-2x200Mbps-1.2SP-RLB2+0 MITRASEL 25-Nov-19

Swap IDU + Add paralel link 200Mbps without23E6654-TN-2x200Mbps-1.2SP-RLB2+0 MITRASEL 25-Nov-19


New Link 200Mbps 23E6651-TN-200Mbps-0.6SP-NP MITRASEL 21-Nov-19

New Link 15E6651-ML6K-200Mbps-1.2SP-NP MITRASEL 14-Nov-19

Swap MMU + Add paralel link 290Mbps witho11E-ML6K-3x290Mbps-1.2DP-RLB3+0 MITRASEL 5-Dec-19

Add paralel link 2x200Mbps without antenna 7EHP-ML6K-4x200Mbps-1.8DP-RLB4+0 MITRASEL 5-Dec-19

Swap Upgrade to 3x200Mbps 23EHP6654-ML6K-3x200Mbps-0.6DP-RLB3+0 MITRASEL 5-Dec-19

Add paralel link 200Mbps without antenna 7E-ML6K-4x200Mbps-2.4DP-RLB4+0 MITRASEL 4-Dec-19


Swap Upgrade to 4x200Mbps 8EHP-ML6K-4x200Mbps-2.4DP-SD4+4 MITRASEL
Swap Upgrade to 4x200Mbps 7EHP-ML6K-4x200Mbps-2.4DP-SD4+4 MITRASEL
Swap Upgrade to 4x200Mbps. Ant BOTENG ch7EHP-ML6K-4x200Mbps-1.2/1.8DP-RLB4+0 MITRASEL
Swap Upgrade to 4x200Mbps. Ant BOTENG ch8EHP-ML6K-4x200Mbps-1.8/1.2DP-RLB4+0 MITRASEL
MOS Remark Start NE Finish NE Start FE Finish NE POINTING RFS Migrasi Dismantle Remark Dismantle

20-Dec-18 21-Dec-18 18-Dec-18 20-Dec-18 22-Dec-18 22-Dec-18 NEED

6-Dec-18 7-Dec-18 4-Dec-18 6-Dec-18 10-Dec-18 12-Dec-18

23-Aug-18 24-Aug-18 24-Aug-18 25-Aug-18 26-Aug-18 27-Aug-18

25-Jan-19 25-Jan-19 24-Jan-19 24-Jan-19 25-Jan-19 25-Jan-19

6-Feb-19 6-Feb-19 6-Feb-19 6-Feb-19 6-Feb-19 6-Feb-19

7-Feb-19 7-Feb-19 6-Feb-19 6-Feb-19 8-Feb-19 7-Feb-19

2-Jun-18 2-Jun-18 3-Jun-18 3-Jun-18 6-Jun-18 11-Jul-18 NEED

10-May-18 30-May-18 11-May-18 29-May-18 6-Jun-18 6-Jun-18 NEED

23-May-18 23-May-18 24-May-18 24-May-18 25-May-18 25-May-18 NEED

20-Jan-19 20-Jan-19 19-Jan-19 19-Jan-19 21-Jan-19 21-Jan-19 NEED

27-May-18 27-May-18 26-May-18 25-May-18 11-Jun-18 11-Jun-18

22-Oct-18 23-Oct-18 23-Oct-18 24-Oct-18 25-Oct-18 29-Oct-18

28-Jan-19 28-Jan-19 26-Jan-19 26-Jan-19 31-Jan-19 30-Jan-19

19-Jul-18 20-Jul-18 17-Jul-18 18-Jul-18 3-Aug-18 3-Aug-18 NEED

26-May-18 9-Jun-18 26-May-18 26-May-18 30-May-18 9-Jun-18

7-Jun-18 7-Jun-18 5-Jun-18 6-Jun-18 11-Jun-18 11-Jun-18 NEED

4-Jan-19 5-Jan-19 2-Jan-19 3-Jan-19 9-Jan-19 8-Jan-19 24-Jan-19

5-Jun-18 6-Jun-18 4-Jun-18 4-Jun-18 7-Jun-18 26-Jun-18 NEED

7-Jun-18 7-Jun-18 6-Jun-18 6-Jun-18 8-Jun-18 8-Jun-18

23-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 25-Jan-19 26-Jan-19 27-Apr-19 NEED

29-Jun-18 29-Jun-18 29-Jun-18 29-Jun-18 11-Jul-18 11-Jul-18

23-Aug-18 24-Aug-18 24-Aug-18 25-Aug-18 26-Aug-18 27-Aug-18 NEED

3-Dec-18 6-Dec-18 4-Dec-18 4-Dec-18 10-Dec-18 12-Dec-18 NEED

13-Dec-18 14-Dec-18 12-Dec-18 16-Dec-18 25-Dec-18 19-Dec-18 24-Jan-19

2-Nov-18 5-Nov-18 19-Oct-18 21-Oct-18 6-Nov-18 6-Nov-18 Dismantle FE

27-May-18 27-May-18 27-May-18 27-May-18 28-May-18 29-May-18


4-Jan-19 5-Jan-19 2-Jan-19 4-Jan-19 7-Jan-19 7-Jan-19 27-Feb-19
8-May-18 9-May-18 9-May-18 10-May-18 11-May-18 11-May-18 NEED

10-Oct-18 10-Oct-18 11-Oct-18 11-Oct-18 11-Oct-18 20-Oct-18

16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 17-Jan-19 24-Jan-19 NEED

15-Dec-18 17-Dec-18 12-Dec-18 16-Dec-18 19-Dec-18 19-Dec-18

9-May-18 8-Jun-18 9-May-18 10-May-18 10-Jun-18 10-Jun-18 12-May-19 11jul : material NE - FE


7-Jul-18 9-Jul-18 7-Jul-18 7-Jul-18 12-Jul-18 12-Jul-18 NEED

19-May-18 19-May-18 21-May-18 21-May-18 9-Jun-18 9-Jun-18

13-Nov-18 17-Nov-18 12-Dec-18 20-Dec-18 22-Dec-18 22-Dec-18

18-May-18 19-May-18 11-May-18 11-May-18 19-May-18 12-Jun-18

16-Sep-18 17-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Nov-18

22-Dec-18 23-Dec-18 22-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18

23-Oct-18 24-Oct-18 24-Oct-18 25-Oct-18 27-Oct-18 27-Oct-18 Done NEED

12-Jul-18 13-Jul-18 6-Jun-18 14-Jul-18 6-Aug-18 8-May 8-May 14-May

20-Jan-19 20-Jan-19 19-Jan-19 19-Jan-19 20-Jan-19 20-Jan-19 7-May-19 25-May 11jul : material NE mas

14-May-18 14-May-18 15-May-18 15-May-18 23-May-18 23-May-18

29-Dec-18 29-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 6-Jan-18 NEED

26-May-18 28-May-18 26-May-18 1-Jun-18 3-Jun-18 3-Jun-18 NEED

17-Jan-19 19-Jan-19 15-Jan-19 15-Jan-19 19-Jan-19 19-Jan-19

22-Jan-19 22-Jan-19 16-Feb-19 16-Feb-19 22-Feb-19 22-Feb-19

11-Jun-18 12-Jun-18 10-Jun-18 11-Jun-18 26-Jun-18 26-Jun-18 NEED

7-Jun-18 7-Jun-18 8-Jun-18 8-Jun-18 8-Jun-18 8-Jun-18 NEED


21-Jul-18 22-Jul-18 21-Jul-18 22-Jul-18 25-Jul-18 25-Jul-18

7-Jun-18 7-Jun-18 6-Jun-18 6-Jun-18 8-Jun-18 11-Jun-18

20-Mar-19 21-Mar-19 14-Feb-19 14-Feb-19 28-May-19 29-May-19 29-May-19

26-Jan-19 26-Jan-19 23-Jan-19 23-Jan-19 30-Jan-19 30-Jan-19

1-Jun-18 1-Jun-18 1-Jun-18 2-Jun-18 5-Jun-18 5-Jun-18 NEED

28-Jan-19 28-Jan-19 26-Jan-19 26-Jan-19 29-Jan-18 30-Jan-19

9-Jun-18 9-Jun-18 9-Jun-18 9-Jun-18 10-Jun-18 10-Jun-18 NEED

3-Jan-19 4-Jan-19 2-Jan-19 3-Jan-19 7-Jan-19 7-Jan-19 24-Jan-19

15-Aug-18 16-Aug-18 16-Aug-18 17-Aug-18 18-Aug-18 NEED

27-Jun-18 5-Jul-18 29-Jun-18 3-Jul-18 7-Jun-18 7-Jun-18


8-May-18 26-May-18 8-May-18 31-May-18 21-May-18 26-May-18

28-Jun-18 20-Jul-18 28-Jun-18 20-Jul-18 20-Jul-18 20-Jul-18

6-Aug-18 7-Aug-18 7-Aug-18 8-Aug-18 10-Aug-18 10-Aug-18 20-May-19 11jul : material NE-FE
20-Sep-18 23-Sep-18 1-Sep-18 6-Sep-18 25-Sep-18 28-Sep-18 NEED

27-Nov-18 27-Nov-18 27-Nov-18 27-Nov-18 8-Dec-18 8-Dec-18 NEED

13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 3-Aug-18 3-Aug-18 DISMANTLE FE

1-Sep-18 2-Sep-18 2-Sep-18 3-Sep-18 4-Sep-18 4-Sep-18 NEED

8-Jun-18 9-Jun-18 11-Jun-18 12-Jun-18 25-Jul-18 25-Jul-18 24-May-19

7-Sep-18 7-Sep-18 7-Sep-18 7-Sep-18 7-Sep-18 7-Sep-18 NEED

31-Jan-19 1-Feb-19 1-Feb-19 2-Feb-19 3-Feb-19 3-Feb-19 Done

11-Oct-18 12-Oct-18 13-Oct-18 14-Oct-18 15-Oct-18 4-Nov-18

27-Jun-18 28-Jun-18 29-Jun-18 30-Jun-18 30-Jun-18 7-Jul-18 NEED

30-Jun-18 30-Jun-18 30-Jun-18 1-Jul-18 8-Nov-18 8-Nov-18 23-May-19

4-Aug-18 5-Aug-18 3-Aug-18 4-Aug-18 14-Nov-18 14-Nov-18 19-May-19

16-Dec-18 17-Dec-18 18-Dec-18 18-Dec-18 20-Dec-18 23-Dec-18

11-May-18 23-May-18 11-May-18 23-May-18 24-May-18 1-Jun-18

28-Sep-18 28-Sep-18 10-Sep-18 10-Sep-18 29-Sep-18 29-Sep-18


1-Feb-19 1-Feb-19 1-Feb-19 1-Feb-19 3-Feb-19 14-Feb-19 22-Apr-19

31-May-18 31-May-18 31-May-18 31-May-18 31-May-18 31-May-18

23-Jan-19 23-Jan-19 15-Feb-19 15-Feb-19 15-Feb-19 15-Feb-19

28-Jan-19 28-Jan-19 29-Jan-19 30-Jan-19 28-Feb-19 4-Mar-19

28-Sep-18 4-Oct-18 5-Oct-18 10-Oct-18 15-Oct-18 3-Nov-18 Done NEED

4-Aug-18 5-Aug-18 5-Aug-18 6-Aug-18 6-Aug-18 6-Aug-18

1-Jun-18 1-Jun-18 23-May-18 23-May-18 2-Jun-18 2-Jun-18

7-Nov-18 8-Nov-18 6-Nov-18 6-Nov-18 29-Dec-18 29-Dec-18

4-Nov-18 5-Sep-19 8-Nov-18 7-Sep-19 9-Dec-19 9-Dec-19

28-Nov-18 28-Nov-18 28-Nov-18 27-Nov-18 7-Dec-18 7-Dec-18 10-Apr-19

29-May-18 4-Jun-18 11-May-18 1-Jun-18 4-Jun-18 4-Jun-18

22-Oct-18 28-Oct-18 26-Oct-18 26-Oct-18 29-Oct-18 29-Oct-18

28-Dec-18 28-Dec-18 27-Dec-18 28-Dec-18 12-Jan-19 29-Dec-18 25-Jan-19

4-Aug-18 5-Aug-18 3-Aug-18 4-Aug-18 26-Sep-18 23-Nov-18 16-May

1-Mar-19 2-Mar-19 6-Mar-19 8-Mar-19 8-Mar-19 8-Mar-19 NEED

21-Jul-18 23-Jul-18 21-Jul-18 23-Jul-18 23-Jul-18 23-Jul-18

29-Jun-18 30-Jun-18 29-Jun-18 30-Jun-18 1-Jul-18 5-Jul-18


17-May-18 23-May-18 16-May-18 23-May-18 25-May-18 25-May-18

17-Jul-18 18-Jul-18 17-Jul-18 18-Jul-18 24-Jul-18 24-Jul-18

19-Dec-18 19-Dec-18 19-Dec-18 19-Dec-18 19-Dec-18 19-Dec-18 NEED

9-Mar-19 9-Mar-19 9-Mar-19 9-Mar-19 11-Mar-19 11-Mar-19

16-Oct-18 17-Oct-18 18-Oct-18 20-Oct-18 22-Oct-18 22-Oct-18

8-Jun-18 9-Jun-18 22-Aug-18 23-Aug-18 29-Aug-18 4-Sep-18 NEED

8-Jun-18 9-Jun-18 13-Jul-18 17-Jul-18 19-Jul-18 20-Nov-18

29-Jul-18 30-Jul-18 31-Jul-18 1-Aug-18 3-Aug-18 3-Aug-18 NEED


5-Jul-18 5-Jul-18 28-Jun-18 28-Jul-18 12-Jul-18 12-Jul-18 NEED
18-Sep-18 20-Sep-18 21-Sep-18 24-Sep-18 26-Sep-18 28-Sep-18 14-May-19 11jul : material NE-FE

17-Jul-18 19-Jul-18 17-Jul-18 19-Jul-18 22-Jul-18 22-Jul-18

20-May-18 21-May-18 21-May-18 22-May-18 22-May-18 28-May-18 NEED

10-Aug-18 11-Aug-18 10-Aug-18 11-Aug-18 12-Aug-18 12-Aug-18

7-Jun-18 10-Jul-18 4-Jun-18 4-Jun-18 12-Jul-18 15-Jul-18 NEED

7-Jun-18 28-Aug-18 29-Aug-18 31-Aug-18 3-Sep-18 3-Sep-18

30-May-18 30-May-18 30-May-18 30-May-18 31-May-18 4-Jun-18

21-Dec-18 21-Dec-18 20-Dec-18 21-Dec-18 23-Dec-18 23-Dec-18

14-Mar-19 14-Mar-19 15-Mar-19 15-Mar-19

23-Dec-18 23-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 3-Jan-19 NEED

30-Jan-19 30-Jan-19 1-Feb-19 1-Feb-19 12-Mar-19 6-Feb-19

4-Dec-18 5-Dec-18 6-Dec-18 7-Dec-18 7-Dec-18 25-Dec-18 NEED

13-Jan-19 1-May-19

11-May-18 20-May-18 12-May-18 20-May-18 21-May-18 21-May-18

27-Feb-19 1-Mar-19 1-Mar-19 7-Mar-19 11-Mar-19 11-Mar-19

8-Mar-19 8-Mar-19 8-Mar-19 8-Mar-19 No Need 5-Oct-19 No Need No Need

23-Dec-18 23-Dec-18 21-Dec-18 22-Dec-18 26-Dec-18 28-Dec-18 Done


Done

25-Jun-19 26-Jun-19 26-Jun-19 16-Aug-19 5-Jul-19 16-Aug-19 12-Sep-19 NEED

27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 30-Dec-18 6-Jan-18 NEED

29-Dec-18 29-Dec-18 30-Dec-18 30-Dec-18 30-Dec-18 30-Dec-18 NEED

15-May-18 19-May-18 16-May-18 19-May-18 18-May-18 19-May-18

25-Jul-18 28-Jul-18 1-Aug-18 5-Aug-18 15-Aug-18 1-Sep-18

1-Sep-18 2-Sep-18 2-Sep-18 3-Sep-18 3-Sep-18 3-Sep-18

21-Jul-19 21-Jul-19 20-Jul-19 20-Jul-19 No Need 10-Dec-19 No Need No Need

21-Jan-19 21-Jan-19 21-Jan-19 21-Jan-19 28-Jan-19 30-Jan-19 Done

18-Jan-19 18-Jan-19 18-Jan-19 18-Jan-19 1-Feb-19 1-Feb-19

4-Jul-18 4-Jul-18 27-Jun-18 28-Jun-18 5-Jul-18 7-Jul-18 NEED

17-Jan-19 17-Jan-19 17-Jan-19 17-Jan-19 18-Jan-19 18-Jan-19 Dismantle FE

15-Aug-18 16-Aug-18 16-Aug-18 17-Aug-18 10-Oct-18 10-Oct-18

22-Jan-19 22-Jan-19 21-Jan-19 21-Jan-19 24-Jan-19 28-Apr-19 28-Apr-19 NEED

2-Aug-18 3-Aug-18 3-Aug-18 4-Aug-18 4-Aug-18 4-Aug-18 2-May-19


9-Sep-18 10-Sep-18 12-Sep-18 12-Sep-18 16-Sep-18 16-Sep-18
30aug:
complete by
Yunus
mos gagal, 2-Sep-19
comcase NE,
material balik ke
gudang

13-May-18 22-May-18 13-May-18 22-May-18 28-May-18 29-May-18 No Need No Need

7-Feb-19 8-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 11-Feb-19 27-Feb-19

5-Jun-18 6-Jun-18 7-Jun-18 10-Jun-18 10-Jun-18 10-Jun-18 NEED

10-Mar-19 10-Mar-19 11-Mar-19 11-Mar-19 12-Mar-19 12-Mar-19

23-Aug-18 23-Aug-18 8-Sep-18 18-Sep-18 21-Sep-18 21-Sep-18

5-Dec-18 6-Dec-18 7-Dec-18 8-Dec-18


10-Dec-18 9-Dec-18 9-Dec-18

11-Jan-19 11-Jan-19 13-Jan-19 14-Jan-19 18-Jan-19 26-Mar-19 7-May-19 NEED

11-Mar-19 11-Mar-19 11-Mar-19 11-Mar-19 3-Nov-18 3-Nov-18


20-Feb-19 20-Feb-19 20-Feb-19 20-Feb-19 20-Feb-19 20-Feb-19 NEED

4-Feb-19 4-Feb-19 4-Feb-19 4-Feb-19 5-Feb-19 5-Feb-19 NEED

11-Jul-18 1-Jul-18 11-Jul-18 1-Jul-18 12-Jul-18 12-Jul-18

29-Dec-18 29-Dec-18 31-Dec-18 1-Jan-19 7-Jan-19 7-Jan-19 NEED

2-Feb-19 2-Feb-19 2-Feb-19 2-Feb-19 3-Feb-19 5-Feb-19 NEED

12-Dec-18 13-Dec-18 13-Dec-18 14-Dec-18 15-Dec-18 15-Dec-18 NEED

8-Jun-18 10-Jun-18 9-Jun-18 10-Jun-18 20-Jun-18 20-Jun-18 NEED

22-Jan-19 25-Jan-19 20-Jan-19 22-Jan-19 26-Jan-19 2-Feb-18 NEED

5-Mar-19 7-Mar-19 3-Mar-19 4-Mar-19 10-Mar-19 3-Apr-19 2-Apr-19 6-Sep-19 Material on site

7-Feb-19 7-Feb-19 8-Feb-19 8-Feb-19 12-Feb-19 8-Feb-19

18-Dec-18 18-Dec-18 18-Dec-18 18-Dec-18 12-Feb-19 12-Feb-19 NEED

23-Feb-19 23-Feb-19 23-Feb-19 23-Feb-19 25-Feb-19 25-Feb-19 NEED

30-May-18 5-Jun-18 29-May-18 29-May-18 1-Jun-18 7-Jun-18 No Need No Need

29-Sep-18 30-Sep-18 30-Sep-18 1-Oct-18 1-Oct-18 1-Oct-18

22-Dec-18 22-Dec-18

12-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18

14-May-18 15-May-18 15-May-18 1-Jun-18 23-May-18 1-Jun-18 NEED

13-Sep-18 18-Sep-18 14-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18

7-Feb-19 8-Feb-19 9-Feb-19 10-Feb-19 21-Feb-19 11-Feb-19 Done

9-Feb-19 9-Feb-19 10-Feb-19 11-Feb-19 12-Feb-19 12-Feb-19

18-Dec-18 19-Dec-18 18-Dec-18 20-Dec-18 3-Jan-19 3-Jan-19 NEED

8-Dec-18 8-Dec-18 9-Dec-18 10-Dec-18 10-Dec-18 10-Dec-18 NEED

8-Feb-19 8-Feb-19 8-Feb-19 8-Feb-19 29-May-19 29-May-19 29-May-19


4-Jun-18 4-Jun-18 6-Jun-18 6-Jun-18 7-Jun-18 23-Jun-18 Done

19-Dec-18 22-Dec-18 23-Dec-18 25-Dec-18 3-Jan-19 6-Jan-19 22-Sep-19 NEED

13-Jan-19 13-Jan-19 13-Jan-19 14-Jan-19 15-Jan-19 15-Jan-19 7-May-19

28-Dec-18 28-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 Done Done ATF belum, material ma

27-Aug-18 28-Aug-18 29-Aug-18 30-Aug-18 8-Sep-18 2-Nov-18

10-Jan-19 11-Jan-19 9-Jan-19 10-Jan-19 12-Jan-19 12-Jan-19 Done NEED

12-Sep-18 16-Sep-18 12-Sep-18 13-Sep-18 17-Sep-18 17-Sep-18

19-Jan-19 19-Jan-19 18-Jan-19 18-Jan-19 20-Jan-19 20-Jan-19

22-May-18 22-May-18 14-May-18 23-May-18 24-May-18 6-Jun-18 NEED

17-Feb-19 17-Feb-19 17-Feb-19 17-Feb-19 17-Feb-19 17-Feb-19 NEED

12-Sep-18 30-Oct-18 12-Sep-18 13-Sep-18 30-Oct-18 30-Oct-18

28-Jun-18 20-Jul-18 28-Jun-18 20-Jul-18 22-Jul-18 22-Jul-18

12-Jul-18 13-Jul-18 10-Jul-18 11-Jul-18 3-Aug-18 3-Aug-18 Done NEED

7-Jun-18 7-Jun-18 7-Jun-18 2-Jun-18 23-Jun-18 29-Jun-18 14-May-19 11jul : material NE-FE

28-Dec-18 29-Dec-18 28-Dec-18 30-Dec-18 3-Jan-19 3-Jan-19 NEED

15-May-18 23-May-18 15-May-18 23-May-18 23-May-18 23-May-18 NEED

28-Jan-19 28-Jan-19 29-Jan-19 29-Jan-19 26-Feb-19 26-Feb-19 NEED

14-Feb-19 14-Feb-19 14-Feb-19 14-Feb-19 14-Feb-19 14-Feb-19 NEED

30-Dec-18 31-Dec-18 28-Dec-18 29-Dec-18 4-Jan-19 3-Jan-19 Done 16jul: info pic isat vi

14-Mar-19 14-Mar-19 11-Mar-19 12-Mar-19 17-Mar-19 18-Mar-19 NEED

26-Jun-18 26-Jun-18 28-Jun-18 28-Jun-18 28-Jun-18 12-Jul-18

3-Feb-19 3-Feb-19 2-Feb-19 2-Feb-19 4-Feb-19 5-Feb-19 NEED

7-Feb-19 7-Feb-19 8-Feb-19 8-Feb-19 8-Feb-19 8-Feb-19 18-Sep-19 NEED

3-Jun-18 3-Jun-18 4-Jun-18 4-Jun-18 6-Jun-18 9-Jun-18 NEED

8-Mar-19 8-Mar-19 3-Mar-19 4-Mar-19 24-Mar-19 24-Mar-19 Done NEED

23-Feb-19 23-Feb-19 24-Feb-19 24-Feb-19 26-Feb-19 26-Feb-19 NEED


8-Mar-19 8-Mar-19 8-Mar-19 8-Mar-19 8-Mar-19 8-Mar-19 NEED

26-Jun-18 29-Jun-18 28-Jun-18 28-Jun-18 29-Jun-18 29-Jun-18

19-Feb-19 20-Feb-19 18-Feb-19 19-Feb-19 21-Feb-19 21-Feb-19 NEED

15-Mar-19 15-Mar-19 14-Mar-19 14-Mar-19 17-Mar-19 17-Mar-19 NEED

10-Mar-19 12-Mar-19 12-Mar-19 13-Mar-19 15-Mar-19 16-Oct-19 Need Need

10-May 11-May 11-May 11-May 11-May 11-May 11-May-19 NY

12-May 13-May 13-May 13-May 13-May 13-May 15-May NY

5-Jul-19 5-Jul-19 4-Jul-19 4-Jul-19 5-Jul-19 5-Jul-19 17-Jul-19 NEED

24-Apr 8-May 24-Apr 8-May 10-May-19 10-May-19 NEED

8-May-19 21-May-19 8-May-19 21-May-19 22-May-19 22-May-19 NEED

22-Jun-19 23-Jun-19 23-Jun-19 23-Jun-19 24-Jun-19 24-Jun-19 24-Jul-19 NEED

18-Jun 19-Jun 19-Jun 20-Jun 21-Jun 21-Jun 4-Jul-19 NEED

21-May 21-May 22-May 22-May 22-May 22-May NY NY

27-May 28-May-19 27-May 28-May-19 29-May-19 29-May-19 4-Jul-19

22-May 22-May 23-May 23-May 23-May 23-May NY NY

27-May 30-May-19 27-May 30-May-19 30-May-19 16-Aug-19

27-May-19 27-May-19 27-May-19 27-May-19 28-May-19 28-May-19 28-May-19

27-Aug-18 28-Aug-18 28-Aug-18 29-Aug-18 7-Sep-18 10-Nov-18 26-Mar-19 10-May

8-Feb-19 9-Feb-19 9-Feb-19 10-Feb-18 11-Feb-19 11-Feb-19 12-Sep-19 NEED


21-Dec-18 22-Dec-18 23-Dec-18 25-Dec-18 3-Jan-19 3-Jan-19 Done 16jul: info pic isat vi

Yunus

NEED
Yusril NE, lius FE 28-Jul-19 29-Jul-19 26-Jul-19 27-Jul-19 31-Jul-19 5-Aug-19

10-Sep-19 10-Sep-19 10-Sep-19 11-Sep-19 No Need 13-Sep-19 No Need No Need

30-Jun-19 1-Jul-19 10-Jul-19 11-Jul-19 16-Aug-19 16-Aug-19 17-Dec-19 Need

Complete, Taufik 6-Sep-19 7-Sep-19 4-Sep-19 5-Sep-19 7-Sep-19 7-Sep-19 Need

Complete, Yusril 30-Aug-19 30-Aug-19 31-Aug-19 31-Aug-19 No Need 6-Sep-19 No Need No Need

Complete, Ramli 7-Sep-19 7-Sep-19 8-Sep-19 8-Sep-19 No Need 9-Sep-19 No Need No Need

Complete, Ramli 8-Sep-19 8-Sep-19 7-Sep-19 7-Sep-19 No Need 9-Sep-19 No Need No Need

