Drawing No. Drawing Title Issue Date & Drawing Number
Drawing No. Drawing Title Issue Date & Drawing Number
2017/DEC/
2018_YU_SG_ST_06 BASE COLUMN LAYOUT ST/001
2017/DEC/
2018_YU_SG_ST_07 SECTION AND DETAILS (SECTION - 5) ST/006b
2017/DEC/
2018_YU_SG_ST_08 SECTION AND DETAILS (SECTION - 6) ST/006c
2017/DEC/
2018_YU_SG_ST_21 SERVICE FLOOR AND CAR PARK GENERAL ARRANGEMENT ST/002
2017/DEC/
2018_YU_SG_ST_22 TYPICAL (FIRST TO SIXTH) FLOOR GENERAL ARRANGEMENT ST/003
2017/DEC/
2018_YU_SG_ST_23 TYPICAL (SEVENTH TO EIGHTH) FLOOR GENERAL ARRANGEMENT ST/004
2017/DEC/
2018_YU_SG_ST_24 TYPICAL (SEVENTH-1M TO EIGHTH-1M) FLOOR GENERAL ARRANGEMENT ST/005
2017/DEC/
2018_YU_SG_ST_25 ROOF TERRACE AND POOL BASE LEVEL LAYOUT ST/006
2017/DEC/
2018_YU_SG_ST_26 POOL DECK LEVEL LAYOUT ST/006a
2017/DEC/
2018_YU_SG_ST_27 MACHINE ROOM LEVEL LAYOUT ST/007
2017/DEC/
2018_YU_SG_ST_31 SERVICE FLOOR & CAR PARK SLAB REINFORCEMENT LAYOUT ST/008
2017/DEC/
2018_YU_SG_ST_32 TYPICAL (FIRST TO SIXTH) FLOOR SLAB REINFORCEMENT LAYOUT_01 ST/009a
2017/DEC/
2018_YU_SG_ST_33 TYPICAL (FIRST TO SIXTH) FLOOR SLAB REINFORCEMENT LAYOUT_02 ST/009b
2017/DEC/
2018_YU_SG_ST_34 TYPICAL (SEVENTH TO EIGHTH) FLOOR SLAB REINFORCEMENT LAYOUT_01 ST/010a
2017/DEC/
2018_YU_SG_ST_35 TYPICAL (SEVENTH TO EIGHTH) FLOOR SLAB REINFORCEMENT LAYOUT_02 ST/010b
2017/DEC/
2018_YU_SG_ST_36 TYPICAL(SEVENTH-1M TO EIGHTH-1M)FLOOR SLAB REINFORCEMENT LAYOUT_01 ST/011a Project
2018_YU_SG_ST_37 TYPICAL(SEVENTH-1M TO EIGHTH-1M)FLOOR SLAB REINFORCEMENT LAYOUT_02
2017/DEC/ PROPOSED APARTMENT COMPLEX FOR
ST/011b
2017/DEC/ MR. SHAMITHA GANEGODA AT
2018_YU_SG_ST_38 ROOF TERRACE AND POOL BASE LEVEL SLAB REINFORCEMENT LAYOUT_01 ST/012a SRI DHAMMA MAWATHA, BORELLA.
2017/DEC/
2018_YU_SG_ST_39 ROOF TERRACE AND POOL BASE LEVEL SLAB REINFORCEMENT LAYOUT_02 ST/012b
2017/DEC/
2018_YU_SG_ST_40 POOL DECK LEVEL SLAB REINFORCEMENT LAYOUT ST/014
Consultant & Structural Designer :
2017/DEC/ NO:18,
2018_YU_SG_ST_41 MACHINE ROOM LEVEL SLAB REINFORCEMENT LAYOUT ST/013 ST' MICHAEL ROAD ,
COLOMBO - 3
2018_YU_SG_ST_45 BASE FLOOR LEVEL BEAM DETAILS_SHEET 1 Designed: Eng.Nipuni Drawn: Indika
2018_YU_SG_ST_46 BASE FLOOR LEVEL BEAM DETAILS_SHEET 2 Checked: Eng.Nilmini Submitted :
2018_YU_SG_ST_47 BASE FLOOR LEVEL BEAM DETAILS_SHEET 3 Scales: 1:100
Approved : Eng.Dhammika
2018_YU_SG_ST_48 BASE FLOOR LEVEL BEAM DETAILS_SHEET 4 Date: 05-02-2018
2018_YU_SG_ST_49 BASE FLOOR LEVEL BEAM DETAILS_SHEET 5 Drawing Title
DRAWING SCHEDULE
2018_YU_SG_ST_85 ROOF TERRACE AND POOL BASE FLOOR LEVEL BEAM DETAILS_SHEET 1 Designed: Eng.Nipuni Drawn: Indika
2018_YU_SG_ST_86 ROOF TERRACE AND POOL BASE FLOOR LEVEL BEAM DETAILS_SHEET 2 Checked: Eng.Nilmini Submitted :
2018_YU_SG_ST_87 ROOF TERRACE AND POOL BASE FLOOR LEVEL BEAM DETAILS_SHEET 3 Scales: 1:100
Approved : Eng.Dhammika
2018_YU_SG_ST_88 ROOF TERRACE AND POOL BASE FLOOR LEVEL BEAM DETAILS_SHEET 4 Date: 05-02-2018
2018_YU_SG_ST_89 ROOF TERRACE AND POOL BASE FLOOR LEVEL BEAM DETAILS_SHEET 5 Drawing Title
2018_YU_SG_ST_90
DRAWING SCHEDULE
ROOF TERRACE AND POOL BASE FLOOR LEVEL BEAM DETAILS_SHEET 6
2018_YU_SG_ST_91 ROOF TERRACE AND POOL BASE FLOOR LEVEL BEAM DETAILS_SHEET 7
Drawing Number Sheet 02 Revision
2018_YU_SG_ST_92 ROOF TERRACE AND POOL BASE FLOOR LEVEL BEAM DETAILS_SHEET 8 2018/ YU /SG/ST/DS/02
SHEET Size : A3 .
ISSUE DATE & DRAWING NUMBER
DRAWING NO. DRAWING TITLE TENDER ISSUE CONSTRUCTION ISSUE
2017-12-12 2017-12-14 2017-12-22 2018-01-09 2018-00-00
Date: 05-02-2018
2018_YU_SG_ST_130 SECTION_SHEET 1 Drawing Title
2018_YU_SG_ST_131
DRAWING SCHEDULE
SECTION_SHEET 2