TORONTO TRANSIT COMMISSION

TO Distribution list

FROM Kathleen Llewellyn-Thomas

DATE April 29, 2020

SUBJECT Service changes for the May 2020 board period

The attached pages list the service changes for the board period that begins on Sunday, May 10, 2020.

Due to COVID-19, there will be a planned service reduction by approximately 15% across the
system compared to the March-April 2020 board period. Seasonal adjustments, including to the
Toronto Zoo, Cherry Beach, Bluffer’s Park, Ontario Place, Woodbine Beach, and the Harbourfront
are deferred.

The proposed service in the May 2020 board period will decrease the scheduled hours per week of
operation for regular service by approximately 22,200 hours compared to the March-April 2020 board
period. The total number of weekly hours of regular service planned for the May 2020 board period will
be approximately 21,910 hours below the level specified in the planned 2020 Service Budget for May
(2020-03-03 version).

The service changes have been developed in consultation with personnel in the Service Delivery Group,
including Bus Transportation, Streetcar Transportation, and Subway Transportation. These changes
have been reviewed by Operations Control, Service Delivery Control, Human Resources, and Bus and
Streetcar Maintenance staff to ensure that they minimize constraints on vehicle availability and workforce.

If there are any questions about these changes, please contact Mark Mis at 416-393-4275, or contact
the Service Planning and Scheduling staff listed below.

Mark Mis - for Kathleen Llewellyn-Thomas


Kathleen Llewellyn-Thomas, Chief Customer Officer

Attachments: Memo, Budget tables

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 2

Strategy and Service Planning Department contacts:

416-393-4276 Schedule/crew information for subway, streetcars and


Peter Borkowski
E-mail: peter.borkowski@ttc.ca station collectors

416-393-6105 Schedule/crew information for Eglinton and Malvern


Mark Zacharczyk
E-mail mark.zacharczyk@ttc.ca divisions

416-393-4516 Schedule/crew information for Birchmount, Wilson,


Frank Longo
E-mail franco.longo@ttc.ca Queensway, Arrow and Mount Dennis divisions

416-393-4512
Jose Rubio System-wide schedule/crew information
E-mail jose.rubio@ttc.ca

416-393-4494
Laurence Lui System-wide service questions
E-mail laurence.lui@ttc.ca

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 3

1. Highlights
Due to COVID-19, service reductions will be made across the system. Details are listed in the
sections below.

City construction project beginning


• Bathurst Street bridge rehabilitation – Bathurst Street closed south of Front will impact service
on 307 BATHURST and 511 BATHURST – diversions operated at the divisional level

Typical seasonal service increase to the Toronto Zoo, Cherry Beach, Bluffer’s Park, Ontario
Place, Woodbine Beach, and the Harbourfront are deferred:
• 85 SHEPPARD EAST – Extended weekend service to Toronto Zoo
• 86 SCARBOROUGH – Extended service to Toronto Zoo
• 92 W OODBINE SOUTH – Weekend seasonal service increase
• 121 FORT YORK-ESPLANADE – Service to Cherry Beach and Ontario Place
• 175 BLUFFERS PARK – Service to Bluffer’s Park

Construction projects ending


• N/A

Construction projects continuing


Some of the costs for alternate service typically required for these projects have been adjusted –
more details on page 29
• Kennedy Station Elevator Overhaul Project until August 2020
• Bus roadway rehabilitation at Sheppard West Station until April 2021
• Keele Station Easier Access construction until September 2020
• Runnymede Station Easier Access construction until late 2020
• McNicoll Garage impacting the 42 CUMMER until November 2020
• City construction on Wellington Street, until December 2020
• Roncesvalles Carhouse renovation continues until December 2020
• Roncesvalles Carhouse partial reopening - January to December 2020
• Line 3 SCARBOROUGH - Vehicle Rehab - January to September 2020
• MX Eglinton LRT Construction (Existing) - January to December 2020
• MX Eglinton LRT Construction - RAD buses - January to December 2020
• MX Finch West LRT Construction - January to December 2020
• City Construction at Six Points - January to December 2020

SERVICE CHANGES REQUIRING STOP OR STOP ANNOUNCEMENT MODIFICATIONS


• None

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 4

2. List of Service Changes


1 Yonge-University WilSub .................................................................................................................................... 5
• Service reduction ............................................................................................................................................ 5
2 Bloor-Danforth DanSub ....................................................................................................................................... 5
• Service reduction ............................................................................................................................................ 5
307 Bathurst Wil .................................................................................................................................................. 6
• City Construction continues – Bathurst Street Bridge Rehabilitation................................................................. 6
511 Bathurst MtD.................................................................................................................................................. 6
• City Construction continues – Bathurst Street Bridge Rehabilitation................................................................. 6
600 Series........................................................................................................................................................... 7
• Additional crews – Service resiliency ............................................................................................................... 7
705 Standy By / RAD Les .................................................................................................................................... 8
• Streetcar Run-As-Directed crews – Service resiliency ..................................................................................... 8

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 5

3. Service Changes – Subway


1 YONGE-UNIVERSITY WILSUB
• Temporary service reduction
Customer impact: Moderate
Budgetary impact: Approximate reduction of 1,200 weekly service hours
Effective date: May 11, 2020
Service will be reduced on Line 1 YONGE-UNIVERSITY, from Monday-Friday. Service will operate every 3
to 4 minutes during the daytime and early evening, and every 5 minutes in the late evening. The short-
turn in the morning peak period at Glencairn Station will be temporarily suspended and service
throughout the day will operate between Finch Station and Vaughan Metropolitan Centre Station.
In addition, all gap trains will be removed from service, and step back operations at the terminals will
be temporarily suspended.
Service Designs
Time Period Service Veh Headway Total Time + Vehicle
recovery Changes
Monday to Friday
AM Peak 1 Finch Stn-Vaughan Metro Centre Stn 46 3 min 30 s 161 RTT -19 trains
Midday 1 Finch Stn-Vaughan Metro Centre Stn 46 3 min 30 s 161 RTT +4 trains
PM Peak 1 Finch Stn-Vaughan Metro Centre Stn 46 3 min 30 s 161 RTT -19 trains
Early Evening 1 Finch Stn-Vaughan Metro Centre Stn 46 3 min 30 s 161 RTT No change
Late Evening 1 Finch Stn-Vaughan Metro Centre Stn 32 5 min 00 s 160 RTT No change

2 BLOOR-DANFORTH D ANSUB
• Temporary service reduction
Customer impact: Moderate
Budgetary impact: Approximate reduction of 1,850 weekly service hours
Effective date: May 11, 2020
Service will be reduced on Line 2 BLOOR-DANFORTH, from Monday-Friday. Service will operate every 3
to 4 minutes during the daytime and every 6 minutes in the evenings.
All gap trains will be removed from service, and step back operations at the terminals will be
temporarily suspended. Trains usually dispatched from Keele Yard will be temporarily changed to be
stored and dispatched from Greenwood Yard for all days of the week. Trains will continue to be stored
and dispatched at both Kennedy and Kipling stations.
Service Designs
Time Period Service Veh Headway Total Time + Vehicle
recovery Changes
Monday to Friday
AM Peak 2 Kipling Stn-Kennedy Stn 27 3 min 45 s 101-102 RTT -19 trains
Midday 2 Kipling Stn-Kennedy Stn 27 3 min 45 s 101-102 RTT -6 trains
PM Peak 2 Kipling Stn-Kennedy Stn 27 3 min 45 s 101-102 RTT -24 trains
Early Evening 2 Kipling Stn-Kennedy Stn 17 6 min 00 s 102 RTT -12 trains
Late Evening 2 Kipling Stn-Kennedy Stn 17 6 min 00 s 102 RTT -3 trains

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 6

4. Service Changes – Bus and Streetcar


307 BATHURST WIL
• City Construction continues – Bathurst Street Bridge Rehabilitation
Customer impact: Major
Budgetary impact: None – schedule change deferred to June Board Period
Effective date: May 10, 2020 to end of 2020
City construction to rehabilitate the Bathurst Street bridge between Front Street and Fort York Boulevard
will require the closure of the bridge to vehicular traffic. Pedestrian access will be maintained.
As a result, 307 BATHURST buses will divert in both directions via Front Street, Spadina Avenue, and
Fort York Boulevard.
This change will operate at the divisional level upon the closure of the bridge, scheduled for early
May. Changes to the schedules will be formally made with the start of the June 2020 Board Period.
Routing Details
307 (Exhibition-Steeles)
Northbound: From Exhibition Loop via east on Manitoba Drive, east on Fleet Street, north and east on Fort York Boulevard,
north on Spadina Avenue, west on Front Street West, north on Bathurst Street, west on Fisherville Road, north on Carpenter
Road, east on Steeles Avenue West, south on Village Gate, west on Greenwin Village Road to Bathurst Street.
Southbound: From Greenwin Village Road and Bathurst Street, via south on Bathurst Street, east on Front Street West, south
on Spadina Avenue, west on Fort York Boulevard, south on Iannuzzi Street, west on Fleet Street and west on Manitoba
Drive, to Exhibition Loop.
Destination Signs
Code 6307 – 307S BATHURST / BLUE NIGHT / SHORT TURN / WILSON AVE

511 BATHURST M TD
• City Construction continues – Bathurst Street Bridge Rehabilitation
Customer impact: Moderate
Budgetary impact: None – schedule change deferred to June Board Period
Effective date: May 10, 2020 to end of 2020
City construction to rehabilitate the Bathurst Street bridge between Front Street and Fort York Boulevard
will require the closure of the bridge to vehicular traffic. Pedestrian access will be maintained.
As a result, 511 BATHURST buses will divert in both directions via Front Street, Spadina Avenue, and
Fort York Boulevard.
This change will operate at the divisional level upon the closure of the bridge, scheduled for early
May. Changes to the schedules will be formally made with the start of the June 2020 Board Period.
Routing Details
511 (Bathurst Stn-Exhibition)
Northbound: From Exhibition Loop via east on Manitoba Drive, east on Fleet Street, north and east on Fort York Boulevard,
north on Spadina Avenue, west on Front Street West, north on Bathurst Street to Bathurst Station.
Southbound: From Bathurst Street via south on Bathurst Street, east on Front Street West, south on Spadina Avenue, west and
south on Fort York Boulevard, west on Lake Shore Boulevard, north on Strachan Avenue, west on Manitoba Drive, to
Exhibition Loop.

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 7

600 SERIES
• Additional crews – Service resiliency
Customer impact: Moderate
Budgetary impact: Major – Approximate increase of 9,690 weekly hours to offset service reductions
Effective date: May 10, 2020

Additional 600 series crews will be added to all bus divisions to offset scheduled service reductions.
These will replace all existing weekday crews and weekend crews, including subway shuttle construction
crews.
Weekdays
3:30a-11:30a 5:00a –1:00p 1:00p –9:00p 5:00p –1:00x 9:00p –5:00x TOTAL
Arrow 9 9 7 7 3 35
Birchmount 9 9 5 7 2 32
Eglinton 9 9 8 10 9 45
Malvern 20 15 20 15 7 77
Mount Dennis 12 12 10 10 8 52
Queensway 6 5 6 7 2 26
Wilson 2 1 1 1 1 6
TOTAL 67 60 57 57 32 273

Saturday, Sunday, Holiday


5:00a –1:00p 1:00p –9:00p TOTAL
Arrow 2 2 4
Birchmount 2 2 4
Eglinton 2 2 4
Malvern 2 2 4
Mount Dennis 2 2 4
Queensway 2 2 4
Wilson 2 2 4
TOTAL 14 14 28

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 8

LES
705 STANDBY / RAD

• Streetcar Run-As-Directed crews – Service resiliency


Customer impact: Minor
Budgetary impact: Moderate – Approximate increase of 160 weekly hours to offset service reduction
Effective date: May 10, 2020

Four streetcar crews will be designated Run-As-Directed from Leslie Barns. These will in place from
Tuesday to Friday only.
Crew Time
1 7:00a –5:00p
2 7:30a –5:30p
3 3:00p –1:00x
4 3:30p –1:30x

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 9

5. Temporary Service Reductions – Effective May 10, 2020


Temporary service reductions will be made throughout the day on many routes across the system to
match reduced ridership levels and the COVID-19 situation. In most cases, the proposed headways on
the routes listed below are the average service frequencies and are not necessarily the scheduled
headway.
There are no planned changes to services not listed below.
Rte Name Monday-Friday Saturday Sunday
5 AVENUE RD AM - 3 veh x 20 min 00 s
PM - 2 veh x 30 min 00 s
6 BAY AM - 9 veh x 7 min 00 s Morn - 3 veh x 20 min 00 s Morn - 3 veh x 20 min 00 s
MD - 5 veh x 12 min 00 s
PM - 8 veh x 7 min 30 s
EE - 3 veh x 20 min 00 s
LE - 2 veh x 30 min 00 s
7 BATHURST AM - 14 veh x 8 min 30 s
MD - 13 veh x 9 min 00 s
PM - 17 veh x 7 min 00 s
EE - 13 veh x 8 min 00 s
LE - 8 veh x 10 min 00 s

9 BELLAMY AM - 4 veh x 18 min 15 s


PM - 4 veh x 19 min 15 s
10 VAN HORNE AM - 1 veh x 30 min 00 s
PM - 2 veh x 15 min 00 s
11 BAYVIEW AM - 10 veh
PM - 11 veh
12 KINGSTON ROAD AM - 12A - 4.5 veh x 20 min 00 s
AM - 12C - 3.5 veh x 20 min 00 s
AM - 12D - 5 veh x 27 min 00 s
PM - 12A - 4 veh x 23 min 00 s
PM - 12C - 3 veh x 23 min 00 s
PM - 12D - 4 veh x 30 min 00 s

14 GLENCAIRN AM - 3 veh x 17 min 00 s


MD - 2 veh x 24 min 00 s
PM - 4 veh x 13 min 00 s

15 EVANS AM - 3 veh x 15 min 00 s


PM - 3 veh x 20 min 00 s

16 McCOWAN AM - 7 veh x 10 min 00 s


PM - 8 veh x 10 min 00 s
EE - 4 veh x 15 min 00 s
20 CLIFFSIDE AM - 4 veh x 20 min 00 s
MD - 4 veh x 20 min 00 s
PM - 4 veh x 20 min 00 s
22 COXWELL AM - 22A - 4 veh x 10 min 00 s
MD - 22A - 5 veh x 9 min 00 s
PM - 22A - 6 veh x 7 min 45 s
EE - 22A - 4 veh x 10 min 00 s
LE - 22A - 4 veh x 10 min 00 s