Complete, Taufik 6-Sep-19 6-Sep-19 7-Sep-19 7-Sep-19 No Need 7-Sep-19 No Need No Need

Yusril 1-Aug-19 1-Aug-19 2-Aug-19 2-Aug-19 No Need 9-Aug-19 No Need No Need

Rauf 3-Sep-19 3-Sep-19 2-Sep-19 3-Sep-19 3-Sep-19 4-Sep-19 12-Sep-19 12-Sep-19

Nasrun, Complet 5-Dec-19 6-Dec-19 7-Dec-19 8-Dec-19 8-Dec-19 9-Dec-19 11-Dec-19 Need

Complete, Rauf 22-Oct-19 23-Oct-19 24-Oct-19 24-Oct-19 26-Oct-19 26-Oct-19 12-Nov-19

Complete, Rauf 11-Sep-19 12-Sep-19 10-Sep-19 11-Sep-19 12-Sep-19 12-Sep-19 27-Sep-19 NEED

Complete, Rauf 14-Nov-19 14-Nov-19 Done Done 14-Nov-19 14-Nov-19 3-Dec-19 NEED

Complete, Taufik 16-Oct-19 17-Oct-19 18-Oct-19 19-Oct-19 20-Oct-19 20-Oct-19


NEED

Complete, Alfons29-Nov-19 29-Nov-19 30-Oct-19 30-Oct-19 No Need

Complete, Adit 15-Oct-19 23-Oct-19 16-Oct-19 23-Oct-19 No Need 31-Oct-19 No Need No Need

Complete, Adit 14-Oct-19 14-Oct-19 15-Oct-19 15-Oct-19 No Need 17-Oct-19 No Need No Need
Complete, Adit 15-Oct-19 15-Oct-19 14-Oct-19 14-Oct-19 No Need 17-Oct-19 No Need No Need

Complete, Rauf 24-Oct-19 2-Dec-19 19-Oct-19 20-Oct-19 2-Dec-19 3-Dec-19 NEED NEED

Complete, Taufik 30-Oct-19 30-Oct-19 31-Oct-19 31-Oct-19 1-Nov-19 1-Nov-19 2-Dec-19 NEED

LOM RAU, Nasru 20-Nov-19 21-Nov-19 22-Nov-19 23-Nov-19 No Need 27-Nov-19

Complete, Nasrun

Alfonsus 28-Nov-19 28-Nov-19 29-Nov-19 29-Nov-19 No Need 30-Nov-19 No Need No Need

Alfonsus 25-Nov-19 25-Nov-19 26-Nov-19 26-Nov-19 No Need 27-Nov-19 No Need No Need

Yunus 26-Nov-19 26-Nov-19 No Need

Yunus 25-Nov-19 25-Nov-19 26-Nov-19 26-Nov-19 No Need 28-Nov-19 28-Dec-19 28-Dec-19


Complete, Arif 21-Nov-19 21-Nov-19 22-Nov-19 22-Nov-19 22-Nov-19 22-Nov-19

LOM MMU 1pcs, 1


A4-Nov-19 14-Nov-19 15-Nov-19 16-Nov-19 20-Nov-19 20-Nov-19

Complete, Yusril 6-Dec-19 6-Dec-19

Complete, Taufik 12-Dec-19 12-Dec-19 13-Dec-19 13-Dec-19 No Need 16-Dec-19 No Need No Need

Complete, Taufik 6-Dec-19 7-Dec-19 8-Dec-19 8-Dec-19 9-Dec-18 9-Dec-18 Need Need

Complete, Nasru 16-Dec-19 16-Dec-19 16-Dec-19 16-Dec-19 No Need 17-Dec-19 No Need No Need

Need Need
Need Need
NetGear RLDW Submit FATP Remark FATP Submit ATP Remark ATP

1 Done 8-Jan-19 FATP Done 24-Jan-19 Endorse By MOM

1 Done 13-Dec-18 FATP Done with remark, Need


22-Feb-19 Endorse By MOM

1 Done 1-Dec-18 FATP Done with remark, Need


Done
update NDB &  NeedEndorse
Rev DocBy
(capture
MOM page 1 not standart, page 8 (NA), Page 12 n

1 Done 19-Feb-19 FATP Done 11-Apr-19 Endorse By MOM

1 Done 19-Feb-19 FATP Done with remark, nee 18-Jun-19 Endorse

1 Done 14-Mar-19 FATP Done 19-Jun-19 Endorse By MOM

1 Done 19-Jul-18 FATP DONE Done Endorse By MOM

1 Done 16-Nov-18 FATP Done Endorse by MOM

1 Done 6-Jul-18 FATP DONE 28-Dec-18 Endorse By MOM

1 Done 6-Feb-19 FATP Done 21-Feb-19 Endorse By MOM

1 Done 26-Jun-18 FATP DONE 26-Jun-18 Endorse

0.5 NY 4-Jan-19 FATP Done 8-Jan-19 Reject

1 Done 19-Feb-19 FATP Done 21-Feb-19 Endorse By MOM

TO FSO TO FSO 8-Jan-19 FATP Done with remark, Need clear alarm FE & NE TO FSO

1 Done 6-Jul-18 FATP DONE 26-Nov-18 Endorse

1 Done 27-Dec-18 FATP Done with remark, Need


28-Dec-18 Partial Accept (RLDW)

1 Done 18-Jan-19 FATP Done 18-Feb-19 Endorse By MOM

1 Done 6-Jul-18 FATP DONE 19-Sep-18 Endorse By MOM

1 NY 11-Jul-18 FATP DONE NEED ON SITE

1 Done 1-Feb-19 FATP Done 1-Feb-19 Endorse By MOM

0.5 NY 27-Nov-18 FATP Done 29-Nov-18 Reject

1 Done 4-Jan-19 FATP Done with remark, Need


29-Nov-18 Endorse By MOM

1 Done 13-Dec-18 FATP Done 9-May Endorse By MOM

1 Done 17-Jan-19 FATP Done with remark, need29-Jan-19 Endorse By MOM

TO FSO TO FSO 21-Jan-19 FATP DONE Endorsed by FSO

0.5 NY 6-Jul-18 FATP DONE 19-Sep-18 Reject


1 Done 14-Jan-19 FATP Done 18-Feb-19 Endorse By MOM
1 Done 15-May-18 FATP DONE 20-May-19 Endorse By MOM

0.5 Done 4-Jan-19 FATP Done 15-May-19 Endorse

0.5 NY 6-Feb-19 FATP Done 21-Feb-19 Partial Accept (RLDW)

1 Done 17-Jan-19 FATP Done with remark, need29-Jan-19 Endorse By MOM

1 Done 29-Jun-18 FATP DONE 2-Oct-18 Endorse By MOM


TO FSO TO FSO 22-Oct-18 FATP Done with remark, Need Update NDB & Need Endorsed
TS by FSO

1 Done 11-Oct-18 FATP DONE 15-Oct-18 Endorse

TO FSO TO FSO 10-Jan-19 FATP Done with remark, Need Update NDB januari,Endorsed by FSO

1 Done 9-Jul-18 FATP DONE 2-Nov-18 Endorse

TO FSO TO FSO 10-Jan-19 FATP Done Submited Endorsed by FSO

1 Done 8-Jan-19 FATP Done with remark, Nee24-Jan-19 Endorse By MOM

TO FSO TO FSO 21-Jan-19 FATP DONE Endorsed by FSO

TO FSO TO FSO 12-Feb-19 FATP Done with remark, Need clear alarm FE & NE TO FSO

1 Done 6-Feb-19 FATP Done 2/21/2019/ Rev CPL 1 Endorse By MOM

1 Done 31-May-18 FATP Done with remark, NeeDone Endorse

1 Done 18-Jan-19 FATP Done 10-Apr-19 Endorse By MOM

1 Done 5-Jun-18 FATP DONE 25-Jun-18 Endorse By MOM

1 Done 23-Jan-19 FATP Done with remark, nee 10-Apr-19 Endorse

TO FSO TO FSO 12-Mar-19 FATP Done 30-Apr-19 TO FSO

1 Done 11-Jul-18 FATP DONE Endorse By MOM

1 Done 11-Jul-18 FATP DONE Endorse By MOM


1 NY 4-Jan-19 FATP Done Done Partial Accept (RLDW)

0.5 NY 26-Jun-18 FATP DONE Done Reject

1 Done 29-May-19 FATP Done 29-May-19 Endorse By MOM

1 Done 1-Feb-19 FATP Done 1-Feb-19 Endorse By MOM

1 Done 11-Jul-18 FATP DONE 25-Jun-19 Endorse By MOM

0.5 NY 19-Feb-19 FATP Done with remark, need21-Feb-19 Obstacle

1 Done 16-Nov-18 FATP DONE Endorse By MOM

1 Done 17-Jan-19 FATP Done 1-Feb-19 Endorse By MOM

1 Done 27-Feb-19 FATP Done with remark, Need clear alarm FE & NE Endorse By MOM

1 Done 19-Jul-18 FATP DONE Done Endorse


1 Done 29-May-18 FATP DONE Done Endorse

1 Done 23-Oct-18 FATP DONE Done Endorse

1 Done 5-Apr-19 FATP DONE Done Endorse By MOM


1 NY 10-Jan-19 FATP Done NEED ON SITE

1 Done 11-Dec-18 FATP Done with remark, Nee2/22/2019/ Rev CPL 1 CPL Submited

TO FSO TO FSO 22-Oct-18 FATP Done Endorsed by FSO

TO FSO TO FSO 22-Oct-18 FATP Done Endorsed by FSO

TO FSO TO FSO 22-Oct-18 FATP DONE Submited Endorsed by FSO

1 Done 1-Dec-18 FATP Done Done Endorse By MOM

1 Done 13-Mar-19 FATP Done with remark, Need


11-Apr-19 Endorse By MOM

1 NY 12-Feb-19 FATP Done with remark, Need


22-May-19 Comcase

1 Done 27-Nov-18 FATP Done with remark, Need


Done Endorse By MOM

1 Done 10-Jan-19 FATP Done with remark, Need


28-May-19 Endorse By MOM

1 Done 19-Jan-19 FATP Done with remark, Nee8-May-19 Endorse By MOM

1 Done 11-Jan-19 FATP Done 21-Feb-19 Endorse By MOM

1 Done 6-Jul-18 FATP DONE Done Endorse

0 NY Need On site NEED ON SITE


1 Done 9-Mar-19 FATP Done with remark, need11-Apr-19 Endorse By MOM

0.5 NY 26-Jun-18 FATP DONE Done Reject

1 Done 12-Mar-19 FATP Done 28-May-19 Endorse By MOM

1 Done 18-Mar-19 waiting feedback indosat 21-May-19 Endorse By MOM

TO FSO TO FSO 23-Apr-19 27-May-19 TO FSO

0.5 NY 4-Jan-19 FATP Done NEED ON SITE

1 Done 4-Jun-18 FATP DONE Done Endorse

TO FSO TO FSO 10-Jan-19 FATP Done with remark, Need Update NDB (freq acEndorsed by FSO

0 NY NEED ON SITE

1 Done 11-Dec-18 FATP Done 10-Apr-19 CPL Submited

0.5 NY 26-Jun-18 FATP DONE Reject

0 NY 4-Jan-19 FATP Done with remark, nee Done Reject

1 Done 18-Jan-19 FATP Done 21-Feb-19 Endorse By MOM

Cancel Cancel Assignment Cancel

TO FSO TO FSO 8-Jan-19 FATP Done with remark, Need Update NDB ( actual Endorsed by FSO

Cancel Cancel Done FATP Done Assignment Cancel

1 Done 18-Mar-19 FATP Done with remark, Need


14-May-19 Endorse By MOM

Cancel Cancel Done FATP Done with remark, need update NDB Online ( Assignment Cancel
Cancel Cancel Done FATP Done with remark, Need clear alarm FE & NE Assignment Cancel

1 NY 23-Jan-19 FATP Done with remark, need update NDB Online (Fr
NEED ON SITE

1 Done 5-Oct-18 FATP DONE 1-Dec-18 Endorse


1 Done 2-Jul-18 FATP DONE 26-Apr-19 Endorse

Cancel Cancel Done FATP DONE Assignment Cancel


Cancel Cancel Done FATP DONE Assignment Cancel
Cancel Cancel Done FATP Done Assignment Cancel

1 Done 23-Oct-18 FATP Done Done Endorse

1 Done 4-Jan-19 FATP Done Done Endorse By MOM

Cancel Cancel 27-Feb-19 FATP Done with remark, Need Update NDB (  freq actual
Assignment
V=7428/7589
Cancel H=7191/7359 ) & need clear alarm

1 Done 19-Mar-19 FATP Done 21-Nov-19 Endorse By MOM

Cancel Cancel 3-Apr-19 FATP Done with remark, Need Update NDB (power Assignment
& Cancel

Cancel Cancel Done FATP DONE Assignment Cancel

1 Done 1-Dec-18 FATP Done with remark, Need


Done
update NDB &  NeedEndorse
Rev DocBy
(capture
MOM page 1 not standart, page 8 (NA), Page 12 n

TO FSO TO FSO 22-Oct-18 FATP DONE Endorsed by FSO

1 Done 8-Jan-19 FATP Done with remark, Need


30-Apr-19 Endorse By MOM

TO FSO TO FSO 22-Oct-18 FATP Done with remark, Need update NDB & Need Er ndorsed by FSO
TO FSO TO FSO 22-Oct-18 FATP Done with remark, Need Update NDB (Freq AcEndorsed by FSO
1 Done 20-Mar-19 FATP Done with remark, nee 20-May-19 Endorse By MOM

1 Done 23-Oct-18 FATP DONE Done Endorse By MOM

1 Done 26-Jun-18 FATP DONE 28-Dec-18 Endorse By MOM

1 Done 1-Dec-18 FATP Done Done Endorse

1 Done 19-Jul-18 FATP DONE Endorse By MOM

1 Done 4-Jan-19 FATP Done with remark, Need Update NDB (online Endorse

1 Done 4-Jun-18 FATP DONE Done Endorse

1 Done 18-Jan-19 FATP Done 29-Jan-19 Endorse By MOM

NY RFS NY RFS Interference

1 Done 21-Jan-19 FATP Done 9-May Endorse By MOM

Cancel Cancel return to asp Assignment Cancel


Cancel Cancel Done FATP Done with remark, need update NDB Online ( Assignment Cancel

TO FSO TO FSO 18-Mar-19 Endorsed by FSO

0 Done 21-Jan-19 FATP Done with remark, need update NDB Online (FEndorse By MOM

Cancel Cancel Assignment Cancel

Cancel Cancel Assignment Cancel

1 Done 5-Jun-18 FATP DONE Done Endorse

1 Done 18-Mar-19 FATP Done with remark, Nee21-May-19 Endorse By MOM

1 Done 19-Nov-19 FATP Submited Partial Accept (FATP)

1 Done 11-Jan-19 FATP Done 18-Feb-19 Endorse By MOM

Cancel Cancel Assignment Cancel


Cancel Cancel Assignment Cancel

1 Done 14-Nov-19 FATP Done Endorse By MOM

0.5 NY 18-Jan-19 FATP Done 21-Feb-19 Reject

1 Done 26-Mar-19 FATP Done Endorse By MOM

1 Done 2-Jul-18 FATP DONE 26-Apr-19 Endorse

1 Done 21-Dec-18 FATP Done 22-Dec-18 Endorse by MOM

0 NY Reject

1 Done 4-Jan-19 FATP Done Done Endorse By MOM

1 Done Partial Accept (FATP)

1 Done 13-Mar-19 waiting feedback indosat 21-Jun-19 Endorse By MOM

0.5 NY 27-Feb-19 FATP Done with remark, Need clear alarm FE & NE NEED ON SITE

1 Done 27-Nov-18 FATP Done with remark, Need


Done
update NDB &  NeedEndorse
Rev DocBy
(capture
MOM page 1 not standart, page 8 (NA), Page 12 n

TO FSO TO FSO 23-Jan-19 Endorsed by FSO

1 Done 5-Apr-19 FATP Done Rev Cpl 20 May Endorse By MOM

1 Done 3-May-19 return to asp/RAU ''2 No contack Endorse By MOM

1 Done 16-Nov-18 FATP DONE 4-Apr-19 Endorse By MOM


1 Done 28-Nov-18 FATP DONE Done Endorse

NY RFS NY RFS Hold

Cancel Cancel Done FATP Done Assignment Cancel


Cancel Cancel Done FATP Done with remark, need repointing (RsL Drop)Assignment Cancel

NY RFS NY RFS Comcase

1 Done 5-Jun-18 FATP DONE Done Endorse

Cancel Cancel Assignment Cancel

1 Done 12-Mar-19 FATP Done with remark,  Ned update NDB ( freq actual
Endorse
11565/11035),
By MOM Need clear Alarm & Need rev doc page 8 &

1 Done 11-Oct-18 FATP DONE Done Endorse By MOM

1 Done 19-Mar-19 FATP Done with remark, Need Update NDB (Site NAEndorse By MOM

Cancel Cancel FATP Done Assignment Cancel


Cancel Cancel Assignment Cancel

1 Done 27-Nov-18 FATP Done Done Reject

Cancel Cancel Assignment Cancel


Cancel Cancel Assignment Cancel

0 NY Need RAU 7Ghz Interference

TO FSO TO FSO 27-May-19 27-May-19 TO FSO


0.5 NY 9-Mar-19 FATP DONE 17-May-19 Partial Accept (RLDW)

Cancel Cancel Done FATP Done with remark, need update NDB Online (uAssignment Cancel

1 Done 28-Feb-19 FATP Done 15-Jun-19 Endorse By MOM

1 Done 19-Jul-18 FATP DONE Done Endorse

0.5 NY 21-Jan-19 FATP DONE NEED ON SITE

Cancel Cancel 14-May-19 waiting feedback indosat Assignment Cancel

1 Done 14-Mar-19 FATP Done 17-May-19 Endorse By MOM

0.5 NY Need RAU 7Ghz 34H NEED ON SITE

Cancel Cancel Assignment Cancel

1 Done 26-Jun-18 FATP DONE Done Endorse By MOM

1 Done 20-Mar-19 FATP Done with remark, need update NDB Online ( Endorse By MOM

1 Done 3-May-19 FATP Done Endorse By MOM

0 NY 19-Feb-19 FATP Done with remark, need update NDB Online Comcase

1 Done 14-Mar-19 FATP Done 17-May-19 Endorse By MOM

Cancel Cancel Assignment Cancel

1 Done 14-Mar-19 FATP Done with remark, Need


19-Nov-19 Endorse By MOM

1 Done 23-Oct-18 FATP DONE Done Endorse

1 NY 4-Jan-19 FATP Done 21-Mar-19 Partial Accept (RLDW)

Cancel Cancel 14-May-19 waiting feedback indosat Assignment Cancel


Cancel Cancel Assignment Cancel
Cancel Cancel Assignment Cancel

1 Done 8-Jan-19 FATP Done 15-May-19 Endorse

1 Done 6-Jul-18 FATP DONE Done Endorse By MOM

0.5 NY 10-Jan-19 FATP Done with remark, Need


24-Jan-19 Interference

1 NY 26-Mar-18 return to asp 21-Jun-19 Partial Accept (FATP)

1 Done 21-Oct-19 FATP Done Endorse By MOM

1 Done 3-May-19 FATP Done Endorse By MOM

0 NY 21-Jan-19 FATP Done NEED ON SITE

1 Done 29-May-19 29-May-19 Endorse


1 Done 6-Jul-18 FATP DONE Done Endorse By MOM

1 NY Wais need data from team NEED ON SITE

1 Done 23-Jan-19 FATP Done 10-Apr-19 Endorse By MOM

1 Done 14-Jan-19 FATP Done 18-Feb-19 Endorse By MOM

1 Done 16-Jan-19 FATP Done with remark, Need


27-May-19
Update NDB ( Freq HEndorse
actual 13115/12849 )
By MOM

1 Done RSL drop Endorse By MOM

1 Done 1-Dec-18 FATP Done Done Endorse

1 Done 3-May-19 FATP Done with remark, need update  MT, need update
Endorse
NDBByOnline
MOM(Update Freq aktual : 15215/14725  Power A

1 Done 11-Oct-18 FATP DONE Done Endorse By MOM

0 NY 9-Mar-19 FATP Done NEED ON SITE

Cancel Cancel Assignment Cancel

1 Done 21-Jan-19 FATP Done with remark, need21-Mar-19 Endorse

1 Done 23-Oct-18 FATP DONE Done Endorse


Cancel Cancel Done FATP Done with remark, need update NDB Online ( Assignment Cancel

1 NY 22-Oct-18 FATP Done with remark, Need


27-May-19 Reject

1 Done 6-Jul-18 FATP DONE Done Endorse By MOM

1 Done 23-Jan-19 FATP Done 3-Dec-19 Endorse By MOM

1 Done 26-Jun-18 FATP DONE Done Endorse By MOM

1 Done 12-Jul-19 FATP Done Partial Accept (FATP)

1 Done 2-Apr-19 FATP Done Endorse By MOM

1 Done 16-Jan-19 FATP Done 10-Apr-19 Endorse By MOM

1 Done 17-Jun-19 FATP Done Endorse By MOM

1 Done 19-Jul-18 FATP DONE Done Endorse

1 Done 6-Feb-19 FATP Done 27-Jun-19 Endorse By MOM

1 Done 28-Feb-19 18-Jun-19 Endorse By MOM

1 Done 6-Jul-18 FATP DONE Done Endorse By MOM

1 Done 23-Apr-19 FATP Done with remark, need udpate NDB Online (FATP ACCEPT

1 Done 13-Mar-19 FATP Done with remark, Need Update NDB ( Freq akEndorse By MOM
1 Done 13-Mar-19 FATP Done with remark, nee 20-Jun-19 Endorse By MOM

1 Done 6-Jul-18 FATP DONE Done Endorse

1 Done 9-Mar-19 FATP Done 15-Jul-19 Endorse By MOM

1 Done 20-Mar-19 FATP Done with remark, need update MT, need up Endorse By MOM

PMR Done NDB Reject

1 Done 24-May-19 FATP Submited 24-May-19 Endorse By MOM

1 Done 24-May-19 FATP Submited 24-May-19 Endorse By MOM

1 Done 9-Jul-19 FATP Submited Endorse By MOM

1 Done 16-Oct-19 FATP Submited Endorse By MOM

1 Done 16-Oct-19 FATP Submited 9-Oct-19 Endorse By MOM

1 Done 9-Jul-19 FATP Submited 26-Jul-19 Endorse By MOM

Cancel Assignment Cancel


Cancel Cancel Assignment Cancel
Cancel Cancel Assignment Cancel
Cancel Cancel Assignment Cancel

1 Done 9-Jul-19 FATP Submited Endorse By MOM

Cancel Cancel Assignment Cancel


Cancel Cancel 12-Jul-19 FATP Done Assignment Cancel
Cancel Cancel Assignment Cancel
Cancel Cancel Assignment Cancel
Cancel Cancel Assignment Cancel
Cancel Cancel Assignment Cancel
Cancel Cancel Assignment Cancel

1 Done 21-Jun-19 FATP Done 21-Jun-19 Endorse

Cancel Assignment Cancel


Cancel Assignment Cancel
Cancel Assignment Cancel
Cancel Assignment Cancel

1 Done 17-Jun-19 FATP Submited 18-Jun-19 Endorse By MOM

Cancel Assignment Cancel


Cancel Assignment Cancel

1 Done 21-Jun-19 FATP Submited 21-Jun-19 Endorse

Cancel Assignment Cancel

1 Done 16-Oct-19 FATP Submited Endorse

1 Done 17-Jun-19 FATP Submited 18-Jun-19 Endorse

1 Done 16-Jan-19 FATP Done with remark, Need


14-May-19
Update NDB (Freq V Endorse
actual 12821/13807
By MOM dan Freq H 12961/13227 )

1 Done 12-Mar-19 FATP Done with remark,  Ned15-May-19


update NDB ( freq actual
Endorse
7170/7331
By MOM), Need clear Alarm & Need rev doc page 8 &
1 Done 11-Jan-19 FATP Done 18-Feb-19 Endorse By MOM

NY RFS
NY RFS NY RFS

Partial Accept (ABD & FATP)


1 Done 20-Aug-19 FATP Done 21-Nov-19

Wais need data from team NEED ON SITE


PMR

1 13-Dec-19 FATP Submited 18-Dec-19 Partial Accept (RLDW)

Endorse By MOM
1 Done 9-Oct-19 FATP Submited

Wais need data from team Partial Accept (FATP)


1 Done

Done FATP Submited Endorse


1 16-Oct-19

FATP Submited Partial Accept (FATP)

1 Done 16-Oct-19

FATP Submited NEED ON SITE


0.5 17-Oct-19

Reject
1 Done 20-Aug-19 FATP Done

Endorse By MOM
1 9-Sep-19 FATP Done 27-Sep-19
Cancel Assignment Cancel

1 Done 10-Dec-19 FATP Submited CPL Submited

NY RFS NY RFS

0.5 Done 30-Oct-19 FATP Submited Reject

Endorse By MOM
1 Done 24-Sep-19 FATP Done 21-Sep-19
NY RFS NY RFS

0 Done 19-Nov-19 FATP Done 19-Nov-19 Reject

0 RAU Faulty
NY RFS NY RFS

NY RFS NY RFS

PMR NEED ON SITE

PMR NEED ON SITE


PMR NEED ON SITE

0.5 Done Submited


NY RFS NY RFS

0 Done 10-Dec-19 FATP Submited Submited

0 Interference

NY RFS NY RFS

PMR Done 3-Dec-19 FATP Submited 2-Dec-19 Submited

PMR Done 3-Dec-19 FATP Submited 2-Dec-19 Submited


NY RFS NY RFS

PMR NY RFS

PMR 3-Dec-19 FATP Submited NEED ON SITE


1 Done 15-Jan-20 FATP Submited Partial Accept (FATP)

1 Done 15-Jan-20 FATP Submited Reject

NY RFS NY RFS

PMR NY NEED ON SITE

PMR NEED ON SITE

0 NY 18-Dec-19 Reject
NY RFS NY RFS
NY RFS NY RFS
NY RFS NY RFS
NY RFS NY RFS
EID ATP Status 15 jan REMARK DOCUMEN REMARK ITC MAIN ISSUE

