Aa ISAT PROJECT TRM SULAWESI 10
Aa ISAT PROJECT TRM SULAWESI 10
169203
SULSEL Phase 1
169138
154904 Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_173 MANADO SULUT
169201
154907 Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_310 MANADO SULUT
169302
169145
169233
169189 ET_2018_Overlay_MW_New Site_SLPP_072 Takalar SULSEL Phase 1
ET_2018_Overlay_MW_New Site_SLPP_081 Sungguminasa SULSEL Phase 1
169139
ET_2018_AccNetwPhase2_SLPP_24 Kotamubago SULUT Phase 1
ET_2018_AccNetwPhase2_SLPP_26 Kotamubago SULUT Phase 1
ET_2018_AccNetwPhase2_SLPP_27 Manado SULUT Phase 1
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_050 Phase 2
MANADO SULUT
ET_H2_2018_Expansion_TRMSwapUpg_SLPP_20 Phase 2
Kotamobagu SULUT
162282 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_363 Takalar SULSEL Phase 2
Phase 1
133303 ET_2018_AccNetwPhase2_SLPP_15 Pangkajene SULSEL
132641
130963 ET_2018_Overlay_MW_Intermediate_Balloci_1 Pangkajene SULSEL Phase 1
Sidrap Phase 2
154158 ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP106 SULSEL
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_155 GORONTALO SULUT Phase 2
153377
Phase 3
184256 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_06 / ET_2019_SL
Selayar SULSEL
ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_05 Phase 3
183747 MAKASSAR MAKASSAR
ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_39 Phase 3
183748 JENEPONTO SULSEL
ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_05 Phase 3
183749 SELAYAR SULSEL
ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_14 Phase 3
183750 Watampone SULSEL
ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_15 Phase 3
ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_20 Phase 3
183752 JENEPONTO SULSEL
Phase 3
184300 ET_2018_4G_Overlay_SLPP_AddOnAndCap_123 SELAYAR SULSEL
186749 Phase 3
186750 Phase 3
ET_2018_4G_Overlay_SLPP_AddOnAndCap_183 SELAYAR SULSEL
186751 Phase 3
ET_2018_4G_Overlay_SLPP_AddOnAndCap_328 MAKASSAR MAKASSAR
Phase 3
187985 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_329 MAKASSAR MAKASSAR
Phase 3
188171 ET_2018_4G_Overlay_SLPP_AddOnAndCAp_358 Watampone SULSEL
188306 ET_2019_SLPP_MW_4GOverlayAddOn_SwUpg_18 MAKASSAR MAKASSAR Phase 3
188307 Phase 3
188308 Phase 3
ET_2019_SLPP_TransCapMWInter_TriggerRAN_07 MAJENE SULSEL
188309 Phase 3
ET_2019_SLPP_TransCapMWInter_TriggerRAN_15 MASAMBA SULSEL
188310 Phase 3
MAKASSAR MAKASSAR
189678 ET_2019_SLPP_MW_4GOverlayAddOn_Upgrade_16 Watampone SULSEL Phase 3
Phase 3
190862 Phase 3
190864 Phase 3
ET_2019_SLPP_MonthlyCapFeb_SupportRan_3 Barru SULSEL
190865 Phase 3
190870 Phase 3
190871 Phase 3
ET_2019_SLPP_TransCapMWInter_TriggerRAN_23 Takalar SULSEL
191014 ET_2018_4G_Overlay_SLPP_AddOnAndCap_296 Sungguminasa Phase 3
SULSEL
Phase 3
Phase 3
BONTOMANAI - PALLENGU
28JNP016
BULADU - LIMBOTO
28PIN018
BULU_TELLUE - TONASA_OFFICE 28PKJ013
KOTABUNAN - TUTUYAN 26KTG024
CAMBA-ROAD_TO_LAPPARIAJA 28MRS006
28BLK014
S_WAHIDIN_SDR - GL_TAMALANREA
28UPD209
MAKASSAR_MALL_PL - MAKASSAR_TRADE 28UPD041
SITAMPAE - NEW_SENGKANG
28SKG011
MUTIARA_MANDAI_INDAH_MT - BATANGASE 28MRS024
TALAWAAN_PL - PANIKI
26TDO035
MODOINDING - MOKOBANG 26AMR002
PAKKATO - LIMBUNG
28SNS004
MOTOLING - TARERAN 26AMR005
26TMH014
PASSANDERANG - SELAYAR
28SLY009
RD_TO_LAPPARIAJA-MALLAWA 20WTP030
MOTOBOI_KECIL_XL-KOTAMOBAGU 26KTG008
MONGKOINIT_SM-HUIDU_OMPU 26KTG021
MASAMATURU_PL - PALEKKO2_AG
28TKA017
SAPANANG - LABAKKANG 28PKJ016
HUIDU_TOLOAYU-HATTA 27BOA003
SEGERI - LABAKKANG
28PKJ005
SMKN1_PATTALASSANG - PATTALASANG2
28SNS062
INOBONTO-HUIDU_OMPU 26KTG009
HUIDU_BANGGA (BB)-BAROKO (BB) 27ISM008
HOTEL_SINGGASANA_MAKASSAR_ST - MONGINSIDI 28UPD180
STMIK_HANDAYA - TODDOPULI
28UPD216
BUNGI - PEKKABATA
28PIN018
TELLU_SIATINGE - ULOE
28WTP036
BONONGOL-HUIDU_TOLOAYU 27ISM025
TENTARA_PELAJAR - BANDANG
28UPD218
TINGGIMAE - PALANGGA 28SNS048
BONE_PANTAI - TPA_POHE 27SWW013
RUMBIA_TB - BONTOMATENE
28JNP021
WIRAE - SIWA
28SKG003
PENEKI- WIRAE
28SKG021
TOGO_TOGO - BANTAENG
28JNP002
POMPANUA - NEW_SENGKANG 28WTP008
PUNCAK_BIRA_SM - PELABUHAN_BIRA 28BLK022
TANETE - BULUKUMBA 28BLK003
ARA - PELABUHAN_BIRA 28BLK024
DESA_PINO - TOGO_TOGO
28BTN017
KARAMAKA_AG - PALLENGU 28JNP026
BANDARA_SELAYAR - BATANGMATA
ROAD_TO_CAMMING - LAPPARIAJA
CAMMING - ROAD_TO_CAMMING
RD_TO_TANETEA_SM - PALLENGU
BUA_ISM - LIMBOTO 27ISM041
LANGGE_SWW - TAPA 27SWW017
TAROANG_TB - TOGO_TOGO
28JNP023
KARAMAKA_AG - PALLENGU 28JNP026
RD_TO_TANETEA_SM - PALLENGU
SALASSAE_BLK - PLAMPANG
28BLK045
PULAU_BARANGLOMPO - GTC_TG_BUNGA 28UPD061
WATTANG_PULU - ARASSIE
28SDR003
WONGKADITI - TAPA 27GTO015
28SKG024
NEW_SENGKANG - SIDENRENG
POMPANUA - NEW_SENGKANG
28WTP008
PULAU_BARANGLOMPO - GTC_TG_BUNGA
28UPD061
KARAMAKA_AG - PALLENGU
28JNP026
BANDARA_SELAYAR - BATANGMATA
28SLY003
ROAD_TO_CAMMING - LAPPARIAJA
28WTP027
CAMMING - ROAD_TO_CAMMING
28WTP010
RD_TO_TANETEA_SM - PALLENGU
28JNP018
BTP_DUA_PL - BTP
28UPD113
TALAWAAN_PL PANIKI
26MNU001
MODOINDING 26AMR021 MOKOBANG
PAKKATO LIMBUNG
28SNS005
MOTOLING 26TDO009 TARERAN
NEW_SENGKANG
28SKG021 PENEKI
RUMBIA_TB
28BTN018 BONTOMATENE
BONTOSUNGGU_TB
28BTN001 BANTAENG
MAKKANINONG_PL
28BLK006 PONRE
PLAMPANG
28BLK004 TANA_BERU
PUNCAK_BIRA_SM 28BLK002 PELABUHAN_BIRA
TANETE 28BLK001 BULUKUMBA
ARA 28BLK002 PELABUHAN_BIRA
ROAD_KASSI - TANABERU 28BLK004 TANA_BERU
28SKG024 NEW_SENGKANG
POMPANUA
28SLY002 BATANGMATA
PALABUNGEN
28MRS007 KARIANGO
PUCAK_PL
BELOPARANG 28BTN001 BANTAENG
28UPD016
DPRD_KOTA_MAKASSAR KERUNG_KERUNG
28TKA001 LENGKESE
PAPPA_TAKALAR