23 DAWES AM - 3 veh x 10 min 00 s


MD - 3 veh x 10 min 00 s
PM - 3 veh x 10 min 00 s
EE - 3 veh x 10 min 00 s
24 VICTORIA PARK AM - 17 veh
MD - 13 veh
PM - 16 veh

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 10

Rte Name Monday-Friday Saturday Sunday

EE - 10 veh
25 DON MILLS AM - 17 veh
PM - 19 veh
EE - 10 veh
LE - 8 veh

26 DUPONT AM - 5 veh x 14 min 00 s Morn - 2 veh x 30 min 00 s Morn - 2 veh x 30 min 00 s


MD - 3 veh x 22 min 00 s Aftn - 2 veh x 30 min 00 s Aftn - 2 veh x 30 min 00 s
PM - 4 veh x 17 min 30 s EE - 2 veh x 30 min 00 s
EE - 2 veh x 30 min 00 s
29 DUFFERIN AM - 15 veh x 7 min 00 s Some trips removed Some trips removed throughout
MD - 15 veh x 7 min 00 s throughout the day the day
PM - 17 veh x 6 min 00 s
EE - 13 veh x 8 min 00 s
LE - 9 veh x 10 min 00 s

32 EGLINTON WEST AM - 45 veh Some trips removed Some trips removed throughout
MD - 26 veh throughout the day the day
PM - 40 veh
EE - 20 veh
LE - 17 veh

35 JANE PM - 35A - 11 veh x 12 min 00 s


PM - 35B - 11 veh x 12 min 00 s
EE - 35A - 11 veh x 8 min 45 s
LE - 35A - 9 veh x 9 min 00 s

36 FINCH WEST AM - 36A - 18 veh x 6 min 00 s


AM - 36D - 3.5 veh x 17 min 00 s
AM - 36F - 3.5 veh x 17 min 00 s
PM - 36A - 17 veh x 7 min 00 s
PM - 36D - 2.5 veh x 25 min 00 s
PM - 36F - 2.5 veh x 25 min 00 s
37 ISLINGTON AM - 37B - 6 veh x 15 min 00 s
PM - 37B - 6 veh x 15 min 00 s

38 HIGHLAND CREEK AM - 38A - 6 veh x 12 min 30 s


MD - 38A - 6 veh x 12 min 00 s
PM - 38A - 7 veh x 11 min 00 s
40 JUNCTION-DUNDAS All service on 40A branch
WEST
AM - 6 veh x 11 min 00 s
MD - 5 veh x 15 min 00 s
PM - 5 veh x 15 min 00 s
EE - 3 veh x 20 min 00 s
LE - 2 veh x 25 min 00 s
42 CUMMER AM - 13 veh
PM - 8 veh
43 KENNEDY PM - 13 veh
EE - 10 veh
LE - 5 veh
44 KIPLING SOUTH EE - 2 veh x 15 min 00 s
LE - 2 veh x 15 min 00 s
45 KIPLING EE - 6 veh x 15 min 00 s
LE - 4 veh x 15 min 00 s
48 RATHBURN AM - 3 veh x 15 min 00 s
PM - 2 veh x 25 min 00 s

49 BLOOR WEST AM - 2 veh x 13 min 30 s


PM - 1 veh x 30 min 00 s
EE - 1 veh x 30 min 00 s
50 BURNHAMTHORPE AM - 3 veh x 15 min 00 s EM - 1 veh x 30 min 00 s EM - 1 veh x 30 min 00 s
MD - 1 veh x 30 min 00 s Morn - 1 veh x 30 min 00 s Morn - 1 veh x 30 min 00 s

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 11

Rte Name Monday-Friday Saturday Sunday

PM - 2 veh x 20 min 00 s Aftn - 1 veh x 30 min 00 s Aftn - 1 veh x 30 min 00 s


51 LESLIE AM - 6 veh x 20 min 00 s
PM - 5 veh x 22 min 00 s

52 LAWRENCE WEST AM - 52A - 8.5 veh x 18 min 00 s


AM - 52B - 9.5 veh x 18 min 00 s
AM - 52F - 5 veh x 18 min 00 s
AM - 52G - 5 veh x 18 min 00 s
MD - 52A - 9 veh x 15 min 00 s
MD - 52B - 10 veh x 15 min 00 s
MD - 52F - 6 veh x 15 min 00 s
MD - 52G - 6 veh x 15 min 00 s
PM - 52A - 10 veh x 16 min 00 s
PM - 52B - 11.5 veh x 16 min 00 s
PM - 52F - 6.5 veh x 16 min 00 s
PM - 52G - 6 veh x 16 min 00 s
55 WARREN PARK AM - 1 veh x 30 min 00 s
PM - 1 veh x 30 min 00 s
56 LEASIDE AM - 5 veh
PM - 6 veh
57 MIDLAND AM - 6 veh x 10 min 00 s
MD - 4 veh x 17 min 30 s
PM - 5 veh x 14 min 00 s
EE - 4 veh x 15 min 30 s
LE - 2 veh x 30 min 00 s

60 STEELES WEST AM - 60A - 9 veh x 8 min 00 s


AM - 60D - 18 veh x 8 min 00 s
PM - 60A - 10 veh x 9 min 00 s
PM - 60D - 18 veh x 9 min 00 s

61 AVENUE RD AM - 3 veh x 15 min 00 s


NORTH PM - 4 veh x 16 min 00 s
62 MORTIMER AM - 2 veh x 20 min 00 s
MD - 2 veh x 20 min 00 s
PM - 2 veh x 20 min 00 s
EE - 2 veh x 18 min 00 s
LE - 2 veh x 18 min 00 s

63 OSSINGTON AM - 14 veh x 5 min 00 s


MD - 10 veh x 7 min 00 s
PM - 12 veh x 6 min 00 s
EE - 8 veh x 8 min 00 s
LE - 4 veh x 12 min 00 s

64 MAIN AM - 2 veh x 10 min 00 s


PM - 2 veh x 10 min 00 s
65 PARLIAMENT PM - 3 veh x 13 min 00 s
66 PRINCE EDWARD PM – 66A 2 veh x 20 min 00 s
PM – 66B 3 veh x 13 min 00 s
EE – 66A 1.5 veh x 24 min 00 s
EE – 66B 1.5 veh x 24 min 00s
LE – 66A 1 veh x 30 min 00 s
LE – 66B 1 veh x 30 min 00 s

67 PHARMACY AM - 6 veh
PM - 4 veh
68 WARDEN AM - 16 veh

71 RUNNYMEDE AM - 7 veh x 9 min 00 s


MD - 4 veh x 13 min 30 s
PM - 6 veh x 10 min 00 s
EE - 3 veh x 15 min 00 s
LE - 2 veh x 25 min 00 s

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 12

Rte Name Monday-Friday Saturday Sunday

72 PAPE All buses on 72B branch in peaks


AM - 8 veh x 8 min 00 s
PM - 8 veh x 9 min 00 s
74 MT PLEASANT AM - 3 veh x 18 min 00 s
MD - 2 veh x 25 min 00 s
PM - 3 veh x 18 min 00 s

75 SHERBOURNE AM - 7 veh x 6 min 30 s


MD - 4 veh x 11 min 00 s
PM - 6 veh x 8 min 30 s

76 ROYAL YORK 76A branch 76A Branch 76A Branch


SOUTH
AM – 6 veh x 6 min 00 s EM - 2 veh x 15 min 00 s Morn - 3 veh x 12 min 00 s
PM - 5 veh x 7 min 00 s Morn - 3 veh x 12 min 00 s Aft - 3 veh x 12 min 00 s
EE - 2 veh x 15 min 00 s Aft - 3 veh x 12 min 00 s EE - 2 veh x 15 min 00 s
LE - 2 veh x 15 min 00 s EE - 2 veh x 15 min 00 s LE - 2 veh x 15 min 00 s
LE - 2 veh x 15 min 00 s
No change to 76B No change to 76B
No change to 76B

77 SWANSEA AM - 4 veh x 9 min 00 s


MD - 3 veh x 13 min 30 s
PM - 4 veh x 10 min 00 s
EE - 2 veh x 15 min 00 s
LE - 1 veh x 25 min 00 s

79 SCARLETT RD AM - 11 veh
MD - 4 veh
PM - 8 veh
EE - 4 veh
LE - 3 veh

81 THORNCLIFFE AM - 5 veh x 7 min 00 s


PARK

83 JONES PM - 3 veh x 14 min 00 s


86 SCARBOROUGH AM - 11 veh
PM - 9 veh
EE - 5 veh
LE - 5 veh

87 COSBURN AM - 6 veh x 10 min 00 s


PM - 6 veh x 10 min 00 s
88 SOUTH LEASIDE PM - 6 veh
89 WESTON AM - 14 veh x 5 min 30 s
MD - 9 veh x 9 min 00 s
PM - 11 veh x 7 min 00 s
EE - 7 veh x 10 min 00 s
LE - 6 veh x 10 min 00 s
90 VAUGHAN AM - 4 veh x 7 min 00 s

94 WELLESLEY All service on 94A branch EE - 5 veh x 10 min 00 s EE - 5 veh x 10 min 00 s


LE - 4 veh x 12 min 00 s LE - 4 veh x 12 min 00 s
AM - 5 veh x 12 min 00 s
MD - 5 veh x 12 min 00 s
PM - 5 veh x 12 min 00 s
EE - 5 veh x 12 min 00 s
LE - 4 veh x 12 min 00 s

98 WILLOWDALE– AM - 4 veh x 16 min 00 s


SENLAC PM - 4 veh x 16 min 00 s
100 FLEMINGDON AM - 10 veh x 6 min 00 s
PARK MD - 7 veh x 9 min 00 s
PM - 7 veh x 9 min 00 s
EE - 7 veh x 9 min 00 s

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 13

Rte Name Monday-Friday Saturday Sunday

LE - 6 veh x 10 min 00 s
101 DOWNSVIEW PARK AM - 1 veh x 20 min 00 s
PM - 1 veh x 20 min 00 s

104 FAYWOOD AM - 3 veh x 18 min 00 s


PM - 3 veh x 18 min 00 s
105 DUFFERIN NORTH AM - 2 veh x 17 min 00 s
PM - 3 veh x 11 min 00 s

106 SENTINEL AM - 7 veh x 8 min 30 s


PM - 5 veh x 12 min 00 s
107 ST REGIS AM - 2 veh x 30 min 00 s
PM - 2 veh x 30 min 00 s
108 DRIFTWOOD LE - 4 veh x 15 min 00 s

110 ISLINGTON SOUTH AM – 110C - 3 veh x 13 min 00 s


No change to 110A/110B
111 EAST MALL AM - 4 veh x 15 min 00 s Morn - 2 veh x 20 min 00 s Morn - 2 veh x 20 min 00 s
PM - 5 veh x 13 min 00 s
112 WEST MALL EE - 4 veh x 20 min 00 s
LE - 3 veh x 30 min 00 s
116 MORNSIDE AM - 20 veh – 116B service
suspended
PM - 20 veh – 116B service
suspended
EE – 116A 3 veh x 30 min 00 s
EE – 116C 9 veh x 11 min 00 s
LE – 116C 7 veh x 13 min 00 s
117 ALNESS- AM - 5 veh x 12 min 00 s
CHESSWOOD PM - 5 veh x 13 min 00 s
118 THISTLE DOWN AM - 2 veh x 30 min 00 s
MD - 2 veh x 30 min 00 s
PM - 2 veh x 30 min 00 s
EE - 2 veh x 30 min 00 s

120 CALVINGTON AM - 2 veh x 30 min 00 s


MD - 2 veh x 30 min 00 s
PM - 2 veh x 30 min 00 s

122 GRAYDON HALL AM - 6 veh x 11 min 00 s


PM - 5 veh x 14 min 00 s

123 SHERWAY AM - 7 veh


PM - 9 veh
124 SUNNYBROOK PM - 3 veh x 9 min 00 s

125 DREWRY AM - 4 veh x 7 min 30 s


127 DAVENPORT AM - 2 veh x 25 min 00 s
PM - 2 veh x 25 min 00 s
129 McCOWAN NORTH MD - 8 veh
PM - 13 veh
EE - 9 veh
LE - 5 veh

141 DOWNTOWN MT Service suspended


PLEASANT
EXPRESS
142 DOWNTOWN Service suspended
AVENUE RD
EXPRESS

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 14

Rte Name Monday-Friday Saturday Sunday

143 DOWNTOWN Service suspended


BEACH EXPRESS
144 DOWNTOWN DON Service suspended
VALLEY EXPRESS
145 DOWNTOWN Service suspended
HUMBER BAY
EXPRESS

160 BATHURST NORTH AM - 3 veh x 25 min 00 s


161 ROGERS RD AM - 6 veh x 13 min 00 s EM - 3 veh x 20 min 00 s
MD - 3 veh x 23 min 00 s Morn - 4 veh x 16 min 00 s
PM - 6 veh x 13 min 00 s Aftn - 5 veh x 15 min 00 s
EE - 3 veh x 22 min 00 s EE - 3 veh x 20 min 00 s
LE - 2 veh x 30 min 00 s LE - 3 veh x 20 min 00 s
163 OAKWOOD AM - 6 veh x 12 min 00 s
PM - 6 veh x 12 min 00 s
EE - 4 veh x 14 min 00 s
168 SYMINGTON AM - 7 veh x 6 min 00 s EM - 2 veh x 20 min 00 s
MD - 3 veh x 12 min 00 s Morn - 4 veh x 10 min 00 s
PM - 7 veh x 6 min 30 s Aftn - 5 veh x 9 min 00 s
EE - 3 veh x 12 min 00 s
176 MIMICO GO Service suspended

501 QUEEN All service operates between Long


Branch and Neville Park on 10 min
headways all day

503 KINGSTON RD Service suspended and replaced by


all-day operation of 22A COXWELL

504 KING 4 AM trippers removed; service


reductions at all times
505 DUNDAS Service reductions at all times.