30ags: rev submited


Endorsed by MOM 22aug: RLDW Rev submited by Wais
need on site
Endorsed by MOM need on site
18sep:
19nov: Tunggu
endorseinfo Isat dari data yang di
by mom 8aug: Migrasi done, team yunus, dokumentasi NE
Endorsed by MOM 10sep: CPLdwi
share pak re-resubmited done minus netgear
05jul: CPL resubmit
9oct: Need Update NDB, Need Rev Doc (Capt 7aug: Pak Sahar minta di migrasi secepatnya
30jul: CPL submited,
Page 1,8,12), Doc Filewait
PDFreview 6aug: LAN cable RTN to MLTN udah di siapin oleh
Endorsed by MOM 17jul:
18sep:rektifikasi grounding amm done, dede
Rev CPL submited Lutfi atas permintaan pak Renaldi dan persetujuan
16jul
8aug::dokumentasi
FE done, grounding
NE done amm perlu
minus netgear pak Sahar, sedangkan site sudah konek antara
perbaikan
18sep:
need onCPL installasinya,
siteReject, needyunus,
onsite dede 9aug:
MLTN outdoorisasi
- Recty - RBSlappariaja odne, lutfi
Endorsed 15jul : netgear
30aug: NE done, FE ny, dokumentasi
Rev Submited 5aug: oudoorisasi lalebata indoor done, lutfi
NE done
Belum complete
Ada SID by Dede
30okt: RLDW aman, info wais
Endorsed by MOM 21sep: CPL Submited
30jul: need on site
Belum Ada
20sep: SIDsubmited
rev cpl
Endorsed by MOM 5aug: CPL submited
18jul : wait review
7jan: endorsed by mom
Endorsed by MOM 17dec: RLDW submited, partial accept (ABD)
13dec: doc atp submited
25nov: endorse belum
31oct: ternyata by mom, dari
take share data pak
data 23okt: data sudh diambil alfonsus tetapi sudah di
Endorsed by MOM Dibud
16okt: take data done, lutfi, netgear done cek wais masih ada kurang, wais info ke alfonsus,
need on
8nov: RLDW
site Submited netgear done, RLDW belum
2dec:
1nov: Endorse by mom
cpl submited 11jul : team yusril, ts rau done, alaram clear after
Endorsed by MOM 25nov: partial Accept (ABD) dari share data ganti rau baru, sdh email ke pak sahar, posisi AMM
pak Dibud harus di perbaiki, bs pindah ke recty sebelah, rsl
21nov: CPL Submited -55 need repointing
8nov:
20dec:netgear
endorseFE done, NE NY, dok ATP FE 10jul: RAU appatana faulty tidak terbaca, need
done,
13dec:NE NY resubmit
RLDW replacement, RAU2 X 11/A01
7aug: dokumentasi
6dec: Partial AcceptFE done, NE-FE minus
RLDW 9jul : team tidak dapat kapal untuk nyebrang
Endorsed netgear
2dec: Partial Accept (ABD) 8jul : link down, need TS on site, info pak sahar
6aug:
28nov:dokumentasi
RLDW submited NE done, FE NY
need
27nov:onCPL
siteSubmited, RLDW ada tapi belum
submit

25nov: issue PMR clear, BALOCCI netgear


Need CPL - Onsite done, lutfi
20nov: wait PMR
5aug: CPL resubmit
Endorsed by MOM 30jul: CPL Submited wait review 5jul: take data done, Dede, Lutfi
23jul: netgear sudah di submit tetapi belum
approved
9oct: Need Update
9jul : NETGEAR NDB,belum
ternyata Capt NE/FE Page 3
di submit
Endorsed by MOM
NA
5jul: take data done, Dede, Lutfi
6dec: endorse
Endorsed 2dec: Partial Accept (ABD)
29nov: RLDW submited
28nov:partial
15jan: CPL submited
accept (RLDW) 14dec: Freq sudah di rubah ke DGPT
Partial Accept (RLDW) 27nov:
7jan: netgear
partial NE-FE
accept done, taufik
(ABD) 30jul: freq tidak masuk DGPT, butuh perbaikan
23dec: RLDW submited
20dec:
29aug: Partial Accept (RLDW & FATP)
Rev submited
Endorsed by MOM 18dec: partial accept (ABD & FATP) 6jul : take data done, alfonsus
9aug: CPL Submited 5jul : need on site
17dec: CPL Submited
10jul : kekurangan LIMBOTO sudah lengkap,
14dec:
alfonsusNetgear
13nov: endorse NE-FE
by MOMdoneemail sapto
Endorsed by MOM 20nov: issue PMR clear
6jul : take data done, alfonsus
hernomo
10nov:
6nov:DOC
5jul netgear FE submited
atp rev
: dokumentasi Need
ulang rev PMR
9oct:Freq
28oct: tidak
RLDW sesuai List DGPT
submited
Need Doc ATP 1okt: Data sudah di ambil Lutfi
18sep: reject to ASP
Endorsed by MOM 9aug: CPL submited minus netgear NE 5jul: no need on site
karena app netgear sedang issue 3 hari, Wais
Need CPL - Onsite sudah
6nov: kordinasiby
Netgear
2dec: Endorse FEdengan
done pak hasan untuk di need on site
mom
submit
25nov: partial accept (ABD) dari share data
Endorsed by MOM 30jul: NE netgear ny
pak Dibud need on site
Tinggal Netgear
20nov: CPL Submited
9oct: Capture
30sep: Interference
data sudah di ambil NE
lutfiNA
Endorsed by MOM 18sep: Reject to ASP 1 ATP SUBMIT
14jul: RLDW FE done, nasrun, NE NY
28aug: Rev submited
Endorsed by MOM 7ags: CPL Submited 5jul : need on site
30jul: doc CPL OG by Wais
Endorsed by MOM 10jul
need :onkekurangan
site LIMBOTO sudah lengkap,
alfonsus
Need CPL - Onsite 5jul : dokumentasi
28nov: bongki sinjaiulang
done dokumentasi lengkaneed on site
Endorsed by MOM 9aug: after ganti rau baru (RAU pakai punya 5jul : need on site
14nov:
site POHE,endorse by mom RAU POHE di kirim
penggantinya
Endorsed by MOM 6aug: info EID retund to asp,kalau
resubmited
dari WH manado) ketahuan AMM 6651
faulty jg, dugaan pak alwin link mungkin
tersambar
15jan: Endorsepetir sehingga error, setelah ganti
amm dari site langge atas arahan dari pak
7jan: reject
alwin
10dec:link normal,
RLDW taufik
submited
8aug: di bongomeme
6dec: CPL konektor bagus,
Submited, mentahan netgearRAU
NE
Endorsed faulty,
sudah di Ada jugatioalaram
kasih FAN failure, req RAU
by wais
sudah di request
5dec: Doc ATP NE done, RLDW NE done,
7aug:
netgear info pak Sahar
belum karenaada alaram
sinyal RCC, team
hp team lutfi
taufik meluncur dari manado untuk TS
ngga dapet
30jul: CPL Submited,
30jul : Need RLDW wait feedback
6jul : take data done, alfonsus
5jul : Need RLDW, Wait ADB, wait CPL
15jan: partial accept (RLDW)
Partial Accept (RLDW) 19jul: FE done by Yusril
need on site
13nov: endorse by mom 12aug: sudah email minta rau 8ghz ke pak ari dan
1nov: RLDW submited pak sahar
Endorsed by MOM 6aug: CPL Submited 9aug: link down lagi, kemungkinan flicker karena
30jul: doc CPL OG rev by Wais interference, solusinya mungkin harus ganti index
Endorsed by MOM 10jul
30jul::wait
kekurangan
inboundLIMBOTO sudah lengkap, RAU ke 8Ghz
alfonsus 29jul: setelah rubah polar link lebih stabil
Endorsed by MOM need: dokumentasi
5jul on site ulang Mbpsnya, kalau di email sudah di persilakan
mengganti link 8Ghz oleh pak Ari, sementara team
6dec: endorse tetap menggunakan 7Ghz 7470 dulu sembari di
02dec: doc ATP submited, Partial Accept monitor > Link stabil di pol H, masukan dari pak
(ABD) alwin tetap di pol H jadi tidak perlu ganti index
Endorsed 28jul: team ts on site, alfonsus, tidak ada alaram
29nov: RLDW Submited
28nov: netgear NE-FE done RCC tetapi link down karena freq 7Ghz sudah full
need on site jadi ada kemungkinan link tidak stabil, setelah
kordinasi team dengan pak Alwin, di sarankan
mengganti index RAU menjadi 8Ghz, tx off scan
8jul
freq :sudah
RFI di email ke pak sahar namun belum ada
Endorsed need on site
Site
hasilNodal Lanud
scan pol H NRFI
Endorsed 27jul: Info Pak Sahar ada alaram RCC
5jul : need on site
16aug: netgear FE belum di submit karena
Endorsed by MOM eror decompres file eror Waiting Permasalahan Tareran Clear
14aug: submited
12aug: data
19nov: endorseNE-FEby sudah di ambil
mom dari data alfonsus
yang di
Endorsed by MOM need on
share paksite
dwi
25sep: CPL submited
Endorsed by MOM need onRejected
22sep: site
3sep:
10jan:Submited
material hilang 1+0, harus ganti
Partial Accept (FATP) sebelum 17 jan 2020, pak dwi Issue Obstacle
9oct: No data , Ip ok / Rsl belum maksimal
(obstackel)
8nov: dok ATP FE done, NE NY
Endorsed by MOM 12ags: data
22sep: donesudah
revisi di ambil,
lagi, sudahalfonsus
di email Migrasi Done
need onreject
21sep: site by EID lagi
20sep:
20dec: Rev CPL submited
endorsed
Endorsed 5aug:
13dec:CPL
RLDW resubmit
resubmited
30jul: CPL submited
6dec: Partial wait feedback
accept RLDW
15jan:
28nov:Endorse by mom
RLDW submited
Endorsed by MOM 30dec:
27nov: RLDW submitedRLDW ada tapi belum
CPL Submited,
20dec:
submit Partial Accept (RLDW)
need onPartial
18dec:
25nov: site accept
endorse (ABD),
by mom, dariCPL submited
share data pak
Endorsed by MOM 16dec: netgear FE done, yunus
Dibud
doc donedone,
21nov: Netgear YunusCPL Submited, RLDW
20nov: PMR di FE
submited
3okt: netgear
20nov: issue PMRada clear
tapi link CAMBA -
LAPPARIAJA,
10nov: netgear need rev PMR
FE Need Revsudah
PMR email ke
6nov: info
Pak Arie tio
EID sudah
> katanya endorse by payment
mo di FU ke Isat
5aug:
25sep: ATP
CPL reject
Submited
Endorsed 1okt: :NE-FE
18jul data done sisa netgear, alfonsus
wait review 5jul : need on site, grounding hilang
24sep:
need onDatasite complete, netgear done, Lutfi
need on site

18sep: Netgear belum


Endorsed by MOM 10aug: CPL resubmited
6aug: CPL Submited
25nov: endorse by mom,
1aug: dokumentasi darialfonsus
lengkap, data share pak
Endorsed by MOM DIbud
30jul: dokumnetasi tinggal untuk doc ATP,
14nov:
alfonsusRLDW submited
13nov: doc
siteATP submited
need onendorse
25nov: by mom, dari share data pak
Endorsed by MOM 10nov: netgear NE reject by vendor, netgear 18jul : site mau di dismantle
Dibud
FE DoneRLDW submited
13nov:
24oct:submited
4nov: take data done, alfonsus
need on
24oct: sitedata done, alfonsus
take
need on site
25nov: partial Accept (RLDW)
Partial Accept (RLDW) 19nov: di ppm ada site ela-ela punya hwi bisa
di contek
need on site

Need CPL - Onsite 7nov: netgear FE, NE NY


need on site

Endorsed by MOM 30jul: dokumentasi done, dede, yunus 30okt: RLDW aman info Wais
Settingan Kunci Cyber Bermasalah
30okt: Netgear dan RLDW aman info Wais 5jul : need on site
Endorsed by MOM 24sep: netgear done, alfon, CPL Submited
wais
18sep:
29aug: NE Revreject,
submitedFE accepted
Endorsed by MOM 5aug:
18jul :CPL
waitresubmit
review
30jul: CPL Submited wait review
19jul: FE done,
9oct: RLS Drop,NE Ny cyber battrenya abis,
obstacle 4okt: link obstacle gedung baru, harus geser ke Obstacle
Need CPL - Onsite Dede
need on site pole baru tetapi butuh coax panjang
Tinggal Netgear 5jul : need ts alaram, need on site, netgear
19nov: endorse by mom, dari data yang di monginsidi done
Endorsed by MOM share pak dwi
10nov: Netgear Done NE-FE
6nov: Doc
27aug: AWEATP submited, RLDW submited
Endorsed by MOM 24oct:RLDW
4aug: take data done, alfonsus
submited 5jul : need on site
need onsite
3aug: doc atp submited minus RLDW
2jul : take
15jan: data done,
Endorse by mom alfonsus 2okt: info apip ada MOM Interference
Endorsed by MOM 5jul : dokumentasi
12dec: netgear NE done ulang 18jul : RAU 8ghz pakai saja ke tana beru -
25nov: partial Accept (FATP) bulukumba > persetujuan pak Dwi, pak Sahar
13nov: doc atp submited, RLDW submited meeting di Kima
Endorsed 8nov: netgear FE done, NE NY 17jul : terbaca 2+0 dengan rau 8ghz, di tanyain pak
Endorsed 9oct: Need Update NDB, Need Clear Alarm sahar kemana rau 7ghz 1pcs? Info wawan rau 7ghz
NE/FE, Need Rev Doc (Capt NE/FE Page ada di basir, Klo berdasarkan NDB Huawei
Endorsed 1,2,3(NA),7,8(NA)), Sesuai Capt di Doc Site Frekuensi existing Panoang 7156 dan Ponre 7317 <
Belum Full config yang interference pakai freq ini saja
Endorsed by MOM need
30jul:on site
wait inbound Interference 3+0 / On 1+0 Dengan 14Mhz
Need Doc ATP 8nov: Take data ATP NE done, alfonsus
10jan: RLDW submited
Partial Accept (RLDW) 7jan: partial accept (RLDW) 26aug: RSL drop, need repointing
16dec: Partial accept (ABD)
Endorsed by MOM 13dec:
need onRLDWsite resubmited
26nov: partial accept (RLDW)
Endorsed by MOM 12ags:
25nov: NE doneAccept
partial minus(ADB)
netgear,
dariFE NY data
share
need on site
pak Dibud
8nov:
14aug:RLDW Submited
submited
Endorsed by MOM 9oct:
12ags:RSL Drop
data -39 di ambil, alfonsus
sudah
18sep:
need onreject
site to ASP
26aug: RSL drop,
2dec: Endorse by need
MOMrepointing
Endorsed by MOM 12aug:
26nov: CPLRLDW Submited
submited 5aug: ketinggian ant tidak sesuai ET, harus rubah ketinggian antenna
10aug:
25nov: grounding sudah diRLDW
doc CPL submited, perbaiki,
adadede
tp
9aug:
belumgrounding
submit outdoor pakai grounding
hitam,
3sep: need
rev rektifikasi
submited
19sep: reject
Endorsed by MOM 30jul:
8aug:
need on OGsite
CPL rev doc by wais
Submited 5jul : need on site
30jul: OG rev Doc by Wais
25nov: partial Accept (RLDW & FATP) 7okt: sudah di email issue comcase ke pak Sahar Comcase
Partial Accept (RLDW & F 9oct: Need Update NDB, Need Clear Alarm 5okt: TAKALALA comcase, PS belum di bayar
NE/FE, Need Rev Doc (Capt NE/FE Page gajinya 3 bulan lebih
18sep: Need onsite,
1,2,3,7,8(NA),12), rejectCapt di Doc Site
Sesuai 3okt:
2okt: RAU mati 1mati
TAKALALA pcs, raunya,
need ts need TS, info apip
Endorsed by MOM 9aug:
BelumCPLFullSubmited
config 9aug:
5aug: outdoorisasi lappariaja
oudoorisasi lalebata done,
indoor lutfi lutfi
done,
18jul : wait review 5aug:
On 2+0oudoorisasi lalebata indoor done, lutfi
9oct: Capture Interference NE/FE NA Power RAU tidak bisa seimbang
Endorsed by MOM 13sep: doc AWE
6aug: Capture
9oct: resubmiited
Interference NE/FE NA
Endorsed by MOM 20aug: AWE
7agu: CPL Submited
30jul:
15aug:wait
ATPISRAccepted
Endorsed by MOM 8aug: CPL Submited 5jul : no need on site
30jul: wait review CPL
5jul
6aug:: Rev
CPLdoc OG by Wais
submited
Endorsed 30jul: OG rev doc by wais
18jul : wait review

15jan: kunci belum ada di isat kima, masih


comcase info dari pak Ahmad Juli, link sempat
Need Doc ATP need on site hidup 1 hari kemudian di matikan oleh pihak BM
RS Wahidin
18jul : comcase NE clear okt 2019
4jul : NE comcase
19sep: revisi CPL submited
Endorsed by MOM 16sep: Drawing tidak jelas, reject > CPL 17jul: need onsite
Submited
30jul: OG rev doc by Wais
7jan: reject
10dec: RLDW submited
6dec: CPL Submited, mentahan netgear NE
sudah di kasih tio by wais
Need CPL - Onsite
5dec: Doc ATP NE done, RLDW NE done,
netgear belum karena sinyal hp team lutfi
ngga dapet
30jul : Need RLDW

28aug: rev submited


Endorsed by MOM 9aug: Resubmited
Belum Ada SID
30okt: RLDW aman info wais
Endorsed by MOM 6aug: Submited Plan Migrasi 14 mei
01aug: kurang foto ketinggian antenna
Need CPL - Onsite need on
25jul: NEsite
sudah di RLDW, sudah audit juga
24jul: FE complete datanya, NE belum RLDW,
12dec:
Dede netgear, ATP, RLDW FE done, NE
Need Doc ATP belum
Belum semua,
Ada SID
need on site
Endorsed
16aug: netgear NE eror pas mau di submit
Endorsed by MOM compress fail Waiting Permasalahan Tareran Clear
12ags : data sudah diambil alfonsus
need on site 9dec: sudah tembus pakai RAU pinjem dari EID
7/31-35, di site ada RAU 7/17 2pcs terpasang di
new sengkang, tinggal cari lawannyan (7/13 2pcs),
butuh juga rau 7/32-36 1pasang
7sep: antenna sidenreng naik, alfonsus, material
banyak yang hilang, coax, mmu, aksesoris tidak ada
Need Doc ATP semua
5sep: antenna new sengkang naik
Issue Tower / CME issue > dismantle dulu lanciran -
sidenreng dan arassie - sidenreng

10jan: Doc ATP & RLDW submited


Partial Accept (RLDW) 10nov: Netgear Done NE-FE
need on site

15jan: Reject
25nov: return to ASP (Doc & RLDW)
10nov: netgear NE done, netgear FE NY
Need CPL - Onsite 22oct: Rev doc format baru submited, need 5jul : need on site
RLDW
18sep: lutfi ngga bisa masuk, nama nya ngga
ada di permit, yang ada Arif, Yulius

25nov: issue PMR clear 1aug: repointing done by lutfi, ternyata baut ant di
Need CPL - Onsite 20nov: still wait PMR mounting kurang kencang sehingga pointing lari,
10nov: netgear wait PMR team tidak bisa stay untuk ambil dokumentasi
need onATP
15aug: siteAccepted karena sdh malam dan permit TBG tidak ada, team
Endorsed by MOM 8aug: CPL Submited masuk seijinonpak
5jul : need siteAjul
30jul: CPL OG by Wais 31jul: pointing drop, need ts on site, info pak sahar
DROP 10jul : kekurangan LIMBOTO sudah lengkap, stickrod
Cancel lepas di n balocci
alfonsus
Endorsed by MOM 9oct: Capt data
2jul : take Interference FE NA
done, alfonsus FE NY dismantle
need on site
5jul : dokumentasi ulang
Endorsed by MOM Cancel
13nov: endorse by mom
Endorsed by MOM 28oct: RLDW submited
23oct: rev format baru submited, need data
Endorsed by MOM NE dari nasrun Cancel
Endorsed by MOM 3okt: netgear done, dede Cancel
02sep: dokumentasi done by Dede
18sep: Reject to ASP 1
14jan: Netgear NE done
Need Doc ATP 9oct: Capture Interference NE/FE NA
18jul : FE dokumentasi ATP done, NE NY

Endorsed Done
Endorsed 27sep: CPL Submited
need on site
Endorsed by MOM Cancel
Endorsed Cancel
Endorsed by MOM Cancel

Endorsed 13nov: endorse, info dari email


15jul : sisa netgear di FE
20dec: endorse by mom
Endorsed by MOM 17dec: RLDW submited
16dec: partial accept (ABD)
Endorsed by MOM 11dec: NE negtear done lama Comcase NE
need
25nov: onendorse
site, CPLbySubmited
mom, dari share data pak
Endorsed by MOM Dibud
21nov: CPL Submited
31oct: NETGEAR tana beru done, Nasrun
Endorsed by MOM 28oct: RLDW submited Cancel
22oct: rev format baru submited, need
Endorsed by MOM 25nov:
RLDW endorse by MOM, dari share data pak Cancel
DIbud
3okt: take data done, taufik
Endorsed by MOM 13nov: RLDWto
18sep: reject Submited
ASP 1
18sep:
Belum AdaCPL Submited
SID
Endorsed need
12agson site sudah diambil alfonsus
: data 23jul: masih 1+0 harusnya 2+0, di complain pak sahar di wa, info wawan sudah
13nov: endorsed by MOM
Endorsed by MOM 7nov: RLDW sumbited 4jul: Interference / Wait RAU clear
1nov: cpl submited
Endorsed by MOM need on site
Endorsed by MOM need on site
Endorsed by MOM 18sep: reject to ASP 1 Maros di hold dismantlenya sama pak Ajul
25nov: ternyata endorse by mom, tadinya
Endorsed by MOM endorse, dari share data pak Dibud
25nov:
24sep: docendorse by mom,
complete, dariCPL
Taufik, share data pak
submited
Dibud
by wais
Endorsed by MOM 10nov:
need onNetgear
site done NE-FE
8nov: RLDW submited
1nov:
19nov:cpl submited
endorse dari data yang di share pak
Endorsed dwi 6aug: harus geser ketinggian antenna dan repointing
10nov: netgear done NE-FE 2okt: Masih Interference pakai 7 14L/H, A34-A38
8nov: info
6nov: RLDW tiosubmited
endorse by payment pol V dan H
Endorsed by MOM 1nov: cpl submited
9oct:
10dec:SN antenna
endorse sama, need xcek 1okt: RAU hilang 1pcs di FE 7 14L 1pcs, kirim rau
6dec: partial accept (ABD) spare di kantor 1pcs
Endorsed 5dec: doc resubmite 5jul : need on site
28nov: Doc Submited, netgear submited,
Endorsed netgear done, yusril
27aug: AWE
Endorsed by MOM 9ags: CPL submited 5jul : need on site
30jul: OG rev by wais
10jul : kekurangan LIMBOTO sudah lengkap, 2okt: masih Interference pakai 7 14L/H, A34-A38 Interference
Need Doc ATP need on site
alfonsus pol V dan H
5jul : dokumentasi ulang 4jul19: sudah ganti RAU 7/A11 dan 7/A34 masih
13nov: endorse by mom interference, team yusril, done email to pak Dibud
Endorsed by MOM 5nov: RLDW Submited 5jul
ATP SUBMIT
17okt: data sudah yusril tapi info wais masih Interference > info pak dibud pake RAU
Endorsed by MOM belum lengkap new_sengkang
Cancel - sidenreng
18sep: reject to ASP 1
Endorsed by MOM Cancel
12ags : data NE kurang netgear, FE kurang 7aug: outdoor tax office done, indor blm bisa
Endorsed by MOM data indoor dan netgear, alfonsus karena kunci di bawa pic isat, alfonsus
need on site 6aug: NIW release, netgear bermasalah, sudah
BelumEndorse
6dec: Ada SIDby mom kordinasi dengan pak hasan tapi belum solve
Endorsed by MOM 25nov: partial Accept (ABD) dari share data karena applikasi dari Isat, NIW done
Pak Dibud 5aug: butuh NIW untuk migrasi, dokumentasi
Partial Accept (FATP) 18nov: doc ATP submited tunggu
Cancel NIW, sudah req NIW ke pak sahar
need on site
Endorsed by MOM Cancel

6dec: Endorse
Endorsed 02dec: Doc ATP submited, Partial Accept 11jul : need onsite
(ABD)
29nov: RLDW Submited
10sep: re-resubmited
Endorsed by MOM 30jul: FE done complete, NE NY
8aug: Resubmited
11jul
Belum: dokumentasi
Ada SID ulang semua
7jan: partial accept (FATP) 5okt: interference clear pakai RAU A31-A35, team
Partial Accept (FATP) 18dec: FATP resubmite, RLDW submited Nasrun
27nov: partial accept (RLDW & FATP) 2okt: coba pakai index RAU2X 7 A31-A35, info apip
25nov: return
10sep: CPL to ASP (RLDW)
resubmited 16jul: rau 11L/H tidak ada stok di eid, mau di coba
Endorsed by MOM 19nov: FATP submited
16aug: netgear sudah di revisi, info pakai rau 7/32 info pak arie eid
18nov: doc ATP
sebelumnya adasubmited
salah di serial number 14jul : interference wait RAU 11L/11H, comfirm
Endorsed by MOM 10nov:
MMU, taufik done NE-FE
netgear arie ivando wag, sudah email ke pak sahar, team
Cancel
need on site
9augL CPL Submited yusril
30jul: CPL Submited, wait review
5jul : take data done, alfonsus
5jul : Need RLDW, Wait ADB, wait CPL, revisi
doc OG by Wais
Endorsed by MOM Cancel

14nov: endorse by mom 12sep: migrasi done, Nasrun


Endorsed by MOM 24okt: FATP belum, data di nasrun 16aug: setelah ganti 32 dan 34 dengan 43 dan 41
23oct: revisi doc submited, RLDW submited, link normal, lagi tunggu capture tx off dari lutfi dan
BOQ
16dec: page 4 andNE
netgear Cover SIDyunus
done, Foto 23 submited capure2an setelah link normal untuk di email ke
Need CPL - Onsite 9okt:
25nov:
need onATP Submited
endorse
site by MOM, dari share data pak pak dibud
need
Dibudon site 6aug: info pak ari dan di fu oleh pak dibud nanti
12nov: RLDW submited akan di RAU
28aug: kasihsudah
rau 6363 8Ghzlink
di ganti, 2 pasang,
normalsudah di
Endorsed by MOM email RAU pengganti sudah di ambil Yusril
27aug:
4nov: submited
27sep:
need onCPL siteSubmited 30jul: NMS
26aug: RAUclear, Interference
pengganti sudah ada NY,digembok
WH kima, PENEKI
info
30jul:
BelumFE
10dec: done,
Ada SID NE
Endorse by ny
MOM di ganti
pak Sahar karena macet, sdh kordinasi dengan pic
Endorsed area, nasrun
17jul: ATP
9dec: accepted done dilengkapi by yunus 24jul:
Dokumentasi AMM sudah di perbaiki installasi terminasi
dari punchlist
12nov: 20jul: kabel lan, rj45 dan spf sudah sama nasrun
netgear done, RLDW done submited coaxnya
24jul::RAU
19jul
21jul: AMM sudahsundul
issueFaulty
NMS di perbaiki
7/34L kembaliinstallasi
BATANGMATA, di email,terminasi
minta
sudah
Endorsed by MOM 10nov: netgear NE done, FE netgear NY coaxnya
8nov: take data ATP NE done, alfonsus kabel ethernet + SFP
email
16jul:
6jul:
24jul:
16jul: AMM sudah
AMM BATANGMATA
interference, NMS
mesti didi perbaiki
perbaikimesti
isseu, di perbaiki
pointing
installasi
installasi sudah
terminasi
Need CPL - Onsite 23aug: CPL Submited info wais
15jan: Reject 9aug: outdoorisasi
installasi terminasi lappariaja done, lutfiterminasi
20sep:
30jul: OGrevrev
CPLdoc
submited
by wais dapat, team
coax
coaxnya nasruncoax
10aug: CPL resubmit 12jul ::AMM
12jul
16jul: BATANGMATA
BATANGMATA grounding
mesti di perbaiki
grounding nya hilang,
installasi
nya hilang, team
terminasi
team
Endorsed by MOM 12aug: CPL Submited yusril
coax
yusril
30jul : OG rev doc by wais 12jul : BATANGMATA grounding nya hilang, team
7jan: partial accept (FATP) 10dec:
yusril tau2 udah 4+0, mungkin NW yang sekalian
Partial Accept (FATP) 17dec: RLDW submited, partial accep (ABD & eksekusi, alfonsus yang kesana, existing rau v1
FATP) layer down WAN nya
16dec: Return
24sep: rev to ASP (RLDW)
resubmited 20jul: RAU 6363 12L/H tx off bagus, saat ini rau
Endorsed by MOM 14dec:
28aug:revdocsubmited
submited 5jul : need on site
menggunakan rau peruntukan wirae - siwa, team
10dec: OG dokumentasi alfonsus
9aug: resubmited lutfi, rsl link existing drop -43/-42, sudah email ke
need on
on site
5jul : need
need RLDW, Belum Ada SID
site pak sahar tgl 21jul19
Need Doc ATP 5jul : need
16jul: ts alaram,
rau sudah sama need on lutfi
nasrun, site bantu di
Belum Ada SID
rappang, nasrung di sidenreng, amm 20p
13nov: endorse by mom 9oct: Need ts
sidendreng RAUga1 bisa
issue FE Nodi contact
login, lagi cari solusi,
Endorsed by MOM 1nov: RLDW submited 9aug:
nasrunoutdoorisasi lappariaja done, lutfi
need on site Power
15jul: rauRAU tidak
dari bisadiseimbang
yusril bawa lutfi untuk di serahkan
need onsite ke nasrun
Endorsed 6jul: OG MOS, Mos done withour RAU (tunggu rau
Belum Ada SID
19nov: endorse by MOM dari yusril)
Endorsed by MOM 30jul:
9nov: wait inbound
Doc ATP submited, RLDW submited 4jul : interference material ny semua
9oct: Need Rev Doc, Need Clear Alarm, Capt
Endorsed by MOM NE/FE Page : 7,8,9,10,11,12,16 NA & need 5jul : need ts rau no contact, need on site
Rev Capture, IP NE/FE : Lemot
Endorsed by MOM need
30jul:on site
wait inbound
Belum Ada SID
Endorsed
10jan: reroute to TAKALAR
4sep: issue link di hold sudah di email ke pak
Sahar, material di basir
Need Doc ATP need on site
3sep: space antenna full, setelah kordinasi dengan Hold
pak Sahar akhirnya antenna di install di ketinggian
28, space indoor full sehingga amm 6692 tidak bsa
Endorsed by MOM terpasang,
Cancel mau coba geser existing / di rapat2in
sesuai arahan pak Dwi taunya dapat info dari pak
Endorsed by MOM Cancel
Ahmad Juli Isat untuk hold pekerjaan karena
seharusnya link PATANI_PL -
Need CPL - Onsite GALESONG_SELATAN_AG itu PATANI_PL - FE Comcase
TAKALAR (sesuai existing)
7jan: endorsed 02sep: akan di install oleh Basir
Endorsed 23dec: RLDW Submited 30aug: MOS done complete by Yunus
20dec: partial accept (RLDW) 28aug: akses aman asal ijin masuk sama pak Dusun
Partial Accept (RLDW) 18dec: CPL submited rumah
Cancel sebrang tower, pak Taufik
13dec:
13nov: netgear
Endorse FE
bydone
MOM 15aug:
24jul: AMMinfo pak Fahri
sudah 082251999967
di perbaiki akses
installasi aman,
terminasi
Endorsed by MOM 9dec:
1nov: Doc
RLDWATP, Netgear, RLDW done semua terakhir
submited coaxnya isat tanggal 2 ags bisa akses, padlock '0214
di NE submited minus RLDW
14oct: 25jul:
16jul: masih comcase,
AMM mesti laporaninstallasi
di perbaiki yunus, ada sekitar 7
terminasi
need
18sep:on
6dec: site by mom
Endorse
Submited kk dan penjaga site belum dapet kompensasi dari
coax
Endorsed by MOM 02dec:
need onDoc
siteATP submited, Partial accept protel, protel pernah ngasih
12jul : BATANGMATA 500rb
grounding nyatphilang,
ngga semua
team
(ABD)
Belum Ada SID dapet,
yusril penjaga site curiga ada permainan antara
20dec:
29nov: endorse by mom
RLDW Submited kepala desa dengan protel, "kalau maksa kerja
Endorsed by MOM 12dec:
28nov: netgear
Netgear FE done
done jangan salahkan kami jika kami bawa parang"
20nov: issue PMR FE clear
clear begitu kata warga. warga nga mau ribed bikin BA,
Endorsed by MOM 14nov:
10nov: doc ATP FE
netgear & RLDW submited
wait PMR sudah
Canceldi info ke pak Sahar via WA
10nov:
need onnetgear
site FE wait PMR 23jul: info adit, material kembali ke gudang karena
Endorsed by MOM need on site Cancel
comcase
Belum Ada SID 19jul : info adit, team basir pernah kunjungi lagi
Need CPL - Onsite 15jan: RLDW need rev kira
Planbulan
MOS, juniCAFtetap tidak bisabelum
Desa_Cakura akses,ada
warga tidak
need on site mau buat BA karena sudah keseringan, team
merasa terancam oleh warga, karena warga
Partial Accept (FATP) Cancel
banyak yang tersambar petir rumahnya sehingga
Endorsed by MOM Cancel
tv nya rusak dan warga minta ganti ke protel,
belum ada titik
19jul : sudah terang
email dariAri,
ke pak protel
pakke warga,
Sahar mengenai Interference
Need Doc ATP 9oct: Need Update NDB, Need Clear Alarm ( Frkomfirmasi ke eid
ganti polarisai, baru
tetapi via telp,
karena raubelum pernah
8ghz tidak bisadidi
email
rubah2 polarnya info wawan, wait respond eid
18jul
18jul :: Comcase
email scanNE clear
freqnya
20nov: Still wait PMR Comcase NEharusnya 3+0, 1 RAU inteference
Need Doc ATP 10nov: netgear wait PMR Masih 2+0,
need on site
Need on site
15jan: partial accept (RLDW)
18dec: partial accept (ABD)
17dec: netgear FE done
Partial Accept (RLDW) 25nov: return to asp (doc & RLDW)
22oct: rev format baru submited, need
RLDW
18sep: Reject to ASP 1
Belum Ada SID

Endorsed by MOM Cancel


3dec: endorse by mom
Endorsed by MOM 29nov: CPL Submited, RLDW submited by
japri 18juni, info wais
Endorsed 28nov:
need onnetgear
site NE-FE done
26aug: dok sudah di gabung sesuai
10okt: netgear
permintaan pakmalawa
Hasan, belum
by wais
Need Doc ATP need 9aug :outdoorisasi lappariaja done, lutfi
Belumon siteSID
Ada
Endorsed by MOM
13nov: endorse by MOM
Endorsed by MOM 6nov: rev doc submited
28oct: RLDW done submited
24okt: netgear
13dec: netgear FE need approval,
Manddenra done NE done 1dec: Need ganti RAU > need scan RAU 8Ghz
Need Doc ATP 22oct:Frek
9oct: rev tdk
format baru
sesuai Listsubmited, need
DGPT, Interference 29jul: baru dapat info,link menggunakan rau 8ghz
RLDW
cek NA punya tsel, padahal di ET 7ghz, ternyata rau 7/34H
2oct: on
need takesite
data done, Dede faulty dan sudah di email oleh wawan, info wawan
Need Doc ATP 18sep: reject to ASP 1 Cancel
rau penggantinya sudah ada, sedang di track adit
23jul: netgear, RLDW, data done, Dede dimana kah rau penggantinya dan rau yang faulty
Belumendorsed
7jan: Ada SID by mom ada dimana
Endorsed by MOM 23dec: RLDW submited
20dec: partial accept (RLDW)
25nov: endorse
18dec: partial by MoM,
accept (ABD) dari share data pak
Endorsed by MOM Dibud
16dec: netgear FE done
13nov:
21nov: RLDW submited
LABAKKANG comcase, done email ke
4nov:
7jan: submited
endorsed
pak sahar > infoby mom
isat comcase clear 16nov 6sep: done dismantle, alfonsus
Endorsed by MOM Belum
16nov: Ada
17dec: SIDaccept
partial
SEGERI (ABD), RLDW
dokumentasi submited
ATP, Netgear, 28jul: 3G masih lewat RTN, lutfi, mesiti pindah dulu
14dec: doc submited
RLDW done ke TN by HWI, sudah email ke pak sahar 29 jul
Belumon
need Ada
siteSID Need Swap to 6692
Need Doc ATP Belum Ada SID 5aug: oudoorisasi lalebata indoor done, lutfi Takalala comcase

25nov: endorse by mom, dari share data pak


Endorsed by MOM Dibud
19nov: netgear semaya done,yunus
Endorsed by MOM 15nov: doc ATP submited, RLDW ada tapi Cancel
belum di submit,
2dec: Endorse by netgear
mom sisa di semaya
Endorsed by MOM 25nov: need ABD
19nov: submited
8nov: Netgear
20dec: endorseFE done, NE belum
Endorsed 7aug: dokumentasi
16dec: partial acceptFE(ABD)
done, NE-FE minus
netgearCPL submited, RLDW Submited
11dec:
need on
10dec:
6dec: site accept
netgear
partial FE done
RLDW
Belum
6dec: Ada
25nov:netgera SIDNE
Partial done,
Accept RLDW
(ABD) NEshare
dari done,data
doc
Partial Accept (RLDW) ATP NE done, sisa FE netgear, RLDW FE, Doc
pak Dibud
ATP
needFEon site
need on site
Endorsed by MOM Cancel
Endorsed by MOM Cancel
Partial Accept (FATP) Cancel
7jan: endorsed
Endorsed 23dec: RLDW submited 5jul : need on site
20dec: Partial accept (RLDW)
9dec: Endorse
2dec: partial accept
by MOM(ABD)
Endorsed by MOM 27sep: CPL
27nov: submited
partial Accept (ABD)
need onCPL
26nov: siteSubmited, RLDW submited
9oct:
19sep:Need Clear Alarm NE/FE, Need Rev Doc 4oct: TAKALALA Comcase, PS belum di gaji, Taufik Comcase, Interference
doc reject
Need CPL - Onsite (Capt
need onNE/FE
site Page 1,2,3,7,8), Sesuai Capt di 2okt: untuk yang mbps drop solusi dari apip
Doc Site Belum Full config matikan rtn exisitng lalu pakai rau 14L/H
25nov:
3aug: docPartial accept (FATP)
atp submited 30sep: ada issue mbps drop, need cek ke NE
Partial Accept (FATP) 9oct: Freq Aktual H:7568/7735 (tidak sesuai 5jul4jul :: need on site, 1+0
Interference perlu perbaikan freq
clear
list DGPT), Capt NE/FE Page 16 NA, aktual
9oct: update
Link Radio freq
Link NAactual
(checkV2=(RX=8426)
IP) 18sep: interference clear ganti ke 8Ghz
Endorsed by MOM 24sep: CPL submited
15jan: EndorseSubmited
by momwais 22jul : sudah email mau pakai 7/32 atau 7/14 ke
23sep: Netgear
8aug: resubmited
25nov: done,(FATP)
partial accept taufik pak dwi, wait respon
20sep: NE sudah,
10jul : kekurangan
20nov: FATP taufik
LIMBOTO sudah lengkap, RFS
rev submited 9nov:2+0,H-Lharusnya
ada 1 yang4+0, 2 RAU nasrun
terbalik, interference > kirim
Endorsed by MOM 19sep:
alfonsusFE datanya di wais, NE belum ada scan
9oct:freqnya
Freq tidak sesuai List DGPT yg H=14Mhz
14nov: RLDW submited
need onDoc
siteATP submited
5jul : dokumentasi
13nov: ulang, Belum Ada SID 19jul : info wais freq tidak sesuai denga DGPT,
Need Doc ATP need
Belumon siteSID
Ada need on site
14nov: endorse 18jul : RFS 1+0, need scan freq di kirim via email
Endorsed 1nov: RLDW submited 6jul: interference clear
8nov: RLDW Submited
Endorsed by MOM
need on site
7jan: belum SD, materialnya tidak ada 22sep: Migrasi done, nasrun, need repointing RSL Drop
Need Doc ATP 13dec: netgear submited NE-FE 23sep: Rau sisa 1pasang 7ghz di ambil Nexwave,
10nov: netgear reject by vendor NE-FE pak taufik, kordinasi dengan pak cahya AMS
7nov: info
13nov: nasrun
endorse bysudah
MOMfull config 4+0 tetapi 19sep: tukeran done, interference clear, rau 7ghz
Endorsed by MOM RLS drop submited
1nov:RLDW 5jul
di : need
bawa ke on site 1pasang, nasrun
kantor
9oct: Capture
25sep: Interference NE/FE NA ,
CPL Submited 18sep: tukeran tau 8 ghz dengan 7ghz punya AMS
30jul:
18sep: wait
Document inbound
Not
reject toComplete,
ASP 2 Aktual 3+0, RSL : 5jul
18jul: sudah
: issue di submit kediEID
perkutana sidenreng, dismantle aja
Endorsed by MOM 12jul: ATP
CPLAccepted
Drop, Need
12aug: Clear Alarm,
Submited 4jul19 : data sudah di ambil ulang alfonsus, og cek
existingnya
5jul
need: wait
30jul:on review
OGsite
rev doc ISAT
by wais by
RFSwais
3+0

Endorsed by MOM 9oct: Capture Interference NE/FE NA


12aug: Doc sudah di ambil Alfonsus
20dec: endorse by mom 18okt: interferece clear, rls mentok, dokumentasi RSL Drop
Endorsed by MOM 16dec: partial accept (ABD) done nasrun
13dec: RLDW resubmited 16okt: 7 14 interference -59, nasrun
13nov: endorse
6dec: Partial by mom
accept RLDW 2okt: Mo di coba pakai 14LH, hasil pembahasan
Endorsed 1nov:
28nov:RLDW
RLDWsubmited
submited dengan pak apip
need
27nov:ondoc
siteATP submited, RLDW wait dari 27sep: aktif 2+0 dari 3+0 krna klo di colok info lutfi
25nov:
Nasrun,endorse by mom,
FATP sesuai dari share
pembicaraa data pak
dengan pak
24jul:
link jadiAMM sudah di perbaiki installasi terminasi
putus
Endorsed by MOM Dibud
Dibud nanti di bantu oleh EID coaxnya
24sep: Npu faulty, AMM faulty, clear by yusril
14nov: doc ATP
9oct: Capture & RLDW submited
Interference NE/FE NA 16jul:
24jul: AMM
alarammesti
cleardi perbaiki
setelah installasi
ganti konektorterminasi
di bungi,
2dec:
need Partial
need on
on site accept (ABD)
site coax
lutfi, ts report sudah di email ke pak sahar
Endorsed by MOM 29nov: RLDW submited 12jul
23jul: konektor korosi, link down perlu gantiteam
: BATANGMATA grounding nya hilang,
28nov: CPL Submited yusril
konektor di sisi Bungi, Lutfi
20nov:
need onissue
site PMR clear 22jul: info pak sahar miu masih pegang rau 14L/H,
Need Doc ATP 10nov: netgear
Belum Ada SID FE wait PMR info wawan rau sudah terpakai unutuk ini,
need on site aktuannya masih gelap, nasrun og to site
Endorsed by MOM Cancel
19jul: scan freq sudah di kirim by email ke pak
9oct: Capture Interference NE/FE NA sahar, 34 interference
Endorsed 23aug: info wais sudah di submit wait review Waiting Recty
18jul : kirim scan freqnya, karena masih temporary
pak Johan rfs
Endorsed Done
30jul: wait ISR
Endorsed by MOM Cancel
22oct: rev format baru submited, need
RLDW
9oct: Need Update NDB (Freq Aktual
Need CPL - Onsite V=15075/14585, )
19apr: netgear ne-fe done

Endorsed by MOM 30jul: wait inbound


10dec: endorse by mom
Endorsed by MOM 6dec: partial accept (ABD)
3dec: Netgear done, CPL submited, RLDW
submited
2dec: Endorse by mom
Endorsed by MOM return to
25nov: partial ASP (Doc
accepted & RLDW)
(abd) dari share data
24okt:
pak RLDW belum, perlu dokumentasi
Dibud
ulang karena
22nov:
25nov: tidak
CPL submited,
partial menggunakan
accept (FATP) open
RLDW submited 24jul: AMM sudah di perbaiki installasi terminasi
Partial Accept (FATP) kamera,
12nov:
need netgear
onnetgear
site done belumne-fe, RLDW & doc ATP coaxnya
22oct: rev format baru submited, need
submited 16jul: AMM BATANGMATA mesti di perbaiki
19nov:
RLDW take
8nov: endorse by mom
data ATP dari data
FE done, yang di
alfonsus installasi terminasi coax
Endorsed by MOM share
Belumpak Adadwi
SID 12jul : BATANGMATA grounding nya hilang, team
10nov: netgear NE description information yusril
26aug:
blank Accepted
Endorsed by MOM 30jul:
9nov: CPL
Doc Submited,
ATP submited,wait RLDW
reviewSubmited 5jul : need on site
5jul
need: take data done, alfonsus
on site
5jul
13nov:
: dokumentasi
Endorse
Belum Ada SID by ulang
MOM 16jul: AMM mesti di perbaiki installasi terminasi
Endorsed by MOM 1nov: RLDW submited coax
14oct: submited minus RLDW 12jul : BATANGMATA grounding nya hilang, team
Endorsed need
22aug:onRLDW
site rev submited by wais yusril
Done, RFS Partial
14nov: endorse by mom RFS 2+0
Endorsed by MOM 1nov: RLDW submited
17okt: format baru sudah di submit, RLDW
belum ada
25nov: data by mom, dari share data pak
endorse
Endorsed by MOM 18sep:
Dibud Reject to ASP 1 18sep: migrasi done, alfonsus, taufik
18jul
13nov: doc review
: wait CPL ATP submited
8aug: Endorse
2dec: Reject, Netgear
by mom
Endorsed by MOM 1aug: wait
25nov: review
partial isat(ABD) dari share data
accept
Belum
pak Ada SID
dibud
need on site 27jul: ant NE done dismantle, lutfi Interference
15jan: ATP Accept 26jul: antenna FE done dismantle, lutfi
7jan: reject RFS 2+0
ATP ACCEPT 16dec: RLDW submited
14dec: doc submited
need on site

2dec: Endorse by mom 3sep: done TS clear ganti kabel LAN, Yunus
Endorsed by MOM 25nov: partial accept (ABD) dari share data 2sep: Link congest karena masih pakai LAN cat5, di
EID minta rubah ke cat6 oleh pak Sahar
15nov: doc ATP submited, RLDW ada tapi
belum di submit
10nov: netgear done NE-FE
need on site
Belum Ada SID
6nov: info tio endorse by Payment
Endorsed by MOM 1nov: RLDW submited
17oct: submited, RLDW done, Netgear done
6dec19: Endorse
18sep: Reject to ASP 1
Endorsed 2dec:
BelumPartial
Ada SIDaccept (ABD)
29nov: RLDW submited
19nov:
28nov: endorse by mom dari data yang di
CPL Submited
Endorsed by MOM share
27nov:pak dwi NE-FE done, Dede
netgear 5aug: oudoorisasi lalebata indoor done, lutfi
1nov:
need onRLDW
site submited
18sep:
18dec: reject
endorse to by
ASPmom1 17sep: Migrasi gagal karena tidak bisa akses
Endorsed by MOM 3aug:
17dec:doc atp submited
netgear done, info minus
tio RLDW malam, alfonsus
18jul
20nov:: wait review
netgear palekko done 16sep: migrasi gagal, team kemaleman sampe site
23okt: netgear
28nov: belum ada di list
RLDW submited dan mbps
20okt: ada yang
ternyata pincang
installasi ada yg pakai waveguide RSL Drop
Need CPL - Onsite 22oct: rev
27nov: docformat
submited,baruRLDW
submited,
masihRLDWsama Planada
dan Migrasi 15 MEI ke ant jadi power harus beda,
yg langsung
submited,
Nasrun, BOQ page
netgear wait 4PMR
and Cover SID Foto 23 di ET waveguide 29, langsung 23, need repointing,
25nov:
submited
23okt: endorse
data sudah bydimom,
ambildari sharenetgear
nasrun, data pak nasrun
Endorsed by MOM Dibud
24sep: ada
belum PMRdibelum
list ada rev ET sehingga 16okt: Interference clear pakai 34L/H dapet -92 -
12nov:
belumEID
9oct: CPL
bisa submited
netgear
Produce /Interference Cek N/A / -87, nasrun, RSL drop curiganya plastic modular
6dec:
BelumEndorse
8nov:
RAU2 SIDby momnetgear done, lutfi
BONTOMATENE
AdaDrop
RSL rau blm di copot karena v1 dapat 31-32 sedangkan
Endorsed by MOM 2dec:
7nov: Partial Acceptnetgear
RUMBIA_TB (ABD) done, lutfi v2 dan h2 jelek, og ts
27nov: RLDWformat
24okt: rubah submited baru, data RLDW belum 26jul: info yunus link sudah selesai di kerjakan
26nov:
25nov: CPL submited,
ada, netgear belum
endorse by MOM, RLDW
diambil dariada tp belum
share data pak 25jul:dokumentasi
6jul: info wawan yunus yang masih
done, data lanjut di
kordinasi,
wais
Endorsed by MOM submit
19Jul : wait review
DIbud apakah
5jul sudah
: RFS, rfs atau
di pasang di belum..
ketinggian Dari54,
penampakan
team basir di
25nov: ATP
19nov: return to ASP (Netgear
accepted dari data & doc)di share
yang site masih
4jul19: belum
ponre done 3+0
install
22nov:
7jan:
pak netgearby
endosed
dwi NEmomdone, alfon 30sep:
Waitinggrounding
Permit sudah di pasang, dokumentasi
Endorsed by MOM 24okt:RLDW
23dec:
5nov: rubah format
RLDWSubmited
submited baru, data RLDW belum done
ada, netgear
18dec:
19jul partial
: data FEaccept
done, sudh, netgear
belum diNE
tapi(RLDW) belum
buat 24sep: grounding di wirae hilang..
diambil
11dec:
7jan: CPL wirae
endorsed bysubmited
mom 21aug: sudah bisa
full config, lutfi cma rsl drop need
19Jul : wait review 11jul : power naik 2dbm
Endorsed by MOM 10dec:
18dec: netgear
partial NE done
accept submit
(ABD) repointing
7jul : need repointing, RSL drop torau -397gb yg
24okt: Wirae
17dec: RLDW reject,
submitedSiwa approved, RLDW 6aug: plan jumat 9aug19 tukeran
ada data
12dec:
25nov: tapi belum
Partial
endorse Accept di(RLDW)
by mom, kerja,
dariNetgear NE pak
share data interference
3sep: sama
info dari raukabel
Yunus 8ghzlan
punya NWdi ganti MS
sudah
Endorsed by MOM reject, FE
11dec:
dibud CPLapproved
Peneki submited 30jul: info lutfi sama aja udah di ganti rau sesuai
setempat
9okt: ATP
10dec:
19nov: ATPsubmited,
netgear donewait
Accepted, darireview
NE-FE data yang di share perintah
2sep: linkpak Ari karena masih pakai cat5, di
congest
Need Doc ATP 24sep:
24okt:
pak grounding
dwiRLDW belum wirae
tapihilang,
datanya belum
ada, 12jul
Cancel: info
minta gantinasrun
ke cat6Apabila linkSahar
oleh pak siwa klw di kasih
dokumentasi
netgear
1nov: belum
RLDW di ambil
Submited transmiter
24jul: on done
Migrasi untukbyngelink
Arif ke wirae,Tn jadi
Endorsed by MOM 16okt:Documen
9oct: FATP submited, tunggu 4+0
Not Complete hasil review Cancel
henk,klw
19jul: di putuskan
migrasi transmiter
gagal karena butuhon tn nya
kabel lan lancar
2x10m,
Endorsed by MOM 9okt: ATP
26jul: ATP Submited
submited, RLDW belum, netgear kembali,kemungkinan
Cancel
4pcs rj45, yusril ada ip yg kena loop ping,
done issue interference sudah email ke pak dibud
Endorsed by MOM Cancel
2 RAU interference, need freq scan
19jul : data done, tapi belum di buat
25nov: endorse by MoM, dari share data pak
Endorsed by MOM Dibud
1nov: RLDW submited
Endorsed by MOM 19jul : data done, tapi belum di buat Cancel
Partial Accept (FATP) Cancel
Endorsed Cancel
Partial Accept (FATP) Cancel
Need Doc ATP Cancel
Endorsed
Endorsed
2dec: Endorse
Endorsed 25nov: partial Accept (ABD) dari share data
pak Dibud
Endorsed by MOM 22oct: rev format baru submited, need Cancel
Endorsed by MOM RLDW Cancel
19Jul : wait review
Endorsed by MOM Cancel
Endorsed by MOM Cancel
10dec: endorse by MOM
Endorsed by MOM 2dec: Partial Accept (ABD)
27nov: RLDW submited
Endorsed by MOM 26nov: CPL submited, RLDW ada tapi belum Cancel
submit
Need Doc ATP 25nov: return to asp (doc & RLDW) Cancel
22nov:
25nov: netgear
endorse,taroang tb done,
dari share alfonsus
data pak dibud
22oct: rev format
8nov: RLDW baru submited, need
Submited
ENDORSED RLDW, data atp ada
3sep: submited, doc kurangnya,
versi baru netgear sisa
taroang tb review
19Jul : wait
19Jul : wait review
Partial Accept (RLDW) Cancel
12nov: RLDW & doc atp submited
ENDORSED 25nov: endorse, dari share data pak Dibud 8nov: NETGEAR NE done
16aug: pointing done, NMS tembus, cma kalau
angin besar bergeser jadi -50, interference RAU
19nov: endorse dari data yang di share pak 8Ghz, harus scan freq di pol H, Yunus, Yusril
Endorsed dwi
1nov: RLDW submited
9oct:
3sep: Capture
submitedInterference NE/FE NA
Endorsed by MOM 12aug: review sidah di ambil alfonsus On 1+0 / Waiting RAU Replacement
dokumentasi
19Jul : wait
need on site
14nov: endorse by mom 12sep: migrasi done, alfonsus
Endorsed by MOM 22oct: rev format baru submited, RLDW Plan Migrasi 12 Mei
done submited, BOQ page 4 and Cover SID
Foto 23 submited
18sep: reject to ASP 1
Belum Ada SID
3sep: rev submited 5jul : sudah submit ke EID
Endorsed by MOM 5aug: CPL resubmit 4jul: OG dokumentasi team alfonsus
5jul : Waiting review CPL
8jan: rau 7ghz interference, sdh di scan, yusril
7sep: material hilang, mmu, coax, aksesoris hilang
Need Doc ATP semua, alfonsus
27nov: partial Accept (ABD & FATP) 18jul: new
24okt: datasengkang
ada cumaexiting ngga taudi dismantle
eror apa ngga, saja dulu
lg di
21nov: doc ATP submited, RLDW submited cek agarwais
yg baru bisa di pasang
#N/A 2aug: revisi ET sedang di minta oleh pak Hasan ke
6jul: kalau
isat, CME issue perkuatan
beruntung > RAU siang
bisa keluar di ambilini untuk
20nov: still wait PMR 13sep:
1aug: RFS,
taneRio
coba diperapihan berudone,
- bulukumba,
NMS tunggu rappang - atasnya,
link di
10nov: netgear wait PMR 10sep:
sidenreng
pelabuhanstartbirainstall
- puncak bira by NW, netgear
Need Doc ATP Nee on site 28aug:
belum ada outbond
karena done,
info Adit
pak hasan ada revisi ET
15jan: Partial accept (RLDW) 30jul: OG
18dec: pointing
migrasi done,baru dapet -43/-42 > pointing
yunus
19dec: Partial Accept (RLDW & FATP) done 33-32
12dec: repointing done dapat 32-33, yusril, yunus
Partial Accept (RLDW) 18dec: Submited 29jul: ternyata
11sep: ada perbedaan
pulau baranglompo sudahketinggian
di ganti ant7ghz
17dec:
13dec: endorse by mom
FATP submited antaraRFS,
7sep:
bagus EToff
tx dengan
perubahan CAF,freq
nya, taufik setelah kordinasi dengan
16dec:
10dec: ATP accept
netgear NE submit pak AriSIK
5sep:
10sep: ivando
di rev akhirnya
GTCdengan
rau sudah namapakai ET,
dansudah
Taufik
ganti sudah
di scan email
ada ke
dengan
Endorsed by MOM 13dec: CPL Submited Ari Ivando
4sep:
7Ghz FE start install,
hasilnya bagus -89 NE belum
-94, sisa bisa
scaninstall karena
di pulau
8nov: RLDW Submited 2dec:
7sep: Endorsed
28jul: RFS,
taufikyusril,
team
baranglompo
nama tidaktinggal
sampe adasore didilisence,
NE, start
permit lisence
rakit2done
ant,
25nov: partial
7nov: Doc ATPAccept
submited(FATP) 25nov:
6sep:
28aug:
4sep: perneed
sudah
yusril di bantu
outbond
WAG ABD
ganti
FSO RAU,
done,
denganAcheng aman
Adit
pak Rahman, rau yang
Partial Accept (FATP) 14nov: doc ATP & RLDW submited
7sep: data sudah di ambil oleh taufik & 22nov:
5sep:
27jul: RAURLDW
puncak
interference &
di akan doc
kirim
bira di ATP
kegunakan
install submited
selayar
done,by
untukyunus
2dec:
nasrunEndorsed 9sep:
26jul: RFS,
4sep: per
BANDARA_SELAYARRamli
startWAG dengan
install, yusril, pak
rsaRahman
- BATANGMATAdone, kurang RAU yg garis
25nov: need ABD 4sep: MOS
interference
polisi, p3k,
31aug: rubah done,
akan
banner, by Ramli
polardirakit
kegunakan
H tetap diinterference
antenna done rau
Endorsed 22nov: RLDW & doc ATP submited 28aug:
8/41LH, outbond
PULAU_BARANGLOMPO
25jul: siksudah
sudahemaildone,
di reminderAdit
ke pak- GTC_TG_BUNGA
di email
Ari, untuk kerubah
pak sahar
index
9sep: RFS, Ramli 2sep:
& pak Email
harus dwi issue
tukar gulinginterference
rau, rau pulau done ke EID
baranglompo
4sep: MOS done, by Ramli 1sep:
24jul: Interference,
sudah team
di ambildanyunus,
mover Yusril saranin
brangkat
gtc tg bunga pakai
karena
belum RAU
didi 8Ghz
minta
ambil
28aug:Partial
2dec: outbond done,
Accept Adit
(FATP) 31aug:
pak dibud,
16aug: Install
sik FE
Pointing donerelease,
belum
done, tapi linkteam
flickerstandby
karenadi area
25nov: need ABD 30aug:
25nov:
antenna Install
23jul: target
need
single NE
ABD done,
minggu
polar ini,existing
sedangkan v2
og req sik,2 raudrop
belum mbps
8 Ghz ada nya
jadi
22nov: RLDW & doc ATP submited namun
22nov: sudahperintah
assignment,
RLDW
kemungkinan 3+0
& doc ATP
interference via submited
WAlokal, team kordinasi
9sep: RFS, Rio 29aug:
9sep:
dengan MOS
RFS,pakRio donedan
Apip malam by Yusril
di suruh req rau 7Ghz 1pcs
4sep: MOS done, by Ramli 28aug:
4sep:
sebagaiMOSoutbond
done,done,
pengganti byRAU Adit
Ramli8 41/LH, email sudah di
Partial Accept (FATP) 28aug: outbond done, Adit 28aug:
kirim keoutbond
pak Ari done, Adit
12sep: info dari pak apip tidak perlu pindahkan
coax di mmu3a ke mmu4a, NIW cancel team taufik
3sep: MOS done, by Taufik
Need Doc ATP 12sep: Dok mentah sudah di kirim ke Wais by 28aug: outbond done, Adit
7jan: reject 7aug: ternyata rau pengiriman beda dengan ET,
18dec: netgear submited, taufik sdh approve pak ari untuk rubah ET sesuai aktual
Need CPL - Onsite 25nov: return to ASP (netgear) 6aug: NIW ganti NPI1 C done, sisa bounding ke 4+0
20nov: endorse
17dec: issue PMR byclear
mom 1aug: start
12sep: FATPinstll NE, butuh
Accepted, 1pcsdone,
migrasi konektor rauf coax
12nov: ATP
16dec: RLDW & doc ATP submited
accept indoorInstall
3sep: karena kurang
done NE-FE, lengkap karet
pointing dan -60an
masih
Endorsed by MOM 10nov: ATP
27sep: netgear wait PMR
submited penjepitnya,
02sep: outbond infodone,
yusrilAdit,
kadang2MOSada done, konektor
Rauf
NY RFS 23okt: netgear
12sep: FATP revbelum ada diaccepted
submited, list, need req pengiriman
11dec : Cancel sepertu itu
18sep: datasubmited,
9sep: FATP sudah di kasih yusril
accept withkeremark
wais

