TURBINE PROTECTIONS (ETS)
TRIP CONDITION ALARM SET POINT TRIP SET POINT
1. Over speed 110% (>=3300 r/min)
2. Axial Displacement (+0.8 mm & -0.8 mm) (+1.0 mm & -1.0 mm)
3. Differential Expansion HP (+9.0 mm & -3.68 mm) (+9.76 mm & -4.45 mm)
4. Differential Expansion LP (+22 mm & -3.50 mm) (+22.76 mm & -4.26 mm)
5. Turbine Shaft Vibration (Absolute ) AVB >= 127 Microns AVB >= 254 Microns
6. Condenser Vacuum-A - >= 0.0313 MPa ( Abs )
7. Condenser Vacuum-B - >= 0.0313 MPa ( Abs )
8. Bearing Oil Pressure LOW - <= 0.042 MPa
9. EH Fluid (Oil) Pressure LOW - <= 9.3 MPa
10. Thrust Bearing Metal Temp HIGH >=99 0C >=103 0C
11. Bearing Metal Temp HIGH >=107 0C >=117 0C
12. Interceptor Stage / HP Exhaust Press Ratio - > 1.73
13. GEN Stator Cooling Water Flow DP - < 152 KPa
14. GEN Trip - -
15. MFT - -
16. PB Trip - -
17. DEH Trip
a) HP Casing Exhaust Temp. - < 428 0C
b) DEH Power Supply Trip
Page 2 of 11
TARGET SPEED = 600 RPM
First Latch The Turbine And Give Command For Target Speed = 600 RPM
Acceleration Rate : 100 RPM/MIN
Hold till Eccentricity Gets Stable Below 0.076 mm
Hold Time
Hold till IP Blade Ring Temp > 121 °C
VALVE POSITIONS FOR SPEED = 600 RPM
Main steam valve TV FULL CLOSED
Governing steam GV FULL OPEN IN SINGLE VALVE MODE
SHALL OPERATE TO GOVERN THE FLOW AND THUS
RH governing steam valve IV
CONTROL ROTATING SPEED (110% OPEN)
RH main steam valve RSV OPEN
HPC exhaust vent valve HEV OPEN
CRH NRV CLOSED
HP drain valve OPEN
IP drain valve OPEN
MS Inlet Vent Valve CLOSED AT 600 RPM
LP exhaust water spray valve CLOSED
HP bypass valve HPBP OPEN TO MAINTAIN REQUIRED REHEAT PRESS
LP bypass valve LPBP OPEN TO MAINTAIN REQUIRED REHEAT PRESS
FRICTION TEST
TRIP THE TURBINE FOR FRICTION TEST AT: 600 RPM
After 5 Mins the speed should not be less than 150 RPM, for Friction Test to be OK
THEN RELATCH AND GO FOR TARGET SPEED: 600 RPM
Page 3 of 11
HP CASING TEMP Greater than 150 °C
FIRST STAGE METAL TEMP Greater than 150 °C
IP BLADE RING TEMP Greater than 200 °C
JOP TO BE STOPPED IN AUTO 2300 RPM
H.P to I.P Casing Steam Flow Distribution Ratio 1.0 : 1.5
VALVE POSITIONS FOR SPEED = 2350 RPM
STARTS TO OPEN AFTER 600 RPM TO CONTROL THE
Main steam valve TV
ROTATING SPEED
Governing steam GV FULL OPEN IN SINGLE VALVE MODE
SHALL OPERATE TO GOVERN THE FLOW AND THUS
RH governing steam valve IV
CONTROL ROTATING SPEED (110% OPEN)
RH main steam valve RSV OPEN
HPC exhaust vent valve HEV OPEN
CRH NRV CLOSED
HP drain valve OPEN
IP drain valve OPEN
MS Inlet Vent Valve CLOSED
LP exhaust water spray valve IN SERVICE AT 2600 R/MIN
HP bypass valve HPBP OPEN TO MAINTAIN REQUIRED REHEAT PRESS
LP bypass valve LPBP OPEN TO MAINTAIN REQUIRED REHEAT PRESS
Page 4 of 11
VALVE POSITIONS FOR SPEED = 2950 RPM
Control the Rotating Speed and hold at the Rotating
Speed of TV/GV valve switching, full open after the
Main steam valve TV
Governing Valve is closed and 30r/min speed drop is
caused.