506 CARLTON 4 AM trippers removed; service


reductions at all times
508 LAKE SHORE Service suspended
509 HARBOURFRONT Service reductions at all times

510 SPADINA Service reductions at all times, most


trips operate on 510A branch
511 BATHURST Bus operation with service
reductions.
512 ST CLAIR Service reductions at all times.

900 AIRPORT EXPRESS Aftn - 5 veh x 8 min 30 s Aftn - 5 veh x 8 min 30 s


902 MARKHAM ROAD Service suspended
EXPRESS

903 KENNEDY- Service suspended


SCARBOROUGH
CENTRE EXPRESS

905 EGLINTON EAST Service suspended


EXPRESS
913 PROGRESS Service suspended
EXPRESS
924 VICTORIA PARK Service suspended
EXPRESS

925 DON MILLS Service suspended

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 15

Rte Name Monday-Friday Saturday Sunday

EXPRESS
927 HIGHWAY 27 AM - 927C - 7 veh x 10 min 00 s
EXPRESS AM - 927D - 9 veh x 10 min 00 s
MD - 927B - 12 veh x 6 min 45 s
PM - 927C - 8 veh x 9 min 00 s
PM - 927D - 11 veh x 9 min 00 s
929 DUFFERIN Service suspended
EXPRESS

935 JANE EXPRESS Service suspended


937 ISLINGTON Service suspended
EXPRESS
939 FINCH EXPRESS Service suspended
941 KEELE EXPRESS Service suspended

944 KIPLING SOUTH Service suspended


EXPRESS
945 KIPLING EXPRESS Service suspended
952 LAWRENCE WEST Service suspended
EXPRESS
953 STEELES EAST Service suspended
EXPRESS

954 LAWRENCE EAST Service suspended


EXPRESS

960 STEELES WEST Service suspended


EXPRESS

984 SHEPPARD WEST Service suspended


EXPRESS
985 SHEPPARD EAST Service suspended
EXPRESS
986 SCARBOROUGH Service suspended
EXPRESS
989 WESTON EXPRESS Service suspended
995 YORK MILLS Service suspended
EXPRESS
996 WILSON EXPRESS Service suspended

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 16

6. HOLIDAY SERVICE
Victoria Day holiday service Monday, May 18

A regular holiday service will be scheduled on most TTC routes (see below for exceptions). There will be
a special holiday sign-up, using holiday crewing crews.

TTC
The following services are included in the schedules but are not required on Victoria Day. These services
will be cancelled at the Divisional level and operators will be reallocated, as deemed appropriate by
Divisional management.
900 AIRPORT EXPRESS – Increased service except in the morning:
Time Period Service Veh Headway Total Time + Vehicle
recovery Changes
Holiday
Morning 900 Kipling Stn-Pearson Airport 7 6 min 00 s 34 + 8 +1 bus
(until 11:00 a.m.)

Afternoon 900 Kipling Stn-Pearson Airport 8 5 min 30 s 34 + 10 +1 bus


Early Evening 900 Kipling Stn-Pearson Airport 7 6 min 30 s 34 + 11-12 +2 bus
(until midnight)

Late Evening 900 Kipling Stn-Pearson Airport 6 7 min 00 s 32 + 10 +2 bus


(after midnight)

Malvern Div – Additional service relief buses: Don Mills Stn (1), Scarborough Centre Stn (1)
22 COXWELL – Victoria Day Standby Buses
1 standby bus – Birchmount ............................. 12:00 p.m.-8:00 p.m.
1 standby bus – Birchmount ............................. 4:30 p.m.-12:30 a.m.
1 standby bus – Birchmount ............................. 5:00 p.m.-1:00 a.m.
5 standby articulated buses – Malvern .............. 4:30 p.m.-12:30 a.m.
92 W OODBINE SOUTH – Victoria Day Standby Buses
4 standby bus – Birchmount ............................. 12:00 p.m.-8:00 p.m.
4 standby bus – Birchmount ............................. 3:00 p.m.-11:00 p.m.
4 standby bus – Birchmount ............................. 4:00 p.m.-12:00 a.m.
6 standby bus – Birchmount ............................. 4:30 p.m.-12:30 a.m.
7 standby bus – Birchmount ............................. 5:00 p.m.-1:00 a.m.
5 standby articulated buses – Malvern .............. 4:30 p.m.-12:30 a.m.

121D FORT YORK-ESPLANADE service to Cherry Beach and Ontario Place;

175 BLUFFER’S PARK

506 CARLTON – bus service is scheduled (to be replaced by streetcar service – TBC)

Mississauga Transit
52 LAWRENCE W EST – Regular holiday service

York Region Transit

TTC Service Planning and Scheduling


Issued April 29, 2020
May 2020 | SERVICE CHANGES Page 17

160 BATHURST NORTH – Regular holiday service


17 BIRCHMOUNT – Regular holiday service
129 MCCOWAN NORTH – Regular holiday service
102 MARKHAM RD – Regular holiday service
68 W ARDEN – Regular holiday service

TTC Service Planning and Scheduling


Issued April 29, 2020
18

Budget, Planned and Scheduled Hours per Week in 2020


BUDGET (Second Edition 2020-03-03) PLANNED/SCHEDULED
Regular Service Construction Regular Service Construction*
Variance to Variance to
Change Total Total TOTAL Change Total Budget Budget (%) Total TOTAL

January 2020 n/a 185,896 7,933 193,830 Scheduled 5,161 186,222 326 0.2% 7,068 193,291
February 2020 43 185,939 7,883 193,822 Scheduled 225 186,448 508 0.3% 6,566 193,013
March 2020 197 186,136 8,207 194,343 Scheduled (250) 186,198 62 0.0% 7,533 193,731
May 2020 (231) 185,905 11,594 197,499 Planned (22,204) 163,994 (21,911) -11.8% 2,628 166,622
June 2020 (3,543) 182,362 12,348 194,709
August 2020 0 182,362 11,486 193,847
September 2020 4,321 186,683 10,909 197,592
October 2020 (444) 186,238 9,846 196,084
November 2020 397 186,636 9,101 195,737
December 2020 (1,860) 184,776 7,501 192,277

The following items are the variance between planned service and the service level specified in the planned 2020 Service Budget (March 3, 2020 version):
Item Budget Planned/Expected Variance Notes
Regular Service
Base Adjustment - Junction Area Study - October 2019 438 517 79
Base Adjustment - 508 LAKE SHORE - Sept 2019 175 158 (17)
Base Adjustment- Introduce New Streetcars on 501 QUEEN Stage 1 - June (561) (561) 0
Base Adjustment- Introduce New Streetcars on 501 QUEEN Stage 2 - Sept (96) (153) (57)
Base Adjustment - 2019 Bus reliability 1,274 1,249 (24)
Base Adjustment - 511 BATHURST return to CLRV operation - June 2019 (216) (216) (0)
Base Adjustment - Misc items - 2019 41 83 41
Base Adjustment - Streetcar reliability 231 348 116
Base Adjustment - Line 1 schedule change 0 0 0
Base Adjustment - 506 CARLTON low floor conversion (334) (354) (20)
Base Adjustment - Gap Trains on Line 2 - Sept 2019 80 80 0
600 Series - January to November 1,680 11,368 9,688
Summer Stage 1 Reductions - May to August (680) 0 680
Summer Stage 1 Increases - May to August 449 0 (449)
511 BATHURST Low Floor Conversion - January to December 2020 (113) (24) 89
January 2020 Carhouse Allocation Changes 0 384 384
Service reliability/capacity - February 2020 43 25 (19)
505 DUNDAS Low Floor Conversion - March 2020 (803) (739) 64
Bus reliability 0 18 18
Board Approved Bus Reliability 1,000 0 (1,000)
5-Year Service Plan: Pillar 1, Year 1 0 0 0
Streetcar reliability 0 (18) (18)
Streetcar Fleet Shortage - 501 QUEEN 0 33 33 Additional AM bus trippers
Streetcar Fleet Shortage - 504 KING 0 (15) (15) Saturday afternoon cut
Streetcar Fleet Shortage - 511 BATHURST 0 609 609 Base adjustment to bus operation
Streetcar Service Reduction - Budget Overage 0 0 0
Line 1 schedule change 0 0 0
McNicoll Garage Opening - November 2020 0 (11) (11)
Pandemic service reduction - Subway 0 (3,403) (3,403)
Pandemic service reduction - Streetcar 0 (4,012) (4,012)
Pandemic service reduction - Bus 0 (27,940) (27,940)
Temporary Construction Change COVID-19 0 3,304 3,304 Construction hours moved temporarily to operating budget
Streetcar RADs 0 160 160
Multi-route trippers 0 11 11
Contract service changes 0 43 43
Misc route changes 0 (246) (246)
Regular service total 2,608 (19,303) (21,911)

Construction*
- City Construction 1,051 0 (1,051)
- Metrolinx Construction 3,891 1,356 (2,535)
- TTC Construction 6,652 1,272 (5,380)
Construction total 11,594 2,628 (8,966)
Total Service Variance to Budget (30,877)

* NOTE: The above construction hours are estimates as to how COVID-19 related
service reductions have reduced billable capital construction hours. The exact
figures can be found in the "2020 TTC and City Construction" tracking file.
19

May 2020
Budget Summary Report
Bus Streetcar Subway Total
Schedule/ # Over / % Over / Schedule/ # Over / % Over / Schedule/ # Over / % Over / Schedule/ # Over / % Over / Notes
Budget Budget Budget Budget
Probable (Under) (Under) Probable (Under) (Under) Probable (Under) (Under) Probable (Under) (Under)
Regular Service

Current Board Period: May


848,121 769,140 -78,980 -9.3% 122,379 93,042 -29,337 -24.0% 132,490 112,645 -19,844 -15.0% 1,102,989 974,828 -128,162 -11.6%
2020

Year to Date 3,500,226 3,427,520 -72,706 -2.1% 475,765 446,510 -29,255 -6.1% 542,603 523,156 -19,447 -3.6% 4,518,594 4,397,186 -121,408 -2.7%

Full Year - 2020 7,387,098 7,314,392 -72,706 -1.0% 1,042,734 1,013,479 -29,255 -2.8% 1,151,689 1,132,242 -19,447 -1.7% 9,581,521 9,460,113 -121,408 -1.3%

Construction

Current Board Period: May


73,742 13,115 -60,627 -82.2% -4,011 2,607 6,618 -165.0% -182 -182 0 0.0% 69,549 15,540 -54,009 -77.7%
2020

Year to Date 214,460 139,759 -74,700 -34.8% 4,466 7,373 2,906 65.1% -746 (746) 0 0.0% 218,180 146,387 -71,793 -32.9%

Full Year - 2020 523,264 448,564 -74,700 -14.3% -10,543 (7,637) 2,906 -27.6% -365 (365) 0 -0.1% 512,356 440,562 -71,793 -14.0%

Total Service

Current Board Period: May


921,863 782,255 -139,607 -15.1% 118,368 95,649 -22,719 -19.2% 132,308 112,464 -19,844 -15.0% 1,172,538 990,368 -182,170 -15.5%
2020

Year to Date 3,714,685 3,567,279 -147,406 -4.0% 480,231 453,883 -26,348 -5.5% 541,857 522,410 -19,447 -3.6% 4,736,774 4,543,572 -193,202 -4.1%

Full Year - 2020 7,910,362 7,762,955 -147,406 -1.9% 1,032,191 1,005,842 -26,348 -2.6% 1,151,324 1,131,877 -19,447 -1.7% 10,093,877 9,900,675 -193,202 -1.9%

Notes
20
May 2020
Planned Service Changes
Type of AM PM Daily Daily Weekly Weekly
Mode Route Division Change Veh Day Time Budget Line Item Description of change Fleet Fleet Hours km Hours km

Add new changes below this line

Bus
Bus Arw Reg -42 Mon-Fri 06-09 Morning peak/All day Pandemic service reduction - Bus Service reduction -42 -699.2 -13285 -3,496 -66,427
Bus Arw A Reg -13 Mon-Fri 06-09 Morning peak/All day Pandemic service reduction - Bus Service reduction -13 included above
Bus Arw Reg -44 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Bus Service reduction -44 included above
Bus Arw A Reg -10 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Bus Service reduction -10 included above
Bus Arw Reg Sat 06-02 All day Pandemic service reduction - Bus Service reduction -172.4 -3275 -172 -3,275
Bus Arw Reg Sun/hol 08-02 All day Pandemic service reduction - Bus Service reduction -146.7 -2786 -147 -2,786
Bus Bir Reg -64 Mon-Fri 06-09 Morning peak/All day Pandemic service reduction - Bus Service reduction -64 -658.9 -12519 -3,294 -62,593
Bus Bir Reg -57 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Bus Service reduction -57 included above
Bus Bir Reg Sat 06-02 All day Pandemic service reduction - Bus Service reduction 1.8 35 2 35
Bus Bir Reg Sun/hol 08-02 All day Pandemic service reduction - Bus Service reduction 0.0 0 0 0
Bus Egl Reg -93 Mon-Fri 06-09 Morning peak/All day Pandemic service reduction - Bus Service reduction -93 -865.7 -16449 -4,329 -82,244
Bus Egl Reg -69 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Bus Service reduction -69 included above
Bus Egl Reg Sat 06-02 All day Pandemic service reduction - Bus Service reduction -202.0 -3838 -202 -3,838
Bus Egl Reg Sun/hol 08-02 All day Pandemic service reduction - Bus Service reduction -176.7 -3358 -177 -3,358
Bus Mal Reg -66 Mon-Fri 06-09 Morning peak/All day Pandemic service reduction - Bus Service reduction -66 -1107.5 -21042 -5,537 -105,211
Bus Mal A Reg -33 Mon-Fri 06-09 Morning peak/All day Pandemic service reduction - Bus Service reduction -33 included above
Bus Mal Reg -55 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Bus Service reduction -55 included above
Bus Mal A Reg -35 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Bus Service reduction -35 included above
Bus Mal Reg Sat 06-02 All day Pandemic service reduction - Bus Service reduction -305.3 -5800 -305 -5,800
Bus Mal Reg Sun/hol 08-02 All day Pandemic service reduction - Bus Service reduction -239.2 -4544 -239 -4,544
Bus MtD Reg -71 Mon-Fri 06-09 Morning peak/All day Pandemic service reduction - Bus Service reduction -71 -837.5 -15913 -4,188 -79,565
Bus MtD A Reg -14 Mon-Fri 06-09 Morning peak/All day Pandemic service reduction - Bus Service reduction -14 included above
Bus MtD Reg -52 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Bus Service reduction -52 included above
Bus MtD A Reg -14 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Bus Service reduction -14 included above
Bus MtD Reg Sat 06-02 All day Pandemic service reduction - Bus Service reduction -260.3 -4945 -260 -4,945
Bus MtD Reg Sun/hol 08-02 All day Pandemic service reduction - Bus Service reduction -129.8 -2467 -130 -2,467
Bus Qsy Reg -43 Mon-Fri 06-09 Morning peak/All day Pandemic service reduction - Bus Service reduction -43 -472.2 -8971 -2,361 -44,854
Bus Qsy Reg -45 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Bus Service reduction -45 included above
Bus Qsy Reg Sat 06-02 All day Pandemic service reduction - Bus Service reduction -61.4 -1167 -61 -1,167
Bus Qsy Reg Sun/hol 08-02 All day Pandemic service reduction - Bus Service reduction -41.5 -788 -41 -788
Bus Wil Reg -29 Mon-Fri 06-09 Morning peak/All day Pandemic service reduction - Bus Service reduction -29 -600.4 -11408 -3,002 -57,041
Bus Wil Reg -32 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Bus Service reduction -32 included above
Bus Wil Reg Sat 06-02 All day Pandemic service reduction - Bus Service reduction 0.0 0 0 0
Bus Wil Reg Sun/hol 08-02 All day Pandemic service reduction - Bus Service reduction 0.0 0 0 0