15jan: netgear submited


7jan: rejected
11dec: RLDW submited 11dec: NIW sukses, nasrun
10dec: Doc ATP submited, netgear PMR, 9dec: RFS, wait skedul NIW, nasrun
Need CPL - Onsite FATP Submited 9okt: material not ready

17okt: outbond done, info pak sahar tower issue


perkuatan
Need CPL - Onsite 9okt: material not ready
7jan: rejected 9nov: Doc ATP submited, RLDW Submited
9dec: netgear dprd kota makassar submited 26oct: RFS, rauf
Need CPL - Onsite 20nov: issue PMR clear 25oct: MMU sudah ada, need upgrade
10nov: endorse
17dec: netgear wait PMR
by mom 24oct: drpd tidak ada mmu yg bisa di pakai, wait
16dec: ATP Accept DN dari adit, request add material MMU sudah di
Endorsed by MOM 24oct: netgear belum di request wais email
Need Doc ATP 24sep: RLDW submited, FATP submited 19oct: MOS done
9sep: Material by Rauf, mos
di manado, di site
info pak BTP,MSG
Fahmi tidak
25nov: return to ASP (RLDW) ada pengiriman
3dec: MMU Migtasi done
RLDW submited,
19nov: FATP submited, doc ATP submied 9okt:
24okt:material not ready yang release tidak ada list
permit protelindo
Need CPL - Onsite 14nov: RFS, rauf teamnya, pic area tidak mengijinkan kalau tidak
20oct:
ada listRFS,
teamRAU
on 23/01L
sitenya faulty looping sisi
tanetteriattang, doneBTP
7okt: info team MSG email replacement
sudah di install, ke EID
Need Doc ATP 15okt: plan mos
BTP_DUA_PL adatoday, Taufik >team
di basecamp MOSMSG complete RAU Faulty
NY RFS

6dec: Mbps pincang, kalau existing di matikan


Mbps bagus, sudah email
29nov: Install NE Done
#N/A 10nov: Install done, waiting lom
1nov: RFS, lutfi
20nov: still issue PMR 28oct: issue coax sudah di email ke pak rahman,
Need Doc ATP 2nov: netgear wait PMR baru email karena coba cari2 stok sisa di kantor PMR
20nov: still wait PMR yang ternyata tidak ada
Need Doc ATP 10nov: netgear wait PMR 25okt:
15okt: coax
installexsisting curiganya
done, yusril, putusMMU
wait pisah sehingga
di bone bone
RAU existing tidak terbaca, lutfi
21okt: mau coba copot RAU 1 per 1 agar site tidak
mati,, lutfi
20okt: NIW untuk copot installasi RAU gagal, team
ngga bs ontime, lutfi
17okt: add material sudah di terima Lutfi
15okt: butuh add material, sudah di email ke pak
rahman
15okt: NIW release
14okt: butuh NIW untuk pisah MMU existing agar
20nov: still wait PMR bisa di bounding dengan add
Need Doc ATP 10nov: netgear wait PMR polar, NIW sudah di req ke pak Sahar

6dec: rau 1 btp mbps drop, performance degreded


4dec: ET rev done release dari pak Tonny
3dec: RFS, ip done, FATP & doc ATP sudah di kirim
Rauf ke Wais > ada perubahan freq krna freq ET
interference, sudah email ke pak Tonny EID
2dec: lanjut installasi, installasi done, og pointing
mentok di -40, lanjut besok karena cuaca tidak
10dec: RLDW submited mendukung, Rauf
6dec: Doc ATP submited, RLDW ada tetapi 27nov: LOM Clear
belum submit, FATP ada masalah rau alaram 26nov: MMU4A sudah ada di WH, di pick up Adit
#N/A makanya blm di submit 24nov: LOM MMU4A 1pcs untuk di BTP
Need Doc ATP

8dec: RFS full config, ganti freq (existing


15jan: data netgear sudah ada tp belum di interderence), need hasil tx off dari yunus,
masukan karena PMR 6dec: NE done config, FE belum karena lemot
10dec: RLDW submited 19nov: LOM complete
10dec: Doc atp submited, FATP submited 5nov: LOM sudah di ambil taufik tetapi masih LOM
9dec: OG dokumentasi, Yunus, RLDW ada tp MMU4A 1pcs, dan MMU 1002 1pcs
#N/A belum submit 1nov: RFS partial 2+0, RAU lom

27nov: NIW Done, 1 RAU Interference, RFS 3+0


26nov: NIW tidak cukup waktu karena cuaca
gerimis, reschedule besok
25nov: RAU menggukanan punya BARRU -
MANGKOSO,
#N/A 20nov: LOM RAU 2pcs (sepasang) Interference

28nov: MMU4A di pakai di site rappang 1pcs >


Sudah di ganti dan sudah di install, Nasrun, wait
full config
24nov: coax mangkosi di pakai 1 untuk site
maddenra karena coax maddenra sudah
kemasukan air, nasrun
23nov: bracket RAU di pakai 1pcs unutk site
maddenra karena rau maddenra terpasang
temporary tidak menggunakan bracket sdh di
#N/A complain, nasrun
2dec: Doc ATP submited, RLDW submited
#N/A 2dec: Doc ATP submited, RLDW submited 30nov: NIW done, RFS

2dec: Doc ATP submited, RLDW submited


27nov: RFS 4+0, alfonsus
#N/A 2dec: Doc ATP submited, RLDW submited 26nov: NIW gagal karena hujan, reschedule besok
NY RFS

28nov: SFP LAN dll sudah ada, yunus yang ambil di


kima > LENGKESE berubah status kepemilikan
tower dari ISAT ke Protelindo
27nov: butuh SFP LAN 2pcs dan kabel lan karena
NY RFS ada pemasangan 6692 di lengkese
3dec: material dismantle (indoor) ada di meja edo
28nov: MMU4A sudah ada, yunus yg ambil ke
Need Doc ATP kima, RFS, Yunus > LENGKESE berubah status
kepemilikan tower dari ISAT ke Protelindo
27nov: untuk add polar butuh MMU4A 1pcs di
lengkese, kordinasi yunus dengan pak lucky, lalu
pak apip bilang MMU4A nya di pasang di 20p
15jan: FATP submited 22nov: material aslinya sudah kembali ke MIU
14jan: netgear NE-FE done, Pertial accept tetapi tidak ada MMU nya, site RFS
Partial Accept (FATP) (FATP) 21nov: pakai material tambelan dari EID untuk RFS,
13dec:FATP
15jan: netgear FE done
submited nanti diDoc
26nov: gantiATP submited
submited
27nov: RLDW Submited 13nov: RFS
20nov: material
pakailagi
MMU di tanya aditR2
existing kepaccinongan
ibu amel yg
Need CPL - Onsite 26nov: Doc ATP submited, Netgear wait PMR dulu outbond
sesuai arahan pak Dwi di meeting
> data2 netgear sudah ada, RLDW ada tapi 12 nov:LOM
15nov: Material
mmualready outbond 18komfirmasi
di sungguminasa, January 2019via
belum di submit (HOTEL_SINGGASANA_MAKASSAR_ST-
WAG
6dec: EID sementara
install start, pakai
butuh MMU
MMU yang1pcs,
1002 ada di site
dan
MONGINSIDI)
facing pacinongan R2 yang kosong untuk pointing
waveguide 4pcs, Rauf
NY RFS 5dec: MOS done, Yusril

16dec: NIW add polar done, existing V1 alaram


11dec: AMM di batangmata full, butuh amm 6692
baru, sudah kordinasi dengan pak lucky, sudah
Need Doc ATP 17dec: dokumentasi done by taufik, data men email juga ke pak dibud

9dec: ini di buat config 4+0 ya pak @Edo MAA PKA


skrng posisi (2+0) + (1+0)
untuk yg 2+0 infonya pakai wavegate cek installasi
lagi karena rsl masih -39
untuk yg 1+0 sudah bagus -32
cek lobang wavegate bersih apa ga. harusnya beda
Need Doc ATP nya tidak terlalu jauh

17dec: RFS, setelah ganti index ke 8/11LH punya


7jan: rejected peruntukan RD TO MALUNDAK - SOMBA
Need CPL - Onsite 18dec: Submited 16dec: start install, freq interference seumua
NY RFS 16dec: RAU 8/11LH 1 pasang di pakai di LABUANG_MAJENE - POLEWALI
NY RFS
NY RFS
NY RFS
MATERIAL RECTI Team Assigment Date Pemit NE NE SIK File Name Permit FE

Outbond Ramli/085796379184
31-Aug 1718 - Mitrasel 17-Sep
Outbond Ramli/085796379184 30-Sep-19 1953 30-Nov

Outbond Ramli/085796379184
28-Feb-18 15-Nov-19 2440_Dokumentasi & AT 15-Nov-19

Outbond Basir
17-Oct-19 2053 18-Oct-19
Outbond Ramli/085796379184
10-Dec 2575 15-Nov

Outbond Arifuddin
30-Nov-19 '2500 30-Nov-19

Outbond RFI Ramli/085796379184


17-Sep 2053 30-Sep-19

Outbond RFI Idris/085311505959


28-Feb-18 30-Dec 2641 F 30-Dec

Outbond RFI Yunus/082271522597


28-Feb-18 31-Oct-19 2200_Permit Ericsson_S 30-Nov-19

Outbond Basir
19-Nov-19 1238286_ISAT_MAINTEN10-Dec-19

Outbond RFI Ramli 2/085656645816

23-Apr-18 29-Nov-19 25.11.2019_322_DMT Gra


30-Dec-19

Outbond
23-Apr-18 30-Dec-19 2641 F On Req

Outbond Basir
31-Aug-19 1718 - Mitrasel 20-Oct-19

Outbond RFI Amran / 081241201242


25-Apr-18 20-Jul-19 1215339_TSEL_MAINTE 31-Aug-19

Outbond RFI Hadi / 085757209178


23-Apr-18 29-Nov-19 25.11.2019_322_DMT Gra
30-Nov-19

Outbond RFI Yusril / 081543346876


12-Apr-18 30-Dec-19 2641 F 30-Dec-19

Outbond Nasrun
31-Aug

Outbond RFI Hadi / 085757209178


28-Feb-18 20-Oct 2093 15-Nov

Outbond RFI Akbar / 085959994727


29-May-18 25-Jan-20 9375_BINAMU 16-Jan

Outbond Rauf
16-Aug-19 430004 17-Oct
Outbond RFI Basir/081340182730 27-Jun-18 25-Jan-20 9375_BINAMU 30-Dec-19

Outbond
29-May-18 30-Nov-19 '2500 30-Nov-19

Outbond Ramli
20-Oct 2093 30-Nov

Outbond Nasrun
31-Aug-19 1718 - Mitrasel 31-Aug
Outbond 29-May-18 10-Aug-19 06.08.2019_58.DMT Du 20-Jul

Outbond RFI Basir/081340182730


23-Apr-18 5-Dec-19 PermitLetter_PTI_ppert 30-Dec-19
Outbond Farhan 31-Aug 1718 - Mitrasel 31-Aug
Outbond RFI Rifai/087740075800 28-Feb-18 20-Oct 2093 30-Nov

Outbond

24-Aug-18 22-Jan-20 474621 30-Dec-19

Outbond Basir
On Req 19-Nov-19 31-Jan-20

Outbond Nasrun
20-Jul 31-Aug
Outbond RFI Ikhsan / 082248147170 28-Feb-18 20-Jul-19 1215335_ISAT_MAINTEN31-Aug-19
Outbond Nano / 081293960649 23-Apr-18 7-Aug-19

Outbond RFI Emyl /085823824347

2-May-18 5-Dec-19 PermitLetter_PTI_ppert 20-Dec

Outbond RFI
26-Apr-18 31-Aug 1718 - Mitrasel
Outbond RFI Setiawan/085825067898 26-Apr-18 31-Aug-19

Outbond Juan / 0895329207354


29-May-18 25-Aug-19 PermitLetter_PTI_ppert 31-Aug-19

Outbond Ramli
15-Nov 2440_Dokumentasi & AT 15-Nov
Outbond 29-May-18 31-Aug-19 1718 - Mitrasel 20-Aug-19

Outbond Nano / 081293960649


23-Apr-18 31-Aug-19 1718 - Mitrasel 31-Aug-19

Outbond Basir
24-Jul-19 PermitLetter_PTI_pperti 10-Dec-19

Outbond RFI Yunus/085796601750


2-May-18 20-Dec-19 SURAT IJIN MASUK SITE 30-Nov-19

Outbond Rauf
30-Dec-19 2641 F 20-Dec-19

Outbond RFI Yusran/085796601750


28-Feb-18 30-Nov-19 '2500 30-Nov-19

Outbond Rauf

11-Dec-19 SURAT IJIN MASUK SITE 30-Nov-19

Outbond Yunus
17-Oct 2053 30de19

Outbond RFI Yunus/082271522597


12-Mar-18 30-Nov '2500 15-Nov

Outbond RFI Sardi/081355902434


3-May-18 15-Nov 2440_Dokumentasi & AT 15-Nov
Outbond RFI Ramli 2/085656645816

20-Jul-18 On Req 19-Nov-19 16-Jan

Outbond RFI Ramli 2/085656645816


2-May-18 On Req 19-Nov-19 16-Jan-20

Outbond Rauf
20-Dec 2599 15-Nov-19

Outbond Rauf
17-Oct-19 2053 25-Nov

Outbond RFI Akbar / 085959994727


28-Feb-18 10-Dec

Outbond Basir
30-Dec 2641 F 30-Dec

Outbond RFI Sardi/081355902434


28-Feb-18 15-Nov 2440_Dokumentasi & AT On Req

Outbond Nasrun
31-Aug-19 1718 - Mitrasel 31-Aug

Outbond
28-Feb-18 15-Nov 2440_Dokumentasi & AT 16-Jan-20
Outbond RFI Ikhsan / 082248147170 16-May-18 31-Aug-19
Outbond RFI Ikhsan / 082248147170 12-Apr-18 NY 30-Nov-19

Outbond RFI Hadi / 085757209178


16-May-18 30-Nov-19
Outbond RFI Rio / 082291555420 28-Feb-18 31-Aug-19 1718 - Mitrasel 30-Sep
Outbond 28-Feb-18 30-Dec 2641 F 16-Jan

Outbond Basir
On Req 19-Sep 18-Oct
Outbond Amran / 081241201242 29-May-18 7-Aug-19 1218955_ISAT_MAINTEN20-Jul

Outbond
23-Apr-18 31-Aug-19 1718 - Mitrasel 31-Aug-19

Outbond Nano / 081293960649


23-Apr-18 31-Aug-19 1718 - Mitrasel 31-Aug-19

Outbond RFI Basir/081340182730


29-May-18 23-Nov-19 1239583_ISAT_SURVEY 23-Nov-19

Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug

Outbond Ramli / 085796379184


28-Feb-18 30-Dec 2641 F 30-Dec

Outbond RFI Ramli 2/085656645816


28-Feb-18 10-Dec 2575 15-Nov
Outbond Rusdi / 082227283322
23-Apr-18 31-Aug-19 1718 - Mitrasel 31-Aug-19
Outbond Amran / 081241201242
29-May-18 31-Aug-19

Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug

Outbond RFI Ramli/085796379184


2-May-18 10-Dec

Outbond

24-Aug-18 26-Jan-20 RSUP.DR.WAHIDIN MAKA16-Jan


Outbond Basir
29-Sep-19 PermitLetter_PTI_pperti 17-Oct-19

Outbond RFI Basir/081340182730

2-May-18 On Req 19-Nov-19 31-Jan-20

Outbond Yunus
20-Aug 1605 - Mitrasel 17-Oct

Outbond Rauf
31-Aug-19 1718 - Mitrasel 31-Aug-19
Outbond 29-May-18 30-Dec-19 2641 F 30-Nov-19

Outbond RFI Yusril / 081543346876


31-Aug-18 On Req 19-Nov-19 16-Jan
Outbond RFI Setiawan/085825067898 23-Apr-18 31-Oct-19

Outbond
29-May-18 31-Aug-19 1718 - Mitrasel 31-Aug-19

Outbond Alfonsus

28-Feb-18 16-Jan 0023 F 16-Jan

Outbond Basir
16-Jan-20 0023 F 30-Nov-19

Outbond RFI Yunus/085796601750

2-Apr-18 1-Dec-19 PermitLetter_PTI_ppert 30-Dec-19

Outbond
2-May-18 30-Dec-19 2641 F -

Outbond Nasrun
31-Aug
NA Cancel 20-Aug-19

Outbond Juan / 0895329207354


29-May-18 25-Aug-19 PermitLetter_PTI_ppert 17-Oct
Outbond Cancel

Outbond Rauf
20-Oct 2093 20-Oct
Outbond Cancel
Outbond Cancel

Outbond RFI Akbar / 085959994727

5-Jul-18 25-Jan-20 9375_BINAMU 23-Jan


Outbond RFI Heri / 0853-9936-7800 29-May-18 22-Aug-19
Outbond RFI Akbar / 085959994727
2-May-18 30-Sep-19 SURAT IJIN MASUK SITE 30-Nov
Outbond Cancel
NA Cancel
Outbond Cancel NY 20-Aug

Outbond RFI Hadi / 085757209178


5-Jul-18 30-Nov-19

Outbond
17-Oct 30-Dec-19 2641 F 30-Dec
NA Cancel

Outbond Basir
30-Nov-19 '2500 15-Nov-19
NA Cancel

NA Cancel

Outbond Ramli / 085796379184


28-Feb-18 17-Oct-19 2053 15-Nov-19
Outbond Nano / 081293960649 31-Aug-19 1718 - Mitrasel 31-Aug-19

Outbond Nando / 081248705495


25-Apr-18 31-Aug-19 1718 - Mitrasel 31-Aug-19
Outbond Amran / 081241201242 10-Aug-19 06.08.2019_58.DMT Du 10-Aug-19
Outbond Nano / 081293960649 7-Aug-19 1218955_ISAT_MAINTEN31-Aug
Outbond Rauf 28-Feb-18 31-Aug-19 1718 - Mitrasel 20-Oct

Outbond RFI Hadi / 085757209178


5-Jul-18 30-Sep-19 SURAT IJIN MASUK SITE 30-Nov-19

Outbond RFI Yunus/082271522597


12-Apr-18 31-Oct-19 2200_Permit Ericsson_S 15-Nov-19

Outbond RFI Basir/081340182730


20-Jul-18 25-Oct-19 8964_ISAT_PASSANDER 15-Nov-19

Outbond RFI Yunus/082271522597


15-Nov 2440_Dokumentasi & AT 30-Nov

Outbond RFI Yunus/085796601750


1-Dec-19 PermitLetter_PTI_ppert 20-Dec
Outbond RFI Ikhsan / 082248147170 2-Apr-18

Outbond Nasrun
31-Aug 1718 - Mitrasel 31-Aug

Outbond Arifuddin
15-Nov 2440_Dokumentasi & AT 16-Jan

Outbond Sumantri
3-Nov PermitLetter_PTI_pperti 30-Nov
Cancel
Outbond Cancel

Outbond Yunus
7-Aug 1218955_ISAT_MAINTEN20-Aug

Outbond Arifuddin
15-Nov 2440_Dokumentasi & AT 15-Nov
Outbond Cancel 20-Aug-19 1605 - Mitrasel 31-Aug-19

Outbond Yunus Cancel

Outbond RFI Ramli 2/085656645816


2-May-18 20-Dec-19 SURAT IJIN MASUK SITE 20-Dec-19

Outbond Yunus
20-Aug 1605 - Mitrasel 20-Aug

Outbond Basir
15-Nov 2440_Dokumentasi & AT 16-Jan

Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug
Outbond Farhan / Internal Cancel
Outbond Farhan / Internal Cancel

Outbond
30-Nov '2500 30-Nov

Outbond Lutfi
20-Dec-19 2608 On Req

Outbond Basir
15-Nov 2440_Dokumentasi & AT 10-Dec

Outbond RFI Akbar / 085959994727


2-May-18 30-Sep SURAT IJIN MASUK SITE 30-Nov
Outbond RFI Akbar / 085959994727
29-May-18 30-Dec 2641 F 20-Dec-19
Ramli 30-Dec-19 2641 F 10-Dec

Outbond Basir/081340182730
28-Feb-18 15-Sep-19 1226056_ISAT_MAINTEN10-Dec

Outbond Alfonsus
20-Dec 2611 16-Jan

Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug

Outbond Arifuddin
On Req 19-Nov-19 16-Jan

Outbond RFI Ramli 2/085656645816


28-Feb-18 15-Nov-19 2440_Dokumentasi & AT 10-Dec

Outbond Yunus
7-Aug 1218955_ISAT_MAINTENOn Req
Outbond RFI 28-Feb-18 30-Sep 2036 31-Oct-19