Start to close and control the speed after 30r/min of
Governing steam GV
speed drop
RH governing steam valve IV HOLD
RH main steam valve RSV OPEN
HPC exhaust non return valve NRV OPEN
CRH NRV CLOSED
HP drain valve OPEN
IP drain valve OPEN
MS Inlet Vent Valve CLOSED
LP exhaust water spray valve IN SERVICE
HP bypass valve HPBP OPEN TO MAINTAIN REQUIRED REHEAT PRESS
LP bypass valve LPBP OPEN TO MAINTAIN REQUIRED REHEAT PRESS
Page 5 of 11
Turbine Trip value of HP EXHAUST TEMP 427 °C
WARMING UP TIME WITH INTIAL 5% LOAD As Per Graph (50 Mins)
HYDROGEN PRESSURE 0.4 Mpa
CRH PRSSURE LESS THAN 0.828 Mpa
VALVE POSTIONS AFTER SYNCHRONIZATION FOR 5% LOAD
Main steam valve TV FULL OPEN
IMMEDIATELY OPEN TO 5% LOAD POSITION AFTER
Governing steam GV
SYNCHRONIZATION (PRESSURE COMPENSATION)
IMMEDIATELY OPEN TO 5% LOAD POSITION AFTER
RH governing steam valve IV
SYNCHRONIZATION (PRESSURE COMPENSATION)
RH main steam valve RSV OPEN
CLOSE WITH 60 SEC DELAY AFTER SYNCHRONIZATION TO
HPC exhaust vent valve HEV
GRID
OPEN WHEN HPC EXHAUST PRESSURE IS GREATER THAN
CRH NRV RH PRESSURE AFTER HPC EXHAUST VENT VALVE IS
CLOSED.
HP drain valve OPEN
IP drain valve OPEN
MS Inlet Vent Valve VVV CLOSED
LP exhaust water spray valve IN SERVICE
HP bypass valve HPBP OPEN TO MAINTAIN REQUIRED REHEAT PRESS
LP bypass valve LPBP OPEN TO MAINTAIN REQUIRED REHEAT PRESS
OPERATING AT LOW STABLE STEAM PRESSURE (LOAD 5% TO 45%)
The MS GV and RH IV start to Open with increase in load
The HP and LP Bypass will start to Close with increase in load
As load increases unit runs at a fixed low MS pressure controlled by the bypass system
VALVE POSTIONS FOR OPERATING AT LOW STABLE STEAM PRESSURE
Main steam valve TV FULL OPEN
Governing steam GV CONTROLLED AT A LOW AND STABLE MS PRESSURE
RH governing steam valve IV NEAR FULL OPEN
RH main steam valve RSV OPEN
HPC exhaust vent valve HEV CLOSE
CRH NRV OPEN
HP drain valve CLOSE AT 10% LOAD
IP drain valve CLOSE AT 20% LOAD
MS Inlet Vent Valve VVV CLOSED
LP exhaust water spray valve CUT OFF AT 15% OF LOAD
HP bypass valve HPBP CLOSE (AT STANDBY MODE)
LP bypass valve LPBP CLOSE (AT STANDBY MODE)
Page 6 of 11
OPERATING AT SLIDING PRESSURE (LOAD > 45%)
Once the optimum value of the GV is reached, Sliding Pressure operation mode will start
The DEH is put into Operator mode or Remote mode according to the need
VALVE POSTIONS FOR OPERATING AT SLIDING PRESSURE
Main steam valve TV FULL OPEN
FIXED AT OPTIMUM VALVE POSITION AND ONLY
Governing steam GV
RESPONDING TO THE CHANGE OF GRID FREQUENCY
RH governing steam valve IV FULL OPEN
RH main steam valve RSV OPEN
HPC exhaust vent valve HEV CLOSED
CRH NRV OPEN
HP drain valve CLOSED
IP drain valve CLOSED
MS Inlet Vent Valve VVV CLOSED
LP exhaust water spray valve CUT OFF
HP bypass valve HPBP CLOSED (AT STANDBY MODE)
LP bypass valve LPBP CLOSED (AT STANDBY MODE)
OPERATING AT RATED PRESSURE (LOAD > 90%)
The steam pressure will reach the rated value in Sliding Pressure mode with increase in Load
The operator can now select Turbine Tracing mode or Turbine Control Mode accordingly
The control of Boiler parameters maintains the Steam at rated Pressure and Temperature
VALVE POSTIONS FOR OPERATING AT RATED PRESSURE
Main steam valve TV FULL OPEN
FEEDBACK CONTROL LOAD WITH PRESSURE AFTER
Governing steam GV GOVERNING STAGE (MS FLOW), IF IT IS NECESSARY, PUT
THE POWER FEEDBACK RETURN PATH IN TO SERVICE
RH governing steam valve IV FULL OPEN
RH main steam valve RSV OPEN
HPC exhaust vent valve HEV CLOSED
CRH NRV OPEN
HP drain valve CLOSE
IP drain valve CLOSE
MS Inlet Vent Valve VVV CLOSED
LP exhaust water spray valve CUT OFF
HP bypass valve HPBP CLOSED (AT STANDBY MODE)
LP bypass valve LPBP CLOSED (AT STANDBY MODE)
Page 8 of 11
Page 9 of 11
The Rotor Warming
period begins after the
IP Inlet Steam
temperature reaches a
minimum of 260 0C.
Page 10 of 11
Page 11 of 11