Rajasthan Vidyut Utpadan Nigam Ltd.

, Jaipur
Club House, Ground Floor
Sr. No. Item no Description No. L B

1 Site Cleareance

2 Excavation upto 1.5 Mtr Depth


for column 233.00 1.20 1.20
for ground beam (400 x 400) 1.00 1180.00 0.40
3 Excavation from 1.5 Mtr to 3 Mtr Depth
233.00 1.20 1.20

4 Sand Filling
In Footing
(503.28 + 335.52 - 341.88)

5 P.C.C. 1:4:8 1.00 1180.00 13.60


Columns upto Plinth

6 P.C.C. 1:5:10
Floor Area

7 Brick Work

a Upto Plinth
rubble masonary
below ground beam
900 mm footing 1.00 1180.00 0.90
720 mm footing 1.00 1180.00 0.72
570 m footing 1.00 1180.00 0.57
up to ground beam 1.00 1180.00 0.40
up to ground lvl 1.00 1180.00 0.40

b From Plinth to Slab Lvl


230 mm thick
masonary above Ground Lvl. 1.00 1180.00 0.40
c Stair Brick Masonary
At Main entry

Back Side

Left Side

d Partition Brick Work


115 mm thick
Ground Floor
(CL = 9.20 m)
Window Projection
Deductions
For D4
For V1
First Floor
(CL = 0.00 m)
Window Projection
Parapet
Elevation Parapet

8 Damp Proof Course

9 Internal Plaster

a Walls
Ground Floor
Card Room

Chess Room

Stair Area

Corridoor

Passage
Manager

L. Toilet

G. Toilet

Reding Library

Ele. Room

Ent. Foyer

Deduction
For W1
For W2
For W3
For W4
For D1
For D2
For D3
For D4
For DW1
For V1
First Floor
Billiard

Ele. Room1

Stair Area
Corridor

Passage infront of Toilet

Toilet

Table Tenis

Ele Room2

Window Projections
For W2
For W3
For W4
Parapet
Elevation Parapet
Deduction
For W2
For W3
For W4
For D1
For D3

b Ceiling
Ground Floor
Card Room
Chess Room
Stair Area
Passage infront of stair area

Passage infront of Reading Library


Passage towards Toilet
Manager
Reding Library
Ele. Room
Ent. Foyer
L. Toilet
G. Toilet
Window Projections
For W1
For W2
For W3
For W4
First Floor
Billiard
Ele. Room1
Stair Area
Passage Near Stair Area
Enterance Foyer Area
Toilet
Table Tenis
Ele Room2
Window Projections
For W2
For W3
For W4

9 External Plaster

a Upto Plinth
Left Side of Bldg
Right Side of Bldg
Front Side of Bldg
Back Side of Bldg

b Above Plinth
Ground Floor
Left Side of Bldg
Right Side of Bldg
Front Side of Bldg
Back Side of Bldg
Deduction
For W1
For W2
For W3
For W4
For DW1
For V1
For W1 Projection
For W2 Projection
For W3 Projection
For W4 Projection
First Floor
Left Side of Bldg
Right Side of Bldg
Front Side of Bldg
Front Side Parapet
Back Side of Bldg
Parapet
Elevation Parapet
Deduction
For W2
For W3
For W4
For W2 Projection
For W3 Projection
For W4 Projection

10 Flooring

b Marble
Ground Floor
Card Room
Chess Room
Stair Area
Passage infront of stair area

Passage infront of Reading Library


Passage towards Toilet
Manager
Reding Library
Ele. Room
Ent. Foyer
First Floor
Billiard
Ele. Room1
Stair Landing
Passage Near Stair Area

Corridor
Passage Infront of Toilet
Table Tenis
Ele Room2

e Ceramic
Ground Floor
L. Toilet
G. Toilet
First Floor
Toilet

f Glazed
Ground Floor
L. Toilet

G. Toilet

Deduction
For D4
For V1
First Floor
Toilet

Deduction
For D3
For W4

Stair steps, Window Sill, Kitchen &


g Pentry Platform
Stair Steps
Lending
At Main entry

Back Side

Left Side

f Skertings
Ground Floor
Card Room

Chess Room

Stair Area

Passage infront of stair area

Passage infront of Reading Library

Passage towards Toilet

Manager

Reding Library

Ele. Room

Ent. Foyer

Deduction
For D1
For D2
For D3
For DW1
First Floor
Billiard

Ele. Room1

Stair Landing
Passage Near Stair Area

Corridor

Passage Infront of Toilet

Table Tenis

Ele Room2

Deduction
For D1
For D3

11 R.C.C.

a Upto Plinth
Columns Below Ground Beam 233.00 0.45 0.45
QTY =H/3 (A1+A2+SQRT(A1*A2) 233.00 0.39
Upto Ground Lvl. 233.00 0.40 0.40
Ground Beams 1.00 1180.00 0.40

b Above Plinth
Columns
Columns upto GF Slab 233.00 0.40 0.40
Coping 1.00 1180.00 0.04
a1 = 0.075 x 0.5, a2 = 0.015 x 0.5 / 2
A = 0.04