Outbond Arifuddin
1-Dec-19 PermitLetter_PTI_ppert 25-Nov
Outbond RFI Rio / 082291555420 29-May-18 31-Aug-19 1718 - Mitrasel 30-Nov-19
Outbond RFI Rio / 082291555420 16-May-18 NY 30-Nov

Outbond Basir

On Req 19-Nov-19 6-Feb


Outbond Cancel
Outbond Cancel

Rauf
9-Jan 'SURAT IJIN MASUK SITE On Req

Outbond RFI Ramli 2/085656645816


2-May-18 20-Dec-19 SURAT IJIN MASUK SITE 16-Jan-20
Outbond Basir Cancel 31-Aug-19 1718 - Mitrasel 31-Aug-19

Outbond Alfonsus
22-Sep-19 PermitLetter_PTI_pperti 10-Dec

Outbond RFI Fatan/085823824348


12-Apr-18 30-Nov-19 '2500 20-Dec

Outbond Basir
30-Dec-19 2641 F 15-Nov
Outbond Cancel
Outbond Cancel

Outbond RFI Rio / 082291555420


2-May-18 On Req 19-Nov-19 6-Feb
Outbond Yunus Cancel
Outbond Yunus Cancel

Outbond Rauf
11-Dec-19 SURAT IJIN MASUK SITE 16-Jan-20

Outbond
30-Nov-19 '2500 30-Nov
Outbond Basir

1-Dec-19 PermitLetter_PTI_ppert 6-Feb


Outbond Cancel 31-Aug-19

Outbond Basir
1-Dec-19 PermitLetter_PTI_ppert 30-Nov
Outbond RFI Ikhsan / 082248147170 5-Jul-18 30-Nov

Outbond Alfonsus
On Req 19-Nov-19 10-Dec
Cancel

Outbond Rauf
30-Nov-19 '2500 30-Nov-19

Outbond Arifuddin
14-Jan 07.01.2020_099_MADDEN
14-Jan

Outbond Cancel

Outbond RFI Yunus/082271522597


7-Jun-18 30-Dec-19 2641 F 30-Dec-19

Outbond Alfonsus
15-Nov 2440_Dokumentasi & AT 15-Nov

Outbond Nasrun
30-Dec 2641 F 16-Jan

Outbond Ramli
30-Dec 2641 F 30-Dec

Outbond Rauf
11-Dec-19 SURAT IJIN MASUK SITE 30-Nov-19
Outbond Cancel 20-Aug

Outbond Basir
19-Nov-19 1238286_ISAT_MAINTEN10-Dec-19
Outbond RFI Hadi / 085757209178
2-May-18 21-Dec-19 SURAT IJIN MASUK SITE 20-Dec

Outbond Ramli 2/085656645816

24-Aug-18 20-Dec-19 SURAT IJIN MASUK SITE 11-Dec-19


Outbond Yunus Cancel
Outbond Cancel
Outbond Cancel 20-Oct-19

Outbond RFI Rauf / 081244022160


24-Aug-18 5-Dec-19 PermitLetter_PTI_ppert 20-Dec-19

Outbond RFI Ramli / 085796379184


28-Feb-18 30-Nov-19 '2500 10-Dec

Outbond
28-Feb-18 30-Dec 2641 F On Req

Outbond Farhan / Internal


31-Aug-19 1718 - Mitrasel 31-Aug

Outbond Basir
30-Nov-19 SURAT IJIN MASUK SITE 15-Nov
Outbond Arifuddin
15-Nov 2440_Dokumentasi & AT 15-Nov
Outbond Arifuddin 30-Dec 2641 F 30-Dec-19

Outbond Ramli
15-Nov 2440_Dokumentasi & AT 15-Nov
Outbond RFI Hadi / 085757209178
28-Feb-18 On Req 20-Nov-19 On Req

Outbond Arifuddin
30-Dec 2641 F 16-Jan

Outbond Rauf
15-Nov-19 2440_Dokumentasi & AT 30-Nov-19

Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug

Outbond
29-May-18 20-Aug-19 1605 - Mitrasel 31-Aug-19

Outbond Arifuddin
20-Dec 2621 20-Dec

Outbond Ramli / 085796379184


24-Aug-18 17-Jul 17-Sep

Outbond Alfonsus
On Req 23-Jul-19 10-Dec

Outbond RFI Emyl /085823824347


30-Nov-19 '2500 20-Dec

Outbond Basir
1-Dec-19 PermitLetter_PTI_ppert 6-Feb
Outbond Cancel

Outbond NRFI
13-Jul-19 1214114_ISAT_MAINTEN18-Oct-19
Outbond RFI Hadi / 085757209178 30-Nov-19
Outbond Cancel 31-Aug-19

Outbond Nando / 081248705495

On Req 19-Nov-19 30-Dec-19


Outbond RFI Ikhsan / 082248147170 30-Nov-19 '2500 31-Aug-19

Outbond Sumantri
30-Nov-19 '2500 30-Nov-19

Outbond RFI Basir/081340182730


30-Nov-19 '2500 30-Nov-19

Outbond Alfonsus
16-Jan-20 0023 F 30-Dec

Outbond Basir
30-Nov SURAT IJIN MASUK SITE 15-Nov

Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug

Outbond Basir
15-Nov-19 2440_Dokumentasi & AT 10-Dec
Outbond NRFI Rio / 081343416616 10-Aug-19 06.08.2019_59.DMT Turi20-Oct

Outbond Ramli
20-Oct 2093 10-Dec

Outbond Basir
11-Dec-19 SURAT IJIN MASUK SITE 30-Nov

Outbond RFI Ramli 2/085656645816


19-Nov-19 1238286_ISAT_MAINTEN10-Dec-19

Outbond Nasrun

30-Dec 2641 F 16-Jan

Outbond Basir
15-Nov 2440_Dokumentasi & AT 15-Nov
Outbond Basir
On Req 17-Oct-19 19-Nov
Outbond RFI Yunus / 082271522597
29-Nov-19 25.11.2019_322_DMT Gra
30-Nov-19

Outbond Ramli
31-Aug 1718 - Mitrasel 15-Nov

Outbond Ramli 2
9-Jan 'SURAT IJIN MASUK SITE 20-Dec

Outbond Ramli 2
20-Dec-19 2621 15-Nov-19

Outbond Basir
23-Nov-19 1239583_ISAT_SURVEY On Req

Outbond Basir
23-Nov-19 1239583_ISAT_SURVEY 20-Dec-19

Outbond Basir
28-Nov-19 PermitLetter_PTI_ppert 10-Dec-19

Outbond
20-Dec-19 2608 20-Dec-19

Outbond
20-Dec-19 2608 20-Dec-19

Outbond
30-Nov-19 '2500 30-Nov-19
Cancel
Cancel
Cancel
Cancel

Outbond
30-Nov-19
Cancel 22-Aug-19 SURAT IJIN MASUK SITE 31-Oct-19
Cancel
Cancel
Cancel
Cancel 27-Aug-19 1222489_ISAT_MAINTEN31-Oct-19
Cancel
Cancel

Outbond Basir
10-Sep-19 1839 15-Nov-19
NY Outbond Cancel
NY Outbond Cancel
NY Outbond Cancel
NY Outbond Cancel

Outbond
23-Nov-19 1239583_ISAT_SURVEY 30-Nov-19
NY Outbond Cancel 22-Aug-19 SURAT IJIN MASUK SITE 31-Oct-19
NY Outbond Cancel 27-Aug-19 1222489_ISAT_MAINTEN31-Oct-19

Outbond Basir
4-Sep-19 433251 10-Sep-19
Outbond Cancel

Outbond Rauf
20-Dec 2599 15-Nov

Outbond basir
4-Sep-19 433251 10-Sep-19

Outbond
20-Aug 1605 - Mitrasel 20-Aug-19

Outbond Arifuddin
25-Oct-19 2307 F 15-Nov-19
Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug

Outbond Alfonsus 16-Jan 0023 F 16-Jan

Outbond Yusril / Yulius 1-Aug-19 On Req 19-Nov-19 23-Nov-19

Outbond Rio 23-Jul-19 30-Dec 2641 F 16-Jan

Outbond Yunus 23-Jul-19 20-Dec 2599 20-Dec

Outbond 23-Jul-19 9-Dec-19 'SURAT IJIN MASUK SITE 30-Dec-19

Outbond RFI 23-Jul-19 15-Nov-19 2440_Dokumentasi & AT 16-Jan-20

Outbond Rio 23-Jul-19 On Req 20-Nov-19 10-Dec

Outbond Rio 23-Jul-19 On Req 20-Nov-19 30-Dec

Outbond 23-Jul-19 23-Nov-19 1239583_ISAT_SURVEY 30-Dec-19

Outdond Yusril 2-Aug-19 On Req 19-Nov-19 16-Jan-20

Outbond Rauf 5-Dec-19 PermitLetter_PTI_ppert 20-Dec-19


6-Sep-19 30-Sep 2036 30-Sep

Outbond Nasrun 6-Sep-19 16-Dec-19 PermitLetter_PTI_SUL-S 20-Dec-19

Outbond Yusril 6-Sep-19 16-Jan-20

Outbond Rauf 6-Sep-19 13-Nov-19 127547_RS Grestelina 20-Dec-19

Outbond Rauf 4-Sep-19 5-Dec-19 PermitLetter_PTI_ppert 20-Dec-19


5-Oct-19 24-Oct-19 SKT-24750_STP-ISAT_SK 31-Jan-20

Outbond Rauf 5-Oct-19 6-Dec-19 PermitLetter_PTI_ppert 16-Jan-20

Outbond Taufik 8-Oct-19 5-Nov-19 NO.236.TC.01.RO.72.XI.215-Nov-19


Outbond Yusril 19-Dec-19 PermitLetter_PTI_46709 31-Jan-20

Outbond Taufik / Dede 8-Dec-19 1241544_ISAT_MAINTEN12-Dec-19

Outbond Lutfi 30-Dec 2641 F 30-Dec

Outbond Yusril On Req 20-Nov-19 30-Dec


Outbond Yusril 30-Dec 2641 F On Req

Outbond Rauf 13-Dec-19 SKT-28193_STP-ISAT_SK 16-Jan-20


Taufik 25-Oct-19 5-Nov-19 NO.236.TC.01.RO.72.XI.215-Nov-19

Outbond Taufik 25-Oct-19 20-Dec-19 2598 16-Jan-20

Outbond Nasrun 7-Nov-19 20-Dec 2621 20-Dec

Outbond Nasrun 7-Nov-19 16-Jan-20 0023 F 16-Jan-20

Outbond Alfonsus 7-Nov-19 30-Nov-19 2504 16-Jan-20

Outbond Alfonsus 7-Nov-19 30-Nov-19 2504 30-Nov-19


Outbond Yunus 7-Nov-19 1-Dec-19 PermitLetter_PTI_ppert 31-Jan-20

Outbond Yunus 7-Nov-19 6-Feb-20 SURAT IJIN MASUK SITE 20-Dec-19

Outbond Yunus 7-Nov-19 28-Nov-19 PermitLetter_PTI_ppert 20-Dec-19


Outbond Dede 6-Feb-20 SURAT IJIN MASUK SITE 16-Jan-20

Outbond Dede 6-Feb-20 SURAT IJIN MASUK SITE 16-Jan-20

Outbond Rauf 17-Nov-19 20-Dec-19 2600 31-Jan-20

Outbond Taufik 17-Nov-19 14-Jan-20 07.01.2020_099_MADDEN


16-Jan-20

Outbond Taufik 17-Nov-19 11-Dec-19 SKT-30246_STP-ISAT_SK 14-Jan-20

Outbond Nasrun 17-Nov-19 23-Dec-19 2658 23-Dec-19


Outbond Nasrun 17-Nov-19 31-Jan-20 0103 F 14-Dec-19
Outbond Nasrun 17-Nov-19 16-Jan-20 0023 F 31-Jan-20
Outbond 27-Dec-19 28-Jan-20 069-Permit Swap MW Bot19-Jan-20
Outbond 27-Dec-19 31-Jan-20 0103 F 28-Jan-20
FE SIK File Name Team Dokumentasi

2053 Endorsed by MOM


'2500 Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM

2235 F Endorsed by MOM

2440_Dokumentasi & ATP Endorsed

'2500 Endorsed by MOM

1932 Endorsed by MOM

2641 F Endorsed by MOM

'2500 Endorsed by MOM

2575 Endorsed by MOM

2641 F Taufik Endorsed

20-Nov-19 Lutfi Need CPL - Onsite

2093 Endorsed by MOM

1718 - Mitrasel Endorsed by MOM

'2500 Taufik Endorsed

2641 F Partial Accept (RLDW)

1718 - Mitrasel Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM

0023 F Need Doc ATP

2053 Endorsed by MOM


2641 F Need CPL - Onsite

'2500 Endorsed by MOM

'2500 Endorsed by MOM

1718 - Mitrasel Endorsed by MOM


Endorsed by MOM

2641 F Yusril Need CPL - Onsite


1718 - Mitrasel Endorsed by MOM
'2500 Endorsed by MOM

2641 F Lutfi Endorsed 49

0103 F Partial Accept (RLDW)

1718 - Mitrasel Endorsed by MOM


1718 - Mitrasel Endorsed by MOM
1218955_ISAT_MAINTENANCE / 1218962_ISA Endorsed by MOM

2620 Yusril Endorsed

Endorsed
1718 - Mitrasel Endorsed

1718 - Mitrasel Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM


1605 - Mitrasel Endorsed by MOM

1718 - Mitrasel Partial Accept (FATP)

2575 Endorsed by MOM

'2500 Yunus Endorsed

2608 Lutfi Endorsed by MOM

'2500 Endorsed by MOM

'2505 Endorsed

2641 F Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM


0023 F Partial Accept (RLDW)

0023 F Need CPL - Onsite

2440_Dokumentasi & ATP Endorsed by MOM

2386 Endorsed by MOM

2575 Endorsed by MOM

2641 F Need CPL - Onsite

11-Nov-19 Endorsed by MOM

1718 - Mitrasel Endorsed by MOM

0023 F Endorsed by MOM


1718 - Mitrasel Endorsed
'2500 Endorsed

'2500 Endorsed
2036 Endorsed by MOM
0023 F Need Doc ATP

2235 F Partial Accept (RLDW)


Endorsed by MOM

1718 - Mitrasel Endorsed by MOM

1718 - Mitrasel Endorsed by MOM

1239583_ISAT_SURVEY Endorsed by MOM

1718 - Mitrasel Endorsed by MOM

2641 F Partial Accept (RLDW & FATP)

2440_Dokumentasi & ATP Endorsed by MOM

1718 - Mitrasel Endorsed by MOM

1718 - Mitrasel Endorsed by MOM

1718 - Mitrasel Endorsed by MOM

2575 Endorsed

0023 F Need Doc ATP


2053 Endorsed by MOM

0103 F Need CPL - Onsite

2053 Endorsed by MOM

1718 - Mitrasel Endorsed by MOM


'2500 Need CPL - Onsite

0023 F Need Doc ATP


2220 F Endorsed

1718 - Mitrasel Endorsed by MOM

0023 F Alfonsus Need Doc ATP50 4-Dec-19

'2500 Yunus Partial Accept (RLDW)

2641 F Dede Need CPL - Onsite

Lutfi Need CPL - Onsite

1718 - Mitrasel Endorsed by MOM


1650 DROP

2053 Endorsed by MOM


Endorsed by MOM

2093 Endorsed by MOM


Endorsed by MOM
Endorsed by MOM

0106 F Need Doc ATP


Format SURAT IJIN MASUK SITE MKS 5247 Endorsed
'2500 Endorsed
Endorsed by MOM
Endorsed
1605 - Mitrasel Endorsed by MOM

'2500 Endorsed

2641 F Dede Endorsed by MOM


Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM

Endorsed by MOM
Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM


1718 - Mitrasel Endorsed

1718 - Mitrasel Endorsed by MOM


06.08.2019_58.DMT Dudepo (DUDEPO_BARAT_Endorsed by MOM
1718 - Mitrasel Endorsed by MOM
2093 Endorsed by MOM

'2500 Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM

2440_Dokumentasi & ATP Endorsed

'2500 Endorsed by MOM

2620 Yusril Endorsed


Endorsed

1718 - Mitrasel Endorsed by MOM

0023 F Need Doc ATP

'2500 Endorsed by MOM


Endorsed by MOM
Endorsed by MOM

1605 - Mitrasel Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM


1718 - Mitrasel Partial Accept (FATP)

Endorsed by MOM

2600 Lutfi Endorsed

1605 - Mitrasel Endorsed by MOM

0023 F Partial Accept (FATP)

1718 - Mitrasel Endorsed by MOM


Endorsed by MOM
Endorsed by MOM

'2500 Endorsed by MOM

11-Nov-19 Lutfi Need CPL - On50

2575 Endorsed by MOM

'2500 Endorsed

2600 Endorsed by MOM


2575 Need CPL - Onsite

2575 Endorsed by MOM

0023 F Alfonsus Partial Accept 50

1718 - Mitrasel Endorsed by MOM

0023 F Need Doc ATP

2575 Endorsed by MOM

21-Jul Endorsed
2155 Endorsed by MOM

2386 Endorsed by MOM


2504 Endorsed by MOM
2440_Dokumentasi & ATP Endorsed

SURAT IJIN MASUK SITE MKS 6460 Need Doc ATP


Endorsed by MOM
Endorsed by MOM

11-Nov-19 Need CPL - Onsite

0023 F Lutfi Endorsed 50


1718 - Mitrasel Partial Accept (RLDW)

2575 Endorsed by MOM

2620 Yusril Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM


Endorsed by MOM
Endorsed by MOM

SURAT IJIN MASUK SITE MKS 6460 Need CPL - Onsite


Partial Accept (FATP)
Endorsed by MOM

0023 F Need Doc ATP

'2500 Need Doc ATP


SURAT IJIN MASUK SITE Taufik Partial Accept (RLDW)
1718 - Mitrasel Endorsed by MOM

SURAT IJIN MASUK SITE Taufik Endorsed by MOM


'2500 Endorsed

2575 Need Doc ATP


Endorsed by MOM

'2500 Endorsed by MOM

Need Doc ATP


07.01.2020_099_MADDENRA.RAPPANG.SELAYAR_D

Need Doc ATP

2641 F Taufik Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM

0023 F Endorsed by MOM

2641 F Need Doc ATP

'2500 Endorsed by MOM


1605 - Mitrasel Endorsed by MOM

2575 Endorsed by MOM

2621 Lutfi Endorsed 50

SURAT IJIN MASUK SITE MKS 6019 Partial Accep 50


Endorsed by MOM
Endorsed by MOM
2093 Partial Accept (FATP)

2621 Yusril Endorsed 49

2575 Endorsed by MOM

20-Nov-19 Need CPL - Onsite

1718 - Mitrasel Partial Accept (FATP)

2440_Dokumentasi & ATP Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM


2641 F Need Doc ATP

2440_Dokumentasi & ATP Endorsed


20-Nov-19 Endorsed by MOM

0023 F Need Doc ATP

'2505 Endorsed by MOM

1718 - Mitrasel Endorsed by MOM

1718 - Mitrasel Endorsed by MOM

2621 Nasrun Endorsed by MOM

2053 Endorsed

2575 Endorsed by MOM

2620 Yusril Endorsed by MOM

SURAT IJIN MASUK SITE Taufik Need Doc ATP


Endorsed by MOM

2235 F Endorsed
'2500 Endorsed
1718 - Mitrasel Endorsed by MOM

2641 F Need CPL - Onsite


1718 - Mitrasel Endorsed by MOM

'2500 Yusril Endorsed by MOM

'2500 Endorsed by MOM

2641 F Partial Accept (FATP)

2440_Dokumentasi & ATP Endorsed by MOM

1718 - Mitrasel Endorsed by MOM

2575 Endorsed by MOM


2093 Endorsed

2575 Endorsed by MOM

SURAT IJIN MASUK SITE 5952 Endorsed by MOM

2575 Endorsed by MOM

0023 F ATP ACCEPT

2440_Dokumentasi & ATP Endorsed by MOM


1238286_ISAT_MAINTENANCE Endorsed by MOM

'2500 Dede Endorsed

2440_Dokumentasi & ATP Endorsed by MOM

2621 Dede Endorsed by MOM

2440_Dokumentasi & ATNasrun Need CPL - Onsite

11-Nov-19 Endorsed by MOM

2620 Endorsed by MOM

2575 Endorsed by MOM

2608 Lutfi Endorsed by 50

2608 Lutfi Endorsed by 50

2504 Endorsed by MOM


Need Doc ATP
Endorsed by MOM
Endorsed by MOM
Endorsed by MOM

'2500 Endorsed by MOM


2155 Endorsed by MOM
Partial Accept (FATP)
Endorsed
Partial Accept (FATP)
2155 Need Doc ATP
Endorsed
Endorsed

2440_Dokumentasi & ATP Endorsed


Endorsed by MOM
Endorsed by MOM
Endorsed by MOM
Endorsed by MOM

'2500 Endorsed by MOM


2155 Endorsed by MOM
2155 Need Doc ATP

1839 ENDORSED
Partial Accept (RLDW)

2440_Dokumentasi & ATP ENDORSED

1839 Endorsed

1605 - Mitrasel Endorsed by MOM

2440_Dokumentasi & ATP Endorsed by MOM


1718 - Mitrasel Endorsed by MOM

0023 F Alfonsus Need Doc ATP50

11-Nov-19 #N/A

0023 F Need Doc ATP

2599 Yusril Partial Accep 50

2641 F Endorsed by MOM

0023 F Partial Accept (FATP)

2575 Endorsed

2641 F Partial Accept (FATP)

2641 F Need Doc ATP

0023 F Need CPL - Onsite

2621 Lutfi Endorsed by 49 4-Dec-19


2036 NY RFS

2621 Nasrun Need CPL - On50 4-Dec-19

0023 F Need CPL - Onsite

2598 Need CPL - Onsite

2621 Lutfi Endorsed by 49


0103 F Need Doc ATP

0023 F Rauf Need CPL - On49

PermitLetter_PTI_parwitasari_01-Nov-19_1646 Need Doc ATP


0103 F Yusril NY RFS 49

PermitLetter_PTI_4650 Dede #N/A 49 4-Dec-19

2641 F Need Doc ATP

2641 F Need Doc ATP


20-Nov-19 Need Doc ATP

0023 F Rauf Need CPL - On49


PermitLetter_PTI_parwitasari_01-Nov-19_1646 Need Doc ATP

0023 F Yunus #N/A 50 4-Dec-19

2621 Nasrun #N/A 50

0023 F Nasrun #N/A 50

0023 F Alfonsus #N/A

2504 Alfonsus #N/A


0103 F Yunus NY RFS 49

2611 Yunus NY RFS 50

2611 Yunus Need Doc ATP


0023 F Dede Partial Accept 50

0023 F Dede Need CPL - On50

0103 F NY RFS 50

0023 F Taufik Need Doc ATP50

07.01.2020_099_MADDEN
Taufik Need Doc ATP50 4-Dec-19

2658 Nasrun Need CPL - On50


1242732_ISAT_MAINTE Nasrun NY RFS 50
0103 F Nasrun NY RFS 50
1247125_ISAT_MAINTENANCE NY RFS
069-Permit Swap MW Botteng (3784)-ISAT NY RFS
PO
Plan Date Activity ID Link route
PHASE

17-May-19 ET_2018_4G_Overlay_SLPP_AddOnAndCap_243 PENEKI- WIRAE Phase 3


ET_2018_Overlay_MW_Intermediate_SLPP_56 PANGKEP - MAROS Phase 1
ET_2018_Overlay_MW_Intermediate_SLPP_11 BONTOBONTO - LABAKKANG Phase 1
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273 GTC_TG_BUNGA - TANJUNG_BUNGA Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_242 NEW_SENGKANG - PENEKI Phase 2
ET_2019_SLPP_Catapult_Intermediate_42 TOGO_TOGO - BANTAENG Phase 2
20-May-19 ET_2018_AccNetwPhase2_SLPP_37 SONDAR - TARERAN Phase 1
ET_2018_AccNetwPhase2_SLPP_35 LEILEM_PL - SONDAR Phase 1

ET_2018_4G_Overlay_SLPP_AddOnAndCap_243 PENEKI- WIRAE Phase 3


ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273 GTC_TG_BUNGA - TANJUNG_BUNGA Phase 2
21-May-19 ET_2018_4G_Overlay_SLPP_AddOnAndCap_244 WIRAE - SIWA Phase 3

ET_2019_SLPP_Catapult_Intermediate_16 PLAMPANG - TANA_BERU Phase 3

Salassae - Plampang
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273 GTC_TG_BUNGA - TANJUNG_BUNGA Phase 2
ET_2018_AccNetwPhase2_SLPP_37 SONDAR - TARERAN Phase 1
22-May-19 ET_2018_4G_Overlay_SLPP_AddOnAndCap_244 WIRAE - SIWA Phase 3

ET_2019_SLPP_Catapult_Intermediate_16 PLAMPANG - TANA_BERU Phase 3

Salassae - Plampang
ET_2018_AccNetwPhase2_SLPP_37 SONDAR - TARERAN Phase 1
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273 GTC_TG_BUNGA - TANJUNG_BUNGA Phase 2
23-May-19 ET_2018_4G_Overlay_SLPP_AddOnAndCap_244 WIRAE - SIWA Phase 3

Salassae - Plampang
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273 GTC_TG_BUNGA - TANJUNG_BUNGA Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_302 MENARA_MAKASSAR - GRAHA_ISAT_MKS Phase 2
ET_2018_Overlay_MW_Intermediate_SLPP_56 PANGKEP - MAROS Phase 1
ET_2018_AccNetwPhase2_SLPP_31 LEMBEAN - KAUDITAN Phase 1
24-May-19 ET_2018_AccNetwPhase2_SLPP_35 LEILEM_PL - SONDAR Phase 1

ET_2018_4G_Overlay_SLPP_AddOnAndCap_244 WIRAE - SIWA Phase 3


ET_2018_Overlay_MW_Intermediate_SLPP_56 PANGKEP - MAROS Phase 1
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_302 MENARA_MAKASSAR - GRAHA_ISAT_MKS Phase 2
27-May-19 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_15 Taroang_Tb - Togo togo Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_188 PATANI_PL - GALESONG_SELATAN_AG
ET_2019_SLPP_New Site_Coverage_002 Bontolojong - loka Phase 3
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273 GTC_TG_BUNGA - TANJUNG_BUNGA Phase 2

28-May-19 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_15 Taroang_Tb - Togo togo Phase 2


ET_2019_SLPP_New Site_Coverage_002 Bontolojong - loka Phase 3
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273 GTC_TG_BUNGA - TANJUNG_BUNGA Phase 3
ET_2018_AccNetwPhase2_SLPP_02 LOPANA_PL - TUMPAAN Phase 1
29-May-19 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_15 Taroang_Tb - Togo togo Phase 2
ET_2019_SLPP_New Site_Coverage_002 Bontolojong - loka Phase 3
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273 GTC_TG_BUNGA - TANJUNG_BUNGA Phase 3
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_120 Takalala - Watansoppeng Phase 2
31-May-19 ET_2019_SLPP_New Site_Coverage_002 Bontolojong - loka Phase 3

