SECTION 3100 – MISCELLANEOUS WORKS
3101. SCOPE
This Section cover the works related to the construction of miscellaneous works
such as precast members, joints, wearing coat on drainage structure, railings,
approach slab, drainage spouts and weep holes. These miscellaneous works are to
be constructed in connection with the structures.
(1) Materials
Concrete and reinforcement for precast members shall comply with Section
2000.
(3) Measurement
Depending upon the nature of works, pre-cast members shall be measured in
numbers, cubic meters or metric tonnes as specified in the Contract.
Reinforcement shall not be measured for payment.
(4) Payment
The quantities measured as provided above shall be paid at the contract unit
rate applicable for the particular type of work. The contract unit rate shall
be the full and the final payment to the Contractor as per Clause 112 to
complete the work as per these Specifications.
Open joints shall be constructed at the locations shown in the Drawing using
suitable stops, which are to be subsequently removed. When removing the
material, care shall be exercised to avoid chipping or breaking the corners of
the concrete. The edges of the concrete, at the joints, shall be properly
finished. Reinforcement shall not extend across an open joint, unless
otherwise shown on the Drawing.
Hardboard joint filler shall be minimum of 3mm thick and approved by the
Engineer. Expanded polystyrene board shall have a minimum flexural
strength of 0.25 N/sq.mm. and a compressive yjeld strength of 0.11
N/sq.mm. minimum and 0.28 N/sq.mm maximum at 5% compression.
Vertical faces of polystyrene against which concrete is to be placed shall be
faced with hardboard of 3mm minimum thickness or other equivalent
material. Other board fillers may be used with the approval of the Engineer.
All board fillers shall be held in place with nails, a waterproof adhesive or
other means approved by the Engineer.
Asbestos sheet packing shall have the approval of the Engineer. It shall be
approximately 1.6 mm thick unless otherwise shown on the Drawing or
specified in the contract and shall be composed essentially of asbestos
firbres bound together with a cementing medium rendering it tough and
pliable. One side shall be coated with graphite. The deformation of the
packing under a load of 70 N/sq.mm shall not be more than 16% and the
loss on ignition shall not be more than 25%. When tested between planed
bronze plates under a load of 5 N/sq.mm the 3' packing shall show a static
coefficient of friction of less than 0.4 after 100 lateral movements at 6.5mm.
(5) Measurement
Open joints, filled joints, board fillers and sheet packing shall not be
measured separately.
(6) Payment
No separate payment for open joints, filled joints, board fillers and sheet
packing shall be made. The cost of such joints is deemed to be included in
the unit rate of the structures, where those joints are required to be formed.
3104. WEARING COAT
The wearing coat shall be the asphalt concrete/surface dressing and shall
comply with Section 1300.
The cross slope in the deck shall be kept as 2.5 percent. For providing cross
camber no variation in thickness of wearing coat shall be permitted.
(3) Measurement
(4) Payment
3105. RAILINGS
(1) General
(a) GI Pipe
All GI pipes shall be free from abrasions, rough or sharp edges, and
shall not be kinked, twisted or bent. Any pipe which does not meet the
requirements of the field Specifications shall be replaced at the
Contractor's expense.
The concrete grade and type of reinforcements for concrete posts shall
be as indicated in the Drawing. The specifications for concrete and
reinforcements shall be as provided under Section 2000.
(6) Measurement
(7) Payment
Railing, measured as provided above, shall be paid at the contract unit rate. The
contract unit rate shall be the full and the final payment to the Contractor as per
Clause 112 to complete the work as per these Specifications.
3106. APPROACH SLAB
(1) General
The gap between the approach slab and superstructures shall be watertight
by filling the gap with approved joint filler. The type and thickness of the
base of approach slab shall be as shown on the Drawing and shall be
constructed as per the requirements of Section 1200. The concrete and
reinforcements shall conform to Section 2000.
(2) Measurement
Approach slab and its base shall be measured separately in cubic meters.
(3) Payment
(2) Fabrication
The whole assembly shall be placed in true position, lines and levels as
shown on the Drawings with necessary cut-out in the shuttering for deck
slab and held in place firmly. Where the reinforcements of the deck are
required to be cut, equivalent reinforcements shall be placed at the corners
of the assembly.
(4) Finishing
After setting of the deck slab concrete, the shrinkage cracks around the
assembly shall be totally sealed with polysulphide sealant or bituminous
sealant as per 18:1834 and the excess sealant trimmed to receive the wearing
coat. After the wearing coat is completed, similar sealant shall be finished
to cover at least 50 mm on the wearing coat surface all round the drainage
assembly.
(5) Measurement
(6) Payment
Drainage spouts shall not be paid separately. The contract unit rate for
concrete shall be deemed to include costs for forming such spouts.
(1) General
Hangers, anchor bolt inserts, manhole frames and covers, sleeves and other
accessories required for such facilities, which must be cast in the concrete
shall be furnished by the respective authorities or the Contractor as
described in the contract and shall be installed by the Contractor in
accordance with the details shown on the Drawing or as directed by the
Engineer. Utility facilities which require installation after the concrete has
been cast and before other construction is in place which would interfere
with it's installation, will be installed, either by the authorities concerned or
by the Contractor as directed by the Engineer at such times as the work is
ready for their installation. The Contractor shall notify the Engineer in
writing at least 30 days in advance of the proposed dates, that the work will
be ready for installation of ere accessories of utilities in the structure. The
Engineer, in turn, shall make necessary arrangements with the utility
authorities.
(3) Measurement
(4) Payment
Unless otherwise provided in the Contract, utility facility shall not be paid
separately. The cost of utility facility shall be deemed to be included in the
unit rates of different items of work of structure.
(2) Measurement
(3) Payment
Weep holes shall not be paid separately. The contract unit rate for
respective items shall be deemed to include costs for providing such holes.
3110. FILTER MATERIALS
(1) Materials
Geotextile shall comply with Section 600. Geomembrane shall comply with
Sub-clause 2404 (2).
d15% filter
b)
>
d15% subsoil
5
Where, d15% designates the 15% size of the material (i.e. the size of the
sieve that allows 15% by weight of the material to pass through it).
Similarly, d50% and d85% designate the sizes of sieve that allow 50% and
85% respectively by weight of the material to pass through it.
(2) Construction
Minimum one set of test for gradation and compaction of filter material
shall be executed for every 50 cu.m. and every change in source of material.
The results shall meet the specified requirements.
(4) Measurement