600s - Add new (M-F = Pam Watson's, SatSun = Sched)


Bus Arw Reg +18 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service increase +18 280.0 5320 1,400 26,600
Bus Arw Reg +14 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service increase +14 included above
Bus Arw Reg +4 Sat 06-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus Arw Reg +4 Sun/hol 08-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus Bir Reg +18 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service increase +18 256.0 4864 1,280 24,320
Bus Bir Reg +12 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service increase +12 included above
Bus Bir Reg +4 Sat 06-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus Bir Reg +4 Sun/hol 08-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus Egl Reg +18 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service increase +18 360.0 6840 1,800 34,200
Bus Egl Reg +18 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service increase +18 included above
Bus Egl Reg +4 Sat 06-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus Egl Reg +4 Sun/hol 08-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus Mal Reg +35 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service increase +35 616.0 11704 3,080 58,520
Bus Mal Reg +35 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service increase +35 included above
Bus Mal Reg +4 Sat 06-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus Mal Reg +4 Sun/hol 08-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus MtD Reg +24 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service increase +24 416.0 7904 2,080 39,520
Bus MtD Reg +20 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service increase +20 included above
Bus MtD Reg +4 Sat 06-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus MtD Reg +4 Sun/hol 08-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus Qsy Reg +11 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service increase +11 208.0 3952 1,040 19,760
Bus Qsy Reg +13 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service increase +13 included above
Bus Qsy Reg +4 Sat 06-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus Qsy Reg +4 Sun/hol 08-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus Wil Reg +3 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service increase +3 48.0 912 240 4,560
Bus Wil Reg +2 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service increase +2 included above
Bus Wil Reg +4 Sat 06-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608
Bus Wil Reg +4 Sun/hol 08-02 All day 600 Series (Operating) - January to November Service increase 32.0 608 32 608

600s - Remove old


Bus 600 Series Arw Reg -3 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service reduction -3 -48.0 -912 -240 -4,560
Bus 600 Series Arw Reg -3 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service reduction -3uded above
Bus 600 Series Bir Reg -3 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service reduction -3 -48.0 -912 -240 -4,560
Bus 600 Series Bir Reg -3 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service reduction -3uded above
Bus 600 Series Egl Reg -3 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service reduction -3 -48.0 -912 -240 -4,560
Bus 600 Series Egl Reg -3 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service reduction -3uded above
Bus 600 Series Mal Reg -3 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service reduction -3 -48.0 -912 -240 -4,560
21
May 2020
Planned Service Changes
Type of AM PM Daily Daily Weekly Weekly
Mode Route Division Change Veh Day Time Budget Line Item Description of change Fleet Fleet Hours km Hours km
Bus 600 Series Mal Reg -3 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service reduction -3uded above
Bus 600 Series MtD Reg -3 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service reduction -3 -48.0 -912 -240 -4,560
Bus 600 Series MtD Reg -3 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service reduction -3uded above
Bus 600 Series Qsy Reg -3 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service reduction -3 -48.0 -912 -240 -4,560
Bus 600 Series Qsy Reg -3 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service reduction -3uded above
Bus 600 Series Wil Reg -3 Mon-Fri 06-09 Morning peak/All day 600 Series (Operating) - January to November Service reduction -3 -48.0 -912 -240 -4,560
Bus 600 Series Wil Reg -3 Mon-Fri 15-19 Afternoon peak 600 Series (Operating) - January to November Service reduction -3uded above

Bus 600 Series Arw Const Sat 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -120.0 -2280 -120 -2,280
Bus 600 Series Bir Const Sat 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -120.0 -2280 -120 -2,280
Bus 600 Series Mal Const Sat 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -40.0 -760 -40 -760
Bus 600 Series MtD Const Sat 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -120.0 -2280 -120 -2,280
Bus 600 Series Qsy Const Sat 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -120.0 -2280 -120 -2,280
Bus 600 Series Arw Const Sun/hol 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -120.0 -2280 -120 -2,280
Bus 600 Series Bir Const Sun/hol 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -120.0 -2280 -120 -2,280
Bus 600 Series Mal Const Sun/hol 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -40.0 -760 -40 -760
Bus 600 Series MtD Const Sun/hol 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -120.0 -2280 -120 -2,280
Bus 600 Series Qsy Const Sun/hol 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -120.0 -2280 -120 -2,280
Bus 600 Series Arw Const -6 Sat 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -48.0 -912 -48 -912
Bus 600 Series Arw Const -4 Sun/hol 08-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -32.0 -608 -32 -608
Bus 600 Series Bir Const -6 Sat 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -48.0 -912 -48 -912
Bus 600 Series Bir Const -4 Sun/hol 08-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -32.0 -608 -32 -608
Bus 600 Series Egl Const -6 Sat 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -48.0 -912 -48 -912
Bus 600 Series Egl Const -4 Sun/hol 08-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -32.0 -608 -32 -608
Bus 600 Series Mal Const -6 Sat 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -48.0 -912 -48 -912
Bus 600 Series Mal Const -4 Sun/hol 08-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -32.0 -608 -32 -608
Bus 600 Series MtD Const -6 Sat 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -48.0 -912 -48 -912
Bus 600 Series MtD Const -4 Sun/hol 08-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -32.0 -608 -32 -608
Bus 600 Series Qsy Const -6 Sat 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -48.0 -912 -48 -912
Bus 600 Series Qsy Const -4 Sun/hol 08-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -32.0 -608 -32 -608
Bus 600 Series Wil Const -6 Sat 06-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -48.0 -912 -48 -912
Bus 600 Series Wil Const -4 Sun/hol 08-01 All day Buses for Subway Closures - January to November 2020 TTC construction ending -32.0 -608 -32 -608

Streetcar
Streetcar Ron Reg Mon-Fri 06-09 Morning peak/All day Pandemic service reduction - Streetcar Service reduction -206.0 -2574 -1,030 -12,872
Streetcar Ron Reg Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Streetcar Service reduction included above
Streetcar Ron Reg Sat 06-02 All day Pandemic service reduction - Streetcar Service reduction -158.9 -1986 -159 -1,986
Streetcar Ron Reg Sun/hol 08-02 All day Pandemic service reduction - Streetcar Service reduction -147.3 -1841 -147 -1,841
Streetcar Rus Reg Mon-Fri 06-09 Morning peak/All day Pandemic service reduction - Streetcar Service reduction -382.7 -4783 -1,913 -23,917
Streetcar Rus Reg Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Streetcar Service reduction included above
Streetcar Rus Reg Sat 06-02 All day Pandemic service reduction - Streetcar Service reduction -511.5 -6394 -512 -6,394
Streetcar Rus Reg Sun/hol 08-02 All day Pandemic service reduction - Streetcar Service reduction -251.7 -3146 -252 -3,146

Streetcar 705 Stand By / RAD Les Reg +2 Mon-Fri 06-09 Morning peak/All day Streetcar RADs Service increase 32.0 400 160 2,000
Streetcar 705 Stand By / RAD Les Reg +4 Mon-Fri 15-19 Afternoon peak Streetcar RADs Service increase included above

Subway
Subway Line 1 Yonge-University 1 Y-U Reg -15 Mon-Fri 06-09 Morning peak Pandemic service reduction - Subway Service reduction -15 -238.8 -6685 -1,194 -33,427
Subway Line 1 Yonge-University 1 Y-U Reg +4 Mon-Fri 09-15 Midday Pandemic service reduction - Subway Service reduction included above
Subway Line 1 Yonge-University 1 Y-U Reg -17 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Subway Service reduction -17 included above
Subway Line 1 Yonge-University 1 Y-U Reg Mon-Fri 19-22 Early evening Pandemic service reduction - Subway Service reduction included above
Subway Line 1 Yonge-University 1 Y-U Reg Mon-Fri 22-02 Late evening Pandemic service reduction - Subway Service reduction included above

Subway Line 1 Yonge-University 1 Y-U Reg -4 Mon-Fri 06-09 Morning peak Pandemic service reduction - Subway Service reduction -4 -55.2 -1546 -276 -7,728
Subway Line 1 Yonge-University 1 Y-U Reg -2 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Subway Service reduction -2 included above

Subway Line 2 Bloor-Danforth 2 B-D Reg -18 Mon-Fri 06-09 Morning peak Pandemic service reduction - Subway Service reduction -18 -370.7 -11047 -1,854 -55,234
Subway Line 2 Bloor-Danforth 2 B-D Reg -6 Mon-Fri 09-15 Midday Pandemic service reduction - Subway Service reduction included above
Subway Line 2 Bloor-Danforth 2 B-D Reg -23 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Subway Service reduction -23 included above
Subway Line 2 Bloor-Danforth 2 B-D Reg -5 Mon-Fri 19-22 Early evening Pandemic service reduction - Subway Service reduction included above
Subway Line 2 Bloor-Danforth 2 B-D Reg +4 Mon-Fri 22-02 Late evening Pandemic service reduction - Subway Service reduction included above

Subway Line 2 Bloor-Danforth 2 B-D Reg -1 Mon-Fri 06-09 Morning peak Pandemic service reduction - Subway Service reduction -1 -16.0 -477 -80 -2,384
Subway Line 2 Bloor-Danforth 2 B-D Reg -1 Mon-Fri 15-19 Afternoon peak Pandemic service reduction - Subway Service reduction -1 included above