13-Jun-19 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_05 PULAU_BARANGLOMPO - GTC_TG_BUNGA Phase 3

17-Jun-19 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_098 KARIANGO - SUDIANG Phase 2


ET_2018_4G_Overlay_SLPP_AddOnAndCAp_098 KARIANGO - SUDIANG Phase 2
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP057 BENGO - LALEBATA Phase 2
ET_2018_Overlay_MW_New Site_SLPP_143 SULTANABDULLAH_RAYA - TALLO Phase 1
ET_H2_2018_Expansion_TRMSwapUpg_SLPP_20 MOLIBAGU - MATAYANGAN Phase 2
Yunus, ijin sakit

18-Jun-19 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP057 BENGO - LALEBATA Phase 2

ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_05 PULAU_BARANGLOMPO - GTC_TG_BUNGA Phase 3

19-Jun-19 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_05 PULAU_BARANGLOMPO - GTC_TG_BUNGA Phase 3


ET_2018_Overlay_MW_Intermediate_SLPP_09 PALAKKA - WATAMPONE Phase 1
ET_2018_Overlay_MW_Intermediate_SLPP_24 MARE - TONRA Phase 1
ET_2018_Overlay_MW_New Site_SLPP_143 SULTANABDULLAH_RAYA - TALLO Phase 1

OTW Gorontalo
Yusril : Telkomsel
Yunus, ijin sakit

20-Jun-19 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_05 PULAU_BARANGLOMPO - GTC_TG_BUNGA Phase 3


ET_2018_Overlay_MW_Intermediate_SLPP_09 PALAKKA - WATAMPONE Phase 1
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP024 UJUNG_BULU2_XL - UJUNG_BULU1_TB Phase 2
Alfonsus : Otw Gonrontalo
SITE ID
SITE ID NE SITE NAME NE SITE NAME FE Scope
FE

28SKG021 PENEKI 28SKG003 WIRAE Swap Upgrade to 800Mbps


28PKJ002 PANGKEP 28MRS009 MAROS Swap Upg
28PKJ009 BONTOBONTO LABAKKANG Swap Upg
28UPD040 GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA Swap Upgrade to 200Mbps
28SKG024 NEW_SENGKANG 28SKG021 PENEKI Swap Upgrade to 800Mbps

28JNP002 TOGO_TOGO 28BTN001 BANTAENG Swap upgrade to 800Mbps


26TDO004 SONDAR 26TDO009 TARERAN Swap Upg
26TDO012 LEILEM_PL 26TDO004 SONDAR Swap Upg

28SKG021 PENEKI 28SKG003 WIRAE Swap Upgrade to 800Mbps


28UPD040 GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA Swap Upgrade to 200Mbps

28SKG003 WIRAE 28SKG006 SIWA Swap Upgrade to 800Mbps


28BLK020 PLAMPANG 28BLK004 TANA_BERU Add Paralel link 200Mbps without antenna

28UPD040 GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA Swap Upgrade to 200Mbps


26TDO004 SONDAR 26TDO009 TARERAN Swap Upg

28SKG003 WIRAE 28SKG006 SIWA Swap Upgrade to 800Mbps


28BLK020 PLAMPANG 28BLK004 TANA_BERU Add Paralel link 200Mbps without antenna

26TDO004 SONDAR 26TDO009 TARERAN Swap Upg


28UPD040 GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA Swap Upgrade to 200Mbps

28SKG003 WIRAE 28SKG006 SIWA Swap Upgrade to 800Mbps

28UPD040 GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA Swap Upgrade to 200Mbps


28UPD018 MENARA_MAKASSAR 28UPD099 GRAHA_ISAT_MKS Swap Upgrade to 200Mbps
28PKJ002 PANGKEP 28MRS009 MAROS Swap Upg
26MNU006 LEMBEAN 26MNU003 KAUDITAN Swap Upg
26TDO012 LEILEM_PL 26TDO004 SONDAR Swap Upg

28SKG003 WIRAE 28SKG006 SIWA Swap Upgrade to 800Mbps


28PKJ002 PANGKEP 28MRS009 MAROS Swap Upg
28UPD018 MENARA_MAKASSAR 28UPD099 GRAHA_ISAT_MKS Swap Upgrade to 200Mbps

28JNP023 TAROANG_TB 28JNP002 TOGO_TOGO Swap Upgrade to 200Mbps


28TKA014 PATANI_PL 28SNS031 GALESONG_SELATASwap Upgrade to 600Mbps

New Link
28UPD040 GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA Swap Upgrade to 200Mbps

28JNP023 TAROANG_TB 28JNP002 TOGO_TOGO Swap Upgrade to 200Mbps

New Link
28UPD040 GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA Swap Upgrade to 200Mbps
26AMR035 LOPANA_PL 26AMR003 TUMPAAN Swap Upg

28JNP023 TAROANG_TB 28JNP002 TOGO_TOGO Swap Upgrade to 200Mbps


28BTN028 BONTO_LOJONG_BTN 28BTN005 LOKA New Link
28UPD040 GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA Swap Upgrade to 200Mbps
28WTG003 TAKALALA 28WTG001 WATANSOPPENG Add Paralel link 200Mbps without antenna
28BTN028 BONTO_LOJONG_BTN 28BTN005 LOKA New Link

28UPD061 PULAU_BARANGLOMPO 28UPD040 GTC_TG_BUNGA Swap Upgrade to 400Mbps

28MRS007 KARIANGO 28UPD015 SUDIANG Swap Upgrade to 400Mbps. Change RAU to 8


28MRS007 KARIANGO 28UPD015 SUDIANG Swap Upgrade to 400Mbps. Change RAU to 8
28WTP012 BENGO 28WTP006 LALEBATA Swap Upgrade
28UPD289 SULTANABDULLAH_RAYA 28UPD009 TALLO New Link
26KTG006 MOLIBAGU 26KTG041 MATAYANGAN Add Paralel link 200Mbps without antenna

28WTP012 BENGO 28WTP006 LALEBATA Swap Upgrade

28UPD061 PULAU_BARANGLOMPO 28UPD040 GTC_TG_BUNGA Swap Upgrade to 400Mbps

28UPD061 PULAU_BARANGLOMPO 28UPD040 GTC_TG_BUNGA Swap Upgrade to 400Mbps


28WTP026 PALAKKA 28WTP001 WATAMPONE Swap Upg
28WTP014 MARE 28WTP015 TONRA Swap Upg
28UPD289 SULTANABDULLAH_RAYA 28UPD009 TALLO New Link

28UPD061 PULAU_BARANGLOMPO 28UPD040 GTC_TG_BUNGA Swap Upgrade to 400Mbps


28WTP026 PALAKKA 28WTP001 WATAMPONE Swap Upg
28BLK036 UJUNG_BULU2_XL 28BLK031 UJUNG_BULU1_TB Swap Upgrade
Final Config PIC On Site Detail pekerjaan

7E6692HP-ML6K-4x200Mbps-2.4DP-RLB4+0 Yusril Pointing


7ETNHP-3x200Mbps-1.8DP-RLB3+0 Alfin Dokumentasi
11ECN-TN-300Mbps-1.2SP-NP Nasrun Dokumentasi
23E6691HP-TN-200Mbps-0.6DP-NP Lutfi Visit tes kunci
7E6692-ML6K-4x200Mbps-2.4DP-RLB4+0 Basir OutBound
8EHP-ML6K-4x200Mbps-1.8DP-RLB4+0 Basir OutBound
13ETNHP-200Mpbs-1.2DP-NP Alfonsus Niw
15HPECN-TN-200Mpbs-1.2SP-NP Burhan Niw
7E6692HP-ML6K-4x200Mbps-2.4DP-RLB4+0 Yusril Pointing
23E6691HP-TN-200Mbps-0.6DP-NP Lutfi Visit tes kunci
7E6692HP-ML6K-4x200Mbps-2.4DP-RLB4+0 Yusril Perapihan - dokumentasi
7E6691-TN-2x200Mbps-2.4DP-RLB2+0 Basir Og Install
Ahmad Og Install
23E6691HP-TN-200Mbps-0.6DP-NP Lutfi Visit tes kunci
13ETNHP-200Mpbs-1.2DP-NP Alfonsus Troubleshoot Di sisi Tareran
7E6692HP-ML6K-4x200Mbps-2.4DP-RLB4+0 Yusril Niw moving
7E6691-TN-2x200Mbps-2.4DP-RLB2+0 Basir Og Install
Ahmad Og Install
13ETNHP-200Mpbs-1.2DP-NP Alfonsus dokumentasi disisi tareran
23E6691HP-TN-200Mbps-0.6DP-NP Lutfi Visit tes kunci
7E6692HP-ML6K-4x200Mbps-2.4DP-RLB4+0 Yusril dokumentasi ATP Netgear
Basir Pointing
23E6691HP-TN-200Mbps-0.6DP-NP Rauf Install
23E6651-TN-200Mbps-0.6SP-NP Aripudin NIW
7ETNHP-3x200Mbps-1.8DP-RLB3+0 Urif Dismantle
15HPECN-TN-200Mpbs-1.2SP-NP Alfonsus Dismantle
15HPECN-TN-200Mpbs-1.2SP-NP Alfonsus Dokumentasi
7E6692HP-ML6K-4x200Mbps-2.4DP-RLB4+0 Yusril Dokumentasi
7ETNHP-3x200Mbps-1.8DP-RLB3+0 Urif Dismantle
23E6651-TN-200Mbps-0.6SP-NP Aripudin NIW & ATP Netgear
15E6651-ML6K-200Mbps-1.2SP-NP Basir Mos&Install
13E6692-66692-3x200Mbps-1.2DP-RLB3+0 Ramli Install
11E6651HP-ML6K-290Mbps-0.6SP-NP Ahmad Mos&Install
23E6691HP-TN-200Mbps-0.6DP-NP Rauf Mos&Install
15E6651-ML6K-200Mbps-1.2SP-NP Basir Og Install
11E6651HP-ML6K-290Mbps-0.6SP-NP Ahmad Og Pointing
23E6691HP-TN-200Mbps-0.6DP-NP Rauf Og install & NIW
23ECN-TN-200Mpbs-0.6SP-NP Alfonsus Dismantle
15E6651-ML6K-200Mbps-1.2SP-NP Basir Og Install
11E6651HP-ML6K-290Mbps-0.6SP-NP Ahmad Dokumentasi
23E6691HP-TN-200Mbps-0.6DP-NP Rauf Dokumentasi di sisi tanjung bunga
7ETN-4x200Mbps-1.8DP-RLB4+0 Rio Install Upgrade
11E6651HP-ML6K-290Mbps-0.6SP-NP Ahmad TS dan Repointing

8E6651HP-ML6K-2x200Mbps-1.8SP-RLB2+0 Lutfi Mos&Install

8E6691HP-6692-2x200Mbps-1.2DP-RLB2+0 Lutfi Dismantle & Dokumentasi


8E6691HP-6692-2x200Mbps-1.2DP-RLB2+0 Yusril Dismantle & Dokumentasi
11E6651-TN-290Mbps-1.2SP-NP Nasrun Dokumentasi
23HPECN-TN-200Mbps-0.6SP-NP Dede Waiting Permit
7ETN-4x200Mbps-1.8DP-RLB4+0 Alfonsus Waiting Permit

11E6651-TN-290Mbps-1.2SP-NP Nasrun Dokumentasi / LALEBATA Done


8E6651HP-ML6K-2x200Mbps-1.8SP-RLB2+0 Lutfi Install

8E6651HP-ML6K-2x200Mbps-1.8SP-RLB2+0 Lutfi Install


7ECN-TN-200Mbps-1.8SP-NP Nasrun Dokumentasi & ATP Net Gear
7ECN-TNHP-200Mbps-1.8SP-NP Nasrun Dokumentasi & ATP Net Gear
23HPECN-TN-200Mbps-0.6SP-NP Dede Dokumentasi

8E6651HP-ML6K-2x200Mbps-1.8SP-RLB2+0 Lutfi Perapihan & Pointing


7ECN-TN-200Mbps-1.8SP-NP Nasrun Dokumentasi & ATP Net Gear
11E6651-TN-290Mbps-1.2SP-NP Yusril Dokumentasi
remark

Masih belum dapet budget pointing

Masih Alrm

Migrasi/ Done
Migrasi/ Done
Pointing Maksimal , tp yusril lg mengarah Ke siwa

mmu dari 6693 to 6692

Pointing

Lanjutin
Done
Done
Done
Done
Done
Done

install cancel masih comcase

Ada kerjaan upgrade lagi


Og Install
RFS
Dokumentasi di sisi tanjung bunga
done
RFS
Done
Done
Done Need doc Submit
Done Need doc Submit
og tgl 18jun19

kunci Bengo di bawa sama org FOP


OG
No Activity ID
1 ET_2018_Overlay_MW_New Site_SLPP_143
2 ET_2018_Overlay_MW_New Site_SLPP_018
3 ET_2018_Overlay_MW_New Site_SLPP_024
4 ET_2018_Overlay_MW_Intermediate_SLPP_15
5 ET_2018_Overlay_MW_Intermediate_SLPP_61
6 ET_2018_Overlay_MW_New Site_SLPP_050
7 ET_2018_Overlay_MW_Intermediate_SLPP_51
8 ET_2018_Overlay_MW_Intermediate_SLPP_50
9 ET_2018_Overlay_MW_Intermediate_SLPP_40
10 ET_2018_Overlay_MW_Intermediate_SLPP_01
11 ET_2018_Overlay_MW_Intermediate_SLPP_05
12 ET_2018_AccNetwPhase2_SLPP_40
13 ET_2018_Overlay_MW_Intermediate_SLPP_09
14 ET_2018_Overlay_MW_Intermediate_SLPP_24
15 ET_2018_Overlay_MW_Intermediate_SLPP_62
16 ET_2018_Overlay_MW_New Site_SLPP_053
17 ET_2018_Overlay_MW_New Site_SLPP_055
18 ET_2018_Overlay_MW_Intermediate_SLPP_69
19 ET_2018_AccNetwPhase2_SLPP_39
20 ET_2018_AccNetwPhase2_SLPP_04
21 ET_2018_AccNetwPhase2_SLPP_06
22 ET_2018_AccNetwPhase2_SLPP_08
23 ET_2018_AccNetwPhase2_SLPP_18
24 ET_2018_AccNetwPhase2_SLPP_21
25 ET_2018_AccNetwPhase2_SLPP_17
26 ET_2018_AccNetwPhase2_SLPP_19
27 ET_2018_AccNetwPhase2_SLPP_05
28 ET_2018_AccNetwPhase2_SLPP_16
29 ET_2018_AccNetwPhase2_SLPP_30
30 ET_2018_AccNetwPhase2_SLPP_35
31 ET_2018_AccNetwPhase2_SLPP_07
32 ET_2018_AccNetwPhase2_SLPP_10
33 ET_2018_AccNetwPhase2_SLPP_12
34 ET_2018_AccNetwPhase2_SLPP_14
35 ET_2018_AccNetwPhase2_SLPP_20
36 ET_2018_AccNetwPhase2_SLPP_24
37 ET_2018_AccNetwPhase2_SLPP_26
38 ET_2018_AccNetwPhase2_SLPP_27
39 ET_2018_AccNetwPhase2_SLPP_36
40 ET_2018_AccNetwPhase2_SLPP_37
41 ET_2018_AccNetwPhase2_SLPP_42
PO
Link route SITE ID NE
PHASE
SULTANABDULLAH_RAYA - TALLO Phase 1 28UPD289
S_WAHIDIN_SDR - GL_TAMALANREA Phase 1 28UPD209
WEWANGREWU - NEW_SENGKANG Phase 1 28SKG013
ANABANUA - TANRUTEDONG Phase 1 28SKG002
NEW_SENGKANG - SIDENRENG Phase 1 28SKG024
SITAMPAE - NEW_SENGKANG Phase 1 28SKG011
ROAD_TO_MALINO - MALINO Phase 1 28SNS029
PANOANG - PONRE Phase 1 28BTN002
PELABUHAN_BIRA - BULUKUMBA Phase 1 28BLK002
NODAL_BARANG_BARANG - NODAL_LAMBANGIA Phase 1 28SLY017
PAMATATA - ROAD_BATANGMATA Phase 1 28SLY004
NODAL_LAMBANGIA - BANDARA_SELAYAR Phase 1 28SLY018
PALAKKA - WATAMPONE Phase 1 28WTP026
MARE - TONRA Phase 1 28WTP014
WATANSOPPENG - NEW_SENGKANG Phase 1 28WTG001
BUKAKA_BONE - WATAMPONE Phase 1 28WTP017
TANEETERIATTANG_TIMUR - WATAMPONE Phase 1 28WTP018
BONTOBULAENG - PALATTAE Phase 1 28SIN005
LANUD / RD_TO_TUTUYAN - NODAL_LANUD / N_LANUD_1 Phase 1 26KTG007 / 26KTG037
LIWUTUNG - TOMBATU Phase 1 26AMR019
RATAHAN - LIWUTUNG Phase 1 26AMR004
TOMBATU - RD_TO_TOMBATU Phase 1 26AMR006
KOTABUNAN - TUTUYAN Phase 1 26KTG024
TUTUYAN - RD_TO_TUTUYAN Phase 1 26KTG028
TRANS_PATOA - MT-DUDEPO_BARAT_MT Phase 1 26KTG017
PINOLOSIAN - LINAWAN Phase 1 26KTG026
POIGAR / RD_TO_TOMBATU - GN_SOKO Phase 1 26KTG025 / 26AMR026
BINTAUNA - PAMOMONTOA Phase 1 26KTG023
TALAWAAN_PL - PANIKI Phase 1 26TDO035
LEILEM_PL - SONDAR Phase 1 26TDO012
MODOINDING - MOKOBANG Phase 1 26AMR002
BUMBUNGON - PONOMPIAAN Phase 1 26KTG046
DULODUO - IBOLIAN Phase 1 26KTG004
LINAWAN/ RD_TO_PINOLOSIAN - MOLIBAGU Phase 1 26KTG036
DUDEPO_BARAT_MT - LINAWAN Phase 1 26KTG016
ATINGGOLA - BOROKO_BB Phase 1 27ISM024
NODAL_LANUD - DANAU_MOOAT Phase 1
TAAS - TAX_OFFICE Phase 1 26MDO025
MOTOLING - TARERAN Phase 1 26AMR005
SONDAR - TARERAN Phase 1 26TDO004
TOMOHON2 - GN_WAWO Phase 1 26TMH014

Ini target RFS Phase 1 & Phase 2

Plan RFS Week 22 4 site


Plan RFS Week 24 5 site

Dan ini plan Migration

Plan Migration Week 22 4 site

Plan Migration Week 24 5 site


SITE NAME NE SITE ID FE SITE NAME FE Scope
SULTANABDULLAH_RAYA 28UPD009 TALLO New Link
S_WAHIDIN_SDR 28UPD008 GL_TAMALANREA New Link
WEWANGREWU 28SKG024 NEW_SENGKANG New Link
ANABANUA 28SDR002 TANRUTEDONG Swap Upg
NEW_SENGKANG 28SDR001 SIDENRENG Swap Upg
SITAMPAE 28SKG024 NEW_SENGKANG New Link
ROAD_TO_MALINO 28SNS001 MALINO Swap Upg
PANOANG 28BLK006 PONRE Swap Upg
PELABUHAN_BIRA 28BLK001 BULUKUMBA Swap Upg
NODAL_BARANG_BARANG 28NOD001 NODAL_LAMBANGIA Swap Upg
PAMATATA 28SLY019 ROAD_BATANGMATA Swap Upg
NODAL_LAMBANGIA 28SLY003 BANDARA_SELAYAR Swap Upg
PALAKKA 28WTP001 WATAMPONE Swap Upg
MARE 28WTP015 TONRA Swap Upg
WATANSOPPENG 28SKG024 NEW_SENGKANG Swap Upg
BUKAKA_BONE 28WTP001 WATAMPONE New Link
TANEETERIATTANG_TIMUR 28WTP001 WATAMPONE New Link
BONTOBULAENG 28WTP005 PALATTAE Swap Upg
LANUD / RD_TO_TUTUYAN 28RPT002 / 26KTG018 NODAL_LANUD / N_LANUD_1 Swap Upg
LIWUTUNG 26AMR006 TOMBATU Swap Upg
RATAHAN 26AMR019 LIWUTUNG Swap Upg
TOMBATU 26AMR026 RD_TO_TOMBATU Swap Upg
KOTABUNAN 26KTG011 TUTUYAN Swap Upg
TUTUYAN 26KTG037 RD_TO_TUTUYAN Swap Upg
TRANS_PATOA 26KTG016 MT-DUDEPO_BARAT_MT Swap Upg
PINOLOSIAN 26KTG036 LINAWAN Swap Upg
POIGAR / RD_TO_TOMBATU 26AMR008 GN_SOKO Swap Upg
BINTAUNA 26KTG012 PAMOMONTOA Swap Upg
TALAWAAN_PL 26MNU001 PANIKI Swap Upg
LEILEM_PL 26TDO004 SONDAR Swap Upg
MODOINDING 26AMR021 MOKOBANG Swap Upg
BUMBUNGON 26KTG001 PONOMPIAAN Swap Upg
DULODUO 26KTG005 IBOLIAN Swap Upg
LINAWAN/ RD_TO_PINOLOSIAN 26KTG006 MOLIBAGU Swap Upg
DUDEPO_BARAT_MT 26KTG036 LINAWAN Swap Upg
ATINGGOLA 26KTG044 BOROKO_BB Swap Upg
NODAL_LANUD 26KTG030 DANAU_MOOAT Swap Upg
TAAS 26MDO003 TAX_OFFICE Swap Upg
MOTOLING 26TDO009 TARERAN Swap Upg
SONDAR 26TDO009 TARERAN Swap Upg
TOMOHON2 26TMH013 GN_WAWO Swap Upg

FS Phase 1 & Phase 2

eek 22 4 site
eek 24 5 site

Migration

on Week 22 4 site

on Week 24 5 site
Final Config Area Plan
23HPECN-TN-200Mbps-0.6SP-NP MAKASSAR 3-Jun
23ECN-TN-200Mbps-0.6SP-NP MAKASSAR 6-Jun
7ECN-TN-200Mbps-1.8SP-NP SENGKANG 6-Jun
7ETN-200Mbps-1.8DP-NP SENGKANG 11-Jun
7ETNHP-3x200Mbps-2.4DP-SD SENGKANG 7-Jun
23ECN-TN-200Mbps-1.2SP-NP SENGKANG 7-Jun
11ETN-2x300Mbps-1.2DP-RLB2+0 SUNGGUMINASA 10-Jun
7ETNHP-3x200Mbps-1.2DP-RLB3+0 BULUKUMBA 10-Jun
7ETNHP-4x200Mbps-2.4DP-SD BULUKUMBA 10-Jun
7ETN-200Mbps-2.4DP-NP SELAYAR 11-Jun
15ECN-TN-200Mbps-1.2SP-NP SELAYAR 12-Jun
13ETN-200Mpbs-1.2SP-NP SELAYAR 13-Jun
7ECN-TN-200Mbps-1.8SP-NP BONE 12-Jun
7ECN-TNHP-200Mbps-1.8SP-NP BONE 12-Jun
7ETNHP-3x200Mbps-2.4DP-RLB3+0 SOPPENG 13-Jun
23ECN-TN-200Mbps-0.6SP-NP BONE 28-Jun
13ECN-TN-200Mbps-1.2SP-NP BONE 14-Jun
7ETNHP-3x200Mbps-1.8DP-RLB3+0 SINJAI 14-Jun
7ETN-200Mpbs-1.8DP-NP KOTAMUBAGO 29-Jun
11ETN-2x300Mpbs-1.2DP-RLB2+0 AMURANG 17-Jun
7ECN-TN-200Mpbs-1.2SP-NP AMURANG 17-Jun
7ETN-2x200Mpbs-1.8DP-RLB2+0 AMURANG 18-Jun
11ETN-300Mpbs-1.2DP-NP KOTAMUBAGO 27-Jun
13ETN-2x200Mpbs-0.6DP-RLB2+0 KOTAMUBAGO 24-Jun
13HPECN-TN-200Mpbs-1.2SP-NP KOTAMUBAGO 18-Jun
11ECN-TN-300Mpbs-1.2SP-NP KOTAMUBAGO 19-Jun
7HPECN-TN-200Mpbs-1.8SP-NP KOTAMUBAGO 20-Jun
7ETN-200Mpbs-1.8DP-NP KOTAMUBAGO 22-Jun
15ECN-TN-200Mpbs-0.6SP-NP TODOALING 19-Jun
15HPECN-TN-200Mpbs-1.2SP-NP TODOALING 19-Jun
13ETN-4x200Mpbs-0.6DP-RLB4+0 AMURANG 21-Jun
13ETN-4x200Mpbs-1.2DP-RLB4+0 KOTAMUBAGO 22-Jun
11ETN-4x300Mpbs-1.2DP-RLB4+0 KOTAMUBAGO 23-Jun
11ETN-4x300Mpbs-1.2DP-RLB4+0 KOTAMUBAGO 24-Jun
7ETNHP-200Mpbs-1.8DP-NP KOTAMUBAGO 25-Jun
7ETN-200Mpbs-1.8SP-1+1 SD Kotamubago 26-Jun
23ETN-200Mpbs-0.6DP-NP Kotamubago 27-Jun
23ETN-3x200Mpbs-0.6DP-RLB3+0 MANADO 28-Jun
7ETNHP-2x200Mpbs-3DP-RLB2x(1+1) SD AMURANG 27-Jun
13ETNHP-200Mpbs-1.2DP-NP TODOALING 30-Jun
23ETN-200Mpbs-0.6DP-NP TOMOHON 30-Jun
Phase - multiple -

Count - Activity ID Area2


Remark ATP MAKASSAR SULSEL SULUT Total Result
Assignment Cancel 1 12 29 42
CPL Submited 2 2
Reject 2 9 1 12
NEED ON SITE 2 10 12
NY RFS 1 1
Endorse 3 29 32
Endorse By MOM 8 75 21 104
Interference 3 3
ATP ACCEPT 1 1
Comcase 3 3
Endorsed by FSO 15 15
Hold 1 1
Obstacle 1 1
Partial Accept (FATP) 3 1 4
Partial Accept (RLDW) 5 5
TO FSO 5 5
Total Result 17 154 72 243
Reject 3 38 3 44
Reject to ASP 1 2 2
Reject to ASP 2 1 1 2
NEED ON SITE 2 29 7 38
NY RFS 9 3 12
Endorse 1 16 1 18
Endorse By MOM 6 21 28 55
Interference 1 1
Grand Total 17 153 74 244

Count of Activity ID Area


Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 11 26 38
Submited 1 19 2 22
CPL Submited 1 6 2 9
Reject 3 34 3 40
Reject to ASP 1 1 1
Reject to ASP 2 1 1
NEED ON SITE 2 26 7 35
NY RFS 9 3 12
Endorse 1 17 1 19
Endorse By MOM 8 28 30 66
Interference 1 1
Grand Total 17 153 74 244