Beams
GF Slab Beams
FF Slab Beams
Frame at roof slab
Frame at roof slab
Stair Steps
Slab GF
Card Room
Chess Room
Stair Area
Passage infront of stair area

Passage infront of Reading Library


Passage towards Toilet
Manager
Reding Library
Ele. Room
Ent. Foyer
L. Toilet
G. Toilet
Window Projections
For W1
For W2
For W3
For W4
Lending
Slab FF
Billiard
Ele. Room1
Stair Area
Passage Near Stair Area
Enterance Foyer Area
Toilet
Table Tenis
Ele Room2
Window Projections
For W2
For W3
For W4
Lintel GF
(CL = 9.20 m)
(CL = 207.94 m)
(CL = 143.74 m)
Coping at Parapet
Elevation Parapet

12 Reinforcement Steel

13 Shuttering for R.C.C.

14 Internal Paint

a Wall

b Ceiling

15 External Paint

16 Door Frames
Ground Floor
For D1
For D2
For D3
For D4
For DW1
First Floor
For D1
For D3

17 Door Shutters
Ground Floor
For D1
For D2
For D3
For D4
For DW1
First Floor
For D1
For D3

18 Window Frames
Ground Floor
For W1
For W2
For W3
For W4
For V1
First Floor
For W2
For W3
For W4

19 Window Shutters
Ground Floor
For W1
For W2
For W3
For W4
For V1
First Floor
For W2
For W3
For W4

20 Window Grills
Ground Floor
For W1
For W2
For W3
For W4
For V1

First Floor
For W2
For W3
For W4
21 MS Grills
horizontal member (20 x 20 ms ) 2.00
(0.02x 0.02 x 4.72) = volume
main vertical (40 x 40 ms ) 2.00
(0.04x 0.04 x 1.36) = volume
intermediate vertical members (20 x 20 ms) 44.00
(0.02x 0.02 x 1.29) = volume
ms flat
[arc length: {4567 - 2(100+40)} / 40] 86.00
(0.02 x 0.006 x 0.098) = volume
hori member at bottom 1.00
(0.02x 0.02 x 4.57) = volume

total: 0.039 cum x 7850 kg/cum


TOTAL 306.15 kg 231.00
Ltd., Jaipur
oor
D Quantity Say Unit

500.00 Sqmt

180.00 Cum
1.50 503.28
0.55 259.60
60.00 Cum
1.00 335.52

270.00 Cum
496.92

0.15 2407.20 15.00 Cum

42.00 Cum

47.00 Cum

0.15 159.30
0.15 127.44
0.15 100.89
0.50 236.00
0.15 70.80
694.43

0.81 382.32
190.00 Cum

185.00 Sqmt
70.00 Sqmt
1225.00 Sqmt
950.00 Sqmt

1000.00 Sqmt
610.00 Sqmt

30.00 Sqmt

95.00 Sqmt
50.00 Sqmt
30.00 Sqmt

1.20 56.62
90.87
0.15 5.59
0.40 188.80

341.88
100.00 Cum

1.44 53.68
49.56

103.24

32.00 Cum
180.00 Cum
37000.00 Kg

1225.00 Sqmt
950.00 Sqmt

1000.00 Sqmt
81.00 Cum

48.00 Sqmt

79.00 Kg

79.00 Sqmt
400.00 Kg

0.004 cum

0.004 cum

0.023 cum

0.006 cum

0.002 cum

70720.65 Kg
1172 3530

1172 3530
3530 5910
3530
3530
Bill of Quantities based on PWD BSR: Baran Circle 2005, PWD integrated BSR 1998 for Electrical Works and PWD BSR 2003 for
Road Work For:-

Name of Work : Construction of Boundry Walls with Gates at Township of 2 X 250 MW Chhbra Thermal Power Plant Project, Chhbra
Distt. Baran (Rajasthan)