28TKA001 LENGKESE
TOPEJAWA
28SNS012 PACCINONGNGANG
MANGKA_BOMBONG_SNS
28SNS009 SUNGGUMINASA
ASOKA_BATANGKALUKU_SNS
MITRASEL 10-Oct-18
New Link
Swap Upgrade to 200Mbps 23E6651-TN-200Mbps-0.6SP-NP MITRASEL 1-Feb-19
MITRASEL 3-Aug-18
New Link 23ECN-TN-200Mbps-1.2SP-NP
New Link 23ECN-TN-200Mbps-1.2SP-NP MITRASEL 23-May-18
MITRASEL 10-Aug-18
New Link 15ECN-TN-200Mbps-1.2SP-NP
Swap Upgrade. ML6K mapping from link WAT 23E6651-ML6K-200Mbps-0.6SP-NP MITRASEL 21-Jan-19
MITRASEL
8E6692HP-ML6K-4x200Mbps-1.8DP-RLB4+0
MITRASEL 7-Jun-18
Swap Upg 7ETNHP-200Mpbs-1.8SP-NP
New Link
Swap Upgrade to 290 Mbps and dismantle exis11ECN-TN-300Mbps-1.2SP-NP MITRASEL 4-Dec-18
Swap Upgrade to 800Mbps 7E6692HP-ML6K-4x200Mbps-2.4DP-RLB4+0 MITRASEL
Swap Upgrade to 200Mbps 23E6651-TN-200Mbps-0.6SP-NP MITRASEL
MITRASEL 12-Sep-18
New Link 11ECN-TN-300Mbps-1.2SP-NP
New Link And AMM 6691 from ET_2018_4G_ 15E6651-ML6K-200Mbps-1.2SP-NP MITRASEL 18-Jan-19
MITRASEL 10-May
Swap Upgrade 15E6651-ML6K-200Mbps-1.2SP-NP
MITRASEL 12-May
Swap Upgrade 23E6651-ML6K-200Mbps-0.6SP-NP
MITRASEL 3-Jul-19
Swap Upgrade 13E6651-TN-200Mbps-1.2SP-NP
MITRASEL 24-Apr-19
Swap Upgrade to 800Mbps 7E6692HP-ML6K-4x200Mbps-2.4DP-RLB4+0
MITRASEL 2-May-19
Swap Upgrade to 800Mbps 7E6692HP-ML6K-4x200Mbps-2.4DP-RLB4+0
MITRASEL 21-May
Add Paralel link 200Mbps without antenna 7E6691-TN-2x200Mbps-2.4DP-RLB2+0
Swap Upgrade to 200Mbps 15E6651-ML6K-200Mbps-1.2SP-NP MITRASEL
Swap Upgrade to 400Mbps 8ETNHP-ML6K-2x200Mbps-2.4DP-RLB2+0 MITRASEL
Swap Upgrade to 290Mbps 11E6651-ML6K-290Mbps-1.2SP-NP MITRASEL
Swap Upgrade to 200Mbps 8EHP-ML6K-200Mbps-1.8DP-NP MITRASEL
Add Polar 8ETNHP-3x200Mbps-1.8DP-RLB4+0 Add Parallel Link 600Mbps without antenMITRASEL 27-Jul-19
MITRASEL 30-Oct-19
MITRASEL 14-Oct-19
Swap IDU + Add Paralel Link 2x290Mbps with 11E-ML6K-TN-4x290Mbps-1.2DP-RLB4+0 MITRASEL 25-Nov-19
Swap IDU + Add Paralel Link 3x290Mbps with 7E-ML6K-4x200Mbps-1.8DP-RLB4+0 MITRASEL 25-Nov-19
Swap IDU + Add paralel link 200Mbps without7E6654HP-TN-2x200Mbps-1.2SP-RLB2+0 MITRASEL
20-Jan-19 20-Jan-19 19-Jan-19 19-Jan-19 20-Jan-19 20-Jan-19 7-May-19 25-May 11jul : material NE mas
6-Aug-18 7-Aug-18 7-Aug-18 8-Aug-18 10-Aug-18 10-Aug-18 20-May-19 11jul : material NE-FE
20-Sep-18 23-Sep-18 1-Sep-18 6-Sep-18 25-Sep-18 28-Sep-18 NEED
13-Jan-19 1-May-19
5-Mar-19 7-Mar-19 3-Mar-19 4-Mar-19 10-Mar-19 3-Apr-19 2-Apr-19 6-Sep-19 Material on site
22-Dec-18 22-Dec-18
28-Dec-18 28-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 Done Done ATF belum, material ma
7-Jun-18 7-Jun-18 7-Jun-18 2-Jun-18 23-Jun-18 29-Jun-18 14-May-19 11jul : material NE-FE
30-Dec-18 31-Dec-18 28-Dec-18 29-Dec-18 4-Jan-19 3-Jan-19 Done 16jul: info pic isat vi
Yunus
NEED
Yusril NE, lius FE 28-Jul-19 29-Jul-19 26-Jul-19 27-Jul-19 31-Jul-19 5-Aug-19
Complete, Yusril 30-Aug-19 30-Aug-19 31-Aug-19 31-Aug-19 No Need 6-Sep-19 No Need No Need
Complete, Ramli 7-Sep-19 7-Sep-19 8-Sep-19 8-Sep-19 No Need 9-Sep-19 No Need No Need
Complete, Ramli 8-Sep-19 8-Sep-19 7-Sep-19 7-Sep-19 No Need 9-Sep-19 No Need No Need
Complete, Taufik 6-Sep-19 6-Sep-19 7-Sep-19 7-Sep-19 No Need 7-Sep-19 No Need No Need
Nasrun, Complet 5-Dec-19 6-Dec-19 7-Dec-19 8-Dec-19 8-Dec-19 9-Dec-19 11-Dec-19 Need
Complete, Rauf 11-Sep-19 12-Sep-19 10-Sep-19 11-Sep-19 12-Sep-19 12-Sep-19 27-Sep-19 NEED
Complete, Rauf 14-Nov-19 14-Nov-19 Done Done 14-Nov-19 14-Nov-19 3-Dec-19 NEED
Complete, Adit 15-Oct-19 23-Oct-19 16-Oct-19 23-Oct-19 No Need 31-Oct-19 No Need No Need
Complete, Adit 14-Oct-19 14-Oct-19 15-Oct-19 15-Oct-19 No Need 17-Oct-19 No Need No Need
Complete, Adit 15-Oct-19 15-Oct-19 14-Oct-19 14-Oct-19 No Need 17-Oct-19 No Need No Need
Complete, Rauf 24-Oct-19 2-Dec-19 19-Oct-19 20-Oct-19 2-Dec-19 3-Dec-19 NEED NEED
Complete, Taufik 30-Oct-19 30-Oct-19 31-Oct-19 31-Oct-19 1-Nov-19 1-Nov-19 2-Dec-19 NEED
Complete, Nasrun
Complete, Taufik 12-Dec-19 12-Dec-19 13-Dec-19 13-Dec-19 No Need 16-Dec-19 No Need No Need
Complete, Taufik 6-Dec-19 7-Dec-19 8-Dec-19 8-Dec-19 9-Dec-18 9-Dec-18 Need Need
Complete, Nasru 16-Dec-19 16-Dec-19 16-Dec-19 16-Dec-19 No Need 17-Dec-19 No Need No Need
Need Need
Need Need
NetGear RLDW Submit FATP Remark FATP Submit ATP Remark ATP
TO FSO TO FSO 8-Jan-19 FATP Done with remark, Need clear alarm FE & NE TO FSO
TO FSO TO FSO 10-Jan-19 FATP Done with remark, Need Update NDB januari,Endorsed by FSO
TO FSO TO FSO 12-Feb-19 FATP Done with remark, Need clear alarm FE & NE TO FSO
1 Done 27-Feb-19 FATP Done with remark, Need clear alarm FE & NE Endorse By MOM
1 Done 11-Dec-18 FATP Done with remark, Nee2/22/2019/ Rev CPL 1 CPL Submited
TO FSO TO FSO 10-Jan-19 FATP Done with remark, Need Update NDB (freq acEndorsed by FSO
0 NY NEED ON SITE
TO FSO TO FSO 8-Jan-19 FATP Done with remark, Need Update NDB ( actual Endorsed by FSO
Cancel Cancel Done FATP Done with remark, need update NDB Online ( Assignment Cancel
Cancel Cancel Done FATP Done with remark, Need clear alarm FE & NE Assignment Cancel
1 NY 23-Jan-19 FATP Done with remark, need update NDB Online (Fr
NEED ON SITE
Cancel Cancel 27-Feb-19 FATP Done with remark, Need Update NDB ( freq actual
Assignment
V=7428/7589
Cancel H=7191/7359 ) & need clear alarm
Cancel Cancel 3-Apr-19 FATP Done with remark, Need Update NDB (power Assignment
& Cancel
TO FSO TO FSO 22-Oct-18 FATP Done with remark, Need update NDB & Need Er ndorsed by FSO
TO FSO TO FSO 22-Oct-18 FATP Done with remark, Need Update NDB (Freq AcEndorsed by FSO
1 Done 20-Mar-19 FATP Done with remark, nee 20-May-19 Endorse By MOM
