Per Unit: Relay - Prim - Trafo - 4 - G OC1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Per Unit

,005 ,01 ,03 ,05 ,1 ,3 ,5 1 3 5 10 30 50 100


1K 1K
Normalized (shifted) TCC
Line-to-Ground (Sym) fault: 9,489kA @ 4,16kV
500 Adj Bus: Barra 8 500
Connector: CT1 - Mtr2
300 SQOP File: Untitled 300

Data Rev: Base


Configuration: Normal
Date: 29-04-2020
100 Relay_Prim_trafo_4 - G 100

OC1
50 Siemens 50
7SJ61
30 CT Ratio 300:5 30
IEC - Normal Inverse
Pickup = 1,1 (0,25 - 20 Sec - 5A)
Time Dial = 0,22
10 3x = 1,39 s, 5x = 0,942 s, 8x = 0,725 s 10
2,496 kA @ 13,2 kV
t1: 0,499 s
5 Relay_Sec_trafo_4 - G 5

Seconds
Seconds

OC1
3 3
Siemens
7SJ61
CT Ratio 800:5
IEC - Normal Inverse
1 1
Pickup = 1,3 (0,05 - 4 Sec - 1A)
Time Dial = 0,14
,5 3x = 0,882 s, 5x = 0,599 s, 8x = 0,462 s ,5
7,919 kA @ 4,16 kV
,3 t1: 0,317 s ,3
CB3
±

I>
Relay_Motor_2 - G
T4 Relay_Prim_trafo_4 OC1
5 MVA
,1 Siemens ,1
±
7SJ61
I>

CB2 Relay_Sec_trafo_4 Barra 8 CT Ratio 300:5


,05 IEC - Normal Inverse ,05

CB1 Relay_Motor_2 Pickup = 1,25 (0,25 - 20 Sec - 5A)


,03 ±
,03
I> Time Dial = 0,05
3x = 0,315 s, 5x = 0,214 s, 8x = 0,165 s
Mtr2
7,919 kA @ 4,16 kV
1500 kW t1: 0,113 s
,01 ,01
,005 ,01 ,03 ,05 ,1 ,3 ,5 1 3 5 10 30 50 100

Per Unit
ETAP Star 12.6.0H

Star40

Project: Date: 28-04-2020


Location: SN:
Contract: Rev: Base
Engineer: Fault: Ground(Normalized)