Professional Documents
Culture Documents
Cementing Proposal Programs TFT-473 - TP-211 PDF
Cementing Proposal Programs TFT-473 - TP-211 PDF
Well : TFT‐473 / TP211
BASSIN: IN AMENAS
Prepared For
Technical Department
HASSI MESSAOUD
Cementing Program
SH FORAGE
Well : TFT-473
Rig : TP-211
Code formulation:
Spacer SC6
Slurry LQ1
Tail Slurry LQ10
Prepared by
Validation by
Revision Date Comments Cementing
Lead Engineer
Engineer
00 11/05/2019 Proposal K. IDIR A. BELOUAD
Imp.011.Eng/V.01
Job number : 19‐0418‐001
Prepared for : SH FOR
Well / Rig: TFT‐473 TP‐211
Casing 13"3/8 Casing with Stinger
Revision : 00
Date : 11/05/19
1. WELL SCHEMATIC 2. FLUIDS
Density Volume
Top mud 0 m kg/lt lbs/gal m3 cu ft bbl
Tail Slurry 0 m Mud (WBM) 1,05 8,76
Preflush 1,00 8,34 5 176,6 31,4
Slurry (LQ1) 1,90 15,85 6,6 233,1 41,5
Displacement 1,05 8,76 0,3 10,3 1,8
3. CAPACITIES
lts/m cu ft/m bbl/m
5" DP G105 (19,5 #/ft) 9,05 0,320 0,057
13 3/8" Csg (54,5#/ft) 80,64 2,848 0,507
Annulus 17,5" OH x 13 3/8" Csg 64,40 2,274 0,405
17"1/2 OH + Excess Tail 100% OH 128,80 4,549 0,810
Toc Inner string 32 m
4. TEMPERATURE
BHST =
BHST = 35 °C
C 86 °FF
13 3/8" F‐S 50 m BHCT = 30 °C 95 °F
Job number : 19‐0418‐001
Prepared for : SH FOR
Well / Rig: TFT‐473 TP‐211
Casing 13"3/8 Casing with Stinger
Revision : 00
Date : 11/05/19
5. FLUID VOLUME CALCULATIONS
Displacement Volume
S f i
Surface ‐ Toc Inner string 9 0
9,05 0 32 32 00,3
3 83
1,83
Total Volume 0,3 1,83
6. HYDROSTATIC PRESSURE AFTER DISPLACEMENT
Fluids Inside Casing
Mud 0,3 0 32 1,05 48 1,05
Slurry (LQ1) 0,16 32 50 1,90 96 1,35
7. FLUID RHEOLOGY
Viscosity / PV Ty
Fluid Rheological Model
(cp) (lbf/hsqft)
Mud Bingham Plastic
Preflush Newtonian 2 0
Slurry (LQ1) Bingham Plastic 66 18
Job number : 19‐0418‐001
Prepared for : SH FOR
Well / Rig: TFT‐473 TP‐211
Casing 13"3/8 Casing with Stinger
Revision : 00
Date : 11/05/19
8. FLUID COMPOSITION & PRODUCT REQUIREMENT
Metric API
9. PUMP SCHEDULE
Recommendations
1‐ Add Febrin in lead slurry and tail slurry with ratio 1,5 Kgs/ m3
2‐ If the Lead slurry come back to the surface start pumping tail slurry
3‐ A Top Job is recommended if the cement slurry does't come back to surface or slurry level dropped on
10. LABORATORY ANALYSIS
Lead Tail Temp
Slurry Slurry °C
Preflush Spacer
Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)
0,00
Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)
Product added
Measurement
Item Quantity Cost/m3 Total (DZD)
Unit
SH FORAGE
Well : TFT-473
Rig : TP-211
9"5/8
9 5/8 Casing
Code formulation:
Spacer SC1
Lead Slurry LT2
Tail Slurry LQ2
Prepared by
Validation by
Revision Date Comments Cementing
Lead Engineer
Engineer
00 11/05/2019 Proposal K. IDIR H. BELOUAD
Imp.011.Eng/V.01
Job number : 19-0419-001
Prepared for : SH FOR
Well / Rig: TFT-473 TP-211
