Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

FLAMINGO FASHIONS LIMITED (LINGERIE)

Operation Bulletin (Production Guide Line)


Buyer: Lee Cooper Total SMV: 5.09 Total Manpower: 26 Target @60% 183.89 CM Tk.
Item: Mens Boxer Machine SMV: 4.23 Total Machine: 22 Target @50% 153.24
Order No: Manual SMV: 0.86 Target @100% 306 Cycle Time 0.20 Target
STYLE No: LC 2671/2681 Total Operator: 22.00 Target @80% 245 Prepared on: 2-Dec-19
Fabrication: Total Helper: 4.00 Target @70% 215 Prepared By: Aminur

Seam Target Shorta


OP Thread Req. Req. Target Total
NO.
M/C Type Operation Description Work-Aid Needle Type SPI allowance
Type
Trims(mm) SMV
M/C Man
@100
@80% Target
ge / TML
(mm) % Excess

1 2N/4T/OL Make pouch DC-9 0.40 2 2 150 120 240 -5 1

2 2N/4T/OL Attach front bottom leg panel with pouch(L&R) DC-9 0.48 2 2 125 100 200 -45 1

Top stitch pouch & front bottom leg panel with


3 3N/5T/FL UY-9 0.45 2 2 133 107 213 -32 1
pouch(L&R)
4 2N/4T/OL Attach front part with side panel(L&R) DC-9 0.40 2 2 150 120 240 -5 1

5 3N/5T/FL Top stitch front part with side panel(L&R) UY-9 0.32 2 2 188 150 300 55 1

6 2N/4T/OL Join back part with front part DC-9 0.40 2 2 150 120 240 -5 1

7 3N/5T/FL Top stitch to back part with front part UY-9 0.32 2 2 188 150 300 55 1

8 2N/4T/OL Join inseam panel DC-9 0.27 1 1 222 178 178 -67 1

9 3N/5T/FL Top stitch to inseam panel UY-9 0.24 1 1 250 200 200 -45 1

10 1N/2T/EBT Make waist elastic ring DP-11 0.18 1 1 333 267 267 21 1

11 HP Mark waist elastic ring 0.16 1 375 300 300 55 1

12 3N/4T/FL Attach elastic to waist UY-11 0.24 2 2 250 200 400 155 1

13 1N/2T/SN Attach label to waist DB-9 0.23 1 1 261 209 209 -36 1

14 2N/3T/FL Hemming to leg (L&R) UY-9 0.30 2 2 200 160 320 75 1

15 HP Trim excess thread from body and label Trimmer 0.70 3 86 69 206 -39 1
Total 5.09 22.00 26.00 12 9 245 0 15

Machine Summary
M/C 2N/4T/OL 3N/5T/FL 1N/2T/EBT 3N/4T/FL 1N/2T/SN 2N/3T/FL TTL M/C TTL HP TTL

SMV 1.95 1.33 0.18 0.24 0.23 0.30 4.23 0.86 5.09

QTY 9 7 1 2 1 2 22 4 26

Work-Study Sample Quality MPD Technician Production


FLAMINGO FASHIONS LIMITED (LINGERIE)
TTL M/C OPERATOR HELPER MANPOWER M/C SMV: MN SMV TTL SMV
SEWING MACHINE 22 22 4 26 4.23 0.86 5.09
LAYOUT
100% SMV
BUYER ORDER NO ITEM SEWING INPUT DATE SEWING START SEWING FINISH PITCH TIME 80% SMV TARGET
TGT:

Lee Cooper LC 2671/2681 Mens Boxer 0.23 306 245

2N/4T/OL 3N/5T/FL 1N/2T/EBT 3N/4T/FL 1N/2T/SN 2N/3T/FL TOTAL


9 7 1 2 1 2 22

LINE NO. 12 DATE: May 8, 2020


END TABLE

Operation SMV Target M/C M/C Target SMV Operation

Hemming to leg (L&R) 0.3 200 2N/3T/FL


14 14 2N/3T/FL 200 0.3 Hemming to leg (L&R)

Operation SMV Target M/C M/C Target SMV Operation

Attach elastic to waist 0.24 250 3N/4T/FL


12 13 1N/2T/SN 260.87 0.23 Attach label to waist

Operation SMV Target M/C C M/C Target SMV Operation


10 e 12
Make waist elastic ring 0.18 333.3 1N/2T/EBT n 3N/4T/FL 250 0.24 Attach elastic to waist
t
r
Operation SMV Target M/C M/C Target SMV Operation
e
Top stitch to inseam panel 0.24 250 3N/5T/FL
9 8 2N/4T/OL 222.22 0.27 Join inseam panel
T
a
Operation SMV Target M/C
b Target SMV Operation

Top stitch to back part with front part 0.32 187.5 3N/5T/FL
7 l 7 3N/5T/FL 187.5 0.32 Top stitch to back part with front part
e

Operation SMV Target M/C M/C Target SMV Operation

Join back part with front part 0.4 150 2N/4T/OL


6 C 6 2N/4T/OL 150 0.4 Join back part with front part
e
n
Operation SMV Target M/C t M/C Target SMV Operation
5 r 5
Top stitch front part with side panel(L&R) 0.32 187.5 3N/5T/FL e 3N/5T/FL 187.5 Top
0.32 stitch front part with side panel(L&R)

T
Operation SMV Target M/C M/C Target SMV Operation
a
Attach front part with side panel(L&R) 0.4 150 2N/4T/OL
4 b 4 2N/4T/OL 150 0.4 Attach front part with side panel(L&R)
l
e
Operation SMV Target M/C M/C Target SMV Operation

titch pouch & front bottom leg panel with pouch(L&R)


0.45 133.3 3N/5T/FL
3 3 3N/5T/FL 133.33 0.45
Top stitch pouch & front bottom
leg panel with pouch(L&R)

Operation SMV Target M/C M/C Target SMV Operation

Attach front bottom leg panel with pouch(L&R)


0.48 125 2N/4T/OL
2 2 2N/4T/OL 125 0.48
Attach front bottom leg panel with
pouch(L&R)

Operation SMV Target M/C M/C Target SMV Operation

Make pouch 0.4 150 2N/4T/OL


1 1 2N/4T/OL 150 0.4 Make pouch

INPUT TABLE

Work-Study MPD Production


Photo Sample

You might also like