Professional Documents
Culture Documents
Servicecharges Estimation
Servicecharges Estimation
Servicecharges Estimation
note1: charge for bull dozers bigger than D60 class already contains dismantling and transportation charge for blade,
does not include any charge for ripper dismantling.
note2: charge for WA500 and 980 series already contains dismantling and transportation charge for cabin and bucket.
note3: charge for excavators bigger than PC400 class already contains dismantling and transportation charge for cabin, arm and bucket.
When pilot car(s) is required for inland transportation, extra charge will be added on aforesaid FOB charge.
In case of special equipment shipment (super long front, high cabin etc.), FOB charge will be estimated every time.
Aforesaid special washing charge is a mere reference. Actual charge depends on condition of units, destination,
requests about cleanliness etc.
2. PARTS HANDLING CHARGE ( parts dismantled from units and items not propelled by themselves )
PER M3 / 1,000 kgs JPY 4,000
In case transportation for parts can be arranged with machines together, no transportation fee accrues.
In case separate tranportation for parts is required, transportation fee accrues.
*************************************************************************************************************************************************
3. FOB CHARGE AND TERMINAL HANDLING CHARGE FOR CONTAINER SHIPMENT
FOB CHARGE THC
20 FT JPY 90,000 JPY 35,000
40 FT JPY 120,000 JPY 47,000
In case net weight exceeds 18,000 kgs (20ft container) or 20,000 kgs (40ft container),
heavy cargo charge JPY 5,000 accrues for hiring tri axle chassis.
*************************************************************************************************************************************************
4. OTHER CHARGE
DOCUMENTATION FEE: JPY 3,000/ 1 B/L
RADIATION INSPECTION FEE: JPY 3,000 / 1 UNIT