1 Done 4-Jan-19 FATP Done with remark, Need Update NDB (online Endorse
0 Done 21-Jan-19 FATP Done with remark, need update NDB Online (FEndorse By MOM
0 NY Reject
0.5 NY 27-Feb-19 FATP Done with remark, Need clear alarm FE & NE NEED ON SITE
1 Done 12-Mar-19 FATP Done with remark, Ned update NDB ( freq actual
Endorse
11565/11035),
By MOM Need clear Alarm & Need rev doc page 8 &
1 Done 19-Mar-19 FATP Done with remark, Need Update NDB (Site NAEndorse By MOM
Cancel Cancel Done FATP Done with remark, need update NDB Online (uAssignment Cancel
1 Done 20-Mar-19 FATP Done with remark, need update NDB Online ( Endorse By MOM
0 NY 19-Feb-19 FATP Done with remark, need update NDB Online Comcase
1 Done 3-May-19 FATP Done with remark, need update MT, need update
Endorse
NDBByOnline
MOM(Update Freq aktual : 15215/14725 Power A
1 Done 23-Apr-19 FATP Done with remark, need udpate NDB Online (FATP ACCEPT
1 Done 13-Mar-19 FATP Done with remark, Need Update NDB ( Freq akEndorse By MOM
1 Done 13-Mar-19 FATP Done with remark, nee 20-Jun-19 Endorse By MOM
1 Done 20-Mar-19 FATP Done with remark, need update MT, need up Endorse By MOM
NY RFS
NY RFS NY RFS
Endorse By MOM
1 Done 9-Oct-19 FATP Submited
1 Done 16-Oct-19
Reject
1 Done 20-Aug-19 FATP Done
Endorse By MOM
1 9-Sep-19 FATP Done 27-Sep-19
Cancel Assignment Cancel
NY RFS NY RFS
Endorse By MOM
1 Done 24-Sep-19 FATP Done 21-Sep-19
NY RFS NY RFS
0 RAU Faulty
NY RFS NY RFS
NY RFS NY RFS
0 Interference
NY RFS NY RFS
PMR NY RFS
NY RFS NY RFS
0 NY 18-Dec-19 Reject
NY RFS NY RFS
NY RFS NY RFS
NY RFS NY RFS
NY RFS NY RFS
EID ATP Status 15 jan REMARK DOCUMEN REMARK ITC MAIN ISSUE
Endorsed by MOM 30jul: dokumentasi done, dede, yunus 30okt: RLDW aman info Wais
Settingan Kunci Cyber Bermasalah
30okt: Netgear dan RLDW aman info Wais 5jul : need on site
Endorsed by MOM 24sep: netgear done, alfon, CPL Submited
wais
18sep:
29aug: NE Revreject,
submitedFE accepted
Endorsed by MOM 5aug:
18jul :CPL
waitresubmit
review
30jul: CPL Submited wait review
19jul: FE done,
9oct: RLS Drop,NE Ny cyber battrenya abis,
obstacle 4okt: link obstacle gedung baru, harus geser ke Obstacle
Need CPL - Onsite Dede
need on site pole baru tetapi butuh coax panjang
Tinggal Netgear 5jul : need ts alaram, need on site, netgear
19nov: endorse by mom, dari data yang di monginsidi done
Endorsed by MOM share pak dwi
10nov: Netgear Done NE-FE
6nov: Doc
27aug: AWEATP submited, RLDW submited
Endorsed by MOM 24oct:RLDW
4aug: take data done, alfonsus
submited 5jul : need on site
need onsite
3aug: doc atp submited minus RLDW
2jul : take
15jan: data done,
Endorse by mom alfonsus 2okt: info apip ada MOM Interference
Endorsed by MOM 5jul : dokumentasi
12dec: netgear NE done ulang 18jul : RAU 8ghz pakai saja ke tana beru -
25nov: partial Accept (FATP) bulukumba > persetujuan pak Dwi, pak Sahar
13nov: doc atp submited, RLDW submited meeting di Kima
Endorsed 8nov: netgear FE done, NE NY 17jul : terbaca 2+0 dengan rau 8ghz, di tanyain pak
Endorsed 9oct: Need Update NDB, Need Clear Alarm sahar kemana rau 7ghz 1pcs? Info wawan rau 7ghz
NE/FE, Need Rev Doc (Capt NE/FE Page ada di basir, Klo berdasarkan NDB Huawei
Endorsed 1,2,3(NA),7,8(NA)), Sesuai Capt di Doc Site Frekuensi existing Panoang 7156 dan Ponre 7317 <
Belum Full config yang interference pakai freq ini saja
Endorsed by MOM need
30jul:on site
wait inbound Interference 3+0 / On 1+0 Dengan 14Mhz
Need Doc ATP 8nov: Take data ATP NE done, alfonsus
10jan: RLDW submited
Partial Accept (RLDW) 7jan: partial accept (RLDW) 26aug: RSL drop, need repointing
16dec: Partial accept (ABD)
Endorsed by MOM 13dec:
need onRLDWsite resubmited
26nov: partial accept (RLDW)
Endorsed by MOM 12ags:
25nov: NE doneAccept
partial minus(ADB)
netgear,
dariFE NY data
share
need on site
pak Dibud
8nov:
14aug:RLDW Submited
submited
Endorsed by MOM 9oct:
12ags:RSL Drop
data -39 di ambil, alfonsus
sudah
18sep:
need onreject
site to ASP
26aug: RSL drop,
2dec: Endorse by need
MOMrepointing
Endorsed by MOM 12aug:
26nov: CPLRLDW Submited
submited 5aug: ketinggian ant tidak sesuai ET, harus rubah ketinggian antenna
10aug:
25nov: grounding sudah diRLDW
doc CPL submited, perbaiki,
adadede
tp
9aug:
belumgrounding
submit outdoor pakai grounding
hitam,
3sep: need
rev rektifikasi
submited
19sep: reject
Endorsed by MOM 30jul:
8aug:
need on OGsite
CPL rev doc by wais
Submited 5jul : need on site
30jul: OG rev Doc by Wais
25nov: partial Accept (RLDW & FATP) 7okt: sudah di email issue comcase ke pak Sahar Comcase
Partial Accept (RLDW & F 9oct: Need Update NDB, Need Clear Alarm 5okt: TAKALALA comcase, PS belum di bayar
NE/FE, Need Rev Doc (Capt NE/FE Page gajinya 3 bulan lebih
18sep: Need onsite,
1,2,3,7,8(NA),12), rejectCapt di Doc Site
Sesuai 3okt:
2okt: RAU mati 1mati
TAKALALA pcs, raunya,
need ts need TS, info apip
Endorsed by MOM 9aug:
BelumCPLFullSubmited
config 9aug:
5aug: outdoorisasi lappariaja
oudoorisasi lalebata done,
indoor lutfi lutfi
done,
18jul : wait review 5aug:
On 2+0oudoorisasi lalebata indoor done, lutfi
9oct: Capture Interference NE/FE NA Power RAU tidak bisa seimbang
Endorsed by MOM 13sep: doc AWE
6aug: Capture
9oct: resubmiited
Interference NE/FE NA
Endorsed by MOM 20aug: AWE
7agu: CPL Submited
30jul:
15aug:wait
ATPISRAccepted
Endorsed by MOM 8aug: CPL Submited 5jul : no need on site
30jul: wait review CPL
5jul
6aug:: Rev
CPLdoc OG by Wais
submited
Endorsed 30jul: OG rev doc by wais
18jul : wait review
15jan: Reject
