PROCESSES &
DOCUMENT
HANDINGOVER
STRATEGIC DEFINITION PREPARATION & BRIEF CONCEPT DESIGN PROPOSE DESIGN TECHNICAL DESIGN CONSTRUCTION IN USE
& CLOSEOUT

BIM-P BIM-P

REVISED EIR REVISED EIR


EIR EIR (DESIGN) (CONSTRUCTION)

OIR AIR ERs ERs COBie COBie

DESIGN TEAM PRE-CONTRACT DESIGN TEAM PRE-CONTRACT

BIM DOCUMENTATIONS
PROPOSAL BEP PROPOSAL BEP

POST- POSR-CONTRACT BEP POSR-CONTRACT BEP


CONTRAC (REVISED FOR DESIGN) (REVISED FOR DESIGN)
T BEP

PIP PIP PIP PIP


PIR
MIDP MIDP
RM MIDP RM MIDP RM RM

TIDP TIDP
TIDP TIDP
SOFT LANDING FRAMEWORK

LEAN-KAIZEN MEETINGS, LAST PLANNER SYSTEM, 5 WHYs, TARGET VALUE DESIGN, CONTINUAL IMPROVEMENT, ELIMINATE WASTE, CREATE VALUE

RIBA PLAN OF WORK/ NBS DIGITAL PLAN O WORK / NBS TOOLKIT

BIM LEVEL 2 STANDARDS


ISO 19650-1:2018 ISO 19650-2:2019

PAS 1192-3:2007+A2:2016

PAS 1192-3:2014

PAS 1192-4:2014

PAS 1192-5:2015

BS 8536-1:2015 / BS 8536-2:2016

ISO 55000:2014 / ISO 55001:2014 / ISO 55002:2018

TENDER / CONTRACT AWARD EMPLOYER DOCUMENT DESIGN DOCUMENT CONTRACTOR DOCUMENT FACILITY MANAGEMENT DOCUMENT