This document provides calculations for end moments on reinforced concrete members due to various load cases. End moments are calculated for floor beams and overhang members on the second floor and roof of Frame A and Frame B under live and dead loads. Load cases include uniformly distributed loads, single concentrated loads, and combinations of both. Resulting end moments are summarized in tables for each member.
This document provides calculations for end moments on reinforced concrete members due to various load cases. End moments are calculated for floor beams and overhang members on the second floor and roof of Frame A and Frame B under live and dead loads. Load cases include uniformly distributed loads, single concentrated loads, and combinations of both. Resulting end moments are summarized in tables for each member.
This document provides calculations for end moments on reinforced concrete members due to various load cases. End moments are calculated for floor beams and overhang members on the second floor and roof of Frame A and Frame B under live and dead loads. Load cases include uniformly distributed loads, single concentrated loads, and combinations of both. Resulting end moments are summarized in tables for each member.
REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
LONGITUDINAL FRAME - FRAME A
LIVE LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member 1-2
Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 7.19 6 -21.57 21.57 Total: -21.57 kN-m 21.57 kN-m Second Floor - Member 2-3 Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 0 4 0 0 Total: 0 kN-m 0 kN-m Second Floor - Member 3-4 - Same as Second Floor - Member 1-2 Second Floor - Overhang Member Left End Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 1.15 1.2 - 0.83 9 7.17 1.2 - 8.6 Total: - kN-m 9.43 kN-m Second Floor - Overhang Member Right End Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 8 2.83 2.2 -3.11 - Total: -3.11 kN-m - kN-m Roofdeck - Member 1-2 - Same as Second Floor - Member 1-2 Roofdeck - Member 2-3 Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 4.79 4 -6.39 6.39 Total: -6.39 kN-m 6.39 kN-m Roofdeck - Member 3-4 Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 11.28 6 -33.84 33.84 Total: -33.84 kN-m 33.84 kN-m Roofdeck - Overhang Member Left End - Same as Second Floor - Overhang Member Left End REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
LONGITUDINAL FRAME - FRAME A
DEAD LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member 1-2
Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 16.99 4 -22.65 22.65 4 3.18 3 3 6 -2.38 2.38 Total: -25.03 kN-m 25.03 kN-m Second Floor - Member 2-3 Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 8.77 4 -11.69 11.69 Total: -11.69 kN-m 11.69 kN-m Second Floor - Member 3-4 Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 16.99 6 -50.97 50.97 Total: -50.97 kN-m 50.97 kN-m Second Floor - Overhang Member Left End Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 9.94 1.2 - 7.16 9 16.68 1.2 - 20.02 Total: - kN-m 27.18 kN-m Second Floor - Overhang Member Right End Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 2.83 2.2 -6.85 - 8 4.71 2.2 -5.18 - Total: -12.03 kN-m - kN-m Roofdeck - Member 1-2 Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 10.74 6 -32.22 32.22 Total: -32.22 kN-m 32.22 kN-m Roofdeck - Member 2-3 Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 6.82 4 -9.09 9.09 Total: -9.09 kN-m 9.09 kN-m Roofdeck - Member 3-4 - Same as Roofdeck - Member 1-2 Roofdeck - Overhang Member Left End Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 4.81 1.2 - 3.46 9 18.09 1.2 - 21.71 Total: - kN-m 25.17 kN-m REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
Fixed End Moments:
General values for end moments in perfectly restrained beams that carry various general loadings. These values are summarized in Table 1.0
Table 1.0 RESTRAINED BEAM LOADINGS
Case no. Type of load
9 REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
LONGITUDINAL FRAME - FRAME B
LIVE LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member 1-2
Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 13.58 6 -40.74 40.74 Total: -40.74 kN-m 40.74 kN-m Second Floor - Member 2-3 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 13.44 4 -17.92 17.92 Total: -17.92 kN-m 17.92 kN-m Second Floor - Member 3-4 - Same as Second Floor - Member 1-2 Second Floor - Overhang Member Left End Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 2.3 1.2 - 1.66 9 14.35 1.2 - 17.22 Total: - kN-m 18.88 kN-m Roofdeck - Member 1-2 - Same as Second Floor - Member 1-2 Roofdeck - Member 2-3 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 9.58 4 -12.77 12.77 Total: -12.77 kN-m 12.77 kN-m Roofdeck - Member 3-4 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 17.67 6 -53.01 53.01 Total: -53.01 kN-m 53.01 kN-m Roofdeck - Overhang Member Left End - Same as Second Floor - Overhang Member Left End Roofdeck - Overhang Member Right End Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 8 1.20 1.2 -0.72 - Total: -0.72 kN-m - kN-m REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
