Actions Plan for post Covid-19 lockdown for carrying out O&M, Construction &
Manufacturing activities on IR
O&M :
1. During the lock-down period around 30% staff is being utilized for
maintenance activates for reliable and safe train operation. It is planned
to take up full maintenance activates one week prior to operation
passenger train to ensure smooth train operation. This will include
following:
Testing of all point machines
Testing of all Signals
Testing of all track circuits.
Project Activities:
1. Targets are being reviewed in view of precious time lost during lock-
down and availability of fund