25nov: return to ASP (Doc & RLDW)
10nov: netgear NE done, netgear FE NY
Need CPL - Onsite 22oct: Rev doc format baru submited, need 5jul : need on site
RLDW
18sep: lutfi ngga bisa masuk, nama nya ngga
ada di permit, yang ada Arif, Yulius
25nov: issue PMR clear 1aug: repointing done by lutfi, ternyata baut ant di
Need CPL - Onsite 20nov: still wait PMR mounting kurang kencang sehingga pointing lari,
10nov: netgear wait PMR team tidak bisa stay untuk ambil dokumentasi
need onATP
15aug: siteAccepted karena sdh malam dan permit TBG tidak ada, team
Endorsed by MOM 8aug: CPL Submited masuk seijinonpak
5jul : need siteAjul
30jul: CPL OG by Wais 31jul: pointing drop, need ts on site, info pak sahar
DROP 10jul : kekurangan LIMBOTO sudah lengkap, stickrod
Cancel lepas di n balocci
alfonsus
Endorsed by MOM 9oct: Capt data
2jul : take Interference FE NA
done, alfonsus FE NY dismantle
need on site
5jul : dokumentasi ulang
Endorsed by MOM Cancel
13nov: endorse by mom
Endorsed by MOM 28oct: RLDW submited
23oct: rev format baru submited, need data
Endorsed by MOM NE dari nasrun Cancel
Endorsed by MOM 3okt: netgear done, dede Cancel
02sep: dokumentasi done by Dede
18sep: Reject to ASP 1
14jan: Netgear NE done
Need Doc ATP 9oct: Capture Interference NE/FE NA
18jul : FE dokumentasi ATP done, NE NY
Endorsed Done
Endorsed 27sep: CPL Submited
need on site
Endorsed by MOM Cancel
Endorsed Cancel
Endorsed by MOM Cancel
6dec: Endorse
Endorsed 02dec: Doc ATP submited, Partial Accept 11jul : need onsite
(ABD)
29nov: RLDW Submited
10sep: re-resubmited
Endorsed by MOM 30jul: FE done complete, NE NY
8aug: Resubmited
11jul
Belum: dokumentasi
Ada SID ulang semua
7jan: partial accept (FATP) 5okt: interference clear pakai RAU A31-A35, team
Partial Accept (FATP) 18dec: FATP resubmite, RLDW submited Nasrun
27nov: partial accept (RLDW & FATP) 2okt: coba pakai index RAU2X 7 A31-A35, info apip
25nov: return
10sep: CPL to ASP (RLDW)
resubmited 16jul: rau 11L/H tidak ada stok di eid, mau di coba
Endorsed by MOM 19nov: FATP submited
16aug: netgear sudah di revisi, info pakai rau 7/32 info pak arie eid
18nov: doc ATP
sebelumnya adasubmited
salah di serial number 14jul : interference wait RAU 11L/11H, comfirm
Endorsed by MOM 10nov:
MMU, taufik done NE-FE
netgear arie ivando wag, sudah email ke pak sahar, team
Cancel
need on site
9augL CPL Submited yusril
30jul: CPL Submited, wait review
5jul : take data done, alfonsus
5jul : Need RLDW, Wait ADB, wait CPL, revisi
doc OG by Wais
Endorsed by MOM Cancel
2dec: Endorse by mom 3sep: done TS clear ganti kabel LAN, Yunus
Endorsed by MOM 25nov: partial accept (ABD) dari share data 2sep: Link congest karena masih pakai LAN cat5, di
EID minta rubah ke cat6 oleh pak Sahar
15nov: doc ATP submited, RLDW ada tapi
belum di submit
10nov: netgear done NE-FE
need on site
Belum Ada SID
6nov: info tio endorse by Payment
Endorsed by MOM 1nov: RLDW submited
17oct: submited, RLDW done, Netgear done
6dec19: Endorse
18sep: Reject to ASP 1
Endorsed 2dec:
BelumPartial
Ada SIDaccept (ABD)
29nov: RLDW submited
19nov:
28nov: endorse by mom dari data yang di
CPL Submited
Endorsed by MOM share
27nov:pak dwi NE-FE done, Dede
netgear 5aug: oudoorisasi lalebata indoor done, lutfi
1nov:
need onRLDW
site submited
18sep:
18dec: reject
endorse to by
ASPmom1 17sep: Migrasi gagal karena tidak bisa akses
Endorsed by MOM 3aug:
17dec:doc atp submited
netgear done, info minus
tio RLDW malam, alfonsus
18jul
20nov:: wait review
netgear palekko done 16sep: migrasi gagal, team kemaleman sampe site
23okt: netgear
28nov: belum ada di list
RLDW submited dan mbps
20okt: ada yang
ternyata pincang
installasi ada yg pakai waveguide RSL Drop
Need CPL - Onsite 22oct: rev
27nov: docformat
submited,baruRLDW
submited,
masihRLDWsama Planada
dan Migrasi 15 MEI ke ant jadi power harus beda,
yg langsung
submited,
Nasrun, BOQ page
netgear wait 4PMR
and Cover SID Foto 23 di ET waveguide 29, langsung 23, need repointing,
25nov:
submited
23okt: endorse
data sudah bydimom,
ambildari sharenetgear
nasrun, data pak nasrun
Endorsed by MOM Dibud
24sep: ada
belum PMRdibelum
list ada rev ET sehingga 16okt: Interference clear pakai 34L/H dapet -92 -
12nov:
belumEID
9oct: CPL
bisa submited
netgear
Produce /Interference Cek N/A / -87, nasrun, RSL drop curiganya plastic modular
6dec:
BelumEndorse
8nov:
RAU2 SIDby momnetgear done, lutfi
BONTOMATENE
AdaDrop
RSL rau blm di copot karena v1 dapat 31-32 sedangkan
Endorsed by MOM 2dec:
7nov: Partial Acceptnetgear
RUMBIA_TB (ABD) done, lutfi v2 dan h2 jelek, og ts
27nov: RLDWformat
24okt: rubah submited baru, data RLDW belum 26jul: info yunus link sudah selesai di kerjakan
26nov:
25nov: CPL submited,
ada, netgear belum
endorse by MOM, RLDW
diambil dariada tp belum
share data pak 25jul:dokumentasi
6jul: info wawan yunus yang masih
done, data lanjut di
kordinasi,
wais
Endorsed by MOM submit
19Jul : wait review
DIbud apakah
5jul sudah
: RFS, rfs atau
di pasang di belum..
ketinggian Dari54,
penampakan
team basir di
25nov: ATP
19nov: return to ASP (Netgear
accepted dari data & doc)di share
yang site masih
4jul19: belum
ponre done 3+0
install
22nov:
7jan:
pak netgearby
endosed
dwi NEmomdone, alfon 30sep:
Waitinggrounding
Permit sudah di pasang, dokumentasi
Endorsed by MOM 24okt:RLDW
23dec:
5nov: rubah format
RLDWSubmited
submited baru, data RLDW belum done
ada, netgear
18dec:
19jul partial
: data FEaccept
done, sudh, netgear
belum diNE
tapi(RLDW) belum
buat 24sep: grounding di wirae hilang..
diambil
11dec:
7jan: CPL wirae
endorsed bysubmited
mom 21aug: sudah bisa
full config, lutfi cma rsl drop need
19Jul : wait review 11jul : power naik 2dbm
Endorsed by MOM 10dec:
18dec: netgear
partial NE done
accept submit
(ABD) repointing
7jul : need repointing, RSL drop torau -397gb yg
24okt: Wirae
17dec: RLDW reject,
submitedSiwa approved, RLDW 6aug: plan jumat 9aug19 tukeran
ada data
12dec:
25nov: tapi belum
Partial
endorse Accept di(RLDW)
by mom, kerja,
dariNetgear NE pak
share data interference
3sep: sama
info dari raukabel
Yunus 8ghzlan
punya NWdi ganti MS
sudah
Endorsed by MOM reject, FE
11dec:
dibud CPLapproved
Peneki submited 30jul: info lutfi sama aja udah di ganti rau sesuai
setempat
9okt: ATP
10dec:
19nov: ATPsubmited,
netgear donewait
Accepted, darireview
NE-FE data yang di share perintah
2sep: linkpak Ari karena masih pakai cat5, di
congest
Need Doc ATP 24sep:
24okt:
pak grounding
dwiRLDW belum wirae
tapihilang,
datanya belum
ada, 12jul
Cancel: info
minta gantinasrun
ke cat6Apabila linkSahar
oleh pak siwa klw di kasih
dokumentasi
netgear
1nov: belum
RLDW di ambil
Submited transmiter
24jul: on done
Migrasi untukbyngelink
Arif ke wirae,Tn jadi
Endorsed by MOM 16okt:Documen
9oct: FATP submited, tunggu 4+0
Not Complete hasil review Cancel
henk,klw
19jul: di putuskan
migrasi transmiter
gagal karena butuhon tn nya
kabel lan lancar
2x10m,
Endorsed by MOM 9okt: ATP
26jul: ATP Submited
submited, RLDW belum, netgear kembali,kemungkinan
Cancel
4pcs rj45, yusril ada ip yg kena loop ping,
done issue interference sudah email ke pak dibud
Endorsed by MOM Cancel
2 RAU interference, need freq scan
19jul : data done, tapi belum di buat
25nov: endorse by MoM, dari share data pak
Endorsed by MOM Dibud
1nov: RLDW submited
Endorsed by MOM 19jul : data done, tapi belum di buat Cancel
Partial Accept (FATP) Cancel
Endorsed Cancel
Partial Accept (FATP) Cancel
Need Doc ATP Cancel
Endorsed
Endorsed
2dec: Endorse
Endorsed 25nov: partial Accept (ABD) dari share data
pak Dibud
Endorsed by MOM 22oct: rev format baru submited, need Cancel
Endorsed by MOM RLDW Cancel
19Jul : wait review
Endorsed by MOM Cancel
Endorsed by MOM Cancel
10dec: endorse by MOM
Endorsed by MOM 2dec: Partial Accept (ABD)
27nov: RLDW submited
Endorsed by MOM 26nov: CPL submited, RLDW ada tapi belum Cancel
submit
Need Doc ATP 25nov: return to asp (doc & RLDW) Cancel
22nov:
25nov: netgear
endorse,taroang tb done,
dari share alfonsus
data pak dibud
22oct: rev format
8nov: RLDW baru submited, need
Submited
ENDORSED RLDW, data atp ada
3sep: submited, doc kurangnya,
versi baru netgear sisa
taroang tb review
19Jul : wait
19Jul : wait review
Partial Accept (RLDW) Cancel
12nov: RLDW & doc atp submited
ENDORSED 25nov: endorse, dari share data pak Dibud 8nov: NETGEAR NE done
16aug: pointing done, NMS tembus, cma kalau
angin besar bergeser jadi -50, interference RAU
19nov: endorse dari data yang di share pak 8Ghz, harus scan freq di pol H, Yunus, Yusril
Endorsed dwi
1nov: RLDW submited
9oct:
3sep: Capture
submitedInterference NE/FE NA
Endorsed by MOM 12aug: review sidah di ambil alfonsus On 1+0 / Waiting RAU Replacement
dokumentasi
19Jul : wait
need on site
14nov: endorse by mom 12sep: migrasi done, alfonsus
Endorsed by MOM 22oct: rev format baru submited, RLDW Plan Migrasi 12 Mei
done submited, BOQ page 4 and Cover SID
Foto 23 submited
18sep: reject to ASP 1
Belum Ada SID
3sep: rev submited 5jul : sudah submit ke EID
Endorsed by MOM 5aug: CPL resubmit 4jul: OG dokumentasi team alfonsus
5jul : Waiting review CPL
8jan: rau 7ghz interference, sdh di scan, yusril
7sep: material hilang, mmu, coax, aksesoris hilang
Need Doc ATP semua, alfonsus
27nov: partial Accept (ABD & FATP) 18jul: new
24okt: datasengkang
ada cumaexiting ngga taudi dismantle
eror apa ngga, saja dulu
lg di
21nov: doc ATP submited, RLDW submited cek agarwais
yg baru bisa di pasang
#N/A 2aug: revisi ET sedang di minta oleh pak Hasan ke
6jul: kalau
isat, CME issue perkuatan
beruntung > RAU siang
bisa keluar di ambilini untuk
20nov: still wait PMR 13sep:
1aug: RFS,
taneRio
coba diperapihan berudone,
- bulukumba,
NMS tunggu rappang - atasnya,
link di
10nov: netgear wait PMR 10sep:
sidenreng
pelabuhanstartbirainstall
- puncak bira by NW, netgear
Need Doc ATP Nee on site 28aug:
belum ada outbond
karena done,
info Adit
pak hasan ada revisi ET
15jan: Partial accept (RLDW) 30jul: OG
18dec: pointing
migrasi done,baru dapet -43/-42 > pointing
yunus
19dec: Partial Accept (RLDW & FATP) done 33-32
12dec: repointing done dapat 32-33, yusril, yunus
Partial Accept (RLDW) 18dec: Submited 29jul: ternyata
11sep: ada perbedaan
pulau baranglompo sudahketinggian
di ganti ant7ghz
17dec:
13dec: endorse by mom
FATP submited antaraRFS,
7sep:
bagus EToff
tx dengan
perubahan CAF,freq
nya, taufik setelah kordinasi dengan
16dec:
10dec: ATP accept
netgear NE submit pak AriSIK
5sep:
10sep: ivando
di rev akhirnya
GTCdengan
rau sudah namapakai ET,
dansudah
Taufik
ganti sudah
di scan email
ada ke
dengan
Endorsed by MOM 13dec: CPL Submited Ari Ivando
4sep:
7Ghz FE start install,
hasilnya bagus -89 NE belum
-94, sisa bisa
scaninstall karena
di pulau
8nov: RLDW Submited 2dec:
7sep: Endorsed
28jul: RFS,
taufikyusril,
team
baranglompo
nama tidaktinggal
sampe adasore didilisence,
NE, start
permit lisence
rakit2done
ant,
25nov: partial
7nov: Doc ATPAccept
submited(FATP) 25nov:
6sep:
28aug:
4sep: perneed
sudah
yusril di bantu
outbond
WAG ABD
ganti
FSO RAU,
done,
denganAcheng aman
Adit
pak Rahman, rau yang
Partial Accept (FATP) 14nov: doc ATP & RLDW submited
7sep: data sudah di ambil oleh taufik & 22nov:
5sep:
27jul: RAURLDW
puncak
interference &
di akan doc
kirim
bira di ATP
kegunakan
install submited
selayar
done,by
untukyunus
2dec:
nasrunEndorsed 9sep:
26jul: RFS,
4sep: per
BANDARA_SELAYARRamli
startWAG dengan
install, yusril, pak
rsaRahman
- BATANGMATAdone, kurang RAU yg garis
25nov: need ABD 4sep: MOS
interference
polisi, p3k,
31aug: rubah done,
akan
banner, by Ramli
polardirakit
kegunakan
H tetap diinterference
antenna done rau
Endorsed 22nov: RLDW & doc ATP submited 28aug:
8/41LH, outbond
PULAU_BARANGLOMPO
25jul: siksudah
sudahemaildone,
di reminderAdit
ke pak- GTC_TG_BUNGA
di email
Ari, untuk kerubah
pak sahar
index
9sep: RFS, Ramli 2sep:
& pak Email
harus dwi issue
tukar gulinginterference
rau, rau pulau done ke EID
baranglompo
4sep: MOS done, by Ramli 1sep:
24jul: Interference,
sudah team
di ambildanyunus,
mover Yusril saranin
brangkat
gtc tg bunga pakai
karena
belum RAU
didi 8Ghz
minta
ambil
28aug:Partial
2dec: outbond done,
Accept Adit
(FATP) 31aug:
pak dibud,
16aug: Install
sik FE
Pointing donerelease,
belum
done, tapi linkteam
flickerstandby
karenadi area
25nov: need ABD 30aug:
25nov:
antenna Install
23jul: target
need
single NE
ABD done,
minggu
polar ini,existing
sedangkan v2
og req sik,2 raudrop
belum mbps
8 Ghz ada nya
jadi
22nov: RLDW & doc ATP submited namun
22nov: sudahperintah
assignment,
RLDW
kemungkinan 3+0
& doc ATP
interference via submited
WAlokal, team kordinasi
9sep: RFS, Rio 29aug:
9sep:
dengan MOS
RFS,pakRio donedan
Apip malam by Yusril
di suruh req rau 7Ghz 1pcs
4sep: MOS done, by Ramli 28aug:
4sep:
sebagaiMOSoutbond
done,done,
pengganti byRAU Adit
Ramli8 41/LH, email sudah di
Partial Accept (FATP) 28aug: outbond done, Adit 28aug:
kirim keoutbond
pak Ari done, Adit
12sep: info dari pak apip tidak perlu pindahkan
coax di mmu3a ke mmu4a, NIW cancel team taufik
3sep: MOS done, by Taufik
Need Doc ATP 12sep: Dok mentah sudah di kirim ke Wais by 28aug: outbond done, Adit
7jan: reject 7aug: ternyata rau pengiriman beda dengan ET,
18dec: netgear submited, taufik sdh approve pak ari untuk rubah ET sesuai aktual
Need CPL - Onsite 25nov: return to ASP (netgear) 6aug: NIW ganti NPI1 C done, sisa bounding ke 4+0
20nov: endorse
17dec: issue PMR byclear
mom 1aug: start
12sep: FATPinstll NE, butuh
Accepted, 1pcsdone,
migrasi konektor rauf coax
12nov: ATP
16dec: RLDW & doc ATP submited
accept indoorInstall
3sep: karena kurang
done NE-FE, lengkap karet
pointing dan -60an
masih
Endorsed by MOM 10nov: ATP
27sep: netgear wait PMR
submited penjepitnya,
02sep: outbond infodone,
yusrilAdit,
kadang2MOSada done, konektor
Rauf
NY RFS 23okt: netgear
12sep: FATP revbelum ada diaccepted
submited, list, need req pengiriman
11dec : Cancel sepertu itu
18sep: datasubmited,
9sep: FATP sudah di kasih yusril
accept withkeremark
wais
Outbond Ramli/085796379184
31-Aug 1718 - Mitrasel 17-Sep
Outbond Ramli/085796379184 30-Sep-19 1953 30-Nov
Outbond Ramli/085796379184
28-Feb-18 15-Nov-19 2440_Dokumentasi & AT 15-Nov-19
Outbond Basir
17-Oct-19 2053 18-Oct-19
Outbond Ramli/085796379184
10-Dec 2575 15-Nov
Outbond Arifuddin
30-Nov-19 '2500 30-Nov-19
Outbond Basir
19-Nov-19 1238286_ISAT_MAINTEN10-Dec-19
Outbond
23-Apr-18 30-Dec-19 2641 F On Req
Outbond Basir
31-Aug-19 1718 - Mitrasel 20-Oct-19
Outbond Nasrun
31-Aug
Outbond Rauf
16-Aug-19 430004 17-Oct
Outbond RFI Basir/081340182730 27-Jun-18 25-Jan-20 9375_BINAMU 30-Dec-19
Outbond
29-May-18 30-Nov-19 '2500 30-Nov-19
Outbond Ramli
20-Oct 2093 30-Nov
Outbond Nasrun
31-Aug-19 1718 - Mitrasel 31-Aug
Outbond 29-May-18 10-Aug-19 06.08.2019_58.DMT Du 20-Jul
Outbond
Outbond Basir
On Req 19-Nov-19 31-Jan-20
Outbond Nasrun
20-Jul 31-Aug
Outbond RFI Ikhsan / 082248147170 28-Feb-18 20-Jul-19 1215335_ISAT_MAINTEN31-Aug-19
Outbond Nano / 081293960649 23-Apr-18 7-Aug-19
Outbond RFI
26-Apr-18 31-Aug 1718 - Mitrasel
Outbond RFI Setiawan/085825067898 26-Apr-18 31-Aug-19
Outbond Ramli
15-Nov 2440_Dokumentasi & AT 15-Nov
Outbond 29-May-18 31-Aug-19 1718 - Mitrasel 20-Aug-19
Outbond Basir
24-Jul-19 PermitLetter_PTI_pperti 10-Dec-19
Outbond Rauf
30-Dec-19 2641 F 20-Dec-19
Outbond Rauf
Outbond Yunus
17-Oct 2053 30de19
Outbond Rauf
20-Dec 2599 15-Nov-19
Outbond Rauf
17-Oct-19 2053 25-Nov
Outbond Basir
30-Dec 2641 F 30-Dec
Outbond Nasrun
31-Aug-19 1718 - Mitrasel 31-Aug
Outbond
28-Feb-18 15-Nov 2440_Dokumentasi & AT 16-Jan-20
Outbond RFI Ikhsan / 082248147170 16-May-18 31-Aug-19
Outbond RFI Ikhsan / 082248147170 12-Apr-18 NY 30-Nov-19
Outbond Basir
On Req 19-Sep 18-Oct
Outbond Amran / 081241201242 29-May-18 7-Aug-19 1218955_ISAT_MAINTEN20-Jul
Outbond
23-Apr-18 31-Aug-19 1718 - Mitrasel 31-Aug-19
Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug
Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug
Outbond
Outbond Yunus
20-Aug 1605 - Mitrasel 17-Oct
Outbond Rauf
31-Aug-19 1718 - Mitrasel 31-Aug-19
Outbond 29-May-18 30-Dec-19 2641 F 30-Nov-19
Outbond
29-May-18 31-Aug-19 1718 - Mitrasel 31-Aug-19
Outbond Alfonsus
Outbond Basir
16-Jan-20 0023 F 30-Nov-19
Outbond
2-May-18 30-Dec-19 2641 F -
Outbond Nasrun
31-Aug
NA Cancel 20-Aug-19
Outbond Rauf
20-Oct 2093 20-Oct
Outbond Cancel
Outbond Cancel
Outbond
17-Oct 30-Dec-19 2641 F 30-Dec
NA Cancel
Outbond Basir
30-Nov-19 '2500 15-Nov-19
NA Cancel
NA Cancel
Outbond Nasrun
31-Aug 1718 - Mitrasel 31-Aug
Outbond Arifuddin
15-Nov 2440_Dokumentasi & AT 16-Jan
Outbond Sumantri
3-Nov PermitLetter_PTI_pperti 30-Nov
Cancel
Outbond Cancel
Outbond Yunus
7-Aug 1218955_ISAT_MAINTEN20-Aug
Outbond Arifuddin
15-Nov 2440_Dokumentasi & AT 15-Nov
Outbond Cancel 20-Aug-19 1605 - Mitrasel 31-Aug-19