Sr.
Particulars Unit Qty. Rate Amt.
No.
1 2 5 3 4 6

1
Earth work in excavation in foundation trenches or drains
including dressing of sides and ramming of bottoms, lift upto
1.5 Mtr. Including taking out the excavated soil and depositing
and refiling of jhiri with watering and ramming and disposal of
surplus excavated soil as directed within a lead of 50
Mtr.including stacking of useful material if available
a) All kinds of soil (B-2/1.8) Cum 1098.4 38 41739.2
b) Mixed rock (B-2/1.9.1) Cum 99 0

Filling available excavated earth (excluding rock) in trenches,


plinth side of foundation etc. in layers not exceeding 20 cm. in
depth, consolidating each deposited layer by ramming and
watering including lead up to 50 mtr. & lift up to 1.5 mtr.
Cum 496.92 18 8944.56

2 Providing and laying in position cement concreting including Cum 2407.2 1025
curing compaction etc. complete in specified grade excluding
the cost of centering and shuttering - All work up to plinth level
1:5:10 (1:cement:5 coarse sand:10 graded stone aggregate 40
mm nominal size) B-13/3.2.8) 0

3 RR masonry for foundation and plinth with cement sand mortar


1:5(1cement:6 coarse sand) For above 30cm thick wall B-
32/6.1.7 Cum 694.43 770 534711.1

4 Random Rubble stone masonry for superstructure above plinth


level one story height, above 30 cm thick walls in : Cement
Mortar 1:6 (1 cement:6 sand) B-32/6..2.7 Cum 382.32 840 0

5 Plaster on new surface on walls in cement sand Mortar 1:4 Sqm 45


including raking of joints etc. complete fine finished: 12 mm
thick B-112/12.8.3 0

6 Pointing on Stone masonry in cement sand mortar 1:3 Sqm 21


(1:cement:3 sand) Flush or ruled pointing:B-118/12.36.1 0

7 Centering and shuttering with plywood or steel sheets including Sqm 53


strutting, Propping bracing both ways and removal of formwork
for foundation in basement rafts.Footing straps beams bases of
columns etc. upto plinth level B-19/4.11 0

8
Centering & shuttering with plywood or steel sheets including
strutting propping bracing both ways with wooden members and
removal of forms work for superstructure upto 4.5m height
above plinth level for Columns, Pillars, posts and struts etc. (B-
19/4.12.3) Sqm 75 0

9
Providing and laying in position cement concreting including
curing compaction etc. complete in specified grade excluding
the cost of centering and shuttering - Cement concrete for super
structure in 1:2:4 (1cement:2 coarse sand:4 graded stone
aggregate 20 mm nominal size)B-13/3.2.3 Cum 1530 0
10
Reinforced cement concrete work in walls (any thickness)
including attached pilasters buttresses, plinth and string
courses, fillets columns, pillars piers, abutments posts and
struts etc. upto floor three level including curing compaction
finishing with rendering in cement sand mortar 1:3 (1:cement
3:coarse sand) and making good the joints excluding cost of
centering shittering and reinforcement:1:1.5:3 (1:cement:1.5
coarse sand: 3 graded stone aggregate 20mm nominal size) All
works upto plinth level (B-17/4.1.2) Cum 341.88 1860 635896.8

11 -do- For columns, pillar, etc (B-17:4.2.2) Cum 103.24 1953 201627.72

12 Add extra for RCC work in super structure (B.18/4.8) Cum 19 0

13
Providing and fabricating reinforcement for RCC work including
straightening cutting binding placing in position and binding
(including cost of binding wire) all complete up to floor three
level Cold twisted deformed bars (IS:1786) B-20/4.13.2 Kg 31 0
Structural steel work in single section fixed without connecting
14 plate including cutting, hoisting fixing in position and applying a
priming coat of approval steel primer all complete above plinth
level upto 4:5 mtr height in R.S.joist flats,tees angles and
channels:(B-88/9.1) Kg 0

15
Supply and fixing G.I. barbedwire fencing in Y, shape angle
poste fitted and fixed with G.I. staples ect.Complete in all
respect (B-100/9.59+9.61) Cum 0

16 Providing and fixing steel gate grating and grills made of angles,
tees square bars or other flats black pipe with holdfast and
fittings complete as per design and drawing including cutting
welding and fabrication with priming coat of red oxide(B-
78/9.19) Kg 70720.65 37 2616664.05

17 Providing and fixing precast cement concrete coping 1:2:4 mix


50mm thick complete as per specification. 50 mm(B-141/15.6.1) Sqm 114 0

18 Painting with enamel paint of approved brand and manufacture


to give an even shade:two or more coats on new work. B-
124/12.68.1 Sqm 24 0

19 Finishing wall with water proofing cement paint of approval


brand and manufacture and or required shade to give an even
shade including all scalfolding for new work (Three or more
coats) B-121/12.53.1) Sqm 15 0