LONGITUDINAL FRAME - FRAME B
DEAD LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member 1-2
Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 4 3.18 3 3 6 -2.38 2.38 2 18.85 6 -38.88 17.67 2 19.34 same as Case 2 (mirrored) 6 -18.13 39.89 Total: -59.39 kN-m 59.94 kN-m Second Floor - Member 2-3 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 13.5 4 -18 18 Total: -18 kN-m 18 kN-m Second Floor - Member 3-4 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 18.36 6 -55.08 55.08 Total: -55.08 kN-m 55.08 kN-m Second Floor - Overhang Member Left End Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 5.47 1.2 - 3.94 9 30.56 1.2 - 36.67 Total: - kN-m 40.61 kN-m Roofdeck - Member 1-2 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 16.17 6 -48.51 48.51 Total: -48.51 kN-m 48.51 kN-m Roofdeck - Member 2-3 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 11.34 4 -15.12 15.12 Total: -15.12 kN-m 15.12 kN-m Roofdeck - Member 3-4 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 16.17 6 -48.51 48.51 Roofdeck - Overhang Member Left End Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 5.09 1.2 - 3.66 9 32.51 1.2 - 39.01 Total: - kN-m 42.67 kN-m Roofdeck - Overhang Member Right End Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 2.83 1.2 -2.04 - 8 2.35 1.2 -1.41 - Total: -3.45 kN-m - kN-m REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
LONGITUDINAL FRAME - FRAME C
LIVE LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member 1-2
Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 13.58 6 -40.74 40.74 Total: -40.74 kN-m 40.74 kN-m Second Floor - Member 2-3 Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 9.58 4 -12.77 12.77 Total: -12.77 kN-m 12.77 kN-m Second Floor - Member 3-4 - Same as Second Floor - Member 1-2 Second Floor - Overhang Member Left End Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 2.3 1.2 - 1.66 9 14.35 1.2 - 17.22 Total: - kN-m 18.88 kN-m Roofdeck - Member 1-2 - Same as Second Floor - Member 1-2 Roofdeck - Member 2-3 Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 9.58 4 -12.77 12.77 Total: -12.77 kN-m 12.77 kN-m Roofdeck - Member 3-4 - Same as Second Floor - Member 1-2 Roofdeck - Overhang Member Left End - Same as Second Floor - Overhang Member Left End REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
LONGITUDINAL FRAME - FRAME C
DEAD LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member 1-2
Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 4 3.18 3 3 6 -2.38 2.38 2 18.85 6 -38.88 17.67 2 19.34 same as Case 2 (mirrored) 6 -18.13 39.89 Total: -59.39 kN-m 59.94 kN-m Second Floor - Member 2-3 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 15.33 4 -20.44 20.44 Total: -20.44 kN-m 20.44 kN-m Second Floor - Member 3-4 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 18.36 6 -55.08 55.08 3 13.06 3.7 2.3 6 -7.1 11.42 Total: -55.08 kN-m 55.08 kN-m Second Floor - Overhang Member Left End Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 5.47 1.2 - 3.94 9 30.56 1.2 - 36.67 Total: - kN-m 40.61 kN-m Roofdeck - Member 1-2 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 16.17 6 -48.51 48.51 Total: -48.51 kN-m 48.51 kN-m Roofdeck - Member 2-3 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 12.25 4 -16.33 16.33 Total: -16.33 kN-m 16.33 kN-m Roofdeck - Member 3-4 - Same as Roofdeck - Member 1-2 Roofdeck - Overhang Member Left End Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 5.09 1.2 - 3.66 9 32.51 1.2 - 39.01 Total: - kN-m 42.67 kN-m REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
LONGITUDINAL FRAME - FRAME D
LIVE LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member 1-2
Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 7.19 6 -21.57 21.57 Total: -21.57 kN-m 21.57 kN-m Second Floor - Member 2-3 Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 4.79 4 -6.39 6.39 Total: -6.39 kN-m 6.39 kN-m Second Floor - Member 3-4 Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 9.18 6 -27.54 27.54 Total: -27.54 kN-m 27.54 kN-m Second Floor - Overhang Member Left End Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 1.15 1.2 - 0.83 9 7.17 1.2 - 8.6 Total: - kN-m 9.43 kN-m Roofdeck - Member 1-2 - Same as Second Floor - Member 1-2 Roofdeck - Member 2-3 - Same as Second Floor - Member 2-3 Roofdeck - Member 3-4 - Same as Second Floor - Member 3-4 Roofdeck - Overhang Member Left End - Same as Overhang Member Left End REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