Outbond Yunus
20-Aug 1605 - Mitrasel 20-Aug
Outbond Basir
15-Nov 2440_Dokumentasi & AT 16-Jan
Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug
Outbond Farhan / Internal Cancel
Outbond Farhan / Internal Cancel
Outbond
30-Nov '2500 30-Nov
Outbond Lutfi
20-Dec-19 2608 On Req
Outbond Basir
15-Nov 2440_Dokumentasi & AT 10-Dec
Outbond Basir/081340182730
28-Feb-18 15-Sep-19 1226056_ISAT_MAINTEN10-Dec
Outbond Alfonsus
20-Dec 2611 16-Jan
Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug
Outbond Arifuddin
On Req 19-Nov-19 16-Jan
Outbond Yunus
7-Aug 1218955_ISAT_MAINTENOn Req
Outbond RFI 28-Feb-18 30-Sep 2036 31-Oct-19
Outbond Arifuddin
1-Dec-19 PermitLetter_PTI_ppert 25-Nov
Outbond RFI Rio / 082291555420 29-May-18 31-Aug-19 1718 - Mitrasel 30-Nov-19
Outbond RFI Rio / 082291555420 16-May-18 NY 30-Nov
Outbond Basir
Rauf
9-Jan 'SURAT IJIN MASUK SITE On Req
Outbond Alfonsus
22-Sep-19 PermitLetter_PTI_pperti 10-Dec
Outbond Basir
30-Dec-19 2641 F 15-Nov
Outbond Cancel
Outbond Cancel
Outbond Rauf
11-Dec-19 SURAT IJIN MASUK SITE 16-Jan-20
Outbond
30-Nov-19 '2500 30-Nov
Outbond Basir
Outbond Basir
1-Dec-19 PermitLetter_PTI_ppert 30-Nov
Outbond RFI Ikhsan / 082248147170 5-Jul-18 30-Nov
Outbond Alfonsus
On Req 19-Nov-19 10-Dec
Cancel
Outbond Rauf
30-Nov-19 '2500 30-Nov-19
Outbond Arifuddin
14-Jan 07.01.2020_099_MADDEN
14-Jan
Outbond Cancel
Outbond Alfonsus
15-Nov 2440_Dokumentasi & AT 15-Nov
Outbond Nasrun
30-Dec 2641 F 16-Jan
Outbond Ramli
30-Dec 2641 F 30-Dec
Outbond Rauf
11-Dec-19 SURAT IJIN MASUK SITE 30-Nov-19
Outbond Cancel 20-Aug
Outbond Basir
19-Nov-19 1238286_ISAT_MAINTEN10-Dec-19
Outbond RFI Hadi / 085757209178
2-May-18 21-Dec-19 SURAT IJIN MASUK SITE 20-Dec
Outbond
28-Feb-18 30-Dec 2641 F On Req
Outbond Basir
30-Nov-19 SURAT IJIN MASUK SITE 15-Nov
Outbond Arifuddin
15-Nov 2440_Dokumentasi & AT 15-Nov
Outbond Arifuddin 30-Dec 2641 F 30-Dec-19
Outbond Ramli
15-Nov 2440_Dokumentasi & AT 15-Nov
Outbond RFI Hadi / 085757209178
28-Feb-18 On Req 20-Nov-19 On Req
Outbond Arifuddin
30-Dec 2641 F 16-Jan
Outbond Rauf
15-Nov-19 2440_Dokumentasi & AT 30-Nov-19
Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug
Outbond
29-May-18 20-Aug-19 1605 - Mitrasel 31-Aug-19
Outbond Arifuddin
20-Dec 2621 20-Dec
Outbond Alfonsus
On Req 23-Jul-19 10-Dec
Outbond Basir
1-Dec-19 PermitLetter_PTI_ppert 6-Feb
Outbond Cancel
Outbond NRFI
13-Jul-19 1214114_ISAT_MAINTEN18-Oct-19
Outbond RFI Hadi / 085757209178 30-Nov-19
Outbond Cancel 31-Aug-19
Outbond Sumantri
30-Nov-19 '2500 30-Nov-19
Outbond Alfonsus
16-Jan-20 0023 F 30-Dec
Outbond Basir
30-Nov SURAT IJIN MASUK SITE 15-Nov
Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug
Outbond Basir
15-Nov-19 2440_Dokumentasi & AT 10-Dec
Outbond NRFI Rio / 081343416616 10-Aug-19 06.08.2019_59.DMT Turi20-Oct
Outbond Ramli
20-Oct 2093 10-Dec
Outbond Basir
11-Dec-19 SURAT IJIN MASUK SITE 30-Nov
Outbond Nasrun
Outbond Basir
15-Nov 2440_Dokumentasi & AT 15-Nov
Outbond Basir
On Req 17-Oct-19 19-Nov
Outbond RFI Yunus / 082271522597
29-Nov-19 25.11.2019_322_DMT Gra
30-Nov-19
Outbond Ramli
31-Aug 1718 - Mitrasel 15-Nov
Outbond Ramli 2
9-Jan 'SURAT IJIN MASUK SITE 20-Dec
Outbond Ramli 2
20-Dec-19 2621 15-Nov-19
Outbond Basir
23-Nov-19 1239583_ISAT_SURVEY On Req
Outbond Basir
23-Nov-19 1239583_ISAT_SURVEY 20-Dec-19
Outbond Basir
28-Nov-19 PermitLetter_PTI_ppert 10-Dec-19
Outbond
20-Dec-19 2608 20-Dec-19
Outbond
20-Dec-19 2608 20-Dec-19
Outbond
30-Nov-19 '2500 30-Nov-19
Cancel
Cancel
Cancel
Cancel
Outbond
30-Nov-19
Cancel 22-Aug-19 SURAT IJIN MASUK SITE 31-Oct-19
Cancel
Cancel
Cancel
Cancel 27-Aug-19 1222489_ISAT_MAINTEN31-Oct-19
Cancel
Cancel
Outbond Basir
10-Sep-19 1839 15-Nov-19
NY Outbond Cancel
NY Outbond Cancel
NY Outbond Cancel
NY Outbond Cancel
Outbond
23-Nov-19 1239583_ISAT_SURVEY 30-Nov-19
NY Outbond Cancel 22-Aug-19 SURAT IJIN MASUK SITE 31-Oct-19
NY Outbond Cancel 27-Aug-19 1222489_ISAT_MAINTEN31-Oct-19
Outbond Basir
4-Sep-19 433251 10-Sep-19
Outbond Cancel
Outbond Rauf
20-Dec 2599 15-Nov
Outbond basir
4-Sep-19 433251 10-Sep-19
Outbond
20-Aug 1605 - Mitrasel 20-Aug-19
Outbond Arifuddin
25-Oct-19 2307 F 15-Nov-19
Outbond Farhan
31-Aug 1718 - Mitrasel 31-Aug
Endorsed
1718 - Mitrasel Endorsed
'2505 Endorsed
'2500 Endorsed
2036 Endorsed by MOM
0023 F Need Doc ATP
2575 Endorsed
'2500 Endorsed
Endorsed by MOM
Endorsed by MOM
Endorsed by MOM
'2500 Endorsed
21-Jul Endorsed
2155 Endorsed by MOM
2053 Endorsed
2235 F Endorsed
'2500 Endorsed
1718 - Mitrasel Endorsed by MOM
1839 ENDORSED
Partial Accept (RLDW)
1839 Endorsed
11-Nov-19 #N/A
2575 Endorsed
0103 F NY RFS 50
07.01.2020_099_MADDEN
Taufik Need Doc ATP50 4-Dec-19
Salassae - Plampang
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273 GTC_TG_BUNGA - TANJUNG_BUNGA Phase 2
ET_2018_AccNetwPhase2_SLPP_37 SONDAR - TARERAN Phase 1
22-May-19 ET_2018_4G_Overlay_SLPP_AddOnAndCap_244 WIRAE - SIWA Phase 3
Salassae - Plampang
ET_2018_AccNetwPhase2_SLPP_37 SONDAR - TARERAN Phase 1
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273 GTC_TG_BUNGA - TANJUNG_BUNGA Phase 2
23-May-19 ET_2018_4G_Overlay_SLPP_AddOnAndCap_244 WIRAE - SIWA Phase 3
Salassae - Plampang
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273 GTC_TG_BUNGA - TANJUNG_BUNGA Phase 2
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_302 MENARA_MAKASSAR - GRAHA_ISAT_MKS Phase 2
ET_2018_Overlay_MW_Intermediate_SLPP_56 PANGKEP - MAROS Phase 1
ET_2018_AccNetwPhase2_SLPP_31 LEMBEAN - KAUDITAN Phase 1
24-May-19 ET_2018_AccNetwPhase2_SLPP_35 LEILEM_PL - SONDAR Phase 1
OTW Gorontalo
Yusril : Telkomsel
Yunus, ijin sakit