Count of Activity ID Area


Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 11 26 38
Submited 1 18 2 21
CPL Submited 1 7 2 10
Reject 3 33 3 39
Reject to ASP 1 1 1
Reject to ASP 2 1 1
NEED ON SITE 2 23 7 32
NY RFS 8 3 11
Endorse 1 18 1 20
Endorse By MOM 8 32 30 70
Interference 1 1
Grand Total 17 153 74 244

Count of Activity ID Area


Row Labels MAKASSAR SULSEL SULUT Grand Total
Assignment Cancel 1 11 26 38
Submited 1 20 2 23
CPL Submited 1 7 2 10
Reject 3 33 3 39
Reject to ASP 1 1 1
Reject to ASP 2 1 1
NEED ON SITE 2 21 7 30
NY RFS 8 3 11
Endorse 1 18 1 20
Endorse By MOM 8 32 30 70
Interference 1 1
Grand Total 17 153 74 244
Activity ID

ET_2018_AccNetwPhase2_SLPP_04
ET_2018_AccNetwPhase2_SLPP_06
ET_2018_AccNetwPhase2_SLPP_08
ET_2018_Overlay_MW_Intermediate_SLPP_50
ET_2018_Overlay_MW_Intermediate_SLPP_09
ET_2018_Overlay_MW_Intermediate_SLPP_24
ET_2018_Overlay_MW_New Site_SLPP_053
ET_2018_Overlay_MW_New Site_SLPP_055
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_122
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_121
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_301
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP057
ET_2018_Overlay_MW_Intermediate_SLPP_40
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_289
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP020
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP024
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_138
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP107
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_161
ET_2018_AccNetwPhase2_SLPP_39
ET_2018_AccNetwPhase2_SLPP_18
ET_2018_AccNetwPhase2_SLPP_21
ET_2018_AccNetwPhase2_SLPP_17
ET_2018_AccNetwPhase2_SLPP_19
ET_2018_AccNetwPhase2_SLPP_05
ET_2018_AccNetwPhase2_SLPP_16
ET_2018_AccNetwPhase2_SLPP_14
ET_2018_AccNetwPhase2_SLPP_20
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_005
ET_2018_Overlay_MW_New Site_SLPP_143
ET_2018_Overlay_MW_New Site_SLPP_018
ET_2018_Overlay_MW_New Site_SLPP_042
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_095
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_339
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP050
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_098
ET_2018_4G_Overlay_SLPP_AddOnAndCap_324
ET_2018_Overlay_MW_New Site_SLPP_024
ET_2018_Overlay_MW_Intermediate_SLPP_01
ET_2018_Overlay_MW_Intermediate_SLPP_05
ET_2018_Overlay_MW_Intermediate_SLPP_15
ET_2018_Overlay_MW_Intermediate_SLPP_62
ET_2018_AccNetwPhase2_SLPP_40
ET_2018_AccNetwPhase2_SLPP_30
ET_2018_AccNetwPhase2_SLPP_35
ET_2018_Overlay_MW_Intermediate_SLPP_51
ET_2018_AccNetwPhase2_SLPP_37
ET_2018_Overlay_MW_New Site_SLPP_050
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP061
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_120
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_063
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_279
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_074
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_024
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_307
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP083
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_265
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_267
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_163
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP049
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_240
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP097
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP128
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_362
ET_2018_4GOverlay_MWFor_FO_Mitigation_5
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_365
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_073
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_169
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_096
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_168
Link route PO PHASE SITE ID NE

LIWUTUNG - TOMBATU Phase 1 26AMR019


RATAHAN - LIWUTUNG Phase 1 26AMR004
TOMBATU - RD_TO_TOMBATU Phase 1 26AMR006
PANOANG - PONRE Phase 1 28BTN002
PALAKKA - WATAMPONE Phase 1 28WTP026
MARE - TONRA Phase 1 28WTP014
BUKAKA_BONE - WATAMPONE Phase 1 28WTP017
TANEETERIATTANG_TIMUR - WATAMPONE Phase 1 28WTP018
LAPPARIAJA - LALEBATA Phase 2 28WTP004
LALEBATA - TAKALALA Phase 2 28WTP006
BAJOE - WATAMPONE Phase 2 28WTP003
BENGO - LALEBATA Phase 2 28WTP012
PELABUHAN_BIRA - BULUKUMBA Phase 1 28BLK002
KALUMEME_TB - PONRE Phase 2 28BLK032
BONTOTIRO - TANA_BERU Phase 2 28BLK018
UJUNG_BULU2_XL - UJUNG_BULU1_TB Phase 2 28BLK036
ENREKANG - BONNE Phase 2 28ENR001
QUALITY_GORONTALO - GORONTALO Phase 2 27GTO002
GORONTALO - LIMBOTO Phase 2 27GTO001
LANUD / RD_TO_TUTUYAN - NODAL_LANUD / N_LANUD_1 Phase 1 26KTG007 / 26KTG037
KOTABUNAN - TUTUYAN Phase 1 26KTG024
TUTUYAN - RD_TO_TUTUYAN Phase 1 26KTG028
TRANS_PATOA - MT-DUDEPO_BARAT_MT Phase 1 26KTG017
PINOLOSIAN - LINAWAN Phase 1 26KTG026
POIGAR / RD_TO_TOMBATU - GN_SOKO Phase 1 26KTG025 / 26AMR026
BINTAUNA - PAMOMONTOA Phase 1 26KTG023
LINAWAN/ RD_TO_PINOLOSIAN - MOLIBAGU Phase 1 26KTG036
DUDEPO_BARAT_MT - LINAWAN Phase 1 26KTG016
PINOLOSIAN - LINAWAN Phase 2 26KTG026
SULTANABDULLAH_RAYA - TALLO Phase 1 28UPD289
S_WAHIDIN_SDR - GL_TAMALANREA Phase 1 28UPD209
PONGTIKU_IB - KERUNG_KERUNG Phase 2 28UPD221
PETTARANI_PL - KERUNG_KERUNG Phase 2 28UPD160
GTC_TG_BUNGA - TANJUNG_BUNGA Phase 2 28UPD040
TIKALA_TB - TAX_OFFICE Phase 2 26MDO020
MALLAWA - LAPPARIAJA Phase 2 28MRS001
KARIANGO - SUDIANG Phase 2 28MRS007
BATUPUTIH - PALOPO Phase 2 28PLO002
WEWANGREWU - NEW_SENGKANG Phase 1 28SKG013
NODAL_BARANG_BARANG - NODAL_LAMBANGIA Phase 1 28SLY017
PAMATATA - ROAD_BATANGMATA Phase 1 28SLY004
ANABANUA - TANRUTEDONG Phase 1 28SKG002
WATANSOPPENG - NEW_SENGKANG Phase 1 28WTG001
NODAL_LAMBANGIA - BANDARA_SELAYAR Phase 1 28SLY018
TALAWAAN_PL - PANIKI Phase 1 26TDO035
LEILEM_PL - SONDAR Phase 1 26TDO012
ROAD_TO_MALINO - MALINO Phase 1 28SNS029
SONDAR - TARERAN Phase 1 26TDO004
SITAMPAE - NEW_SENGKANG Phase 1 28SKG011
TETEWATU - CABBENGE Phase 2 28WTG017
TAKALALA - WATANSOPPENG Phase 2 28WTG003
SELAYAR - BATANGMATA Phase 2 28SLY001
ONTO_PL - BATANGMATA Phase 2 28SLY021
NODAL BARANG-BARANG - LEMBANGIA_SELAYAR Phase 2 28SLY017
MONCONG_BALANG_AG - SUNGGUMINASA Phase 2 28SNS041
MASAMATURU_PL - PALEKKO2_AG Phase 2 28TKA017
MADDENRA - RAPPANG Phase 2 28SDR019
LEMBANGIA_SELAYAR - BANDARA_SELAYAR Phase 2 28SLY023
LANCIRANG - SIDENRENG Phase 2 28SDR016
GALESONG_SELATAN_AG - LIMBUNG Phase 2 28SNS031
DONRI_DONRI - BATU_BATU Phase 2 28WTG004
CEMPA_PASAR - SIDENRENG Phase 2 28PIN005
BUNGI - PEKKABATA Phase 2 28PIN018
BUKI_SELAYAR - BATANGMATA Phase 2 28SLY008
BONTOMARANNU_PL - GALESONG_SELATAN_AG Phase 2 28TKA012
BATANGMATA - PELABUHAN_BIRA Phase 2 28SLY002
BAREMBENG_AG - LIMBUNG Phase 2 28SNS043
BANDARA_SELAYAR - BATANGMATA Phase 2 28SLY003
BAJENG2_AG - PALEKKO2_AG Phase 2 28TKA016
ARASSIE - SIDENRENG Phase 2 28PIN006
PALEKKO2_AG - PALEKKO Phase 2 28SNS034
SITE NAME NE SITE ID FE SITE NAME FE Scope

LIWUTUNG 26AMR006 TOMBATU Swap Upg


RATAHAN 26AMR019 LIWUTUNG Swap Upg
TOMBATU 26AMR026 RD_TO_TOMBATU Swap Upg
PANOANG 28BLK006 PONRE Swap Upg
PALAKKA 28WTP001 WATAMPONE Swap Upg
MARE 28WTP015 TONRA Swap Upg
BUKAKA_BONE 28WTP001 WATAMPONE New Link
TANEETERIATTANG_TIMUR 28WTP001 WATAMPONE New Link
LAPPARIAJA 28WTP006 LALEBATA Add Paralel li
LALEBATA 28WTG003 TAKALALA Add Paralel li
BAJOE 28WTP001 WATAMPONE Swap Upgrade
BENGO 28WTP006 LALEBATA Swap Upgrade
PELABUHAN_BIRA 28BLK001 BULUKUMBA Swap Upg
KALUMEME_TB 28BLK006 PONRE Swap Upgrade
BONTOTIRO 28BLK004 TANA_BERU Swap Upgrade.
UJUNG_BULU2_XL 28BLK031 UJUNG_BULU1_TB Swap Upgrade
ENREKANG 28PIN003 BONNE Swap Upgrade
QUALITY_GORONTALO 27GTO001 GORONTALO Swap Upgrade.
GORONTALO 27ISM001 LIMBOTO Swap Upgrade
LANUD / RD_TO_TUTUYAN 28RPT002 / 26KTG018 NODAL_LANUD / N_LANUD_1 Swap Upg
KOTABUNAN 26KTG011 TUTUYAN Swap Upg
TUTUYAN 26KTG037 RD_TO_TUTUYAN Swap Upg
TRANS_PATOA 26KTG016 MT-DUDEPO_BARAT_MT Swap Upg
PINOLOSIAN 26KTG036 LINAWAN Swap Upg
POIGAR / RD_TO_TOMBATU 26AMR008 GN_SOKO Swap Upg
BINTAUNA 26KTG012 PAMOMONTOA Swap Upg
LINAWAN/ RD_TO_PINOLOSIAN 26KTG006 MOLIBAGU Swap Upg
DUDEPO_BARAT_MT 26KTG036 LINAWAN Swap Upg
PINOLOSIAN 26KTG036 LINAWAN Add Paralel li
SULTANABDULLAH_RAYA 28UPD009 TALLO New Link
S_WAHIDIN_SDR 28UPD008 GL_TAMALANREA New Link
PONGTIKU_IB 28UPD016 KERUNG_KERUNG New Link, MMU
PETTARANI_PL 28UPD016 KERUNG_KERUNG Swap upgrade
GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA Swap Upgrade
TIKALA_TB 26MDO003 TAX_OFFICE Swap upgrade
MALLAWA 28WTP004 LAPPARIAJA Swap Upgrade
KARIANGO 28UPD015 SUDIANG Swap Upgrade
BATUPUTIH 28PLO001 PALOPO Swap Upgrade
WEWANGREWU 28SKG024 NEW_SENGKANG New Link
NODAL_BARANG_BARANG 28NOD001 NODAL_LAMBANGIA Swap Upg
PAMATATA 28SLY019 ROAD_BATANGMATA Swap Upg
ANABANUA 28SDR002 TANRUTEDONG Swap Upg
WATANSOPPENG 28SKG024 NEW_SENGKANG Swap Upg
NODAL_LAMBANGIA 28SLY003 BANDARA_SELAYAR Swap Upg
TALAWAAN_PL 26MNU001 PANIKI Swap Upg
LEILEM_PL 26TDO004 SONDAR Swap Upg
ROAD_TO_MALINO 28SNS001 MALINO Swap Upg
SONDAR 26TDO009 TARERAN Swap Upg
SITAMPAE 28SKG024 NEW_SENGKANG New Link
TETEWATU 28WTG002 CABBENGE Swap Upgrade
TAKALALA 28WTG001 WATANSOPPENG Add Paralel li
SELAYAR 28SLY002 BATANGMATA Swap Upgrade
ONTO_PL 28SLY002 BATANGMATA Swap Upgrade
NODAL BARANG-BARANG 28SLY023 LEMBANGIA_SELAYAR Add Paralel li
MONCONG_BALANG_AG 28SNS009 SUNGGUMINASA Swap Upgrade
MASAMATURU_PL 28SNS034 PALEKKO2_AG Swap Upgrade
MADDENRA 28SDR005 RAPPANG Swap Upgrade
LEMBANGIA_SELAYAR 28SLY003 BANDARA_SELAYAR Swap Upgrade
LANCIRANG 28SDR001 SIDENRENG Swap Upgrade
GALESONG_SELATAN_AG 28SNS005 LIMBUNG Swap Upgrade
DONRI_DONRI 28WTG005 BATU_BATU Swap Upgrade
CEMPA_PASAR 28SDR001 SIDENRENG Add Paralel li
BUNGI 28PIN004 PEKKABATA Swap Upgrade
BUKI_SELAYAR 28SLY002 BATANGMATA New Link And
BONTOMARANNU_PL 28SNS031 GALESONG_SELATAN_AG Swap upgrade
BATANGMATA 28BLK002 PELABUHAN_BIRA Add Paralel li
BAREMBENG_AG 28SNS005 LIMBUNG Swap upgrade
BANDARA_SELAYAR 28SLY002 BATANGMATA Swap upgrade
BAJENG2_AG 28SNS034 PALEKKO2_AG Swap Upgrade
ARASSIE 28SDR001 SIDENRENG Swap Upgrade
PALEKKO2_AG 28SNS006 PALEKKO Swap Upgrade
Final Config Area Plan

11ETN-2x300Mpbs-1.2DP-RLB2+0 AMURANG 11-Jun


7ECN-TN-200Mpbs-1.2SP-NP AMURANG 11-Jun
7ETN-2x200Mpbs-1.8DP-RLB2+0 AMURANG 10-Jun
7ETNHP-3x200Mbps-1.2DP-RLB3+0 BANTAENG
7ECN-TN-200Mbps-1.8SP-NP BONE 4-Jun
7ECN-TNHP-200Mbps-1.8SP-NP BONE 4-Jun
23ECN-TN-200Mbps-0.6SP-NP BONE 4-Jun
13ECN-TN-200Mbps-1.2SP-NP BONE 4-Jun
7ETNHP-4x200Mbps-1.2DP-RLB4+0 BONE 4-Jun
7ETNHP-4x200Mbps-1.8DP-RLB4+0 BONE 4-Jun
13E6691-TN-200Mbps-1.2DP-NP BONE 4-Jun
11E6651-TN-290Mbps-1.2SP-NP BONE 4-Jun
7ETNHP-4x200Mbps-2.4DP-SD BULUKUMBA 7-Jun
11E6651-TN-290Mbps-1.2SP-NP BULUKUMBA 8-Jun
8E6651-TNHP-200Mbps-1.2SP-NP BULUKUMBA 9-Jun
11E6651-TN-290Mbps-1.2SP-NP BULUKUMBA 10-Jun
7E6691HP-ML6K-2x200Mbps-1.8DP-RLB2+0 ENREKANG 15-Jun
23E6651-ML6K-200Mbps-0.6SP-NP GORONTALO 13-Jun
7E6691-ML6K-2x200Mbps-1.8DP-RLB2+0 GORONTALO 13-Jun
7ETN-200Mpbs-1.8DP-NP KOTAMUBAGO 10-Jun
11ETN-300Mpbs-1.2DP-NP KOTAMUBAGO 10-Jun
13ETN-2x200Mpbs-0.6DP-RLB2+0 KOTAMUBAGO 10-Jun
13HPECN-TN-200Mpbs-1.2SP-NP KOTAMUBAGO 10-Jun
11ECN-TN-300Mpbs-1.2SP-NP KOTAMUBAGO 10-Jun
7HPECN-TN-200Mpbs-1.8SP-NP KOTAMUBAGO 10-Jun
7ETN-200Mpbs-1.8DP-NP KOTAMUBAGO 10-Jun
11ETN-4x300Mpbs-1.2DP-RLB4+0 KOTAMUBAGO 10-Jun
7ETNHP-200Mpbs-1.8DP-NP KOTAMUBAGO 10-Jun
11ECN-TN-2x290Mpbs-1.2SP-RLB2+0 KOTAMUBAGO 10-Jun
23HPECN-TN-200Mbps-0.6SP-NP MAKASSAR 3-Jun
23ECN-TN-200Mbps-0.6SP-NP MAKASSAR 3-Jun
23ECN-TN-200Mbps-0.6SP-NP MAKASSAR 3-Jun
23E6651-TN-2x200Mbps-0.6SP-RLB2+0 MAKASSAR 3-Jun
23E6691HP-TN-200Mbps-0.6DP-NP MAKASSAR 3-Jun
23E6651-TNHP-200Mbps-0.6SP-NP MANADO 11-Jun
7E6651-TN-200Mbps-2.4SP-NP MAROS 3-Jun
8E6691HP-6692-2x200Mbps-1.2DP-RLB2+0 MAROS 3-Jun
15E6651-ML6K-2x200Mbps-1.2DP-RLB2+0 PALOPO 6-Jun
7ECN-TN-200Mbps-1.8SP-NP SENGKANG 4-Jun
7ETN-200Mbps-2.4DP-NP SELAYAR 14-Jun
15ECN-TN-200Mbps-1.2SP-NP SELAYAR 14-Jun
7ETN-200Mbps-1.8DP-NP SENGKANG 4-Jun
7ETNHP-3x200Mbps-2.4DP-RLB3+0 SOPPENG 5-Jun
13ETN-200Mpbs-1.2SP-NP SELAYAR 14-Jun
15ECN-TN-200Mpbs-0.6SP-NP TODOALING 11-Jun
15HPECN-TN-200Mpbs-1.2SP-NP TODOALING 11-Jun
11ETN-2x300Mbps-1.2DP-RLB2+0 SUNGGUMINASA 3-Jun
13ETNHP-200Mpbs-1.2DP-NP TODOALING 11-Jun
23ECN-TN-200Mbps-1.2SP-NP SENGKANG 5-Jun
7E6651-ML6KHP-200Mbps-1.2SP-NP SOPPENG 5-Jun
7ETN-4x200Mbps-1.8DP-RLB4+0 SOPPENG 5-Jun
7E6692HP-6692-2x200Mbps-1.8DP-RLB2+0 SELAYAR 14-Jun
11E6651-6692-290Mbps-1.2SP-NP SELAYAR 14-Jun
7E6691-ML6K-2x200Mbps-2.4DP-RLB2+0 SELAYAR 14-Jun
8E6691HP-6692-3x200Mbps-1.2DP-RLB3+0 SUNGGUMINASA 3-Jun
23E6651-TN-200Mbps-1.2SP-NP TAKALAR 3-Jun
7E6651-TNHP-200Mbps-1.2SP-NP SIDRAP 5-Jun
11E6692-ML6K-2x290Mbps-1.2DP-RLB2+0 SELAYAR 14-Jun
8E6691HP-6692-2x200Mbps-1.8DP-RLB2+0 SIDRAP 5-Jun
8E6692-TN-4x200Mbps-1.8DP-RLB4+0 SUNGGUMINASA 4-Jun
7E6651-TN-200Mbps-1.8SP-NP SOPPENG 5-Jun
7E6692HP-ML6K-4x200Mbps-2.4DP-SD PINRANG 6-Jun
7E6651-ML6K-200Mbps-1.8SP-NP PINRANG 6-Jun
15E6651-ML6K-200Mbps-1.2SP-NP SELAYAR 14-Jun
15E6651-ML6K-200Mbps-1.2SP-NP TAKALAR 4-Jun
7E6692-TNHP-4x200Mpbs-3.0DP-RLB4x(1+1) SD SELAYAR 14-Jun
11E6651-TN-290Mbps-1.2SP-NP SUNGGUMINASA 4-Jun
7E6692-6692-3x200Mbps-2.4DP-RLB3+0 SELAYAR 14-Jun
13E6651-TN-2x200Mbps-1.2DP-RLB2+0 TAKALAR 4-Jun
7E6692-TN-3x200Mbps-1.8DP-RLB3+0 PINRANG 6-Jun
15ETN-3x200Mbps-1.2DP-RLB3+0 SUNGGUMINASA 4-Jun
ATF No PM Vendor Requester Area Site ID Site Name ATF Status
PR-REC-0219-31602 Tutiek Sundari M Hasan MAKASSAR 28PKJ008 TONASA1 Approved
PR-REC-0219-31632 Tutiek Sundari M Hasan MAKASSAR 28SNS008 KANREAPIA Approved
PR-REC-0219-31657 Tutiek Sundari M Hasan MAKASSAR 28PKJ002 PANGKEP Approved
PR-REC-0219-32173 Tutiek Sundari M Hasan MAKASSAR 28BLK034 CAILE_PL Approved
PR-REC-0219-32195 Tutiek Sundari M Hasan MAKASSAR 28PKJ002 PANGKEP Approved
PR-REC-0219-32225 Tutiek Sundari M Hasan MAKASSAR 28SNS029 ROAD_TO_MALINO Approved
PR-REC-0219-32250 Tutiek Sundari M Hasan MAKASSAR 28MRS009 MAROS Approved
PR-REC-0219-32766 Tutiek Sundari M Hasan MAKASSAR 28BLK006 PONRE Approved
Activity Type Site ID / WH ID (Destination) Site Name / WH Name (Destination)
Site to Warehouse WH05 WH DHL Makassar
Site to Warehouse WH05 WH DHL Makassar
Site to Warehouse WH05 WH DHL Makassar
Site to Warehouse WH05 WH DHL Makassar
Site to Warehouse WH05 WH DHL Makassar
Site to Warehouse WH05 WH DHL Makassar
Site to Warehouse WH05 WH DHL Makassar
Site to Warehouse WH05 WH DHL Makassar
Activity ID Area Phase

ET_2018_4G_Overlay_SLPP_AddOnAndCAp_115 Sidrap Phase 2


ET_2018_4G_Overlay_SLPP_AddOnAndCAp_242 Sengkang Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_119 Sengkang Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_240 Sidrap Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_138 Enrekang Phase 2
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP097 Bone Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCap_163
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_073 MAKASSAR Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_064 MAKASSAR Phase 2
Link route Plan RFS REMARK

RAPPANG - SIDENRENG 7-Jul RAU Interference


NEW_SENGKANG - PENEKI 5-Jul RAU Interference
WATANSOPPENG - NEW_SENGKANG 5-Jul RAU Interference
CEMPA_PASAR - SIDENRENG Need Perkuatan di Sidenreng HOLD
ENREKANG - BONNE RAU Interference
BUNGI - PEKKABATA Onsite Ganti RAU RAU Interference
GALESONG_SELATAN_AG - LIMBUNG RAU Interference
BANDARA_SELAYAR - BATANGMATA Clear
TANA_BERU - BULUKUMBA RAU Interference
Site ID Site Name SOW
26KTG023 BINTAUNA Swap Upg

26KTG016 DUDEPO_BARAT_MT Swap Upg


26KTG024 KOTABUNAN Swap Upg
26KTG036 LINAWAN/ RD_TO_PINOLOSIAN Swap Upg
26KTG026 PINOLOSIAN Swap Upg
26KTG025 RD_TO_TOMBATU Swap Upg

26KTG006 MOLIBAGU Swap Upg


26KTG012 PAMOMONTOA Swap Upg
26KTG017 TRANS_PATOA Swap Upg
26KTG028 TUTUYAN Swap Upg
26MDO020 TIKALA_TB Swap upgrade to 200Mbps
26KTG026 PINOLOSIAN Add Paralel link 290Mbps without antenna
26KTG015 TOLONDADU_TB Swap Upg
26KTG012 PAMOMONTOA Swap Upg
26KTG011 TUTUYAN Swap Upg
26KTG018 N_LANUD_1 Swap Upg
26KTG006 MOLIBAGU Swap Upg
26AMR008 GN_SOKO Swap Upg

26KTG041 MATAYANGAN Swap Upg


26KTG011 BATUMEJA Swap Upg
26KTG016 MT-DUDEPO_BARAT_MT Swap Upg
26KTG006 MOLIBAGU Swap Upg
Config Work Detail
7ETN-200Mpbs-1.8DP-NP Dokumentasi Isat SLPP 2018
7ETNHP-200Mpbs-1.8DP-NP Dokumentasi Isat SLPP 2018
11ETN-300Mpbs-1.2DP-NP Dokumentasi Isat SLPP 2018
11ETN-4x300Mpbs-1.2DP-RLB4+0 Dokumentasi Isat SLPP 2018
11ECN-TN-300Mpbs-1.2SP-NP Dokumentasi Isat SLPP 2018
7HPECN-TN-200Mpbs-1.8SP-NP Dokumentasi Isat SLPP 2018
7ETN-3x200Mpbs-1.8DP-RLB3+0 Dokumentasi Isat SLPP 2018
7ETNHP-200Mpbs-2.4DP-NP Dokumentasi Isat SLPP 2018
13HPECN-TN-200Mpbs-1.2SP-NP Dokumentasi Isat SLPP 2018
13ETN-2x200Mpbs-0.6DP-RLB2+0 Dokumentasi Isat SLPP 2018
23E6651-TNHP-200Mbps-0.6SP-NP Dokumentasi Isat SLPP 2018
11ECN-TN-2x290Mpbs-1.2SP-RLB2+0 Dokumentasi Isat SLPP 2018
15ECN-TN-200Mpbs-0.6SP-NP Dokumentasi Isat SLPP 2018
7ETN-200Mpbs-1.8DP-NP Dokumentasi Isat SLPP 2018
11ETN-300Mpbs-1.2DP-NP Dokumentasi Isat SLPP 2018
7ETN-200Mpbs-1.8DP-NP Dokumentasi Isat SLPP 2018
11ETN-4x300Mpbs-1.2DP-RLB4+0 Dokumentasi Isat SLPP 2018
7HPECN-TN-200Mpbs-1.8SP-NP Dokumentasi Isat SLPP 2018
7ETN-3x200Mpbs-1.8DP-RLB3+0 Dokumentasi Isat SLPP 2018
7ETNHP-200Mpbs-2.4DP-NP Dokumentasi Isat SLPP 2018
13HPECN-TN-200Mpbs-1.2SP-NP Dokumentasi Isat SLPP 2018
15ECN-TN-200Mpbs-0.6SP-NP Dokumentasi Isat SLPP 2018