11 - D6b - PENYELIA-BORANG PENILAIAN DRAF AKHIR PSM II DAN BUKU LOG - SEPT 2015

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

D6b – Borang Penilaian Draf Akhir PSM II dan Buku Log (Penyelia) Versi 2/2015


FAKULTI KEJURUTERAAN MEKANIKAL DAN PEMBUATAN
UNIVERSITI TUN HUSSEIN ONN MALAYSIA

BORANG PENILAIAN DRAF AKHIR PSM II DAN BUKU LOG


EVALUATION FORM FOR PSM II FINAL DRAFT AND LOG BOOK
Nama Penyelia:
Supervisor Name
Nama Pelajar:
Student Name
No. Matrik:
Matrix Nr.
Tajuk PSM:
PSM Title
Semester / Sesi 2/2018/2019
Semester / Session

(1) Penilaian Draf Akhir (Final Draft Evaluation): 50 %

Rating
Bil. Item pemarkahan Pemberat Markah
(1-5)
Abstrak
1 1
Abstract
Pengenalan, objektif dan skop kajian
2 2
Introduction, objective and scope of project
Kajian literature dan teori
3 3
Literature review and theories
Metodologi kajian
4 3
Research methodology
Keputusan
5 1
Result
Perbincangan dan analisa
6 3
Discussion and analysis
Kesimpulan dan cadangan
7 2
Conclusion and recommendation
Rujukan
8 1
References
Pencapaian objektif kajian
9 1
Fulfillment of research objectives
Kreativiti, inovatif dan nilai komersil
10 1
Creative, innovative and has commercial value
Tatabahasa dan penggunaan bahasa
11 2
Grammar and usage of language
Jumlah
Total

1/2
D6b – Borang Penilaian Draf Akhir PSM II dan Buku Log (Penyelia) Versi 2/2015

FAKULTI KEJURUTERAAN MEKANIKAL DAN PEMBUATAN


UNIVERSITI TUN HUSSEIN ONN MALAYSIA

(2) Penilaian Buku Log (Log Book Evaluation): 10 %

Rating
Bil. Item pemarkahan Pemberat Markah
(1-5)
Frekuensi pengumpulan data
1 1
Frequency of data collection
Releven maklumat
2 1
Relevance of information
Sikap dan keazaman pelajar
3 1
Student determination
Jumlah
Total

(3) Penilaian Lestari (Sustainable Evaluation): 5 %

Rating
Bil. Item pemarkahan Pemberat Markah
(1-5)
Elemen Kelestarian
1 1
Elements in Sustainability
Konsep Pembangunan Lestari
2 1
Concept of Sustainable Development
Impak Penyelesaian Kejuruteraan pada
Pembangunan Lestari
3 1
Impact of Engineering Solution to
Sustainable Development
Peningkatan Kualiti Hidup
4 1
Improvement of Quality of Life
Jumlah
Total

Tandatangan penyelia: __________________________ Tarikh: ______________


Supervisor signature Date

2/2

You might also like