Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

WIRE CAPACITY CALCULATION OF WINCHDRUM Date: 26/03/18

Project/yardno: T132-225- Fore winch (split drum)

Wire type: 150 m 88 mm synthetic rope

INPUT:
Wire diameter (dw) = 40 mm Type:Euroflex, friction wire, full first layer
Wire diameter (dw) = 88 mm Type:Euroflex
Drum diameter (D) = 660 mm
Drum diameter (D), including friction wire
= 740 mm 8,4 x dw
Drum length (L) = 735 mm 8,4 x dw
Extra space on drum (for stretchers) = 104 mm
Pull 1st layer = 41,0 Ton (1) 7,7 Ton (2)
Speed 1st layer = 8,1 m/min (1) 35,5 m/min (2) [rpm] [sec]
Hold.force 1st layer = 181,1 Ton speed 1: 3,12 19,2
speed 2: 13,64 4,4
OUTPUT:
Layer Layer Store- Length Shield Pull Speed Pull Speed Holding
diam. length on drm diameter (1) (1) (2) (2) force
wire Total Minimal
mm m m mm ton m/min ton m/min ton

First 828 20 20 1124 41,0 8,1 7,7 35,5 181,1


Second (1st layer for towing) 980 24 45 1276 34,6 9,6 6,5 42,0 152,9
Third 1133 28 73 1429 29,9 11,1 5,6 48,5 132,3
Fourth 1285 32 104 1581 26,4 12,6 5,0 55,1 116,6
Fifth 1452 36 140 1748 23,4 14,2 4,4 62,2 103,3

Non prefered layers for fibre rope


Sixth 1604 40 180 1900 21,1 15,7 4,0 68,7 93,5
Seventh 1756 43 223 2052 19,3 17,2 3,6 75,2 85,4
Eighth 1909 47 270 2205 17,8 18,7 3,3 81,8 78,5

Non prefered layers for steel wire


Ninth 2061 51 321 2357 16,5 20,2 3,1 88,3 72,7
Tenth 2214 55 376 2510 15,3 21,7 2,9 94,8 67,7
Eleventh 2366 58 434 2662 14,3 23,2 2,7 101,4 63,4
Twelfth 2518 62 496 2814 13,5 24,7 2,5 107,9 59,5

You might also like