Hydraulic Analysis Report - B4 :

INT-1

Generated by Aspen Plus V9

Simulation case: C:\Users\diana\OneDrive\Escritorio\DISEÑO DE


PLANTAS Y EQUIPOS\TORRES DESTILACION.bkp

20/03/2020
Contents
1. Column Internals Summary----------------------------------------------------------------------------------------------------------------3
2. Feed/Draw Summary------------------------------------------------------------------------------------------------------------------------4
3. CS-1--------------------------------------------------------------------------------------------------------------------------------------------- 5
3.1. Tray Geometry----------------------------------------------------------------------------------------------------------------------------- 5
3.2. Design Parameters------------------------------------------------------------------------------------------------------------------------7
3.3. Results Summary--------------------------------------------------------------------------------------------------------------------------8
3.4. By Tray Results---------------------------------------------------------------------------------------------------------------------------- 10
3.4.1. Hydraulic Results----------------------------------------------------------------------------------------------------------------------- 10
3.4.2. State Conditions------------------------------------------------------------------------------------------------------------------------- 19
3.4.3. Physical Properties--------------------------------------------------------------------------------------------------------------------- 21
3.5. Hydraulic Plots----------------------------------------------------------------------------------------------------------------------------- 23
4. CS-2--------------------------------------------------------------------------------------------------------------------------------------------- 54
4.1. Tray Geometry----------------------------------------------------------------------------------------------------------------------------- 54
4.2. Design Parameters------------------------------------------------------------------------------------------------------------------------56
4.3. Results Summary--------------------------------------------------------------------------------------------------------------------------57
4.4. By Tray Results---------------------------------------------------------------------------------------------------------------------------- 59
4.4.1. Hydraulic Results----------------------------------------------------------------------------------------------------------------------- 59
4.4.2. State Conditions------------------------------------------------------------------------------------------------------------------------- 66
4.4.3. Physical Properties--------------------------------------------------------------------------------------------------------------------- 67
4.5. Hydraulic Plots----------------------------------------------------------------------------------------------------------------------------- 68
5. Column Profile-------------------------------------------------------------------------------------------------------------------------------- 91
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

1. Column Internals Summary


Summary

Property Value Unit

Number of Trayed/Packed stages 55

Total height 16,5 meter

Total head loss (Hot liquid height) 3,33596 meter

Total pressure drop 0,233181 bar

Number of sections 2

Number of diameters 2

Sections

Section Section
Column Start End Diameter Internals Tray or % Approach Limiting
Height Pressure
1 Stage Stage (meter) Type Packing Type to Flood Stage
(meter) Drop (bar)

CS-1 2 32 2,9907 9,3 Trayed SIEVE 0,147672 80,0003 2

CS-2 33 56 2,87524 7,2 Trayed SIEVE 0,0855087 80,0003 33

Page 3 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

2. Feed/Draw Summary
Feed/Draw Summary

Stage Stream Feed/Draw

1 10 Draw

33 1 Feed

57 8 Draw

Page 4 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

3. CS-1
3.1. Tray Geometry
Section

Property Value Unit

Tray type SIEVE

Diameter 3,06308 meter

Tray spacing 0,3 meter

Number of passes 4

Hole diameter 0,0127 meter

Hole area / Active area 0,1

Number of Holes 4654

Deck gauge thickness 10 GAUGE

Deck gauge thickness value 3,4 mm

Cross-sectional area 7,36896 sqm

Active area 5,89517 sqm

Net area 6,63207 sqm

Downcomer geometry

Property Side Off-center Center Unit

Downcomer clearance 18,75 18,75 18,75 mm

Downcomer width top 186,328 135,448 120,318 mm

Downcomer width bottom 186,328 135,448 120,318 mm

Downcomer area top 0,184224 0,368448 0,368448 sqm

Downcomer area bottom 0,184224 0,368448 0,368448 sqm

Downcomer location (dist.


