Contents
ABOUT COMPANY ...................................................................................................................... 1
I. Warehouse 33X45m installation ............................................................................................. 2
I.1. Base Plate installation ...................................................................................................... 2
I.2. Tapered column installation ............................................................................................. 3
I.3. Cable, pipe brace and girts on tapered column ................................................................ 4
I.4. Tapered rafter ................................................................................................................... 5
I.5. Cable, flange brace and purlin installation ....................................................................... 6
I.6. Zinc installation ................................................................................................................ 7
I.7. Roof-monitor installation ................................................................................................. 8
II. BATI warehouse 40x48m design ............................................................................................ 9
II.1. Modeling .......................................................................................................................... 9
II.2. Load ................................................................................................................................ 10
II.3. Deflection ....................................................................................................................... 11
II.4. Drift ................................................................................................................................ 11
II.5. Member design ............................................................................................................... 12
II.5.1. Rafter I (800-500-800)x214x6x8 ............................................................................ 12
II.5.2. Tapered column I(300-800)x214x6x8 .................................................................... 13
II.5.3. Middle Column (I 500x214x6x10) ......................................................................... 14
II.5.4. Column and Rafter I300x214x5x6.......................................................................... 15
II.5.5. Purlin and Girt Z200x75x1.5 .................................................................................. 15
II.6. Connection design .......................................................................................................... 16
II.6.1. Column base connection ......................................................................................... 17
II.6.2. Column-beam connection ....................................................................................... 18
II.6.3. Beam-Beam connection .......................................................................................... 19
II.6.4. Beam-Column-Beam connection ............................................................................ 20
III. Conclusion ......................................................................................................................... 21
INTERNSHIP REPORT Date:10/10/2019

ABOUT COMPANY

IS STEEL BUILDINGS (CAMBODIA) CO.,Ltd is the company that have a


lot of experience about steel construction and their vision want to develop their company to be
the professional of steel construction in the civil sector. IS STEEL company also have a good
cooperation with Build X Construction & Decoration to serve the customers with the
good quality and comfortable.
Address: #9H, st. Veng Sreng, Songkat Steung Man Chey, Khan Man Chey,
Phnom Penh
Tel: 088 930 000 9
Email: sale@issteelbuilding.com

NAME: KORNG DINA 1


INTERNSHIP REPORT Date:10/10/2019

I. Warehouse 33X45m installation


I.1. Base Plate installation
First, we must make a reference level (level 0.00) and then we measure up from reference
level of 50mm to make sure that the base plate level is +0.05m from reference level. The reason
we take a gap of 50mm is easy to install mezzanine column and can edit level of base plate. Nuts
are inputted at the base plate level to bearing mezzanine column during installation.

Nuts at base plate level Elevation plan

Measure level

NAME: KORNG DINA 2


INTERNSHIP REPORT Date:10/10/2019

I.2. Tapered column installation


Tapered columns are installed by using mobile crane after we have base plate level and
then we have to make sure that tapered column is perpendicular. After tapered column is
perpendicular, we need to input double nuts and a washer on the base plate via anchor bolt for
stability of tapered column. After we already installed tapered column, we need to cast grout
thickness of 50mm under the base plate.

Tapered column Verify perpendicular of column

Install nut Cast grout

NAME: KORNG DINA 3


INTERNSHIP REPORT Date:10/10/2019

I.3. Cable, pipe brace and girts on tapered column


After we already install tapered column, we need to install cable brace, flange brace and
pipe brace due to displacement of tapered column. Girts are installed after we already installed
tapered column and for stability of girts, we use sag rod to brace at the middle span of girts.

Purlin and cable brace Pipe brace

Flange brace Sag rod

NAME: KORNG DINA 4


INTERNSHIP REPORT Date:10/10/2019

I.4. Tapered rafter


For tapered rafter, we devise to 3 pieces because the length of the tapered rafter is very
long. So, we need to connect these 3 pieces of the tapered rafter to whole rafter. Then using the
mobile crane to connect tapered rafter with tapered column (beam-column connection). After that
we use 2 mobile cranes for install connection between tapered rafter and tapered rafter.

Assembly rafter Rafter to column connection

Uplift a rafter Rafter to rafter connection

NAME: KORNG DINA 5


INTERNSHIP REPORT Date:10/10/2019

I.5. Cable, flange brace and purlin installation


After we finish mezzanine installation, we need to install cable brace, flange bracing and
purlin because it can aid stability of mezzanine rafter. For purlin we use sag rod diameter of
12mm to brace it at the middle span.

Purlin

Cable bracing

Flange bracing

NAME: KORNG DINA 6


INTERNSHIP REPORT Date:10/10/2019

I.6. Zinc installation


Zinc that has thickness 0.4mm was installed on the wall and roof connect with girts and
purlins respectively by screws.

Zinc Screw

Zinc on roof Zinc on wall

NAME: KORNG DINA 7


INTERNSHIP REPORT Date:10/10/2019

I.7. Roof-monitor installation


Roof-monitor was installed on the middle roof for reduction the heat in the warehouse.
For installing the roof-monitor, we need to install main structure (column and beam) of it first
and then we install the secondary structure (purlin, sag rod, zinc).