Casing : 9"5/8 Casing
Revision 00
Date : 11/05/19
3. CAPACITIES
lts/m cu ft/m bbl/m
9 5/8" Csg (36#/ft) 40,33 1,4241 0,2536
12" 1/4 Open Hole Annulaire 13 3/8" Csg x 9 5/8" Csg (36#/ft) 33,69 1,1899 0,2119
Annulaire 12 1/4" OH x 9 5/8" Csg 32 1,1301 0,2013
+ Excess Lead OH 0% 32,00 1,130 0,201
+ Excess Tail OH 0% 32,00 1,130 0,201
BHST = 46 °C 115 °F
9 5/8" Anneau 601 m BHCT = 38 °C 100 °F
9 5/8" Sabot 625 m Gradient = 2,90 °C/100m
Page 1
Job number : 19-0419-001
Prepared for : SH FOR
Well / Rig: TFT-473 TP-211
Casing : 9"5/8 Casing
Revision 00
Date : 11/05/2019
Displacement
p Volume
Surface to FC 40,33 0 601 601 24,2 152,44
Total Volume 24,2 152,4
7. FLUID RHEOLOGY
Viscosity / PV Ty
Fluid Rheological Model
(cp) (lbf/100 ft²)
Mud (OBM) Newtonian 12 16
Spacer(SC1) Newtonian 25 8
Lead Slurry (LT2) Bingham Plastic 33 19
Tail Slurry (LQ2) Bingham Plastic 78 16
Page 2
Job Number : 19-0419-001
Prepared for : SH FOR
Well / Rig : TFT-473 TP-211
Casing : 9"5/8 Casing
Revision : 00
Date : 11/05/2019
Metric API
Page 3
Job number : 19-0419-001
Prepared for : SH FOR
Well / Rig: TFT-473 TP-211
Casing : 9"5/8 Casing
Revision 00
Date : 11/05/19
9. PUMP SCHEDULE
Recommendations
*If losses occur during the circulation prior to the job, Added the Fibrin 23 with Ratio of 0.3 Kg/m3 for the Lead & Tail Slurries
* Hold Prejob safety Meeting
* The Mix Water & cement need to be brought back to the yard as soon as the job performed.
* The job must be monitored from the beginning until the bump plug and test casing
* After the job make sure to leave the area clean
Page 4
Job Proforma Date : 11/05/2019
Job Number : 19-0419-001
Preflush Spacer
Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)
Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)
19,92 LT2 24 228,01 482 736,85 4,49 LQ2 45 545,76 204 401,30
Product added
Measurement
Item Quantity Cost/m3 Total (DZD)
Unit
SH FORAGE
Well : TFT-473
Rig : TP-211
7"Casing
7"C i
Code formulation:
Spacer SC6
Lead Slurry LT6G
Tail Slurry LQ12
Prepared by
Validation by
Revision Date Comments Cementing
Lead Engineer
Engineer
00 11/05/2019 Proposal K. IDIR A. BELOUAD
Cover
Job Number : 19-0420-001
Prepared for : SH-FORAGE
Well / Rig : TFT-473 TP-211
Casing : 7"Casing
Revision : #REF!
Date : #REF!
3. CAPACITIES
9 5/8" Shoe 625 m lts/m cu ft/m bbl/m
7" Csg (29#/ft) 19,38 0,684 0,122
Annulus 9 5/8" Csg (36#/ft) x 7" Csg 15,50 0,547 0,097
Annulus 8 1/2" OH x 7" Csg 11,73 0,414 0,074
+ Excess LT 0,00% OH 11,73 0,414 0,074
+ Excess LQ 0,00% OH 11,73 0,414 0,074
8 1/2" OH 8 1/2" OH 36,60 1,293 0,230
BHST = 88 °C 190 °F
7" F.C 1980,00 m BHCT = 53 °C 127 °F
TD 2004 m T° Gradient = 3,1 °C/100m 1,72 °F/100ft
Page 1
Job Number : 19-0420-001
Prepared for : SH-FORAGE
Well / Rig : TFT-473 TP-211
Casing : 7"Casing
Revision : #REF!
Date : #REF!
