AZURA EDO-POWER PLANT

MAINTENANCE CHECK SHEET / JOB HAZARD ANALYSIS


MAINTENANCE SAFETY PROTOCOL
UNIT NUMBER GT11 Month Start time Stop time
SYSTEM MBK - Turning Gear System WO#
SN Job Step Hazard Hazard controls Status Comments

1 identify maintenance equipment according to P&IDs

2 Inspect the sensors, transmitters for physical damage or abnormal conditions


Use Proper PPE
Noise, Vibration, slips, trips and Take short breaks
falls Clean out spilled oil
Do proper house keeping
3 Check
same.
for any leakage in the complete MBK system. In case of leakage, arrest

4 Check condition of the Turning gear control block

General Comments:

Lead Technician Signature Date


Supervisor Signature Date
AZURA EDO-POWER PLANT
MAINTENANCE CHECK SHEET / JOB HAZARD ANALYSIS
MAINTENANCE SAFETY PROTOCOL
UNIT NUMBER GT12 Month Start time Stop time
SYSTEM MBK - Turning Gear System WO#
SN Job Step Hazard Hazard controls Status Comments

1 identify maintenance equipment according to P&IDs

2 Inspect the sensors, transmitters for physical damage or abnormal conditions


Use Proper PPE
Noise, Vibration, slips, trips and Take short breaks
falls Clean out spilled oil
Do proper house keeping
3 Check
same.
for any leakage in the complete MBK system. In case of leakage, arrest

4 Check condition of the Turning gear control block

General Coments:

Lead Technician Signature Date


Supervisor Signature Date
AZURA EDO-POWER PLANT
MAINTENANCE CHECK SHEET / JOB HAZARD ANALYSIS
MAINTENANCE SAFETY PROTOCOL
UNIT NUMBER GT13 Month Start time Stop time
SYSTEM MBK - Turning Gear System WO#
SN Job Step Hazard Hazard controls Status Comments

1 identify maintenance equipment according to P&IDs

2 Inspect the sensors, transmitters for physical damage or abnormal conditions


Use Proper PPE
Noise, Vibration, slips, trips and Take short breaks
falls Clean out spilled oil
Do proper house keeping
3 Check
same.
for any leakage in the complete MBK system. In case of leakage, arrest

4 Check condition of the Turning gear control block

General Coments:

Lead Technician Signature Date


Supervisor Signature Date