TEMPORARY CONSTRUCTION SERVICES ENDING


Bus 45 Kipling Qsy Const Mon-Fri 06-09 Morning peak/All day City Construction at Six Points - January to December 2020 City construction ending -17.4 173.0 -87 865
Bus 45 Kipling Qsy Const Mon-Fri 15-19 Afternoon peak City Construction at Six Points - January to December 2020 City construction ending Included above
Bus 45 Kipling Qsy Const -1 Sat 06-25 All day City Construction at Six Points - January to December 2020 City construction ending -11.3 64.0 -11 64
Bus 45 Kipling Qsy Const -1 Sun/hol 06-25 All day City Construction at Six Points - January to December 2020 City construction ending -13.0 -58.0 -13 -58
Bus 46 Martin Grove Arw Const Mon-Fri 06-09 Morning peak/All day City Construction at Six Points - January to December 2020 City construction ending 2.7 254.0 13 1,270
Bus 46 Martin Grove Arw Const Mon-Fri 15-19 Afternoon peak City Construction at Six Points - January to December 2020 City construction ending Included above
Bus 46 Martin Grove Arw Const Sat 06-25 All day City Construction at Six Points - January to December 2020 City construction ending 0.2 103.0 0 103
Bus 46 Martin Grove Arw Const Sun/hol 06-25 All day City Construction at Six Points - January to December 2020 City construction ending -4.0 -1.0 -4 -1
Streetcar 503 Kingston Rd Rus Const +8 Mon-Fri 06-09 Morning peak/all day City Construction on Wellington - January to December 2020 City construction ending +8 46.3 578.3 231 2,892
22
May 2020
Planned Service Changes
Type of AM PM Daily Daily Weekly Weekly
Mode Route Division Change Veh Day Time Budget Line Item Description of change Fleet Fleet Hours km Hours km
Streetcar 503 Kingston Rd Rus Const +8 Mon-Fri 15-19 Afternoon peak City Construction on Wellington - January to December 2020 City construction ending +8 Included above
Bus 503 Kingston Rd Bir Const -8 Mon-Fri 06-09 Morning peak/all day City Construction on Wellington - January to December 2020 City construction ending -8 -52.0 -650.0 -260 -3,250
Bus 503 Kingston Rd Bir Const -8 Mon-Fri 15-19 Afternoon peak City Construction on Wellington - January to December 2020 City construction ending -8 Included above
Bus 5 Avenue Road Wil Const Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -5.9 -67.0 -29 -335
Bus 5 Avenue Road Wil Const Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending included above
Bus 5 Avenue Road Wil Const Sat 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -5.8 -69.0 -6 -69
Bus 5 Avenue Road Wil Const Sun/hol 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 5.7 116.0 6 116
Bus 7 Bathurst Wil Const Mon-Fri 06-01 Morning peak/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -6.7 95.0 -34 475
Bus 7 Bathurst Wil Const Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending included above
Bus 7 Bathurst Wil Const -1 Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -10.4 162.0 -10 162
Bus 7 Bathurst Wil Const -1 Sun/hol 08-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -15.2 -53.0 -15 -53
Bus 11 Bayview Wil Const Mon-Fri 06-01 Morning peak/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -0.6 243.0 -3 1,215
Bus 11 Bayview Wil Const Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending included above
Bus 11 Bayview Wil Const Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1.5 -24.0 -1 -24
Bus 11 Bayview Wil Const Sun/hol 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1.5 222.0 -1 222
Bus 29 Dufferin MtD A Const Mon-Fri 06-01 Morning peak/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -0.8 504.0 -4 2,520
Bus 29 Dufferin MtD A Const Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending included above
Bus 29 Dufferin MtD A Const -2 Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -15.5 182.0 -16 182
Bus 29 Dufferin MtD A Const -3 Sun/hol 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -30.9 8.0 -31 8
Bus 32 Eglinton West MtD Const -3 Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -3 -60.2 -142.7 -301 -714
Bus 32 Eglinton West MtD Const -8 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -8 included above
Bus 32 Eglinton West MtD Const -1 Mon-Fri 22-01 Late evening MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending uded above
Bus 32 Eglinton West MtD Const Sat 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -25.4 11.0 -25 11
Bus 32 Eglinton West MtD Const Sun/hol 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -27.1 -103.0 -27 -103
Bus 34 Eglinton East Egl Const -10 Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -10 -153.1 -2196.0 -765 -10,980
Bus 34 Eglinton East Egl Const -10 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -10 included above
Bus 34 Eglinton East Egl Const Sat 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -98.3 -1283.0 -98 -1,283
Bus 34 Eglinton East Egl Const -1 Sun/hol 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -79.4 -1117.0 -79 -1,117
Bus 51 Leslie Wil Const -1 Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 -18.3 -275.0 -91 -1,375
Bus 51 Leslie Wil Const -1 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 included above
Bus 51 Leslie Wil Const -1 Sat 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -12.4 -231.0 -12 -231
Bus 51 Leslie Wil Const -1 Sun/hol 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -12.4 -228.0 -12 -228
Bus 54 Lawrence East Egl Const -2 Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -2 -37.1 -151.0 -186 -755
Bus 54 Lawrence East Egl Const -2 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -2 included above
Bus 54 Lawrence East Egl Const -1 Sat 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -9.1 202.0 -9 202
Bus 54 Lawrence East Egl Const -1 Sun/hol 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -15.8 -114.0 -16 -114
Bus 56 Leaside Wil Const -1 Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 -14.8 -28.0 -74 -140
Bus 56 Leaside Wil Const -1 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 included above
Bus 56 Leaside Wil Const -1 Sat 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -15.6 -153.7 -16 -154
Bus 56 Leaside Wil Const -1 Sun/hol 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -23.8 -384.7 -24 -385
Bus 61 Avenue Road North Wil Const Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -7.4 -32.0 -37 -160
Bus 61 Avenue Road North Wil Const Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending included above
Bus 61 Avenue Road North Wil Const Sat 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -10.0 -105.0 -10 -105
Bus 61 Avenue Road North Wil Const Sun/hol 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -6.0 -55.0 -6 -55
Bus 63 Ossington Wil Const Mon-Fri 06-01 Morning peak/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 2.8 252.0 14 1,260
Bus 63 Ossington Wil Const Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending included above
Bus 74 Mt Pleasant Wil Const -2 Mon-Fri 06-01 Morning peak/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -2 -40.8 -434.0 -204 -2,170
Bus 74 Mt Pleasant Wil Const -2 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -2 included above
Bus 74 Mt Pleasant Wil Const -1 Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -33.3 -376.0 -33 -376
Bus 74 Mt Pleasant Wil Const -1 Sun/hol 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -30.6 -341.0 -31 -341
Bus 90 Vaughan Wil Const +1 Mon-Fri 06-09 Morning peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending +1 8.1 97.0 40 485
Bus 90 Vaughan Wil Const +1 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending +1uded above
Bus 363 Ossington Wil Const Mon-Fri 01-06 Overnight MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.3 3.9 1.5500 19
Bus 363 Ossington Wil Const Sat 01-06 Overnight MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.3 3.6 0.2850 4
Bus 363 Ossington Wil Const Sun/hol 01-06 Overnight MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.3 4.2 0.3350 4
Bus 100 Flemingdon Park Egl Const +6 Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending +6 95.0 2010.0 475 10,050
Bus 100 Flemingdon Park Egl Const +3 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending +3 included above
Bus 100 Flemingdon Park Egl Const -1 Sat 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 52.9 1164.0 53 1,164
Bus 100 Flemingdon Park Egl Const Sun/hol 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 50.3 1081.0 50 1,081
Bus 103 Mt Pleasant North Wil Const +2 Mon-Fri 06-01 Morning peak/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending +2 37.3 469.0 187 2,345
Bus 103 Mt Pleasant North Wil Const +2 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending +2 included above
Bus 103 Mt Pleasant North Wil Const +1 Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 32.9 435.0 33 435
Bus 103 Mt Pleasant North Wil Const +1 Sun/hol 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 28.9 385.0 29 385
Bus 109 Ranee Wil Const Mon-Fri 06-01 Morning peak/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.5 184.0 2 920
Bus 109 Ranee Wil Const Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending included above
Bus 109 Ranee Wil Const Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.8 188.0 1 188
Bus 109 Ranee Wil Const Sun/hol 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -0.2 161.0 0 161
Bus 51 Leslie Wil Const Mon-Fri 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -0.7 -11.2 -3 -56
Bus 61 Avenue Rd North Wil Const Mon-Fri 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -0.4 -7.5 -2 -37
Bus 61 Avenue Road North Wil Const Sat 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -0.2 0.0 0 0
Bus 61 Avenue Road North Wil Const Sun/hol 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -0.1 0.0 0 0
Bus 14 Glencairn MtD Const -1 Mon-Fri 06-01 Morning peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 -8.6 -29.0 -43 -145
Bus 14 Glencairn MtD Const -1 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 included above
Bus 34 Eglinton East Egl Const +1 Mon-Fri 22-01 Late evening MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -0.3 -5.3 -1 -27
Bus 54 Lawrence East Egl Const -2 Mon-Fri 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -2 -17.9 -394.0 -90 -1,970
Bus 54 Lawrence East Egl Const -2 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -2 Included above
Bus 56 Leaside Wil Const -1 Mon-Fri 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 -14.9 -212.0 -74 -1,060
Bus 56 Leaside Wil Const -2 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -2 Included above
23
May 2020
Planned Service Changes
Type of AM PM Daily Daily Weekly Weekly
Mode Route Division Change Veh Day Time Budget Line Item Description of change Fleet Fleet Hours km Hours km
Bus 63 Ossington Wil Const -1 Mon-Fri 06-09 Morning peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 -8.5 -143.0 -43 -715
Bus 63 Ossington Wil Const -1 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 included above
Bus 71 Runnymede MtD Const -1 Mon-Fri 06-09 Morning peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 -7.0 -32.0 -35 -160
Bus 71 Runnymede MtD Const -1 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 included above
Bus 74 Mt Pleasant Wil Const Mon-Fri 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 2.0 -127.0 10 -635
Bus 74 Mt Pleasant Wil Const Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -0.2 -163.0 0 -163
Bus 74 Mt Pleasant Wil Const Sun/hol 08-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -0.8 -164.0 -1 -164
Bus 56 Leaside Wil Const Mon-Fri 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1.1 -14.1 -6 -70
Bus 12 Kingston Rd Bir Const -1 Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 -2.4 -210.0 -12 -1,050
Bus 12 Kingston Rd Bir Const Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending included above
Bus 12 Kingston Rd Bir Const -1 Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -19.9 -436.0 -20 -436
Bus 12 Kingston Rd Bir Const -1 Sun/hol 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -18.4 -404.0 -18 -404
Bus 20 Cliffside Bir Const -1 Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 -14.9 -187.0 -74 -935
Bus 20 Cliffside Bir Const -1 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 included above
Bus 20 Cliffside Bir Const Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -3.4 12.0 -3 12
Bus 20 Cliffside Bir Const -1 Sun/hol 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 1.9 157.0 2 157
Bus 21 Brimley Bir Const -1 Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 -11.2 -164.0 -56 -820
Bus 21 Brimley Bir Const -1 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 included above
Bus 21 Brimley Bir Const Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -0.8 145.0 -1 145
Bus 21 Brimley Bir Const Sun/hol 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.4 116.0 0 116
Bus 25/185 Don Mills / D M Rocket Egl Const -2 Sat 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -20.0 -237.0 -20 -237
Bus 25/185 Don Mills / D M Rocket Egl Const -2 Sun/hol 06-26 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -27.5 -476.0 -28 -476
Bus 25/185 Don Mills / D M Rocket Egl Const +2 Sat 06-26 All day MX Eglinton LRT Construction (Reduction) - February to December 202 Metrolinx construction ending 20.0 237.0 20 237
Bus 25/185 Don Mills / D M Rocket Egl Const +2 Sun/hol 06-26 All day MX Eglinton LRT Construction (Reduction) - February to December 202 Metrolinx construction ending 27.5 476.0 28 476
Bus 25/185 Don Mills / D M Rocket Egl Const Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.8 -39.0 4 -195
Bus 25/185 Don Mills / D M Rocket Egl Const Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending uded above
Bus 34 Eglinton East Egl Const Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -3.0 -701.0 -15 -3,505
Bus 34 Eglinton East Egl Const Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending included above
Bus 34 Eglinton East Egl Const Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -6.9 -163.0 -7 -163
Bus 34 Eglinton East Egl Const Sun/hol 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -11.4 -347.0 -11 -347
Bus 34 Eglinton East Egl Const Mon-Fri 06-09 Morning peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 22.2 310.6 111 1,553
Bus 34 Eglinton East Egl Const -1 Mon-Fri 09-15 Midday MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending uded above
Bus 34 Eglinton East Egl Const -4 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -4uded above
Bus 34 Eglinton East Egl Const Mon-Fri 19-22 Early evening MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending uded above
Bus 34 Eglinton East Egl Const Mon-Fri 22-01 Late evening MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending uded above
Bus 34 Eglinton East Egl Const +3 Mon-Fri 06-09 Morning peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending +3 uded above
Bus 34 Eglinton East Egl Const +2 Mon-Fri 09-15 Midday MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending uded above
Bus 34 Eglinton East Egl Const +4 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending +4uded above
Bus 34 Eglinton East Egl Const +2 Mon-Fri 19-22 Early evening MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending uded above
Bus 51 Leslie Wil Const -1 Mon-Fri 09-15 Midday MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -4.1 -57.4 -21 -287
Bus 43 Kennedy Egl Const -2 Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -2 -32.9 -191.0 -165 -955
Bus 43 Kennedy Egl Const -2 Mon-Fri 15-09 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -2 included above
Bus 43 Kennedy Egl Const -2 Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -36.0 -186.0 -36 -186
Bus 43 Kennedy Egl Const -2 Sun/hol 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -32.8 -163.0 -33 -163
Bus 57 Midland Egl Const -1 Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 -11.1 -219.0 -55 -1,095
Bus 57 Midland Egl Const -1 Mon-Fri 15-09 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 included above
Bus 57 Midland Egl Const Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.4 121.0 0 121
Bus 57 Midland Egl Const -1 Sun/hol 08-19 Daytime MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -12.3 -197.0 -12 -197
Bus 62 Mortimer Bir Const -1 Mon-Fri 22-01 Late evening MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.2 -23.0 1 -115
Bus 62 Mortimer Bir Const -1 Sat 22-01 Late evening MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.2 8.0 0 8
Bus 62 Mortimer Bir Const -1 Sun/hol 19-01 Evening MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -6.2 -103.0 -6 -103
Bus 86 Scarborough Egl Const Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -20.8 63.0 -104 315
Bus 86 Scarborough Egl Const -1 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending +1 included above
Bus 86 Scarborough Egl Const Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -19.8 -283.0 -20 -283
Bus 86 Scarborough Egl Const Sun/hol 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -9.6 -167.0 -10 -167
Bus 113 Danforth Bir Const -1 Mon-Fri 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 -16.4 -101.0 -82 -505
Bus 113 Danforth Bir Const -1 Mon-Fri 15-19 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 Included above
Bus 113 Danforth Bir Const -1 Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -14.1 -117.0 -14 -117
Bus 113 Danforth Bir Const Sun/hol 08-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.4 8.0 0 8
Bus 116 Morningside Egl Const -2 Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -2 -31.5 162.0 -157 810
Bus 116 Morningside Egl Const -1 Mon-Fri 15-09 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 included above
Bus 116 Morningside Egl Const Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -11.4 526.0 -11 526
Bus 116 Morningside Egl Const -1 Sun/hol 08-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -14.1 338.0 -14 338
Bus 131 Nugget Mal Const Mon-Fri 06-25 Morn/All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.0 -31.0 0 -155
Bus 198 U of T Scarborough Rocket Egl Const -1 Mon-Fri 06-09 Morning peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 -11.2 -106.0 -56 -530
Bus 198 U of T Scarborough Rocket Egl Const -1 Mon-Fri 15-09 Afternoon peak MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending -1 included above
Bus 198 U of T Scarborough Rocket Egl Const Sat 06-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.3 209.0 0 209
Bus 198 U of T Scarborough Rocket Egl Const Sun/hol 08-01 All day MX Eglinton LRT Construction (Existing) - January to December 2020 Metrolinx construction ending 0.6 179.0 1 179
Bus 36 Finch West Arw A Const -1 Mon-Fri 06-09 Morning peak MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending -1 -22.5 -281.2 -113 -1,406
Bus 36 Finch West Arw A Const -1 Mon-Fri 09-15 Midday MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending uded above
Bus 36 Finch West Arw A Const -2 Mon-Fri 15-19 Afternoon peak MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending -2uded above
Bus 36 Finch West Arw A Const -1 Mon-Fri 19-22 Early evening MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending uded above
Bus 36 Finch West Arw A Const -1 Mon-Fri 22-01 Late evening MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending uded above
Bus 36 Finch West Arw A Const -3 Sat 06-01 All day MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending -14.2 -177.9 -14 -178
Bus 36 Finch West Arw A Const -4 Sun/hol 06-01 All day MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending -14.4 -179.8 -14 -180
Bus 36 Finch West Arw A Const -5 Mon-Fri 06-01 Morning peak/All day MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending -5 -58.0 -12.3 -290 -61
Bus 36 Finch West Arw A Const -4 Mon-Fri 15-19 Afternoon peak MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending -4 Included above
Bus 36 Finch West Arw A Const +1 Mon-Fri 22-01 Late evening MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending uded above
24
May 2020
Planned Service Changes
Type of AM PM Daily Daily Weekly Weekly
Mode Route Division Change Veh Day Time Budget Line Item Description of change Fleet Fleet Hours km Hours km
Bus 36 Finch West Arw A Const -4 Sat 06-01 All day MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending -50.3 -63.0 -50 -63
Bus 36 Finch West Arw A Const -4 Sun/hol 08-01 All day MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending -51.3 -81.0 -51 -81
Bus 36 Finch West Arw A Const -2 Mon-Fri 06-09 Morning peak MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending -2 -23.6 -472.0 -118 -2,360
Bus 36 Finch West Arw A Const -1 Mon-Fri 09-15 Midday MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending uded above
Bus 36 Finch West Arw A Const -2 Mon-Fri 15-19 Afternoon peak MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending -2uded above
Bus 36 Finch West Arw A Const -1 Mon-Fri 19-22 Early evening MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending uded above
Bus 36 Finch West Arw A Const -1 Sat 08-12 Morning MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending -11.5 -230.7 -12 -231
Bus 36 Finch West Arw A Const -1 Sat 12-19 Afternoon MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending uded above
Bus 36 Finch West Arw A Const -1 Sun/hol 08-12 Morning MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending -9.5 -189.3 -9 -189
Bus 36 Finch West Arw A Const -1 Sun/hol 12-19 Afternoon MX Finch West LRT Construction - January to December 2020 Metrolinx construction ending uded above
Streetcar 508 Lake Shore Ron Const +3 Mon-Fri 06-01 Morning peak/All day Roncesvalles Carhouse Renovation - January to December 2020 TTC construction ending +3 12.9 160.6 64 803
Streetcar 508 Lake Shore Ron Const +2 Mon-Fri 15-19 Afternoon peak Roncesvalles Carhouse Renovation - January to December 2020 TTC construction ending +2 Included above
Streetcar 508 Lake Shore Rus Const -3 Mon-Fri 06-01 Morning peak/All day Roncesvalles Carhouse Renovation - January to December 2020 TTC construction ending -3 -13.7 -171.5 -69 -857
Streetcar 508 Lake Shore Rus Const -2 Mon-Fri 15-19 Afternoon peak Roncesvalles Carhouse Renovation - January to December 2020 TTC construction ending -2 Included above

TEMPORARY CONSTRUCTION SERVICES --> REGULAR SERVICE


Bus 45 Kipling Qsy Reg Mon-Fri 06-09 Morning peak/All day Temporary Construction Change COVID-19 Service change 17.4 -173 87 -865
Bus 45 Kipling Qsy Reg Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change Included above
Bus 45 Kipling Qsy Reg +1 Sat 06-25 All day Temporary Construction Change COVID-19 Service change 11.3 -64 11 -64
Bus 45 Kipling Qsy Reg +1 Sun/hol 06-25 All day Temporary Construction Change COVID-19 Service change 13.0 58 13 58
Bus 46 Martin Grove Arw Reg Mon-Fri 06-09 Morning peak/All day Temporary Construction Change COVID-19 Service change -2.7 -254 -13 -1,270
Bus 46 Martin Grove Arw Reg Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change Included above
Bus 46 Martin Grove Arw Reg Sat 06-25 All day Temporary Construction Change COVID-19 Service change -0.2 -103 0 -103
Bus 46 Martin Grove Arw Reg Sun/hol 06-25 All day Temporary Construction Change COVID-19 Service change 4.0 1 4 1
Streetcar 503 Kingston Rd Rus Reg -8 Mon-Fri 06-09 Morning peak/all day Temporary Construction Change COVID-19 Service change -8 -46.3 -578 -231 -2,892
Streetcar 503 Kingston Rd Rus Reg -8 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change -8 Included above
Bus 503 Kingston Rd Bir Reg +8 Mon-Fri 06-09 Morning peak/all day Temporary Construction Change COVID-19 Service change +8 52.0 650 260 3,250
Bus 503 Kingston Rd Bir Reg +8 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +8 Included above
Bus 5 Avenue Road Wil Reg Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change 5.884 67 29 335
Bus 5 Avenue Road Wil Reg Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change included above
Bus 5 Avenue Road Wil Reg Sat 06-26 All day Temporary Construction Change COVID-19 Service change 5.750 69 6 69
Bus 5 Avenue Road Wil Reg Sun/hol 06-26 All day Temporary Construction Change COVID-19 Service change -5.666 -116 -6 -116
Bus 7 Bathurst Wil Reg Mon-Fri 06-01 Morning peak/All day Temporary Construction Change COVID-19 Service change 6.7 -95 34 -475
Bus 7 Bathurst Wil Reg Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change included above
Bus 7 Bathurst Wil Reg +1 Sat 06-01 All day Temporary Construction Change COVID-19 Service change 10.4 -162 10 -162
Bus 7 Bathurst Wil Reg +1 Sun/hol 08-01 All day Temporary Construction Change COVID-19 Service change 15.2 53 15 53
Bus 11 Bayview Wil Reg Mon-Fri 06-01 Morning peak/All day Temporary Construction Change COVID-19 Service change 0.616 -243 3 -1,215
Bus 11 Bayview Wil Reg Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change included above
Bus 11 Bayview Wil Reg Sat 06-01 All day Temporary Construction Change COVID-19 Service change 1.483 24 1 24
Bus 11 Bayview Wil Reg Sun/hol 06-01 All day Temporary Construction Change COVID-19 Service change 1.450 -222 1 -222
Bus 29 Dufferin MtD A Reg Mon-Fri 06-01 Morning peak/All day Temporary Construction Change COVID-19 Service change 0.8 -504 4 -2,520
Bus 29 Dufferin MtD A Reg Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change included above
Bus 29 Dufferin MtD A Reg +2 Sat 06-01 All day Temporary Construction Change COVID-19 Service change 15.5 -182 16 -182
Bus 29 Dufferin MtD A Reg +3 Sun/hol 06-01 All day Temporary Construction Change COVID-19 Service change 30.9 -8 31 -8
Bus 32 Eglinton West MtD Reg +3 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change +3 60.2 143 301 714
Bus 32 Eglinton West MtD Reg +8 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +8 included above
Bus 32 Eglinton West MtD Reg +1 Mon-Fri 22-01 Late evening Temporary Construction Change COVID-19 Service change uded above
Bus 32 Eglinton West MtD Reg Sat 06-26 All day Temporary Construction Change COVID-19 Service change 25.4 -11 25 -11
Bus 32 Eglinton West MtD Reg Sun/hol 06-26 All day Temporary Construction Change COVID-19 Service change 27.1 103 27 103
Bus 34 Eglinton East Egl Reg +10 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change +10 153.1 2196 765 10,980
Bus 34 Eglinton East Egl Reg +10 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +10 included above
Bus 34 Eglinton East Egl Reg Sat 06-26 All day Temporary Construction Change COVID-19 Service change 98.3 1283 98 1,283
Bus 34 Eglinton East Egl Reg +1 Sun/hol 06-26 All day Temporary Construction Change COVID-19 Service change 79.4 1117 79 1,117
Bus 51 Leslie Wil Reg +1 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change +1 18.3 275 91 1,375
Bus 51 Leslie Wil Reg +1 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +1 included above
Bus 51 Leslie Wil Reg +1 Sat 06-26 All day Temporary Construction Change COVID-19 Service change 12.4 231 12 231
Bus 51 Leslie Wil Reg +1 Sun/hol 06-26 All day Temporary Construction Change COVID-19 Service change 12.4 228 12 228
Bus 54 Lawrence East Egl Reg +2 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change +2 37.1 151 186 755
Bus 54 Lawrence East Egl Reg +2 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +2 included above
Bus 54 Lawrence East Egl Reg +1 Sat 06-26 All day Temporary Construction Change COVID-19 Service change 9.1 -202 9 -202
Bus 54 Lawrence East Egl Reg +1 Sun/hol 06-26 All day Temporary Construction Change COVID-19 Service change 15.8 114 16 114
Bus 56 Leaside Wil Reg +1 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change +1 14.8 28 74 140
Bus 56 Leaside Wil Reg +1 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +1 included above
Bus 56 Leaside Wil Reg +1 Sat 06-26 All day Temporary Construction Change COVID-19 Service change 15.600 154 16 154
Bus 56 Leaside Wil Reg +1 Sun/hol 06-26 All day Temporary Construction Change COVID-19 Service change 23.799 385 24 385
Bus 61 Avenue Road North Wil Reg Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change 7.4 32 37 160
Bus 61 Avenue Road North Wil Reg Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change included above
Bus 61 Avenue Road North Wil Reg Sat 06-26 All day Temporary Construction Change COVID-19 Service change 10.0 105 10 105
Bus 61 Avenue Road North Wil Reg Sun/hol 06-26 All day Temporary Construction Change COVID-19 Service change 6.0 55 6 55
Bus 63 Ossington Wil Reg Mon-Fri 06-01 Morning peak/All day Temporary Construction Change COVID-19 Service change -2.8 -252 -14 -1,260
Bus 63 Ossington Wil Reg Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change included above
Bus 74 Mt Pleasant Wil Reg +2 Mon-Fri 06-01 Morning peak/All day Temporary Construction Change COVID-19 Service change +2 40.8 434 204 2,170
Bus 74 Mt Pleasant Wil Reg +2 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +2 included above
Bus 74 Mt Pleasant Wil Reg +1 Sat 06-01 All day Temporary Construction Change COVID-19 Service change 33.3 376 33 376
Bus 74 Mt Pleasant Wil Reg +1 Sun/hol 06-01 All day Temporary Construction Change COVID-19 Service change 30.6 341 31 341
Bus 90 Vaughan Wil Reg -1 Mon-Fri 06-09 Morning peak Temporary Construction Change COVID-19 Service change -1 -8.1 -97 -40 -485
Bus 90 Vaughan Wil Reg -1 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change -1uded above
25
May 2020
Planned Service Changes
Type of AM PM Daily Daily Weekly Weekly
Mode Route Division Change Veh Day Time Budget Line Item Description of change Fleet Fleet Hours km Hours km
Bus 363 Ossington Wil Reg Mon-Fri 01-06 Overnight Temporary Construction Change COVID-19 Service change -0.3 -4 -1.5500 -19
Bus 363 Ossington Wil Reg Sat 01-06 Overnight Temporary Construction Change COVID-19 Service change -0.3 -4 -0.2850 -4
Bus 363 Ossington Wil Reg Sun/hol 01-06 Overnight Temporary Construction Change COVID-19 Service change -0.3 -4 -0.3350 -4
Bus 100 Flemingdon Park Egl Reg -6 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change -6 -95.0 -2010 -475 -10,050
Bus 100 Flemingdon Park Egl Reg -3 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change -3 included above
Bus 100 Flemingdon Park Egl Reg +1 Sat 06-26 All day Temporary Construction Change COVID-19 Service change -52.9 -1164 -53 -1,164
Bus 100 Flemingdon Park Egl Reg Sun/hol 06-26 All day Temporary Construction Change COVID-19 Service change -50.3 -1081 -50 -1,081
Bus 103 Mt Pleasant North Wil Reg -2 Mon-Fri 06-01 Morning peak/All day Temporary Construction Change COVID-19 Service change -2 -37.3 -469 -187 -2,345
Bus 103 Mt Pleasant North Wil Reg -2 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change -2 included above
Bus 103 Mt Pleasant North Wil Reg -1 Sat 06-01 All day Temporary Construction Change COVID-19 Service change -32.9 -435 -33 -435
Bus 103 Mt Pleasant North Wil Reg -1 Sun/hol 06-01 All day Temporary Construction Change COVID-19 Service change -28.9 -385 -29 -385
Bus 109 Ranee Wil Reg Mon-Fri 06-01 Morning peak/All day Temporary Construction Change COVID-19 Service change -0.5 -184 -2 -920
Bus 109 Ranee Wil Reg Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change included above
Bus 109 Ranee Wil Reg Sat 06-01 All day Temporary Construction Change COVID-19 Service change -0.8 -188 -1 -188
Bus 109 Ranee Wil Reg Sun/hol 06-01 All day Temporary Construction Change COVID-19 Service change 0.2 -161 0 -161
Bus 51 Leslie Wil Reg Mon-Fri 06-01 All day Temporary Construction Change COVID-19 Service change 0.7 11 3 56
Bus 61 Avenue Rd North Wil Reg Mon-Fri 06-01 All day Temporary Construction Change COVID-19 Service change 0.4 7 2 37
Bus 61 Avenue Road North Wil Reg Sat 06-26 All day Temporary Construction Change COVID-19 Service change 0.2 0 0 0
Bus 61 Avenue Road North Wil Reg Sun/hol 06-26 All day Temporary Construction Change COVID-19 Service change 0.1 0 0 0
Bus 14 Glencairn MtD Reg +1 Mon-Fri 06-01 Morning peak Temporary Construction Change COVID-19 Service change +1 8.6 29 43 145
Bus 14 Glencairn MtD Reg +1 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +1 included above
Bus 34 Eglinton East Egl Reg -1 Mon-Fri 22-01 Late evening Temporary Construction Change COVID-19 Service change 0.3 5 1 27
Bus 54 Lawrence East Egl Reg +2 Mon-Fri 06-01 All day Temporary Construction Change COVID-19 Service change +2 17.9 394 90 1,970
Bus 54 Lawrence East Egl Reg +2 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +2 Included above
Bus 56 Leaside Wil Reg +1 Mon-Fri 06-01 All day Temporary Construction Change COVID-19 Service change +1 14.9 212 74 1,060
Bus 56 Leaside Wil Reg +2 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +2 Included above
Bus 63 Ossington Wil Reg +1 Mon-Fri 06-09 Morning peak Temporary Construction Change COVID-19 Service change +1 8.5 143 43 715
Bus 63 Ossington Wil Reg +1 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +1 included above
Bus 71 Runnymede MtD Reg +1 Mon-Fri 06-09 Morning peak Temporary Construction Change COVID-19 Service change +1 7.0 32 35 160
Bus 71 Runnymede MtD Reg +1 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +1 included above
Bus 74 Mt Pleasant Wil Reg Mon-Fri 06-01 All day Temporary Construction Change COVID-19 Service change -2.0 127 -10 635
Bus 74 Mt Pleasant Wil Reg Sat 06-01 All day Temporary Construction Change COVID-19 Service change 0.2 163 0 163
Bus 74 Mt Pleasant Wil Reg Sun/hol 08-01 All day Temporary Construction Change COVID-19 Service change 0.8 164 1 164
Bus 56 Leaside Wil Reg Mon-Fri 06-01 All day Temporary Construction Change COVID-19 Service change 1.1 14 6 70
Bus 12 Kingston Rd Bir Reg +1 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change +1 2.4 210 12 1,050
Bus 12 Kingston Rd Bir Reg Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change included above
Bus 12 Kingston Rd Bir Reg +1 Sat 06-01 All day Temporary Construction Change COVID-19 Service change 19.9 436 20 436
Bus 12 Kingston Rd Bir Reg +1 Sun/hol 06-01 All day Temporary Construction Change COVID-19 Service change 18.4 404 18 404
Bus 20 Cliffside Bir Reg +1 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change +1 14.9 187 74 935
Bus 20 Cliffside Bir Reg +1 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +1 included above
Bus 20 Cliffside Bir Reg Sat 06-01 All day Temporary Construction Change COVID-19 Service change 3.4 -12 3 -12
Bus 20 Cliffside Bir Reg +.5 Sun/hol 06-01 All day Temporary Construction Change COVID-19 Service change -1.9 -157 -2 -157
Bus 21 Brimley Bir Reg +1 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change +1 11.2 164 56 820
Bus 21 Brimley Bir Reg +1 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +1 included above
Bus 21 Brimley Bir Reg Sat 06-01 All day Temporary Construction Change COVID-19 Service change 0.8 -145 1 -145
Bus 21 Brimley Bir Reg Sun/hol 06-01 All day Temporary Construction Change COVID-19 Service change -0.4 -116 0 -116
Bus 25/185 Don Mills / D M Rocket Egl Reg +2.0 Sat 06-26 All day Temporary Construction Change COVID-19 Service change 20.0 237 20 237
Bus 25/185 Don Mills / D M Rocket Egl Reg +2.0 Sun/hol 06-26 All day Temporary Construction Change COVID-19 Service change 27.5 476 28 476
Bus 25/185 Don Mills / D M Rocket Egl Reg -2.0 Sat 06-26 All day Temporary Construction Change COVID-19 Service change -20.0 -237 -20 -237
Bus 25/185 Don Mills / D M Rocket Egl Reg -2.0 Sun/hol 06-26 All day Temporary Construction Change COVID-19 Service change -27.5 -476 -28 -476
Bus 25/185 Don Mills / D M Rocket Egl Reg .0 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change -0.8 39 -4 195
Bus 25/185 Don Mills / D M Rocket Egl Reg .0 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change uded above
Bus 34 Eglinton East Egl Reg Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change 3.0 701 15 3,505
Bus 34 Eglinton East Egl Reg Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change included above
Bus 34 Eglinton East Egl Reg Sat 06-01 All day Temporary Construction Change COVID-19 Service change 6.9 163 7 163
Bus 34 Eglinton East Egl Reg Sun/hol 06-01 All day Temporary Construction Change COVID-19 Service change 11.4 347 11 347
Bus 34 Eglinton East Egl Reg Mon-Fri 06-09 Morning peak Temporary Construction Change COVID-19 Service change -22.2 -311 -111 -1,553
Bus 34 Eglinton East Egl Reg +1 Mon-Fri 09-15 Midday Temporary Construction Change COVID-19 Service change uded above
Bus 34 Eglinton East Egl Reg +4 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +4uded above
Bus 34 Eglinton East Egl Reg Mon-Fri 19-22 Early evening Temporary Construction Change COVID-19 Service change uded above
Bus 34 Eglinton East Egl Reg Mon-Fri 22-01 Late evening Temporary Construction Change COVID-19 Service change uded above
Bus 34 Eglinton East Egl Reg -3 Mon-Fri 06-09 Morning peak Temporary Construction Change COVID-19 Service change -3 uded above
Bus 34 Eglinton East Egl Reg -2 Mon-Fri 09-15 Midday Temporary Construction Change COVID-19 Service change uded above
Bus 34 Eglinton East Egl Reg -4 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change -4uded above
Bus 34 Eglinton East Egl Reg -2 Mon-Fri 19-22 Early evening Temporary Construction Change COVID-19 Service change uded above
Bus 51 Leslie Wil Reg +1 Mon-Fri 09-15 Midday Temporary Construction Change COVID-19 Service change 4.1 57 21 287
Bus 43 Kennedy Egl Reg +2 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change +2 32.9 191 165 955
Bus 43 Kennedy Egl Reg +2 Mon-Fri 15-09 Afternoon peak Temporary Construction Change COVID-19 Service change +2 included above
Bus 43 Kennedy Egl Reg +2 Sat 06-01 All day Temporary Construction Change COVID-19 Service change 36.0 186 36 186
Bus 43 Kennedy Egl Reg +2 Sun/hol 06-01 All day Temporary Construction Change COVID-19 Service change 32.8 163 33 163
Bus 57 Midland Egl Reg +1 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change +1 11.1 219 55 1,095
Bus 57 Midland Egl Reg +1 Mon-Fri 15-09 Afternoon peak Temporary Construction Change COVID-19 Service change +1 included above
Bus 57 Midland Egl Reg Sat 06-01 All day Temporary Construction Change COVID-19 Service change -0.4 -121 0 -121
Bus 57 Midland Egl Reg +1 Sun/hol 08-19 Daytime Temporary Construction Change COVID-19 Service change 12.3 197 12 197
Bus 62 Mortimer Bir Reg +.5 Mon-Fri 22-01 Late evening Temporary Construction Change COVID-19 Service change -0.2 23 -1 115
Bus 62 Mortimer Bir Reg +.5 Sat 22-01 Late evening Temporary Construction Change COVID-19 Service change -0.2 -8 0 -8
Bus 62 Mortimer Bir Reg +.5 Sun/hol 19-01 Evening Temporary Construction Change COVID-19 Service change 6.2 103 6 103
Bus 86 Scarborough Egl Reg Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change 20.8 -63 104 -315
26
May 2020
Planned Service Changes
Type of AM PM Daily Daily Weekly Weekly
Mode Route Division Change Veh Day Time Budget Line Item Description of change Fleet Fleet Hours km Hours km
Bus 86 Scarborough Egl Reg +1 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +1 included above
Bus 86 Scarborough Egl Reg Sat 06-01 All day Temporary Construction Change COVID-19 Service change 19.8 283 20 283
Bus 86 Scarborough Egl Reg Sun/hol 06-01 All day Temporary Construction Change COVID-19 Service change 9.6 167 10 167
Bus 113 Danforth Bir Reg +1 Mon-Fri 06-01 All day Temporary Construction Change COVID-19 Service change +1 16.4 101 82 505
Bus 113 Danforth Bir Reg +1 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +1 Included above
Bus 113 Danforth Bir Reg +1 Sat 06-01 All day Temporary Construction Change COVID-19 Service change 14.1 117 14 117
Bus 113 Danforth Bir Reg Sun/hol 08-01 All day Temporary Construction Change COVID-19 Service change -0.4 -8 0 -8
Bus 116 Morningside Egl Reg +2 Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change +2 31.5 -162 157 -810
Bus 116 Morningside Egl Reg +1 Mon-Fri 15-09 Afternoon peak Temporary Construction Change COVID-19 Service change +1 included above
Bus 116 Morningside Egl Reg Sat 06-01 All day Temporary Construction Change COVID-19 Service change 11.4 -526 11 -526
Bus 116 Morningside Egl Reg +1 Sun/hol 08-01 All day Temporary Construction Change COVID-19 Service change 14.1 -338 14 -338
Bus 131 Nugget Mal Reg Mon-Fri 06-25 Morn/All day Temporary Construction Change COVID-19 Service change 0.0 31 0 155
Bus 198 U of T Scarborough Rocket Egl Reg +1 Mon-Fri 06-09 Morning peak Temporary Construction Change COVID-19 Service change +1 11.2 106 56 530
Bus 198 U of T Scarborough Rocket Egl Reg +1 Mon-Fri 15-09 Afternoon peak Temporary Construction Change COVID-19 Service change +1 included above
Bus 198 U of T Scarborough Rocket Egl Reg Sat 06-01 All day Temporary Construction Change COVID-19 Service change -0.3 -209 0 -209
Bus 198 U of T Scarborough Rocket Egl Reg Sun/hol 08-01 All day Temporary Construction Change COVID-19 Service change -0.6 -179 -1 -179
Bus 36 Finch West Arw A Reg +1 Mon-Fri 06-09 Morning peak Temporary Construction Change COVID-19 Service change +1 22.5 281 113 1,406
Bus 36 Finch West Arw A Reg +1 Mon-Fri 09-15 Midday Temporary Construction Change COVID-19 Service change uded above
Bus 36 Finch West Arw A Reg +2 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +2uded above
Bus 36 Finch West Arw A Reg +1 Mon-Fri 19-22 Early evening Temporary Construction Change COVID-19 Service change uded above
Bus 36 Finch West Arw A Reg +1 Mon-Fri 22-01 Late evening Temporary Construction Change COVID-19 Service change uded above
Bus 36 Finch West Arw A Reg +3 Sat 06-01 All day Temporary Construction Change COVID-19 Service change 14.2 178 14 178
Bus 36 Finch West Arw A Reg +4 Sun/hol 06-01 All day Temporary Construction Change COVID-19 Service change 14.4 180 14 180
Bus 36 Finch West Arw A Reg +5 Mon-Fri 06-01 Morning peak/All day Temporary Construction Change COVID-19 Service change +5 58.0 12 290 61
Bus 36 Finch West Arw A Reg +4 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +4 Included above
Bus 36 Finch West Arw A Reg -1 Mon-Fri 22-01 Late evening Temporary Construction Change COVID-19 Service change uded above
Bus 36 Finch West Arw A Reg +4 Sat 06-01 All day Temporary Construction Change COVID-19 Service change 50.3 63 50 63
Bus 36 Finch West Arw A Reg +4 Sun/hol 08-01 All day Temporary Construction Change COVID-19 Service change 51.3 81 51 81
Bus 36 Finch West Arw A Reg +2 Mon-Fri 06-09 Morning peak Temporary Construction Change COVID-19 Service change +2 23.6 472 118 2,360
Bus 36 Finch West Arw A Reg +1 Mon-Fri 09-15 Midday Temporary Construction Change COVID-19 Service change uded above
Bus 36 Finch West Arw A Reg +2 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +2uded above
Bus 36 Finch West Arw A Reg +1 Mon-Fri 19-22 Early evening Temporary Construction Change COVID-19 Service change uded above
Bus 36 Finch West Arw A Reg +1 Sat 08-12 Morning Temporary Construction Change COVID-19 Service change 11.5 231 12 231
Bus 36 Finch West Arw A Reg +1 Sat 12-19 Afternoon Temporary Construction Change COVID-19 Service change uded above
Bus 36 Finch West Arw A Reg +1 Sun/hol 08-12 Morning Temporary Construction Change COVID-19 Service change 9.5 189 9 189
Bus 36 Finch West Arw A Reg +1 Sun/hol 12-19 Afternoon Temporary Construction Change COVID-19 Service change uded above
Streetcar 508 Lake Shore Ron Reg -3 Mon-Fri 06-01 Morning peak/All day Temporary Construction Change COVID-19 Service change -3 -12.9 -160.6 -64 -803
Streetcar 508 Lake Shore Ron Reg -2 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change -2 Included above
Streetcar 508 Lake Shore Rus Reg +3 Mon-Fri 06-01 Morning peak/All day Temporary Construction Change COVID-19 Service change +3 13.7 171.5 69 857
Streetcar 508 Lake Shore Rus Reg +2 Mon-Fri 15-19 Afternoon peak Temporary Construction Change COVID-19 Service change +2 Included above

