No. Name of Building (M) Building Foot Print (M) Built Up Area Mark
No. Name of Building (M) Building Foot Print (M) Built Up Area Mark
抗爆结构
中央控制室
7 1920 1920 Bl a s t res i s ta nt
Center control bui l di ng
s tructure
中央化验室
8 660 1320
Centra l l a bora tory
危险化学品库
9 Ha za rdous Chemi ca l s 432 432
s tora ge
一般化学品库
10 432 432
General Chemicals storage
维修厂房
11 2070 3510
Maintenance Warehouse
综合仓库
12 2700 2700
General Storage Warehouse
脱盐水站及冷凝液精制厂房和
泵房(包括贮药间)
Des a l i na ti on s ta ti on a nd
13 880 880
condens a te refi ni ng pl a nt
a nd pump hous e (Incl udi ng
Drug s tora ge room)
综合泵房
14 540 540
Comprehens i ve pump hous e
循环水泵房
15 Ci rcul a ti on wa ter pump 504 504
hous e
循环水加药及旁滤间
16 ci rcul a ti ng wa ter dos i ng a nd 450 450
s i de fi l ter room
空分主压缩厂房
17 Ai r Sepa ra ti on Ma i n 1800 3600
Compres s i on bui l di ng
预冷厂房
18 384 384
Pre cool i ng bui l di ng
膨胀机房
19 225 225
Expa ns i on bui l di ng
空压厂房
20 540 540
Ai r compres s or bui l di ng
空分循环水泵房
21 Ai r Sepa ra ti on Ci rcul a ti on 432 432
wa ter pump hous e
换热站
22 300 300
Hea t excha nge s ta ti on
总变220kv变电所
23 220 kV tota l tra ns former 864 1728
s ubs ta ti on
甲醇装置10kv变电所
24 Metha nol pl a nt 10 kV 648 1296
Subs ta ti on
循环水变电所
25 circulating water 540 1080
s ubs ta ti on
空分变电所
26 150 300
Ai r Di s tri buti on Subs ta ti on
甲醇装置机柜间
43 metha nol pl a nt ca bi net 320 320
room
燃气锅炉
27 650
Ga s fi red boi l er
内燃机主厂房
28 Ma i n Works hop of Interna l 2304 2304
Combus ti on Engi ne
甲醇装置压缩厂房
29 Compres s i on pl a nt of 1200 2400
metha nol pl a nt
废锅框架
30 800
Wa s te pot fra me
脱硫框架
31 260
Des ul furi za ti on fra mework
合成框架
32 1340
Compos i te fra mework
精馏框架
33 1484
Di s ti l l a ti on Fra me
锅炉给水泵房
34 Boi l er Feed Wa ter Pump 450 450
Hous e
甲醇中间罐区泵房
Pumpi ng Hous e for
35 144 144
i ntermedi a te ta nk of
metha nol
甲醇中间罐区泡沫消防站
Foa m fi re s ta ti on i n
36 82.5 82.5
i ntermedi a te ta nk of
metha nol
甲醇成品罐区泵房
37 Pumpi ng Hous e of Metha nol 374 374
Product Ta nk Area
甲醇成品罐区泡沫消防站
38 Foa m fi re s ta ti on for 342 342
metha nol product ta nk a rea
甲醇精馏泵房
39 Metha nol di s ti l l a ti on pump 810 810 暂定Hol d
hous e
门卫3
40 20 20
Gua rd hous e3
海水预处理及淡化(包括加药间
、污泥脱水间、海水淡化厂房
、海水淡化泵房)
Sea wa ter pretrea tment
41 works hop (i ncl udi ng dos i ng 2898 2898
room a nd Sl udge wa ter
trea tment room, s ea wa ter
des a l i na ti on pl a nt a nd
pump hous e)
污水处理及回用水处理厂房
(包括泵房、加药间、鼓风机
房、贮药间)
Sewa ge Trea tment Sta ti on
42 a nd Reus e Wa ter Trea tment 981 981
pl a nt (Incl udi ng pump
hous e, dos i ng room, Bl ower
room a nd Drug s tora ge
room)
水处理机柜间
43 Water treatment ca bi net 200 200 暂定Hol d
room
水处理变电所
44 288 576
Wa ter trea tment s ubs ta ti on
门卫4
45 20 20
Gua rd hous e4
海水取水泵站
46 Sea wa ter i nta ke pump 288 288
s ta ti on
码头装船机柜间
47 70 70 暂定Hol d
Dock l oa di ng ca bi net room
码头变电所
48 50 100
Wha rf s ubs ta ti on