1. What is “Black Start” facility in case of GT ?
2. All 33 kV breakers at CPP can be opened from local and remote both when it is
selected to :-
a. Remote mode
b. Local mode
c. Off mode
b. Any mode
a. Islanding of 33 kV board
b. Load shedding
c. Adjustment of generation / load
d. All of above
5. Before actually 33 kV cable Tie is closed at CPP 33 kV board, it’s all required
parameters for synchronizing are checked by
a. A check-synchronizing relay mounted on cable tie breaker
automatically
b. The operating personnel through 7SJ600 relay mounted on
cable tiebreaker
c. SE (power generation & distribution) on EDMS
d. None of these
De-Engg-2004-APO-CPP_Elect Confidential 1
7 Incase of failure of UPS-B at CPP UPS unit, all load will be transferred to,
a. UPS-A
b. Static bypass UPS-A
c. Static bypass UPS-B
d. Manual Bypass
9. On start command in case of GT # 4 at CPP, its diesel engine starting drive gets
DC power from :-
a. GT # 4 125 V service charger
b. GT # 4 rectifier unit
c. GT # 4 MCC
d. None of these
10. All GT and STG MCC at CPP are having following facility,
a. Manual paralleling
b. Auto change over
c. Both a and b
d. None
11. Under which condition FCB of GT-1 and GT-4 will not open at CPP ?
a. Generator differential operation
b. Over fluxing operation
c. Reverse power operation
d. None
13. Under normal operation of GT (M/C on load), what is the current drawn by its
AOP?
a. 60 Amp
b. 45 Amp
c. 30 Amp
d. Not applicable
De-Engg-2004-APO-CPP_Elect Confidential 2
17. Reduction in oil level of transformer will give alarm through,
a. MOGL
b. OTI
c. WTI
d. Buchholz
18. Balloons in transformer conservator are provided for,
a. Saving transformer oil
b. isolating atmospheric air from oil
c. Pressure control
d. none of above
22. What is the normal operating air pressure of switch yard breakers & what is the cut in pressure of it’s
air compressor?
23. What is the fault level at CPP 132 kV Switch yard bus?
a. 25 kA
b. 40 kA
c. 50 kA
d. 60 kA
24. For connecting two 33 kV boards directly through cables, total number of cable Ties in CPP are: -
a. One
b. Two
c. Three
d. Four
De-Engg-2004-APO-CPP_Elect Confidential 3
25. Earth switch and isolators in CPP 132 kV switchyard are provided with,
a. Electrical Interlock
b. Mechanical Interlock
c. Soft interlock
d. all of above
29. How many trip coils is used in CPP switchyard 132 kV circuit breaker?
a. One
b. Two
c. Three
d. Four
31. In case of earth fault on Bus bar, which protection will operate?
a. Generator E/F
b. Feeder E/F
c. Bus-bar differential Vend
d. none of the above
33. Distance protection for transmission line connecting Reliance at CPP is thorugh :
De-Engg-2004-APO-CPP_Elect Confidential 4
a. RADHD
b. REL 100
c. RADSS
d. RAICA
35. Starting of each GT starting drive (HT drive) in CPP is possible from :
a. DCS
b. LCS place nearby respective drive
c. EDMS
d. None of above
38. Which system among following at CPP while in operation do not need aux oil pump running? (GT,
STG, HP process pump, HHP BFW pump, TFD & IAC).
40. Bus coupler closure at downstream plants are inhibited in case of Load shedding operation through
EDMS from CPP :
a. To help downstream for locating fault
1. To help CPP end for locating fault
2. To help EDMS panel engineer to note down affetced loads
3. None of above
41. What is the basic law which governs CPP 33 kV Bus differential protection?
De-Engg-2004-APO-CPP_Elect Confidential 5
42. Power load shedding priority on CPP EDMS are :
a. 5
b. 10
c. 12
d. none of above
43. How many different types of control supplies are used in CPP MCCs? List out all with location?
45. Both EDG sets will start in auto in case of total power failure by sensing :-
a. U/V ON 6.6 kV bus of S/S 961-10
b. U/V ON 6.6 kV bus of MRS-1
c. U/V ON 6.6 kV bus of MRS-2
d. U/V ON 33 kV bus of MRS-1
De-Engg-2004-APO-CPP_Elect Confidential 6
48. 220 V DC system is for the control of :-
a. Steam Turbine controller (Turbolog)
b. Gas Turbine controller (Mk-V)
c. DCS system
d. HT / LT panels & some MCCs
49. For CPP UPS : Both UPS-B and Bypass mains are supplied from,
a. Miscellaneous MCC
b. Black start GT MCCs
c. Directly from PCC
d. Emergency LT system