LONGITUDINAL FRAME - FRAME D
DEAD LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member 1-2
Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 12.04 6 -36.12 36.12 3 3.18 3 3 6 -2.38 2.38 Total: -36.12 kN-m 36.12 kN-m Second Floor - Member 2-3 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 13.1 4 -17.47 17.47 Total: -17.47 kN-m 17.47 kN-m Second Floor - Member 3-4 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 13.33 6 -39.99 39.99 3 16.70 3.7 2.3 6 -9.08 14.61 Total: -39.99 kN-m 39.99 kN-m Second Floor - Overhang Member Left End Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 9.94 1.2 - 7.16 9 16.68 1.2 - 20.02 Total: - kN-m 27.18 kN-m Roofdeck - Member 1-2 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 10.74 6 -32.22 32.22 Total: -32.22 kN-m 32.22 kN-m Roofdeck - Member 2-3 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 6.82 4 -9.09 9.09 Total: -9.09 kN-m 9.09 kN-m Roofdeck - Member 3-4 Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 4.79 6 -14.37 14.37 Total: -14.37 kN-m 14.37 kN-m Roofdeck - Overhang Member Left End Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 4.81 1.2 - 3.46 9 18.09 1.2 - 21.71 Total: - kN-m 25.17 kN-m REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
TRANSVERSAL FRAME - FRAME 1
LIVE LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member A-B
Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 9.58 6 -28.74 28.74 Total: -28.74 kN-m 28.74 kN-m Second Floor - Member B-C Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 8.38 4 -11.17 11.17 Total: -11.17 kN-m 11.17 kN-m Second Floor - Member C-D Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 9.58 6 -28.74 28.74 Total: -28.74 kN-m 28.74 kN-m Roofdeck - Member A-B - Same as Second Floor - Member A-B Roofdeck - Member B-C - Same as Second Floor - Member B-C Roofdeck - Member C-D - Same as Second Floor - Member C-D REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
LONGITUDINAL FRAME - FRAME 1
DEAD LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member A-B
Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 13.78 6 -41.34 41.34 Total: -41.34 kN-m 41.34 kN-m Second Floor - Member B-C Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 13.19 4 -17.59 17.59 Total: -17.59 kN-m 17.59 kN-m Second Floor - Member C-D Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 13.78 6 -41.34 41.34 Total: -41.34 kN-m 41.34 kN-m Roofdeck - Member A-B Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 12.24 6 -36.72 36.72 Total: -36.72 kN-m 36.72 kN-m Roofdeck - Member B-C Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 11.07 4 -14.76 14.76 Total: -14.76 kN-m 14.76 kN-m Roofdeck - Member C-D - Same as Roofdeck - Member A-B REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
TRANSVERSAL FRAME - FRAME 2
LIVE LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member A-B
Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 3 7.72 3.76 2.24 6 -4.05 6.79 5 7.19 3.76 2.24 6 -18.34 11.25 6 8.19 3.76 2.24 6 -3.68 11.75 Total: -26.07 kN-m 29.79 kN-m Second Floor - Member B-C Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 9.58 4 -12.77 12.77 Total: -12.77 kN-m 12.77 kN-m Second Floor - Member C-D Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 13.58 6 -40.74 40.74 Total: -40.74 kN-m 40.74 kN-m Roofdeck - Member A-B - Same as Second Floor - Member C-D Roofdeck - Member B-C - Same as Second Floor - Member B-C Roofdeck - Member C-D - Same as Second Floor - Member C-D REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
LONGITUDINAL FRAME - FRAME 2
DEAD LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member A-B
Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 3 14.50 3.76 2.24 6 -7.6 12.76 5 11.05 3.76 2.24 6 -28.18 17.3 6 12.19 3.76 2.24 6 -5.48 17.49 Total: -41.26 kN-m 47.55 kN-m Second Floor - Member B-C Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 14.68 4 -19.57 19.57 Total: -19.57 kN-m 19.57 kN-m Second Floor - Member C-D Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 18.36 6 -55.08 55.08 Total: -55.08 kN-m 55.08 kN-m Roofdeck - Member A-B Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 16.17 6 -48.51 48.51 Total: -48.51 kN-m 48.51 kN-m Roofdeck - Member B-C Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 12.25 4 -16.33 16.33 Total: -16.33 kN-m 16.33 kN-m Roofdeck - Member C-D - Same as Roofdeck - Member A-B REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