Total -400 -361 -27,108 -524,125

Totals by type of change


Buses on streetcar routes 0 0 0 0
Deadhead savings 0 0 0 0
Deadhead increases 0 0 0 0
Carhouse allocation change 0 0 0 0
Garage allocation change 0 0 0 0
Route change 0 0 0 0
Route change - temporary 0 0 0 0
Route elimination 0 0 0 0
Route extension 0 0 0 0
Route extension - Contract 0 0 0 0
Route extension ending 0 0 0 0
RTT increase 0 0 0 0
RTT reduction 0 0 0 0
New service 0 0 0 0
Schedule change 0 0 0 0
Schedule change - Contract 0 0 0 0
Schedule change - school trip 0 0 0 0
Schedule change - Subway 0 0 0 0
Seasonal service change 0 0 0 0
Seasonal service change - Contract 0 0 0 0
Seasonal service change ending 0 0 0 0
Seasonal service change ending - Contract 0 0 0 0
Seasonal service increase 0 0 0 0
Seasonal service reduction 0 0 0 0
Seasonal service reduction - Subway 0 0 0 0
Service change 31 42 3,304 13,989
Service change - Contract 0 0 0 0
Service increase 127 114 11,528 217,992
Service increase - Contract 0 0 0 0
Service increase - school trip 0 0 0 0
Service increase - Subway 0 0 0 0
Service increase - Sif2015/10 min 0 0 0 0
Service increase - Sif2015/AllDayEveryDay 0 0 0 0
Service increase - Sif2015/Overnight 0 0 0 0
27
May 2020
Planned Service Changes
Type of AM PM Daily Daily Weekly Weekly
Mode Route Division Change Veh Day Time Budget Line Item Description of change Fleet Fleet Hours km Hours km
Service increase - Sif2015/ExprOffPeak 0 0 0 0
Service increase - Sif2015/ExprPeak 0 0 0 0
Service increase - Sif2015/OffPeakStd 0 0 0 0
Service increase - Sif2016/SunMorn 0 0 0 0
Service reduction - Sif2016/SunMorn 0 0 0 0
Service reduction -527 -477 -37,036 -711,717
Service reduction - Contract 0 0 0 0
Service reliability improvement 0 0 0 0
Trial service ends 0 0 0 0
Vehicle type change - artic bus 0 0 0 0
Vehicle type change - low floor car 0 0 0 0
Vehicle type change 0 0 0 0
Regular service Sub-total Sub-total -22,204 -479,736

TTC construction 0 0 0 0
TTC construction ending 0 0 -1,604 -30,454
Construction - garage allocation change 0 0 0 0
Contract construction 0 0 0 0
Contract construction ending 0 0 0 0
Metrolinx construction 0 0 0 0
Metrolinx construction ending -31 -40 -3,170 -15,820
City construction 0 0 0 0
City construction ending 0 0 -130 1,885
Construction Sub-total Sub-total -4,904 -44,389

