The document contains two tables that are used for tracking work center performance. Table 1 is a work center check sheet that records status information like machine, tool, and material details. Table 2 is a work center output sheet that logs order details, run times, output quantities, material usage, defects, and other production metrics. Together these forms provide a way to monitor key production data and resources at the work center level.
The document contains two tables that are used for tracking work center performance. Table 1 is a work center check sheet that records status information like machine, tool, and material details. Table 2 is a work center output sheet that logs order details, run times, output quantities, material usage, defects, and other production metrics. Together these forms provide a way to monitor key production data and resources at the work center level.
The document contains two tables that are used for tracking work center performance. Table 1 is a work center check sheet that records status information like machine, tool, and material details. Table 2 is a work center output sheet that logs order details, run times, output quantities, material usage, defects, and other production metrics. Together these forms provide a way to monitor key production data and resources at the work center level.
Work Center Check Sheet Work Center No. Number of Machine Power Status (OK/Not OK) Ite Dat Tim Orde Output Remark m e e r No. Machin Tool Opt Materia No. Eng dr e s r l
Tabel 2. Work Center Output Sheet
Work Center Output Sheet Work Center No. Number of Machine Power Resource Record Ite Time Opt Remar Dat Orde Output Material m r k e r No. No. Star Finis Accep Defec Use Wast t h t t d e