Displacement Volume
Surface to FC 19,38 0 1980 1980 38,4 241,4
Total Volume 38,4 241,36
7. FLUID RHEOLOGY
Pv Ty
Fluids Rheological Model
(cp) (lbf/hsqft)
Mud (OBM) Bingham Plastic 14 14
Spacer (SC6) Bingham Plastic 8 4
Lead Slurry (Surface) (LT6G) Bingham Plastic 46,5 13,5
Tail Slurry (LQ12) Bingham Plastic 85,5 16,5
Page 2
Job Number : 19-0420-001
Prepared for : SH-FORAGE
Well / Rig : TFT-473 TP-211
Casing : 7"Casing
Revision : #REF!
Date : #REF!
Metric API
Lead Slurry (Surface) (LT6G) 1,25 kg/lt Volume 20,2 m3 Volume 712,2 cu ft
Page3
Job Number : 19-0420-001
Prepared for : SH-FORAGE
Well / Rig : TFT-473 TP-211
Casing : 7"Casing
Revision : #REF!
Date : #REF!
9. PUMP SCHEDULE
Recommendations
10.LABORATORY ANALYSIS
Lead Tail Temp Temp
Slurry Slurry °C °F
Page 4
Job Proforma Date : #REF!
Job Number : 19-0420-001
Preflush Spacer
Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)
0,00 0,00 0,00 6,00 SC6 35 997,67 215 986,02
Product added
Item Measurement Unit Quantity Cost/m3 Total (DZD)
Tonne
SH FORAGE
Well : TFT-473
Rig : TP 211
4"1/2 Liner
Code formulation:
Spacer SC6
Cement Slurry LQ12
Prepared by
Validation by
Revision Date Comments Cementing
Lead Engineer
Engineer
00 11/05/2019 proposal K. IDIR A.BELOUAD
Tel: 0699998907
Job Number : 19-0421-001
Prepared for : SH-FORAGE
Well / Rig TFT-473 TP 211
Casing: 4"1/2 Liner
Revision : 00
Date 00
3. CAPACITIES
Top Spacer 1416 m lts/m cu ft/m bbl/m
4. TEMPERATURE
BHST = 93 °C 199 °F
4 1/2" Liner L.C 2090 m BHCT = 56 °C 133 °F
4 1/2"
1/2 Liner F.S
FS 2120 m T
T° Gradient = 3,10
3 10 C/100m
°C/100m 1,72
1 72 F/100ft
°F/100ft
Page 1
Job Number : 19-0421-001
Prepared for : SH-FORAGE
Well / Rig TFT-473 TP 211
Casing: 4"1/2 Liner
Revision : 00
Date 00
Displacement Volume
Surface - Top Top Liner 3,82 0 1854 1854 7,1 44,5
Top Liner - L.C. 7,79 1854 2090 236 1,84 11,6
Total Volume 8,92 56,1
7. FLUID RHEOLOGY
Viscosity / PV Ty
Fluids Rheological Model
(cp) Pole:
Mud (OBM) Bingham Plastic 7 8
Spacer (SC6) Bingham Plastic 22 13
Cement Slurry (LQ12) Bingham Plastic 81 19
Page 2
Job Number : 19-0421-001
Prepared for : SH-FORAGE
Well / Rig TFT-473 TP 211
Casing: Liner 4 1/2"
Revision : 00
Date 00
Metric API
Page 3
Job Number : 19-0421-001
Prepared for : SH-FORAGE
Well / Rig TFT-473 TP 211
Casing: 4"1/2 Liner
Revision : 00
Date 00
9. PUMP SCHEDULE
Recommendations
* If losses occur while circutate prior to the Job, add the fibers After pumping 2 m3 of slurry , ratio fiber is 0.5 kg /m3 of
cement slurry
* After pumping the total displacement volume, do not over displace more than half shoe track volume to get the final plug bump.
* Mix Water, cement and Slurry samples, need to be brought to the yard once the job performed.
* The job must be monitored from the beginning until the bump plug and test Liner.
* After performing the cement job ,make sure to leave the area Clean.
10.LABORATORY ANALYSIS
Page 4
Job Proforma Date : 00
Job Number : 19-0421-001
Preflush Spacer
Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)
Volume (m3) Code Cost/m3 Total (DZD) Volume (m3) Code Cost/m3 Total (DZD)
Product added