NAME: KORNG DINA 8


INTERNSHIP REPORT Date:10/10/2019

II. BATI warehouse 40x48m design


For this ware warehouse, we design via code AISC 360-10 and we use ROBOT
STRUCTURAL ANALAYSIS software for design it.
II.1. Modeling

Section Strength (MPa)


Tapered Column I (300-800)x214x6x8 345
Column I 500x214x6x10 345
I 300x214x5x6
Tapered Rafter I (800-500-800)x214x6x8 345
Purlin Z 200x75x1.5 450
Girt Z 200x75x1.5 450
Cable CB 16mm 600
Pipe Pipe 114x3.2 235
Concrete column C 40x80 25
Concrete beam B 25x40 25

NAME: KORNG DINA 9


INTERNSHIP REPORT Date:10/10/2019

II.2. Load
• Live load: LL=0.3 kN (ASCE 5-10)
• Dead load: DL=0.1 kN
• Self-weight (calculated by software)
• Wind load (calculated by software, wind speed=42 m/s)
For wind load we generate in Robot Structural Analysis as following:
1. Click on Load icon
2. Select wind loads simulation
3. Select Generate wind loads
4. Tick on wind direction x+, x-, y+ and y-
5. Input wind speed 42 m/s
6. Input terrain level 0 m
7. Click Start

NAME: KORNG DINA 10


INTERNSHIP REPORT Date:10/10/2019

II.3. Deflection

 Deflection limit = L/120=0.2 m > Deflection maximum = 0.15 m


Thus, Deflection is OK!
II.4. Drift

 Drift limit = H/60 =0.11 m > Drift maximum = 0.039


Thus, Drift is OK!

NAME: KORNG DINA 11


INTERNSHIP REPORT Date:10/10/2019

II.5. Member design


First, we define the Member Type of each element as following:
1. Click: Member Type
2. Click: New steel member type
3. Define: Member type, kz, ky, Lateral buckling length and lateral buckling (Cb)
4. Save

II.5.1. Rafter I (800-500-800)x214x6x8


Rafters are designed as following:
1. Select all rafters and input in Member verification
2. Calculate as ULS (Ultimate Limit State)
3. Click on Calculation bottom
4. Check Ratio: if Ratio < 1, The rafter is OK!
Ratio > 1, The rafter is not OK!

NAME: KORNG DINA 12


INTERNSHIP REPORT Date:10/10/2019

II.5.2. Tapered column I(300-800)x214x6x8


Do the same way to rafter and we get result below:

Thus, the mezzanine column I(300-800)x214x6x8 is OK!

NAME: KORNG DINA 13


INTERNSHIP REPORT Date:10/10/2019

II.5.3. Middle Column (I 500x214x6x10)


For Middle column, we need to assign live load only one side because the structure is
critic when the live load has only one side.

By using the same way to the rafter and we get result below:

Thus, the column (I 500x214x6x10) is OK!

NAME: KORNG DINA 14


INTERNSHIP REPORT Date:10/10/2019

II.5.4. Column and Rafter I300x214x5x6


By using the same way to the rafter and we get result below:

Thus, column and rafter I300x214x5x6 is OK!


II.5.5. Purlin and Girt Z200x75x1.5
By using the same way to the rafter and using sag rod to brace the purlin and girt at the
middle span then we get result below:

Thus, purlin and girt Z200x75x1.5 is OK!

NAME: KORNG DINA 15


INTERNSHIP REPORT Date:10/10/2019

II.6. Connection design


For design connection, we design in IDEA STATICA software by export data from
ROBOT ANALAYSIS as following:
1. Select node and members
2. Click: Add-Ins
3. Click: RobotConnectionToIdeaOpenModelWPF
4. Start design connection in IDEA STATICA

NAME: KORNG DINA 16


INTERNSHIP REPORT Date:10/10/2019

II.6.1. Column base connection

NAME: KORNG DINA 17


INTERNSHIP REPORT Date:10/10/2019

II.6.2. Column-beam connection

NAME: KORNG DINA 18


INTERNSHIP REPORT Date:10/10/2019

II.6.3. Beam-Beam connection

NAME: KORNG DINA 19


INTERNSHIP REPORT Date:10/10/2019

II.6.4. Beam-Column-Beam connection

NAME: KORNG DINA 20


INTERNSHIP REPORT Date:10/10/2019

III. Conclusion
When I finish year 4th at ITC I just learn about theory but during internship at ISSteel
company for 2 months I have learned a lot of new experiences such as:
 Design steel with software
 Properties of steel
 Connect theory with practice
 Bill of quantity (BOQ)
 Technology of field
Therefore, this internship is very extreme important for all civil engineer students for practice
all theories that they learned at school and especially the internship will teach you how to be a
success engineer and have a good communication with other in the company.

NAME: KORNG DINA 21