QUALITY CONTROL PROJECT

Gamuda Berhad INSPECTION CHECKLIST RSKUSCV

PHASE: Document Ref.: PD-CL-021-1


PRECAST PANEL
BLOCK NO.: RFI No:
UNIT NO.:
INSTALLATION Received By:
CHECKLIST Date: Time:

Location: Effective Date: 1/12/02 Rev. 0 Page 1 of 1

Item Inspection Attributes GB PKNS Consultant

(Representative's name in block letter)


Pass Fail Pass Fail Pass Fail

1 PRE-ERECTION

a Tools & Equipment (Drills, Auto-level, Brackets, Bolts) and Temporary Props

b Survey Reference Lines and Level Marks

c Location and Conditions of Corrugated Pipe Sleeves

d Shim Plate Level

e Backer Rods and Waterproofing Strip Position

2 INSTALLATION

a Setting Out and Position of elements (Verticality/Alignment/Level)

b Adequacy of Temporary Supports

c Grouting Work (Check Mix Ratio)


* Horizontal Joints
* Corrugated Pipe Sleeve Connection (Vertical Joints)

d Joint and Connection Details (Rebar Connections/Weld Connection


/Cast in-situ Joint Connection)

e No Visible Crack or Damage

(Representative's name in block letter)


Pass Fail Pass Fail Pass Fail
Final Inspection
Review of all records including required test results

Reason for Failure or Re-inspection:

Nonconformance Report raised during inspection/ re-inspection YES NO NCR No.:

Signature of Contractor Rep: Date: Time:

Full name in block letters:

Signature of Consultants Rep: Date: Time:

Full name in block letters:

Signature of Others Rep: Date: Time: