Cement Proposal Program

Well : TFT‐473 /  TP211

BASSIN: IN AMENAS

Prepared For

Sonatrach Division Forage


Hassi Messaoud

Date Prepared by (Cementing Engineer) Validation by (Lead Engineer)

11/05/2019 K. IDIR A. BLOUAD

Technical Department
HASSI MESSAOUD 
Cementing Program

SH FORAGE

Job Number : 19-0418-001

Well : TFT-473
Rig : TP-211

13"3/8 Casing with Stinger

Code formulation:
Spacer SC6
Slurry LQ1
Tail Slurry LQ10

Prepared by
Validation by
Revision Date Comments Cementing
Lead Engineer
Engineer
00 11/05/2019 Proposal K. IDIR A. BELOUAD

Imp.011.Eng/V.01
Job number : 19‐0418‐001
Prepared for : SH FOR 
Well / Rig: TFT‐473 TP‐211
Casing 13"3/8 Casing with Stinger
Revision : 00
Date : 11/05/19

 1. WELL SCHEMATIC  2. FLUIDS
Density Volume
Top mud 0 m kg/lt lbs/gal m3 cu ft bbl
Tail Slurry 0 m  Mud (WBM) 1,05 8,76
Preflush 1,00 8,34 5 176,6 31,4
Slurry (LQ1) 1,90 15,85 6,6 233,1 41,5
Displacement 1,05 8,76 0,3 10,3 1,8

 3. CAPACITIES
lts/m cu ft/m bbl/m
 5" DP G105 (19,5 #/ft) 9,05 0,320 0,057
 13 3/8" Csg (54,5#/ft) 80,64 2,848 0,507
 Annulus 17,5" OH x 13 3/8" Csg 64,40 2,274 0,405
17"1/2  OH + Excess Tail 100% OH 128,80 4,549 0,810

 Toc Inner string 32 m

 4. TEMPERATURE

BHST =
BHST = 35 °C
C 86 °FF
 13 3/8" F‐S 50 m BHCT = 30 °C 95 °F
 Job number : 19‐0418‐001
 Prepared for : SH FOR 
 Well / Rig: TFT‐473 TP‐211
 Casing 13"3/8 Casing with Stinger
 Revision : 00
 Date : 11/05/19

5. FLUID VOLUME CALCULATIONS

Capacity Depth Range (m) Height Volume


(lts/m) Top Bottom (m) (m3) (bbl)
Tail Slurry 1,90 kg/lt
Annulus 17"1/2 OH x 13 3/8" Csg 128,80 0 50 50 6,4 40,51
Inside 5" DP 9,05 32 50 18 0,16 1,01
Total Volume 6,6 41,52

Displacement Volume
S f i
Surface ‐ Toc Inner string 9 0
9,05 0 32 32 00,3
3 83
1,83
Total Volume 0,3 1,83

6. HYDROSTATIC PRESSURE AFTER DISPLACEMENT

Volume Depth Range (m) Density Hydrostatic Pressure


Fluids Outside Casing (m3) Top Bottom 0 (psi) (EMW)
Slurry (LQ1) 6,4 0 50 1,90 135 1,90

Fluids Inside Casing
Mud 0,3 0 32 1,05 48 1,05
Slurry (LQ1) 0,16 32 50 1,90 96 1,35

Hydrostatic Differential Pressure (External Pressure ‐ Internal Pressure) 39 0,55

7. FLUID RHEOLOGY

Viscosity / PV Ty
Fluid Rheological Model
(cp) (lbf/hsqft)
Mud Bingham Plastic
Preflush Newtonian 2 0
Slurry (LQ1) Bingham Plastic 66 18
Job number : 19‐0418‐001
 Prepared for : SH FOR 
 Well / Rig: TFT‐473 TP‐211
 Casing 13"3/8 Casing with Stinger
 Revision : 00
 Date : 11/05/19

 8. FLUID COMPOSITION & PRODUCT REQUIREMENT

Metric API

 Preflush : 1,00 kg/lt Volume: 5 m3 62,9 bbl


  Additve Description Unit per m3 Total Unit per bbl Total
 Water Fresh Water m3 1 5 gal 42,0 2641,7

Slurry (LQ1) 1,90 kg/lt Volume: 6,6 m3 233,1 cuft


  Additve Description Unit per Ton Total Unit per Sack Total
 Cement HSR "G" Ton 1 8,7 Sack 1 203,2
 Water Fresh Water m3 0,446 3,9 gal 5,0 1020,6
 D42L Defoamer lts 1 8,7 gal 0,01 2,3

Yield cement slurry  0,762 m3/Ton 1,147 cuft/sk


Yield mixing Water 0,448 m3/Ton 0,674 cuft/sk
Total Mixing Water volume 3,9 m3 24,4 bbls

 Total Product Requirement Metric API


  Product Unit Quantity Unit Quantity
 Cement HSR "G" Ton 8,7 sack 331,5
 Fresh Water m3 8,9 bbl 55,7
 D42L lts 8,7 gal 2,3
 Fibrin 23 kgs 13 gal 29
Job number : 19‐0418‐001
Prepared for : SH FOR 
Well / Rig: TFT‐473 TP‐211
Casing 13"3/8 Casing with Stinger
Revision : 00
Date : 11/05/19

9. PUMP SCHEDULE

Volume Rate Time


Stage Description (m3) (lts/min) (min)
1 Pump Fresh Water 0,5 500 1
2 Pressure Test Lines @ 3000 psi  10
3 Pump preflush 5 800 6
4 Pump Slurry 6,6 600 11,0
5 Start Displacement With Unit pump  0,3 200 1,5
6 Unset string & POOH 30

Total Job Time  (hours:minutes) 00:59


Total Lead Slurry Time  (hours:minutes) 00:42
Total Tail Slurry Time (hours:minutes) 00:48

Recommendations

1‐ Add Febrin in lead slurry and tail slurry with ratio 1,5 Kgs/ m3
2‐ If the Lead slurry come back to the surface start pumping tail slurry

3‐ A Top Job is recommended if the cement slurry does't come back to surface or slurry level dropped on

10. LABORATORY ANALYSIS
Lead Tail Temp
Slurry Slurry °C

Thickening Time To 40 Bc (minutes) #REF! 255 30


30
Thickening Time To 40 Bc (hours:minutes) #REF! 04:15 30
30
Thickening Time To 100 Bc (minutes) #REF! 275 30
30
Thickening Time To 100 Bc  (hours:minutes) #REF! 04:35 30
30
Safety Margin   (hours:minutes) #REF! 03:26 30

24 Hour Compressive Strength  (psi) #REF! 1600 35


Job Proforma Date : 11/05/2019
Job Number : 19-0418-001

RIG : TP-211 Well: TFT-473 Activity: 13"3/8 Casing with Stinger

Preflush Spacer
Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)

0,00

Lead Slurry Tail Slurry

Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)

0,00 6,60 LQ1 26 400,41 174 276,53

Product added
Measurement
Item Quantity Cost/m3 Total (DZD)
Unit

Service Charge 406 361,85 (DZD)

Total Product Charge 174 276,53 (DZD)

Total added Product Charge 0,00 (DZD)

Total Job estimation Cost 580 638,4 (DZD)


Cementing Program

SH FORAGE

Job Number : 19-0419-001

Well : TFT-473
Rig : TP-211

9"5/8
9 5/8 Casing

Code formulation:
Spacer SC1
Lead Slurry LT2
Tail Slurry LQ2

Prepared by
Validation by
Revision Date Comments Cementing
Lead Engineer
Engineer
00 11/05/2019 Proposal K. IDIR H. BELOUAD

Imp.011.Eng/V.01
Job number : 19-0419-001
Prepared for : SH FOR
Well / Rig: TFT-473 TP-211
Casing : 9"5/8 Casing
Revision 00
Date : 11/05/19

1. WELL SCHEMATIC 2. FLUIDES


Density Volumes
Top Mud 0 m kg/lt lbs/gal m3 cu ft bbl
Mud (OBM) 1,05 8,76
Spacer(SC1) 1,20 10,01 8 282,5 50,3
13 3/8" Csg Sabot 50 m Lead Slurry (LT2) 1,58 13,18 19,9 703,6 125,3
Tail Slurry (LQ2) 1,90 15,85 4,5 158,5 28,2
Displacement (OBM) 1,05 8,76 24,2 855,9 152,4

3. CAPACITIES
lts/m cu ft/m bbl/m
9 5/8" Csg (36#/ft) 40,33 1,4241 0,2536
12" 1/4 Open Hole Annulaire 13 3/8" Csg x 9 5/8" Csg (36#/ft) 33,69 1,1899 0,2119
Annulaire 12 1/4" OH x 9 5/8" Csg 32 1,1301 0,2013
+ Excess Lead OH 0% 32,00 1,130 0,201
+ Excess Tail OH 0% 32,00 1,130 0,201

Top Tail Slurry 525 m


4. TEMPERATURES

BHST = 46 °C 115 °F
9 5/8" Anneau 601 m BHCT = 38 °C 100 °F
9 5/8" Sabot 625 m Gradient = 2,90 °C/100m

Page 1
Job number : 19-0419-001
Prepared for : SH FOR
Well / Rig: TFT-473 TP-211
Casing : 9"5/8 Casing
Revision 00
Date : 11/05/2019

5. FLUID VOLUME CALCULATIONS

Capacity Interval (m) Height Volume


Lead Slurry (LT2) 1,58 kg/lt (lts/m) Top Bottom (m) (m3) (bbl)
Annulaire 12 1/4" OH x 9 5/8" Csg 20% 32,00 50 525 475 18,2 114,73
Annulaire 13 3/8" Csg x 9 5/8" Csg (47#/ft) 33,69 0 50 50 1,7 10,60
Total Volume 19,9 125,3

Tail Slurry (LQ2) 1,90 kg/lt


Annulaire 12 1/4" OH x 9 5/8" Csg 10% 32,00 525 625 100 3,5 22,14
FC-FS volume 40,33 601 625 24 1,0 6,09
Total Volume 4,5 28,2

Displacement
p Volume
Surface to FC 40,33 0 601 601 24,2 152,44
Total Volume 24,2 152,4

6. HYDROSTATIC PRESSURE AFTER DISPLACEMENT

Volume Interval (m) Density Hydrostatic Pressure


Fluides Exterieur Casing (m3) Top Bottom kg/lt (psi) (EMW)
Lead Slurry (LT2) 19,9 0 525 1,58 1180 1,6
Tail Slurry (LQ2) 3,5 525 625 1,90 1451 1,6

Fluides Interieur Casing


Mud (OBM) 24,2 0 601 1,05 898 1,1
Tail Slurry (LQ2) 1,0 601 625 1,90 963 1,1

Hydrostatic Differential Pressure (Exterior - Interior) 488 0,549

7. FLUID RHEOLOGY

Viscosity / PV Ty
Fluid Rheological Model
(cp) (lbf/100 ft²)
Mud (OBM) Newtonian 12 16
Spacer(SC1) Newtonian 25 8
Lead Slurry (LT2) Bingham Plastic 33 19
Tail Slurry (LQ2) Bingham Plastic 78 16

Page 2
Job Number : 19-0419-001
Prepared for : SH FOR
Well / Rig : TFT-473 TP-211
Casing : 9"5/8 Casing
Revision : 00
Date : 11/05/2019

8. FLUID COMPOSITION & PRODUCT REQUIREMENT

Metric API

Spacer(SC1) 1,20 kg/lt Volume 8,0 m3 Volume 50,3 bbl


Additive Description Unité per m3 Total Unité par bbl Total
Water Eau douce m3 0,906 7,25 gal 38,05 1448,0
D-42L Anti Mousse lts 1 8 gal 42,00 1598,2
(GW22) Xanthan Gum Agent Gelifiant kgs 3 24 lbs 1,05 40,0
Barite Alourdissant kgs 266 2128 lbs 93,10 3542,6
MCSB Surfactant lts 25 200 gal 1,05 40,0
Lead Slurry (LT2) 1,58 kg/lt Volume 19,9 m3 Volume 703,6 cu ft
Additive Description Unit per Ton Total Unit par bbl Total
Cement LAFARGE "G"HSR Ton 1 16,54 Sack 1 387,8
Water Fresh Water m3 0,874 14,5 gal 9,84 3817,8
D-42L Foam Preventer lts 1 16,5 gal 0,011 4,4
Bentonite Extender kgs 20 330,7 lbs 1,9 729,1
FL-52 Fluid Loss Control kgs 5 82,7 lbs 0,5 182,3
R-12L Retarder lts 4,50 74,4 gal 50,69 19657,0

Yield cement slurry 1,205 m3/Ton 1,814 cuft/sk


Yield mixing water 0 891
0,891 m3/Ton 1 341
1,341 cuft/sk
Total mixing water 14,73 m3 92,6 bbls

Tail Slurry (LQ2) 1,90 kg/lt Volume 4,49 m3 Volume 287,9 cu ft


Additive Description Unit per Ton Total Unit par bbl Total
Cement LAFARGE "G"HSR Ton 1 5,88 Sack 1 250,6
Water Fresh Water m3 0,442 2,6 gal 4,98 1247,5
D-42L Defoamer lts 1 5,9 gal 0,011 2,8
FL-32 ( Polytrol ) Fluid Loss Control kgs 3 17,6 lbs 0,282 70,7
R-12L Retarder lts 3,0 17,6 gal 33,79 13104,6

Yield cement slurry 0,763 m3/Ton 1,149 cuft/sk


Yield mix water 0,449 m3/Ton 0,675 cuft/sk
Mix water total volume 2,6 m3 16,6 bbls

Total Product Requirement Metric API


Products Unit Quantity Unit Quantity
Cement LAFARGE "G"HSR Ton 22,4 Sack 250,6
Water m3 24,3 bbl 52,9
D-42L lts 30,4 gal 1605,4
Bentonite kgs 330,7 lbs 729,1
FL-52 kgs 82,7 lbs 182,3
FL-32 ( Polytrol ) kgs 17,6 lbs 70,7
R-12L lts 92,1 lbs 32761,6
(GW22) Xanthan Gum kgs 24 lbs 40,0
MCSB lts 200,0 gal 40,0
Barite kgs 2128,0 lbs 3542,6
Fibrin 23 kgs 22,4 lbs 250,6

Page 3
Job number : 19-0419-001
Prepared for : SH FOR
Well / Rig: TFT-473 TP-211
Casing : 9"5/8 Casing
Revision 00
Date : 11/05/19

9. PUMP SCHEDULE

Stage Description Volume Rate Time


(m3) (lts/min) (min)
1 Pump Fresh Water 0,75 750 1,0
2 Test Lines @ 3000 psi 10
Circulate prior the job 500 150
Batch mixed Lead & Tail slurry 60
3 Pump Spacer 8 500 16
4 Drop Bottom Plug 10
5 Pump lead slurry (already batch mixed) 19,9 500 39,8
6 Pump tail slurry(already batch mixed) 4,5 500 9,0
7 Drop Top Plug 10
8 Start displacemenrt by Rig Pumps 23 300 76,7
9 Continue displacement & reduce rate (With BJSP unit) 1,24 200 6,2
10 Bump pressure plug & test casing 10,0

Total Job Time ((hours:minutes)) 04:08


Total Cement Time Lead Slurry (hours:minutes) 03:57
Total Cement Time Tail Slurry (hours:minutes) 03:57

Recommendations

*If losses occur during the circulation prior to the job, Added the Fibrin 23 with Ratio of 0.3 Kg/m3 for the Lead & Tail Slurries
* Hold Prejob safety Meeting
* The Mix Water & cement need to be brought back to the yard as soon as the job performed.
* The job must be monitored from the beginning until the bump plug and test casing
* After the job make sure to leave the area clean

10. LABORATORY ANALYSIS


Lead Tail Temp Temp
Slurry Slurry °C °F

Thickening Time To 40 Bc (minutes) 435 392 38 100

Thickening Time To 40 Bc (hours:minutes) 07:15 06:32 38 100

Thickening Time To 100 Bc (minutes) 455 395 38 100

Thickening Time To 100 Bc (hours:minutes) 07:35 06:35 38 100

Safety Margin (hours:minutes) 03:17 02:34 38 100

24 Hour Compressive Strength (psi) 900 2800 46 115

Page 4
Job Proforma Date : 11/05/2019
Job Number : 19-0419-001

RIG : TP-211 Well: TFT-473 Activity: 9"5/8 Casing

Preflush Spacer
Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)

0,00 8,00 SC1 34 697,45 277 579,60

Lead Slurry Tail Slurry

Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)

19,92 LT2 24 228,01 482 736,85 4,49 LQ2 45 545,76 204 401,30

Product added
Measurement
Item Quantity Cost/m3 Total (DZD)
Unit

Service Charge 371 707,29 (DZD)

Total Product Charge 964 717,74 (DZD)


Total added Product Charge 0,00 (DZD)

Total Job estimation Cost 1 336 425,0 (DZD)


Cementing Program

SH FORAGE

Job Number : 19-0420-001

Well : TFT-473
Rig : TP-211

7"Casing
7"C i

Code formulation:
Spacer SC6
Lead Slurry LT6G
Tail Slurry LQ12

Prepared by
Validation by
Revision Date Comments Cementing
Lead Engineer
Engineer
00 11/05/2019 Proposal K. IDIR A. BELOUAD

Cover
Job Number : 19-0420-001
Prepared for : SH-FORAGE
Well / Rig : TFT-473 TP-211
Casing : 7"Casing
Revision : #REF!
Date : #REF!

1. WELL SHEMATIC 2. FLUIDS


Density Volume
Top Mud 0 m kg/lt lbs/gal m3 cu ft bbl
Mud (OBM) 1,08 9,01
Spacer (SC6) 1,20 10,01 6 211,9 37,7
Lead Slurry (Surface) (LT6G) 1,25 10,43 20,2 712,2 126,9
Top Spacer 38 m Lead Slurry (Down Hole) 1,28 10,68 19,7 695,5 123,9
Tail Slurry (LQ12) 1,90 15,85 3,0 107,6 19
Displacement (OBM) 1,08 9,01 38,4 1355,1 241

Top Lead Slurry 425 m

3. CAPACITIES
9 5/8" Shoe 625 m lts/m cu ft/m bbl/m
7" Csg (29#/ft) 19,38 0,684 0,122
Annulus 9 5/8" Csg (36#/ft) x 7" Csg 15,50 0,547 0,097
Annulus 8 1/2" OH x 7" Csg 11,73 0,414 0,074
+ Excess LT 0,00% OH 11,73 0,414 0,074
+ Excess LQ 0,00% OH 11,73 0,414 0,074
8 1/2" OH 8 1/2" OH 36,60 1,293 0,230

Top Tail Slurry 1804 m 4. TEMPERATURE

BHST = 88 °C 190 °F
7" F.C 1980,00 m BHCT = 53 °C 127 °F
TD 2004 m T° Gradient = 3,1 °C/100m 1,72 °F/100ft

Page 1
Job Number : 19-0420-001
Prepared for : SH-FORAGE
Well / Rig : TFT-473 TP-211
Casing : 7"Casing
Revision : #REF!
Date : #REF!

5. FLUID VOLUME CALCULATIONS

Capacities Interval (m) Height Volume


Lead Slurry (Down Hole) 1,28 kg/lt (lts/m) Top Bottom (m) (m3) (bbl)
Annulus 7" Csg x 8 1/2" OH + Over Caliper 20% 11,73 625 1804 1179 16,6 104,4
Annulus 7" Csg x 9 5/8" Csg 15,50 425 625 200 3,1 19,5
Total Volume 19,7 123,88

Tail Slurry (LQ12) 1,90 kg/lt


Annulus 7" Csg x 8 1/2" OH + Over Caliper 10% 11,73 1804 2004 200 2,58 16,2
FC-FS 19,38 1980 2004 24 0,5 2,9
Total Volume 3,0 19,16

Displacement Volume
Surface to FC 19,38 0 1980 1980 38,4 241,4
Total Volume 38,4 241,36

6 HYDROSTATIC PRESSURE AFTER DISPLACEMENT


6.

Volume Interval (m) Density Hydrostatic Pressure

Fluides Exterior Casing (m3) Top Bottom (lts/kg) (psi) (EMW)


Mud (OBM) 0,6 0 38 1,08 58 1,08
Spacer 6,0 0 425 1,20 784 1,30
Lead Slurry (Down Hole) 19,7 425 1804 1,28 3295 1,28
Tail Slurry (LQ12) 2,6 1804 2004 1,9 3836 1,35

Fluides Interior Casing


Mud (OBM) 38,4 0 1980 1,08 3043 1,08
Tail Slurry (LQ12) 0,5 1980 2004 1,90 3107 1,09

Hydrostatic Differential Pressure (External Pressure - Internal Pressure) 728,6 0,25552

7. FLUID RHEOLOGY

Pv Ty
Fluids Rheological Model
(cp) (lbf/hsqft)
Mud (OBM) Bingham Plastic 14 14
Spacer (SC6) Bingham Plastic 8 4
Lead Slurry (Surface) (LT6G) Bingham Plastic 46,5 13,5
Tail Slurry (LQ12) Bingham Plastic 85,5 16,5

Page 2
Job Number : 19-0420-001
Prepared for : SH-FORAGE
Well / Rig : TFT-473 TP-211
Casing : 7"Casing
Revision : #REF!
Date : #REF!

8. FLUID COMPOSITION & PRODUCT REQUIREMENT

Metric API

Spacer (SC6) 1,20 kg/lt Volume 6,0 m3 Volume 37,7 bbl


Additif Description Unit par m3 Total Unit par bbl Total
Water Fresh water m3 0,906 5,4 gal 38,1 1436,0
D-42L Defoamer lts 1 6,0 gal 0,04 1,6
GW 22( Xanthan gum) Gelling Agent kgs 3 18,0 lbs 1,1 39,6
Barite Weighting agent kgs 266 1596,0 lbs 93,1 3513,5
MCSB Mud Clean Surfactant lts 25 150,0 gal 1,1 39,6

Lead Slurry (Surface) (LT6G) 1,25 kg/lt Volume 20,2 m3 Volume 712,2 cu ft

Additif Description Unit par m3 Total Unit par bbl Total


Blend Cement Blend (DGM50 )  Ton 1 8,6 Sack 1 202,3
Water Fresh Water m3 1,362 11,7 gal 15,34 3103,8
D42L Foam Preventer lts 1 8,6 gal 0,011 2,3
A‐3L Stabilizer lts 10 86,3 gal 0,113 22,8
BA56 Anti Gas migration kgs 20 172,5 lbs 1,9 380,4
BA58 Micro Silice kgs 100 862,6 lbs 9,4 1901,8
FL‐52  Fluid Loss Control kgs 10 86,3 lbs 0,9 190,2
LR‐1  Retarder lts 12,00 103,5 gal 0,135 27,3
LW6 (Lot A1 ) Light  Weight Cement kgs 400 3450,5 lbs 37,6 7607,1

Yield cement slurry 2,338 m3/Ton 3,520 cuft/sk


Yield mix water 2,009 m3/Ton 3,025 cuft/sk
Total Mix Water (with LW6) 17,3 m3 109,0 bbl
Total Mix Water (without LW6) 12,5 m3 78,9 bbl

Tail Slurry (LQ12) 1,90 kg/lt Volume 3,0 m3 Volume 107,6 cu ft

Additif Description Unit par m3 Total Unit par bbl Total


Cement Lafarge Ton 1 4,0 Sack 1 93,0
Water Fresh Water m3 0,436 1,7 gal 4,91 456,8
D42L Foam Preventer lts 1 4,0 gal 0,011 1,0
A2 Stabilizer Kgs 2 7,9 lbs 0,188 17,5
BA56 Anti Gas migration  Kgs 12 47,6 lbs 1,1 104,9
CD32 Dispersant Kgs 8 31,7 lbs 0,8 69,9
LR‐1  Retarder lts 0,75 3,0 gal 0,008 0,8

Yield cement slurry 0,768 m3/Ton 1,156 cuft/sk


Yield mix water 0,454 m3/Ton 0,683 cuft/sk
Total Mix Water volume 1,799 m3 11,3 bbl

Total Product Requirement Metric API

Products Unit Quantity Unit Quantity


Blend Cement Blend (DGM50 ) sent from INAS Ton 8,6 Sack 202,3
Cement Lafarge Ton 4,0 Sack 93,0
Fresh Water m3 18,9 gal 4996,7
D-42L lts 18,6 gal 3106,5
A-3L lts 86,3 gal 22,8
BA58 kgs 862,6 gal 1901,8
BA56 kgs 220,1 lbs 380,4
FL-52 lts 86,3 gal 190,2
LW6 (Lot A1 ) kgs 3450,5 lbs 7607,1
LR-1 lts 106,5 gal 28,1
CD32 kgs 31,7 lbs 69,9
MCSB lts 150,0 gal 39,6
GW 22( Xanthan gum) kgs 18,0 lbs 39,6
Barite kgs 1596,0 lbs 3513,5
Fibrin 23 kgs 18,9 lbs 93,0

Page3
Job Number : 19-0420-001
Prepared for : SH-FORAGE
Well / Rig : TFT-473 TP-211
Casing : 7"Casing
Revision : #REF!
Date : #REF!

9. PUMP SCHEDULE

Stage Description Volume Rate Time


(m3) (lts/min) (min)
1 Pump fresh water 0,75 750 1
2 Test lines @ 4000 psi 10
3 Casing @ TD Circulate Prior the Job 500 240
4 Batch mix Lead Slurry & Tail slurry 60
5 Pump Spacer 6 400 15
6 Drop Bottom Plug 10
7 Pump Lead Slurry (BJSP Lite) 20,2 400 50,4
8 Pump Tail Slurry . 3,0 400 7,6
9 Drop Top Plug 10,0
10 Start Displacement with Cement unit pumps 15,0 400 38
11 Continue displacing and reduce rate 21 300 70
12 Continue displacing with cement unit pumps & reduce rate 2,4 200 12
13 Pressure Up and test casing 10,0

Total Job Time (hours:minutes) 03:53


Total lead Slurry Time (hours:minutes) 04:22
Total tail slurry Time (hours:minutes) 03:06

Recommendations

* Hold Prejob meeting before the cement job .


* If losses occured, Add the Fibrin23 with ratio of 0.10 kg/m3 to lead slurry & with ratio of 0.1 kg/m3 to Tail slurry.
* Additives need to be mixed with correct quantities as per program using scale and graduate bucket .
* Mix Water, cement and Slurry samples, need to be brought to the yard once the job performed.
* The job must be monitored from the beginning until the bump plug and test casing .
* Make sure to leave the area clean after performing the job .

10.LABORATORY ANALYSIS
Lead Tail Temp Temp
Slurry Slurry °C °F

Thickening Time To 40 Bc (minutes) 495 385 53 127

Thickening Time To 40 Bc (hours:minutes) 08:15 06:25 53 127

Thickening Time To 100 Bc (minutes) 512 405 53 127

Thickening Time To 100 Bc (hours:minutes) 08:32 06:45 53 127

Safety Margin (hours:minutes) 03:52 03:18 53 127

36 Hour Compressive Strength 1600 88 190


24 Hour Compressive Strength (psi) 2250 88 190

Page 4
Job Proforma Date : #REF!
Job Number : 19-0420-001

RIG : TP-211 Well: TFT-473 Activity: 7"Casing

Preflush Spacer
Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)
0,00 0,00 0,00 6,00 SC6 35 997,67 215 986,02

Lead Cement slurry


Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)
20,17 LT6G 92 444,44 1 864 447,14 3,05 LQ12 45 289,48 137 939,07

Product added
Item Measurement Unit Quantity Cost/m3 Total (DZD)
Tonne

Service Charge 4 872 193,11 (DZD)


Total Product Charge 2 218 372,23 (DZD)
Total added Product Charge 0,00 (DZD)

Total Job estimation Cost 7 090 565,3 (DZD)


Cementing Program

SH FORAGE

Job Number : 19-0421-001

Well : TFT-473
Rig : TP 211

4"1/2 Liner

Code formulation:
Spacer SC6
Cement Slurry LQ12

Prepared by
Validation by
Revision Date Comments Cementing
Lead Engineer
Engineer
00 11/05/2019 proposal K. IDIR A.BELOUAD

Tel: 0699998907
Job Number : 19-0421-001
Prepared for : SH-FORAGE
Well / Rig TFT-473 TP 211
Casing: 4"1/2 Liner
Revision : 00
Date 00

1. WELL SCHEMATIC 2. FLUIDS


Density Volume
Top Mud 0 m kg/lt lbs/gal m3 cu ft bbl

Mud (OBM) 0,90 7,51


Spacer (SC6) 1,30 10,84 5 176,6 31,4
Cement Slurry (LQ12) 1,90 15,85 5,00 176,7 31,5
Displacement (OBM) 0,90 7,51 8,9 315,0 56,1

3. CAPACITIES
Top Spacer 1416 m lts/m cu ft/m bbl/m

3 1/2" DP G105 (13,3#/ft) 3,82 0,135 0,024


4 1/2" Liner (13,5#/ft) 7,79 0,275 0,049
7" Csg (29#/ft) 19,38 0,684 0,122
Top cement slurry 1804 m Annulus 7" Csg x 3 1/2" DP 12,90 0,456 0,081
Annulus 7" Csg x 4 1/2" Csg 9,08 0,321 0,057
Top 4 1/2" Liner 1854,0 m Annulus 6" OH x 4 1/2" Liner 7,94 0,280 0,050
+ Excess 0,00% OH 7,94 0,280 0,050

7" Casing Shoe 2004 m

4. TEMPERATURE

BHST = 93 °C 199 °F
4 1/2" Liner L.C 2090 m BHCT = 56 °C 133 °F
4 1/2"
1/2 Liner F.S
FS 2120 m T
T° Gradient = 3,10
3 10 C/100m
°C/100m 1,72
1 72 F/100ft
°F/100ft

Page 1
Job Number : 19-0421-001
Prepared for : SH-FORAGE
Well / Rig TFT-473 TP 211
Casing: 4"1/2 Liner
Revision : 00
Date 00

5. FLUID VOLUME CALCULATIONS

Capacities Interval (m) Height Volume


Cement Slurry (LQ12) 1,90 kg/lt (lts/m) Top Bottom (m) (m3) (bbl)
Annulus 6" OH x 4 1/2" Liner + Over Caliper 200% 7,94 2004 2120 116 2,76 17,4
Annulus 7" Csg x 4 1/2" Liner 9,08 1854 2004 150 1,36 8,6
Annulus 7" Csg x 3 1/2" DP 12,90 1804 1854 50 0,65 4,1
F.C - F.S 7,79 2090 2120 30 0,23 1,5
Total Volume 5,00 31,5

Displacement Volume
Surface - Top Top Liner 3,82 0 1854 1854 7,1 44,5
Top Liner - L.C. 7,79 1854 2090 236 1,84 11,6
Total Volume 8,92 56,1

6. HYDROSTATIC PRESSURE AFTER DISPLACEMENT

Volume Interval (m) Density Hydrostatic Pressure

Fluides Exterior Casing (m3) Top Bottom kg/lt (psi) (EMW)


Mud (OBM) 18,3 0 1416 0,90 1814 1,28
Spacer (SC6) 5 1416 1804 1,30 2531 1,40
Cement Slurry (LQ12) 4,8 1804 2120 1,90 3385 1,60

Fluides Interior Casing


Mud (OBM) 8,9 0 2090 0,90 2676 1,28
Cement Slurry (LQ12) 0,2 2090 2120 1,90 2757 1,30
110,9
Hydrostatic Differential Pressure (External Pressure - Internal Pressure) 628 0,30

7. FLUID RHEOLOGY

Viscosity / PV Ty
Fluids Rheological Model
(cp) Pole:
Mud (OBM) Bingham Plastic 7 8
Spacer (SC6) Bingham Plastic 22 13
Cement Slurry (LQ12) Bingham Plastic 81 19

Page 2
Job Number : 19-0421-001
Prepared for : SH-FORAGE
Well / Rig TFT-473 TP 211
Casing: Liner 4 1/2"
Revision : 00
Date 00

8. FLUID COMPOSITION & PRODUCT REQUIREMENT

Metric API

Spacer (SC6) 1,30 kg/lt Volume 5,0 m3 Volume 31,4 bbl

Additive Description Unit per m3 Total Unit per bbl Total


Water Fresh Water m3 0,875 4,4 gal 36,8 1155,8
D-42L Foam Preventer lts 1 5 gal 0,04 1,3
GW38 Gelling Agent kgs 4 20 lbs 1,40 44,0
MCSB Mud Clean Surfactant lts 25 125 gal 1,05 33,0
Barite Weighting Agent kgs 397 1985 lbs 139,0 4369,8

Cement Slurry (LQ12) 1,90 kg/lt Volume 5,00 m3 Volume 176,7 cu ft

Additive Description Unit per m3 Total Unit per bbl Total


Cement Lafarge HSR "G" Ton 1 6,5 Sack 1 152,8
Water Fresh Water m3 0,436 2,8 gal 4,911 750,4
D-42L Foam Preventer lts 1 6,5 gal 0,011 1,7
A-2
A 2 Stabiliser kgs 2 13 0
13,0 lbs 0 188
0,188 28 7
28,7
BA-56 Bonding Agent kgs 12 78,2 lbs 1,13 172,3
CD-32 Dispersent kgs 8 52,1 lbs 0,75 114,9
LR-1 Retarder lts 1,00 6,5 gal 0,01 1,7

Yield cement slurry 0,768 m3/Ton 1,156 cuft/sk


Yield mix water 0,454 m3/Ton 0,683 cuft/sk
Total Mix Water volume 2,95 m3 18,6 bbl

Total Product Requirement Metric API

Products Unit Quantity Unit Quantity


Cement Lafarge "G" Ton 6,5 sack 153
Water Fresh Water m3 7,2 gal 1906
D-42L Foam Preventer lts 12 gal 3
A-2 Stabiliser kgs 13 lbs 29
BA-56 Bonding Agent kgs 78 lbs 172
CD-32 Dispersent kgs 52,1 lbs 115
LR-1 Retarder lts 6,5 gal 2
GW38 Gelling Agent kgs 20,0 lbs 44
MCSB Mud Clean Surfactant lts 125,0 gal 33
Barite Weighting Agent kgs 1985,0 lbs 4370
Fibrin 23 Fibers kgs 9,8 lbs 22

Page 3
Job Number : 19-0421-001
Prepared for : SH-FORAGE
Well / Rig TFT-473 TP 211
Casing: 4"1/2 Liner
Revision : 00
Date 00

9. PUMP SCHEDULE

Stage Description Volume Rate Time


(m3) (lpm) (min)
1 Pump Fresh Water 0,75 759 1
2 Pressure test lines @ 4000 psi 10
3 Circulation prior to the Job 400 240
4 Batch mix Cement slurry (Spacer Already batch mixed) 5,00 40
5 Pump Spacer 5 300 17
6 Pump Cement Slurry 5,00 300 17
7 Drop the dart 10
8 Start displacement with unit pumps by pumping water. 2,0 300 7
9 Continue displacement with mud 5,0 250 20
10 Continue displacement & reduce rate final bump 1,9 200 10
11 Bump plug & pressure test liner 10
12 Direct Circulation 31,0 1000 31

Total Job Time (hours:minutes) 02:51


Total Cement Time (hours:minutes) 02:40

Recommendations
* If losses occur while circutate prior to the Job, add the fibers After pumping 2 m3 of slurry , ratio fiber is 0.5 kg /m3 of
cement slurry

* Slurry density measurement using a pressurized densimeter.


* Additives need to be mixed with correct quantities as per program using scale and graduate bucket.
* Displacement volume need to be checked with correct string configuration on location & pumped by unit pumps.

* After pumping the total displacement volume, do not over displace more than half shoe track volume to get the final plug bump.

* Mix Water, cement and Slurry samples, need to be brought to the yard once the job performed.
* The job must be monitored from the beginning until the bump plug and test Liner.
* After performing the cement job ,make sure to leave the area Clean.

10.LABORATORY ANALYSIS

Cement Temp Temp


Slurry °C °F

Thickening Time To 40 Bc (minutes) 365 56 133

Thickening Time To 40 Bc (hours:minutes) 06:05 56 133

Thickening Time To 100 Bc (minutes) 390 56 133

Thickening Time To 100 Bc (hours:minutes) 06:30 56 133

Safety Margin (hours:minutes) 03:24 56 133

24 Hour Compressive Strength (psi) 2800 93 199

Page 4
Job Proforma Date : 00
Job Number : 19-0421-001

RIG : TP 211 Well: TFT-473 Activity: 4"1/2 Liner

Preflush Spacer

Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)

0,00 5,00 5,00 35 997,67 179 988,35

Lead Cement slurry

Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)

0,00 5,00 LQ12 45 289,48 226 620,40

Product added

Item Measurement Unit Quantity Cost/m3 Total (DZD)

Service Charge 286 695,08 (DZD)

Total Product Charge 406 608,75 (DZD)

Total added Product Charge 0,00 (DZD)

Total Job estimation Cost 693 303,8 (DZD)