New Link
28UPD040 GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA Swap Upgrade to 200Mbps
New Link
28UPD040 GTC_TG_BUNGA 28UPD010 TANJUNG_BUNGA Swap Upgrade to 200Mbps
26AMR035 LOPANA_PL 26AMR003 TUMPAAN Swap Upg
Masih Alrm
Migrasi/ Done
Migrasi/ Done
Pointing Maksimal , tp yusril lg mengarah Ke siwa
Pointing
Lanjutin
Done
Done
Done
Done
Done
Done
eek 22 4 site
eek 24 5 site
Migration
on Week 22 4 site
on Week 24 5 site
Final Config Area Plan
23HPECN-TN-200Mbps-0.6SP-NP MAKASSAR 3-Jun
23ECN-TN-200Mbps-0.6SP-NP MAKASSAR 6-Jun
7ECN-TN-200Mbps-1.8SP-NP SENGKANG 6-Jun
7ETN-200Mbps-1.8DP-NP SENGKANG 11-Jun
7ETNHP-3x200Mbps-2.4DP-SD SENGKANG 7-Jun
23ECN-TN-200Mbps-1.2SP-NP SENGKANG 7-Jun
11ETN-2x300Mbps-1.2DP-RLB2+0 SUNGGUMINASA 10-Jun
7ETNHP-3x200Mbps-1.2DP-RLB3+0 BULUKUMBA 10-Jun
7ETNHP-4x200Mbps-2.4DP-SD BULUKUMBA 10-Jun
7ETN-200Mbps-2.4DP-NP SELAYAR 11-Jun
15ECN-TN-200Mbps-1.2SP-NP SELAYAR 12-Jun
13ETN-200Mpbs-1.2SP-NP SELAYAR 13-Jun
7ECN-TN-200Mbps-1.8SP-NP BONE 12-Jun
7ECN-TNHP-200Mbps-1.8SP-NP BONE 12-Jun
7ETNHP-3x200Mbps-2.4DP-RLB3+0 SOPPENG 13-Jun
23ECN-TN-200Mbps-0.6SP-NP BONE 28-Jun
13ECN-TN-200Mbps-1.2SP-NP BONE 14-Jun
7ETNHP-3x200Mbps-1.8DP-RLB3+0 SINJAI 14-Jun
7ETN-200Mpbs-1.8DP-NP KOTAMUBAGO 29-Jun
11ETN-2x300Mpbs-1.2DP-RLB2+0 AMURANG 17-Jun
7ECN-TN-200Mpbs-1.2SP-NP AMURANG 17-Jun
7ETN-2x200Mpbs-1.8DP-RLB2+0 AMURANG 18-Jun
11ETN-300Mpbs-1.2DP-NP KOTAMUBAGO 27-Jun
13ETN-2x200Mpbs-0.6DP-RLB2+0 KOTAMUBAGO 24-Jun
13HPECN-TN-200Mpbs-1.2SP-NP KOTAMUBAGO 18-Jun
11ECN-TN-300Mpbs-1.2SP-NP KOTAMUBAGO 19-Jun
7HPECN-TN-200Mpbs-1.8SP-NP KOTAMUBAGO 20-Jun
7ETN-200Mpbs-1.8DP-NP KOTAMUBAGO 22-Jun
15ECN-TN-200Mpbs-0.6SP-NP TODOALING 19-Jun
15HPECN-TN-200Mpbs-1.2SP-NP TODOALING 19-Jun
13ETN-4x200Mpbs-0.6DP-RLB4+0 AMURANG 21-Jun
13ETN-4x200Mpbs-1.2DP-RLB4+0 KOTAMUBAGO 22-Jun
11ETN-4x300Mpbs-1.2DP-RLB4+0 KOTAMUBAGO 23-Jun
11ETN-4x300Mpbs-1.2DP-RLB4+0 KOTAMUBAGO 24-Jun
7ETNHP-200Mpbs-1.8DP-NP KOTAMUBAGO 25-Jun
7ETN-200Mpbs-1.8SP-1+1 SD Kotamubago 26-Jun
23ETN-200Mpbs-0.6DP-NP Kotamubago 27-Jun
23ETN-3x200Mpbs-0.6DP-RLB3+0 MANADO 28-Jun
7ETNHP-2x200Mpbs-3DP-RLB2x(1+1) SD AMURANG 27-Jun
13ETNHP-200Mpbs-1.2DP-NP TODOALING 30-Jun
23ETN-200Mpbs-0.6DP-NP TOMOHON 30-Jun
Phase - multiple -
ET_2018_AccNetwPhase2_SLPP_04
ET_2018_AccNetwPhase2_SLPP_06
ET_2018_AccNetwPhase2_SLPP_08
ET_2018_Overlay_MW_Intermediate_SLPP_50
ET_2018_Overlay_MW_Intermediate_SLPP_09
ET_2018_Overlay_MW_Intermediate_SLPP_24
ET_2018_Overlay_MW_New Site_SLPP_053
ET_2018_Overlay_MW_New Site_SLPP_055
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_122
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_121
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_301
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP057
ET_2018_Overlay_MW_Intermediate_SLPP_40
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_289
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP020
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP024
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_138
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP107
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_161
ET_2018_AccNetwPhase2_SLPP_39
ET_2018_AccNetwPhase2_SLPP_18
ET_2018_AccNetwPhase2_SLPP_21
ET_2018_AccNetwPhase2_SLPP_17
ET_2018_AccNetwPhase2_SLPP_19
ET_2018_AccNetwPhase2_SLPP_05
ET_2018_AccNetwPhase2_SLPP_16
ET_2018_AccNetwPhase2_SLPP_14
ET_2018_AccNetwPhase2_SLPP_20
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_005
ET_2018_Overlay_MW_New Site_SLPP_143
ET_2018_Overlay_MW_New Site_SLPP_018
ET_2018_Overlay_MW_New Site_SLPP_042
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_095
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_273
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_339
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP050
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_098
ET_2018_4G_Overlay_SLPP_AddOnAndCap_324
ET_2018_Overlay_MW_New Site_SLPP_024
ET_2018_Overlay_MW_Intermediate_SLPP_01
ET_2018_Overlay_MW_Intermediate_SLPP_05
ET_2018_Overlay_MW_Intermediate_SLPP_15
ET_2018_Overlay_MW_Intermediate_SLPP_62
ET_2018_AccNetwPhase2_SLPP_40
ET_2018_AccNetwPhase2_SLPP_30
ET_2018_AccNetwPhase2_SLPP_35
ET_2018_Overlay_MW_Intermediate_SLPP_51
ET_2018_AccNetwPhase2_SLPP_37
ET_2018_Overlay_MW_New Site_SLPP_050
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP061
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_120
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_063
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_279
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_074
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_024
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_307
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP083
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_265
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_267
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_163
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP049
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_240
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP097
ET_H2_2018_4GOverlayMWCovLasMilUpg_SLPP128
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_362
ET_2018_4GOverlay_MWFor_FO_Mitigation_5
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_365
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_073
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_169
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_096
ET_2018_4G_Overlay_SLPP_AddOnAndCAp_168
Link route PO PHASE SITE ID NE