Total, Regular Service and Construction Total, Regular Service and Construction -27,108 -524,125

Totals by division
Arw Reg -27 -33 -2,601 -50,604
Arw A Reg -5 -2 672 4,749
Bir Reg -37 -37 -1,645 -34,293
Egl Reg -67 -37 -1,827 -51,101
Mal Reg -34 -23 -3,178 -60,224
Mal A Reg -33 -35 0 0
McN Reg 0 0 0 0
McN A Reg 0 0 0 0
MtD Reg -45 -25 -2,243 -49,691
MtD A Reg -14 -14 50 -2,710
Qsy Reg -35 -35 -1,489 -31,264
Wil Reg -26 -29 -2,461 -54,833
Wil A Reg 0 0 0 0
Mal&Wil Reg 0 0 0 0

Arw Contract 0 0 0 0
Arw A Contract 0 0 0 0
Bir Contract 0 0 0 0
Egl Contract 0 0 0 0
Mal Contract 0 0 0 0
Mal A Contract 0 0 0 0
McN Contract 0 0 0 0
McN A Contract 0 0 0 0
MtD Contract 0 0 0 0
MtD A Contract 0 0 0 0
Qsy Contract 0 0 0 0
Wil Contract 0 0 0 0
Wil A Contract 0 0 0 0

Arw Const 0 0 -310 -4,708


Arw A Const -8 -8 -672 -4,749
Bir Const -12 -11 -864 -13,369
Egl Const -11 -15 -1,336 -9,004
Mal Const 0 0 -160 -3,195
Mal A Const 0 0 0 0
McN Const 0 0 0 0
McN A Const 0 0 0 0
MtD Const -5 -10 -751 -7,191
MtD A Const 0 0 -50 2,710
Qsy Const 0 0 -431 -5,209
Wil Const -3 -4 -557 -2,512
Wil A Const 0 0 0 0

Ron Reg -3 -2 -1,400 -17,502


Rus Reg -5 -6 -2,839 -35,491
Les Reg 0 0 160 2,000
Ron&Rus Reg 0 0 0 0

Ron Const 3 2 64 803


Rus Const 5 6 163 2,034
28
May 2020
Planned Service Changes
Type of AM PM Daily Daily Weekly Weekly
Mode Route Division Change Veh Day Time Budget Line Item Description of change Fleet Fleet Hours km Hours km
Les Const 0 0 0 0
Ron&Rus Const 0 0 0 0

1 Y-U Reg -19 -19 -1,470 -41,155


2 B-D Reg -19 -24 -1,934 -57,618
3 SCARB Reg 0 0 0 0
4 SHEPP Reg 0 0 0 0

1 Y-U Const 0 0 0 0
2 B-D Const 0 0 0 0
3 SCARB Const 0 0 0 0

Total, all divisions Total, all divisions -27,108 -524,125


29
May 2020
Construction Summary
Hours KM
Expected Total Weekly Total Weekly
Last resumption Hours km
List of projects Started Description Type Mon-Fri Sat Sun Sun/hol Mon-Fri Sat Sun Sun/hol
Changed of regular
service
City Lawrence Heights Redevelopment - Varna Drive closure 2020/Jan 2020/Jan 2020/Dec City construction operating 0 0 0 0 0 0 0 0 0 0
City Waterfront Toronto Port Lands Flood Protection 2019/Nov 2019/Oct 2022/Jun City construction operating 0 0 0 0 0 0 0 0 0 0
MX Eglinton CrosstownLRT construction 2020/Mar 2020/Mar 2020/Sep Metrolinx construction capital 111 70 0 89 716 1,393 869 0 1,116 8,951
MX Eglinton CrosstownLRT construction - RADs 2018/Jan 2019/Jan mid 2019 Metrolinx construction capital 128 0 0 0 640 1,216 0 0 0 6,080
MX Finch West LRT Construction 2020/Mar 2020/Mar 2020/Sep Metrolinx construction capital 0 0 0 0 0 0 0 0 0 0
TTC Articulated Bus Capital Program 2019/Feb 2019/Feb 2020/Dec TTC construction capital 53 0 0 0 264 687 0 0 0 3,433
TTC Runnymede Station Easier Access 2019/Oct 2019/Oct 2020/Dec TTC construction capital 16 21 0 15 114 142 363 0 251 1,325
TTC Line 3 car rehab 2016/Jun 2016/Jun late 2019 TTC construction capital -6 0 0 0 -31 -380 0 0 0 -1,900
TTC McNicoll Garage construction 2017/Jun 2017/Jun 2020/Jan TTC construction capital 6 9 0 6 44 120 116 0 99 815
TTC Surface Special Track Work 2019/Jun 2019/Jun 2025/Jan TTC construction capital 50 39 0 40 331 783 623 0 631 5,169
TTC Roncesvalles Yard, track and carhouse renovations 2018/Feb 2020/Jan 2021/Jan TTC construction capital 17 15 0 6 107 213 179 0 67 1,310
TTC Sheppard West Station Paving 2019/Sep 2019/Sep 2020/Mar TTC construction capital 14 13 0 11 94 174 165 0 143 1,177
TTC Kennedy Stn Elevator to Line 3 Overhaul - January to March
2020/Jan 2020/Jan 2020/Mar TTC construction capital 2 2 0 6 19 43 35 0 108 357
2020
TTC Keele Stn Bus Roadway Rehab and Easier Access 2020/Mar 2020/Mar 2020/Oct TTC construction capital 48 53 0 37 330 599 659 0 467 4,122

SUMMARY TABLES Hours KM


* NOTE: The above hours are estimates as to how COVID-19
related service reductions have reduced billable capital Total Weekly Total Weekly
Description Type Mon-Fri Sat Sun Sun/hol Mon-Fri Sat Sun Sun/hol
construction hours. The exact figures can be found in the "2020 Hours KM
TTC and City Construction" tracking file.
TTC construction capital 200 151 0 121 1,272 2,380 2,140 0 1,767 15,808
Metrolinx construction capital 239 70 0 89 1,356 2,609 869 0 1,116 15,031
Other capital 0 0 0 0 0 0 0 0 0 0
Total 439 221 0 210 2,628 4,989 3,009 0 2,883 30,839

City construction operating 0 0 0 0 0 0 0 0 0 0


Metrolinx construction operating 0 0 0 0 0 0 0 0 0 0
Other operating 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0

TOTAL Construction 439 221 0 210 2,628 4,989 3,009 0 2,883 30,839

Daily Hours Daily KM


Total Weekly Total Weekly
Mon-Fri Sat Sun Sun/hol Mon-Fri Sat Sun Sun/hol
Hours KM
Bus 378 167 0 164 2,221 4,374 2,207 0 2,184 26,260
Streetcar 67.7 53.8 0.0 45.7 438 996 802 0 699 6,479
Subway -6.3 0.0 0.0 0.0 -31 -380 0 0 0 -1,900
30

May 2020
Scheduled peak buses

Morning Peak Bus Fleet Afternoon Peak Bus Fleet


Base Change in Total in Base Change in Total in
Maximum RAD Total Total in Variance to RAD
going into regular regular going into regular regular Variance to Percent of Total Total in
Capacity Buses construction service capacity Buses
service service service service morning morning construction service
May 2020 May 2020 May 2020 May 2020 May 2020 May 2020 May 2020 May 2020 May 2020 May 2020

Arrow Road 12 m Std bus 220 -27 193 0 0 193 220 -33 187 -6 97% 0 0 187
Arrow Road A 18 m Artic 27 -5 22 0 0 22 22 -2 20 -2 91% 0 0 20
combined 259 247 -32 215 0 0 215 -44 242 -35 207 -8 96% 0 0 207
Birchmount 219 188 -37 151 0 1 152 -67 184 -37 147 -4 97% 0 1 148
Eglinton 271 255 -67 188 0 1 189 -82 227 -37 190 2 101% 0 3 193
Malvern 12 m Std bus 223 -34 189 0 0 189 211 -23 188 -1 99% 0 0 188
Malvern A 18 m Artic 33 -33 0 0 0 0 35 -35 0 0 n/a 0 0 0
combined 271 256 -67 189 0 0 189 -82 246 -76 188 -1 99% 0 0 188
McNicoll 12 m Std bus 0 0 0 0 0 0 0 0 0 0 n/a 0 0 0
McNicoll A 18 m Artic 0 0 0 0 0 0 0 0 0 0 n/a 0 0 0
combined 0 0 0 0 0 0 0 0 0 0 0 n/a 0 0 0
Mount Dennis 12 m Std bus 188 -45 143 0 8 151 168 -25 143 0 100% 0 10 153
Mount Dennis A 18 m Artic 39 -14 25 0 1 26 44 -14 30 5 120% 0 1 31
combined 235 227 -59 168 0 9 177 -58 212 -46 173 5 103% 0 11 184
Queensway 160 155 -35 120 0 1 121 -39 161 -35 126 6 105% 0 1 127
Wilson 12 m Std bus 226 -26 200 0 21 221 225 -29 196 -4 98% 0 25 221
Wilson A 18 m Artic 15 0 15 0 -15 0 18 0 18 3 120% 0 -18 0
combined 260 241 -26 215 0 6 221 -39 243 -29 214 -1 100% 0 7 221

System total 1,675 1,569 -323 1,246 0 18 1,264 -411 1,515 -295 1,245 -1 100% 0 23 1,268
Notes: Figures include inside- and outside-Toronto buses
Articulated buses are included on a one-for one basis.
RAD Buses: Maximum number of buses shown, on some weekdays, one less bus may be scheduled at some divisions.
RAD Buses for MX Construction are now included in the Construction column.
May 2020 31
Scheduled peak streetcars
Morning peak Afternoon peak
Morning Peak Streetcar Fleet Afternoon Peak Streetcar Fleet by Yard by Yard

Maximum Base Change in Total in Variance Maximum Base Change in Total in Variance Variance
Capacity going into regular regular Total Total in to Capacity going into regular regular to Percent of Total Total in to
AM service service construction service capacity PM service service morning morning constr. service capacity Ronce Leslie Russell Ronce Leslie Russell
May 2020 May 2020 May 2020 May 2020 May 2020 May 2020 May 2020 May 2020 May 2020 May 2020

Low Floor Streetcar


501 Queen (Hum-Nev) 27 -1 26 0 26 30 30 4 115% 0 30 26 30
501 Queen (LB-Hum) 8 -8 0 0 0 8 -8 0 0 n/a 0 0
502 Downtowner 0 0 0 0 0 0 0 n/a 0 0
503 Kingston Rd 0 0 0 0 0 0 0 n/a 0 0
504A King 23 -4 19 0 19 22 -2 20 1 105% 0 20 19 20
504B King 22 -1 21 0 21 20 -3 17 -4 81% 0 17 21 17
505 Dundas 15 -1 14 0 14 18 -4 14 0 100% 0 14 14 14
506 Carlton 22 -6 16 0 16 22 -6 16 0 100% 0 16 16 16
508 Lake Shore 5 -5 0 0 0 5 -5 0 0 n/a 0 0
509 Harbourfront 8 -2 6 0 6 6 6 0 100% 0 6 6 6
510 Spadina 14 14 0 14 14 -2 12 -2 86% 0 12 14 12
511 Bathurst 0 0 0 0 0 0 0 n/a 0 0
512 St Clair 20 -8 12 0 12 18 -6 12 0 100% 0 12 12 12
705 Stand By / RAD 0 +2 2 0 2 0 +4 4 2 200% 0 4 2 4
Streetcar total 161 164 -34 130 0 130 -31 161 163 -32 131 1 101% 0 131 -30 19 85 26 20 81 30
130 131

Ronce Leslie Russell Ronce Leslie Russell

LFSC 19 85 26 20 81 30

Yard total 19 85 26 20 81 30
Grand Total 130 131
Additional buses required on some streetcar routes due to various streetcar fleet programs, TTC/City construction, mixed-traffic congestion, and growing ridership.

AM Buses Arw Bir Egl Mal MtD Qsy Wil Total


501 Queen 0
502 Downtowner 0
503 Kingston Rd 0
504 King 0
505 Dundas 0
506 Carlton 0
511 Bathurst 17 17
0 0 0 0 17 0 0 17

PM Buses Arw Bir Egl Mal MtD Qsy Wil Total


501 Queen 0
502 Downtowner 0
503 Kingston Rd 0
504 King 0
505 Dundas 0
506 Carlton 0
511 Bathurst 19 19
0 0 0 0 19 0 0 19

Operator Hours per week Arw Bir Egl Mal MtD Qsy Wil Total `
501 Queen 0
502 Downtowner 0
503 Kingston Rd 0
504 King 0
505 Dundas 0
506 Carlton 0
511 Bathurst 2,047 2,047
0 0 0 0 2,047 0 0 2,047
All hours in this chart are charged to the Operating Budget except for part of 503 Kingston Road (which is charged to City Construction)
32

May 2020
Planned Hours per Week by Division

Total
Base Change in Total service -
going into regular service - excl. Planned incl.
May 2020 service construction Construction construction
excl.
construction May 2020 May 2020 May 2020 May 2020
Arrow Road 23,093 -1,929 21,164 94 21,258
Birchmount 17,656 -1,645 16,011 120 16,131
Eglinton 22,411 -1,827 20,584 240 20,824
Malvern 22,204 -3,178 19,026 19 19,044
Mount Dennis 21,768 -2,192 19,576 861 20,437
Queensway 14,529 -1,489 13,040 96 13,137
McNicoll 0 0 0 0 0
Wilson 22,563 -2,461 20,102 791 20,893
Bus total 144,223 -14,721 129,502 2,221 131,724
Roncesvalles 5,439 -1,400 4,039 -1,727 2,312
Russell 14,219 -2,679 11,540 2,165 13,705
Streetcar total 19,658 -4,079 15,578 438 16,016
Greenwood - Line 2 8,375 -1,934 6,442 0 6,442
Wilson / Davisville - Lines 1 and 4 13,307 -1,470 11,837 0 11,837
Subway total 21,683 -3,403 18,279 0 18,279
McCowan - Line 3 634 0 634 -31 603
GRAND TOTAL 186,198 -22,204 163,994 2,628 166,622

Notes:
1. Figures include inside- and outside-Toronto service.
2. Subway hours are Operator hours.