The MOW current procurement (as shown Figure-3) BIM Overlay to the RIBA Outline Plan of Works

RIBA Work Stage Core BIM Activities


should study in the area of present nature of • Identify client's Business Case and Strategic Brief and other core
project requirements.
•Initial assembling the project team.
information and its flow, supply chain management •Establish Project Programme.

thinking of the Government Organization (GO). For 0 Strategic Definition •Prepare pre-application discussion.
•Review Feedback from previous projects.
• Exchange information strategic brief.
the process of the adaptation, soft innovative methods • Drop data 0
•Implication of BIM, extent of BIM level 4D(Time), 5D(Cost)
on the cloud, big data engineering management, and 6D(FM) following software assessment.
•Advise client on integrated Team scope of service in totally and
process innovation will enhance to the MOW (Arayici for each designer including requirements for specialist and
appointment of a BIM Model Manager(KEO).
et Al., 2012). Novak et al. (2008) finding showed that •Define long-term responsibilities, including ownership of model.

there three predominant themes that are organizational 1 Preparation •Define BIM inputs and outputs and scope of post-occupancy
evaluation (Soft Landings).
•Identify scope of and commission BIM surveys and investigation
culture, education and training and information reports.
• Data drop 1
management. BIM adaptation for an institution should
disclose its impact on organization asset, personal, and • BIM pre-start meeting.
•Initial model sharing with Design Team for Strategic analysis and
organization’s use of technologies (Tekes, 2008). optional appraisal
•BIM data used for environmental performance and area analysis.
Arayici et al. (2012) concluded that BIM adaptation
2
•Identify key model elements and crate concept level parametric
Concept Design
objects for all major elements.
strategy should be adequate, and the centred employ • Enable design team access to BIM data.
• Agree extent of performance specified work.
human, and big data process-driven methodologies, •Data drop 2

and when considering technology, it is about people • Data sharing and integration for design co-ordination and
detailed analysis including data links between models.
and process. Moreover, the implementation should 3 Developed Design •Integration/ development of generic/bespoke design components.
•BIM data used for environmental performance and area analysis.
•Data sharing of design coordination, technical analysis and
have clear mission and vision on the BIM life cycle additional of specification data.
• Export data for Planning Application.
and BIM Overlay to the RIBA POW and its data • 4D and/or 5D assessment.

collection procedures and protect them when it 4 Technical Design • Data Drop 3 & 4

necessary use giving authority and responsibility to the •Export data for Building control analysis.
•Data sharing for construction of analysis co-ordination and
project authorized team members. detailed analysis with subcontractors.
•Detailed modelling, integration and analysis.
•Create production level parametric objects for all major
elements.
•Embed specification to model.
5 Specialist Design •Final review and sign off of model.
•Enable access to BIM model to contractor(s).
•Integration of subcontractor performance specified work model
information into BIM model data.
•Review construction sequencing (4D) with contractor.
•Data drop 5.

•Agree timing and scope of 'Soft Landings'


•Co-ordinate and release of 'End of Construction' BIM record
Construction (Offsite model data.
6 and Onsite •Use of4D/5D BIM data for contract administration purposes.
•Data drop 6.

•FM BIM model data issued as asset changes are made.


• Study of parametric object information contained within BIM
model data.
7 Use & Aftercare
•Data drop 7.

Figure 7: BIM Overlay to the RIBA Plan of Work (RIBA,


2013).