TRANSVERSAL FRAME - FRAME 3
LIVE LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member A-B
Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 3 7.72 3.76 2.24 6 -4.05 6.79 5 7.19 3.76 2.24 6 -18.34 11.25 6 8.19 3.76 2.24 6 -3.68 11.75 Total: -26.07 kN-m 29.79 kN-m Second Floor - Member B-C Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 9.58 4 -12.77 12.77 Total: -12.77 kN-m 12.77 kN-m Second Floor - Member C-D Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 13.58 6 -40.74 40.74 Total: -40.74 kN-m 40.74 kN-m Second Floor - Overhang Member Right End Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 0.92 1.05 -0.51 - 9 5.97 1.05 -6.27 - Total: -6.78 kN-m - kN-m Roofdeck - Member A-B Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 17.67 6 -53.01 53.01 Total: -53.01 kN-m 53.01 kN-m Roofdeck - Member B-C - Same as Second Floor - Member B-C Roofdeck - Member C-D - Same as Second Floor - Member C-D Roofdeck - Overhang Member Right End - Same as Second Floor - Overhang Member Right End REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
LONGITUDINAL FRAME - FRAME 3
DEAD LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member A-B
Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 3 14.50 3.76 2.24 6 -7.6 12.76 5 12.04 3.76 2.24 6 -30.71 18.84 6 13.18 3.76 2.24 6 -5.93 18.91 Total: -44.24 kN-m 50.51 kN-m Second Floor - Member B-C Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 14.78 4 -19.71 19.71 Total: -19.71 kN-m 19.71 kN-m Second Floor - Member C-D Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 18.36 6 -55.08 55.08 3 16.51 0.9 5.1 6 -10.74 1.9 3 14.39 3.5 2.5 6 -8.74 12.24 3 4.85 4.85 1.15 6 -0.86 3.64 Total: -75.42 kN-m 72.86 kN-m Second Floor - Overhang Member Right End Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 9.83 1.05 -5.42 - 9 34.63 1.05 -36.36 - Total: -41.78 kN-m - kN-m Roofdeck - Member A-B Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 16.17 6 -48.51 48.51 Total: -48.51 kN-m 48.51 kN-m Roofdeck - Member B-C Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 12.25 4 -16.33 16.33 Total: -16.33 kN-m 16.33 kN-m Roofdeck - Member C-D - Same as Roofdeck - Member A-B Roofdeck Floor - Overhang Member Right End Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 4.59 1.05 -2.53 - 9 16.92 1.05 -17.77 - Total: -20.3 kN-m - kN-m REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
TRANSVERSAL FRAME - FRAME 4
LIVE LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member A-B
Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 7.19 6 -21.57 21.57 Total: -21.57 kN-m 21.57 kN-m Second Floor - Member B-C Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 4.79 4 -6.39 6.39 Total: -6.39 kN-m 6.39 kN-m Second Floor - Member C-D - Same as Second Floor - Member A-B Second Floor - Overhang Member Right End Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 0.92 1.05 -0.51 - 9 5.97 1.05 -6.27 - Total: -6.78 kN-m - kN-m Roofdeck - Member A-B Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 11.28 6 -33.84 33.84 Total: -33.84 kN-m 33.84 kN-m Roofdeck - Member B-C - Same as Second Floor - Member B-C Roofdeck - Member C-D - Same as Second Floor - Member C-D Roofdeck - Overhang Member Right End - Same as Second Floor - Overhang Member Right End REINFORCED CONCRETE DESIGN 2Fixed End Moments Computations
LONGITUDINAL FRAME - FRAME 4
DEAD LOAD Note: *Cases are based on general values for end moments, see Table 1.0.
Second Floor - Member A-B
Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 16.99 6 -50.97 50.97 Total: -50.97 kN-m 50.97 kN-m Second Floor - Member B-C Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 14.25 4 -19 19 Total: -19 kN-m 19 kN-m Second Floor - Member C-D Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 16.99 6 -50.97 50.97 3 7.65 0.9 5.1 6 -4.98 0.88 3 14.23 3.5 2.5 6 -8.65 12.11 3 4.69 4.85 1.15 6 -0.84 3.52 Total: -65.44 kN-m 67.48 kN-m Second Floor - Overhang Member Right End Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 9.83 1.05 -5.42 - 9 35.04 1.05 -36.8 - Total: -42.22 kN-m - kN-m Roofdeck - Member A-B Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 10.74 6 -32.22 32.22 Total: -32.22 kN-m 32.22 kN-m Roofdeck - Member B-C Dead Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 1 8.39 4 -11.19 11.19 Total: -11.19 kN-m 11.19 kN-m Roofdeck - Member C-D - Same as Roofdeck - Member A-B Roofdeck Floor - Overhang Member Right End Live Load End Moments Case w (kN/m) P (kN) a b L Left support Right support 7 4.59 1.05 -2.53 - 9 16.92 1.05 -17.77 - Total: -20.3 kN-m - kN-m