702,685 mm
from ctr.)

Weir geometry

Off-center
Property Side Off-center Inside Center Unit
Outside

Weir height 0,025 0,025 0,025 0,025 meter

Page 5 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Off-center
Property Side Off-center Inside Center Unit
Outside

Weir length 1,46427 2,64733 2,78743 3,06072 meter

Panels

Property A B C D Unit

Flow path length 0,574803 0,574803 0,574803 0,574803 meter

Page 6 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

3.2. Design Parameters


Design Parameters

Property Value Unit

% Jet flood and downcomer choke flood for


80
design

Minimum downcomer area / Total tray area 0,1

Maximum acceptable pressure drop 0,025 bar

Maximum % jet flood 100

Maximum % downcomer backup 100

Maximum % liquid entrainment 10

Minimum weir loading 4,47098 cum/hr-meter

Maximum weir loading 28,7653 cum/hr-meter

Warning status (% to limit) 10

System foaming factor 1

Aeration factor multiplier 1

Over design factor 1

Weep method Hsieh

Jet flood method Glitsch6

Maximum downcomer loading method Glitsch

Page 7 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

3.3. Results Summary


Summary

Property Value Unit

Section starting stage 2

Section ending stage 32

Calculation Mode Sizing

Tray type SIEVE

Number of passes 4

Tray spacing 0,3 meter

Section Diameter 3,06308 meter

Section height 9,3 meter

Section pressure drop 0,147947 bar

Section head loss (Hot liquid height) 2,11618 meter

Trays with weeping None

Limiting conditions

Property Value Unit Tray Location

Maximum % jet flood 80,0003 2

Maximum % downcomer
44,8267 2
backup (aerated)

Maximum downcomer
165,906 cum/hr/sqm 2 Side
loading

Maximum % downcomer
39,6118 2 Side
choke flood

Maximum weir loading 20,8731 cum/hr-meter 2 Side

Maximum aerated height


0,0416765 meter 2
over weir

Maximum % approach to
39,2183 2
system limit

Maximum Cs based on
0,0711111 m/sec 2
bubbling area

Messages Summary

Page 8 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Messages

The length of the side weir is less than 50% of the column diameter. We recommend increasing downcomer widths
or using swept back weirs.

Tray spacing is less than 0,3048 meter.

Page 9 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

3.4. By Tray Results


3.4.1. Hydraulic Results
CS-1 Hydraulic results (1)
Dry pressure Total pressure Downcomer
% Downcomer
Total pressure Dry pressure drop (Hot drop (Hot backup
Stage % Jet flood backup
drop (bar) drop (bar) liquid height) liquid height) (Aerated)
(Aerated)
(meter) (meter) (meter)
2 80,0003 0,00482195 44,8267 0,00330039 0,0472042 0,0689664 0,145687

3 79,9891 0,00482106 44,8194 0,0032995 0,0471915 0,0689538 0,145663

4 79,9768 0,0048201 44,8116 0,00329853 0,0471777 0,0689401 0,145638

5 79,9634 0,00481905 44,803 0,00329747 0,0471626 0,0689252 0,14561

6 79,9489 0,0048179 44,7936 0,00329631 0,0471461 0,0689089 0,145579

7 79,9329 0,00481664 44,7834 0,00329505 0,0471281 0,0688911 0,145546

8 79,9155 0,00481527 44,7722 0,00329367 0,0471085 0,0688716 0,14551

9 79,8964 0,00481377 44,7599 0,00329215 0,047087 0,0688502 0,14547

10 79,8755 0,00481212 44,7465 0,0032905 0,0470634 0,0688269 0,145426

11 79,8526 0,00481031 44,7318 0,00328868 0,0470375 0,0688012 0,145378

12 79,8273 0,00480832 44,7155 0,00328667 0,047009 0,068773 0,145326

13 79,7995 0,00480613 44,6977 0,00328447 0,0469776 0,0687419 0,145268

14 79,7688 0,00480372 44,678 0,00328204 0,046943 0,0687076 0,145204

15 79,7348 0,00480105 44,6563 0,00327935 0,0469048 0,0686697 0,145133

16 79,6972 0,00479809 44,6322 0,00327637 0,0468624 0,0686277 0,145055

17 79,6554 0,0047948 44,6054 0,00327306 0,0468153 0,0685811 0,144968

18 79,6088 0,00479114 44,5756 0,00326937 0,0467629 0,0685291 0,144871

19 79,5567 0,00478704 44,5423 0,00326525 0,0467043 0,0684711 0,144763

20 79,4983 0,00478246 44,5051 0,00326064 0,0466387 0,0684061 0,144641

21 79,4326 0,0047773 44,4632 0,00325545 0,0465649 0,068333 0,144505

22 79,3583 0,00477147 44,4158 0,00324958 0,0464815 0,0682504 0,144351

23 79,2739 0,00476486 44,3621 0,00324292 0,0463868 0,0681567 0,144177

24 79,1776 0,00475731 44,3009 0,00323532 0,0462789 0,0680498 0,143978

25 79,0669 0,00474865 44,2307 0,0032266 0,046155 0,0679271 0,14375

26 78,9387 0,00473864 44,1496 0,00321652 0,0460118 0,0677853 0,143486

Page 10 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Dry pressure Total pressure Downcomer


% Downcomer
Total pressure Dry pressure drop (Hot drop (Hot backup
Stage % Jet flood backup
drop (bar) drop (bar) liquid height) liquid height) (Aerated)
(Aerated)
(meter) (meter) (meter)
27 78,7892 0,00472696 44,0551 0,00320477 0,0458449 0,0676201 0,143179

28 78,6123 0,00471318 43,9437 0,00319089 0,0456478 0,0674251 0,142817

29 78,3986 0,00469658 43,8095 0,00317417 0,0454102 0,0671901 0,142381

30 78,1271 0,0046756 43,6398 0,00315299 0,0451088 0,0668922 0,141829

31 77,7344 0,00464567 43,3958 0,00312265 0,044674 0,0664631 0,141036

32 76,9834 0,00458997 42,9346 0,0030656 0,0438458 0,0656481 0,139537

CS-1 Hydraulic results (2)


Downcomer Liquid mass Liquid volume
% Downcomer Fs (bubbling
backup rate / Column rate / Column Fs (net area) Cs (net area)
Stage backup area)
(Unaerated) area area (sqrt(atm)) (m/sec)
(Unaerated) (sqrt(atm))
(meter) (kg/hr-sqm) (cum/hr/sqm)
2 0,0882527 27,1547 11828,4 16,5906 0,0052824 0,0059427 0,0632099

3 0,0882385 27,1503 11825,9 16,5871 0,00528168 0,0059419 0,0632013

4 0,0882229 27,1455 11823,1 16,5832 0,00528091 0,00594102 0,063192

5 0,088206 27,1403 11820,2 16,5791 0,00528006 0,00594007 0,0631819

6 0,0881876 27,1346 11816,9 16,5745 0,00527913 0,00593902 0,0631708

7 0,0881674 27,1284 11813,4 16,5696 0,00527812 0,00593789 0,0631587

8 0,0881454 27,1217 11809,5 16,5642 0,00527701 0,00593664 0,0631455

9 0,0881213 27,1142 11805,2 16,5582 0,0052758 0,00593528 0,063131

10 0,0880948 27,1061 11800,5 16,5517 0,00527447 0,00593378 0,0631152

11 0,0880658 27,0972 11795,4 16,5446 0,00527301 0,00593214 0,0630977

12 0,0880339 27,0874 11789,8 16,5368 0,00527141 0,00593033 0,0630786

13 0,0879988 27,0765 11783,6 16,5281 0,00526964 0,00592835 0,0630574

14 0,08796 27,0646 11776,7 16,5186 0,00526769 0,00592615 0,0630341

15 0,0879172 27,0514 11769,2 16,508 0,00526553 0,00592372 0,0630083

16 0,0878697 27,0368 11760,8 16,4964 0,00526314 0,00592103 0,0629798

17 0,087817 27,0206 11751,5 16,4834 0,00526048 0,00591804 0,062948

Page 11 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Downcomer Liquid mass Liquid volume


% Downcomer Fs (bubbling
backup rate / Column rate / Column Fs (net area) Cs (net area)
Stage backup area)
(Unaerated) area area (sqrt(atm)) (m/sec)
(Unaerated) (sqrt(atm))
(meter) (kg/hr-sqm) (cum/hr/sqm)
18 0,0877584 27,0026 11741,1 16,4689 0,00525752 0,00591471 0,0629126

19 0,0876929 26,9824 11729,5 16,4528 0,0052542 0,00591098 0,0628731

20 0,0876194 26,9598 11716,5 16,4347 0,00525049 0,0059068 0,0628288

21 0,0875369 26,9344 11701,9 16,4144 0,00524631 0,00590209 0,0627788

22 0,0874437 26,9058 11685,4 16,3914 0,00524158 0,00589677 0,0627224

23 0,087338 26,8732 11666,7 16,3654 0,0052362 0,00589073 0,0626583

24 0,0872174 26,8361 11645,3 16,3356 0,00523007 0,00588383 0,0625851

25 0,0870792 26,7936 11620,7 16,3015 0,00522301 0,00587589 0,062501

26 0,0869195 26,7444 11592,4 16,262 0,00521485 0,0058667 0,0624036

27 0,0867334 26,6872 11559,3 16,2161 0,00520531 0,00585597 0,0622899

28 0,086514 26,6197 11520,3 16,1618 0,00519403 0,00584329 0,0621555

29 0,0862498 26,5384 11473,3 16,0965 0,0051804 0,00582795 0,0619929

30 0,0859155 26,4355 11414 16,0139 0,00516309 0,00580848 0,0617862

31 0,0854354 26,2878 11330,1 15,896 0,00513819 0,00578046 0,0614867

32 0,0845285 26,0088 11176,1 15,6756 0,00509103 0,00572741 0,0609125

CS-1 Hydraulic results (3)


Side Center Off-center
Approach to % Side % Center
Cs (bubbling downcomer downcomer downcomer
Stage system limit Downcomer Downcomer
area) (m/sec) exit velocity exit velocity exit velocity
(%) Choke Flood Choke Flood
(m/sec) (m/sec) (m/sec)
2 0,0711111 0,309231 0,147938 0,16663 39,2183 39,6118 39,6118

3 0,0711015 0,309166 0,147907 0,166595 39,2127 39,6035 39,6035

4 0,071091 0,309095 0,147873 0,166557 39,2066 39,5944 39,5944

5 0,0710796 0,309018 0,147836 0,166515 39,1999 39,5845 39,5845

6 0,0710672 0,308933 0,147796 0,16647 39,1927 39,5736 39,5736

7 0,0710536 0,308841 0,147752 0,16642 39,1847 39,5618 39,5618

8 0,0710387 0,30874 0,147703 0,166365 39,1761 39,5489 39,5489

Page 12 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Side Center Off-center


Approach to % Side % Center
Cs (bubbling downcomer downcomer downcomer
Stage system limit Downcomer Downcomer
area) (m/sec) exit velocity exit velocity exit velocity
(%) Choke Flood Choke Flood
(m/sec) (m/sec) (m/sec)
9 0,0710224 0,308629 0,14765 0,166306 39,1666 39,5347 39,5347

10 0,0710046 0,308508 0,147592 0,166241 39,1561 39,5192 39,5192

11 0,0709849 0,308375 0,147529 0,166169 39,1447 39,5022 39,5022

12 0,0709634 0,308229 0,147459 0,16609 39,1321 39,4835 39,4835

13 0,0709396 0,308068 0,147382 0,166003 39,1183 39,4629 39,4629

14 0,0709134 0,30789 0,147297 0,165907 39,103 39,4401 39,4401

15 0,0708844 0,307693 0,147203 0,165802 39,0861 39,415 39,415

16 0,0708522 0,307476 0,147098 0,165684 39,0674 39,3872 39,3872

17 0,0708165 0,307234 0,146983 0,165554 39,0466 39,3562 39,3562

18 0,0707767 0,306965 0,146854 0,165409 39,0234 39,3218 39,3218

19 0,0707322 0,306664 0,14671 0,165247 38,9975 39,2833 39,2833

20 0,0706823 0,306327 0,146549 0,165065 38,9685 39,2402 39,2402

21 0,0706262 0,305948 0,146368 0,164861 38,9358 39,1918 39,1918

22 0,0705627 0,30552 0,146163 0,16463 38,8989 39,137 39,137

23 0,0704906 0,305034 0,14593 0,164368 38,857 39,0749 39,0749

24 0,0704082 0,30448 0,145665 0,16407 38,8092 39,004 39,004

25 0,0703136 0,303844 0,145361 0,163727 38,7543 38,9227 38,9227

26 0,0702041 0,303108 0,145009 0,163331 38,6908 38,8287 38,8287

27 0,0700761 0,302251 0,144599 0,162869 38,6168 38,7192 38,7192

28 0,0699249 0,30124 0,144115 0,162324 38,5293 38,5901 38,5901

29 0,069742 0,300022 0,143533 0,161668 38,4237 38,4344 38,4344

30 0,0695094 0,298484 0,142797 0,160839 38,29 38,2375 38,2375

31 0,0691726 0,296286 0,141745 0,159654 38,0975 37,9551 37,9551

32 0,0685265 0,292178 0,13978 0,157441 37,7329 37,4227 37,4227

CS-1 Hydraulic results (4)

Page 13 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Height over Side Side Side


% Offcenter Height over Side
weir downcomer downcomer downcomer
Stage Downcomer weir (Aerated) downcomer
(Unaerated) residence time velocity from velocity from
Choke Flood (meter) volume (l)
(meter) (hr) top (m/sec) bottom (m/sec)
0,00053194
2 39,6118 0,0416765 0,00911072 16,2583 0,0460849 0,0460849
5

0,00053197
3 39,6035 0,041668 0,0091097 16,2556 0,0460752 0,0460752
1

4 39,5944 0,0416589 0,0091086 16,2528 0,000532 0,0460646 0,0460646

0,00053203
5 39,5845 0,0416489 0,00910739 16,2497 0,0460531 0,0460531
2

0,00053206
6 39,5736 0,041638 0,00910608 16,2463 0,0460405 0,0460405
6

0,00053210
7 39,5618 0,0416261 0,00910464 16,2426 0,0460267 0,0460267
3

0,00053214
8 39,5489 0,041613 0,00910307 16,2385 0,0460116 0,0460116
4

0,00053218
9 39,5347 0,0415988 0,00910135 16,2341 0,0459952 0,0459952
9

0,00053223
10 39,5192 0,0415831 0,00909946 16,2292 0,0459771 0,0459771
9

0,00053229
11 39,5022 0,041566 0,00909739 16,2238 0,0459573 0,0459573
3

0,00053235
12 39,4835 0,0415471 0,00909512 16,218 0,0459355 0,0459355
2

0,00053241
13 39,4629 0,0415263 0,00909261 16,2115 0,0459115 0,0459115
8

0,00053249
14 39,4401 0,0415033 0,00908985 16,2044 0,045885 0,045885
1

0,00053257
15 39,415 0,041478 0,00908679 16,1965 0,0458557 0,0458557
1

0,00053266
16 39,3872 0,0414499 0,0090834 16,1877 0,0458233 0,0458233
1

17 39,3562 0,0414186 0,00907963 16,178 0,00053276 0,0457872 0,0457872

0,00053287
18 39,3218 0,0413838 0,00907544 16,1672 0,0457471 0,0457471
1

0,00053299
19 39,2833 0,041345 0,00907076 16,1551 0,0457023 0,0457023
6

Page 14 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Height over Side Side Side


% Offcenter Height over Side
weir downcomer downcomer downcomer
Stage Downcomer weir (Aerated) downcomer
(Unaerated) residence time velocity from velocity from
Choke Flood (meter) volume (l)
(meter) (hr) top (m/sec) bottom (m/sec)
0,00053313
20 39,2402 0,0413014 0,0090655 16,1416 0,0456521 0,0456521
5

0,00053329
21 39,1918 0,0412524 0,0090596 16,1264 0,0455956 0,0455956
3

0,00053347
22 39,137 0,041197 0,00905292 16,1092 0,0455318 0,0455318
2

0,00053367
23 39,0749 0,0411341 0,00904534 16,0898 0,0454594 0,0454594
6

0,00053390
24 39,004 0,0410623 0,00903669 16,0676 0,0453767 0,0453767
9

0,00053417
25 38,9227 0,0409798 0,00902676 16,0421 0,0452819 0,0452819
9

0,00053449
26 38,8287 0,0408845 0,00901528 16,0127 0,0451724 0,0451724
2

27 38,7192 0,0407733 0,00900188 15,9784 0,00053486 0,0450447 0,0450447

0,00053529
28 38,5901 0,040642 0,00898607 15,938 0,044894 0,044894
8

29 38,4344 0,0404836 0,008967 15,8893 0,00053583 0,0447125 0,0447125

0,00053650
30 38,2375 0,0402832 0,0089429 15,8277 0,0444832 0,0444832
5

0,00053746
31 37,9551 0,0399962 0,00890843 15,7393 0,0441556 0,0441556
4

0,00053923
32 37,4227 0,0394574 0,00884396 15,5722 0,0435434 0,0435434
5

CS-1 Hydraulic results (5)


Center Center Center Off-center Off-center
Center Off-center
downcomer downcomer downcomer downcomer downcomer
Stage downcomer downcomer
residence time velocity from velocity from residence time velocity from
volume (l) volume (l)
(hr) top (m/sec) bottom (m/sec) (hr) top (m/sec)
0,00053194 0,00053194
2 32,5165 0,0460849 0,0460849 32,5165 0,0460849
5 5

0,00053197 0,00053197
3 32,5113 0,0460752 0,0460752 32,5113 0,0460752
1 1

4 32,5056 0,000532 0,0460646 0,0460646 32,5056 0,000532 0,0460646

Page 15 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Center Center Center Off-center Off-center


Center Off-center
downcomer downcomer downcomer downcomer downcomer
Stage downcomer downcomer
residence time velocity from velocity from residence time velocity from
volume (l) volume (l)
(hr) top (m/sec) bottom (m/sec) (hr) top (m/sec)
0,00053203 0,00053203
5 32,4994 0,0460531 0,0460531 32,4994 0,0460531
2 2

0,00053206 0,00053206
6 32,4926 0,0460405 0,0460405 32,4926 0,0460405
6 6

0,00053210 0,00053210
7 32,4851 0,0460267 0,0460267 32,4851 0,0460267
3 3

0,00053214 0,00053214
8 32,477 0,0460116 0,0460116 32,477 0,0460116
4 4

0,00053218 0,00053218
9 32,4681 0,0459952 0,0459952 32,4681 0,0459952
9 9

0,00053223 0,00053223
10 32,4584 0,0459771 0,0459771 32,4584 0,0459771
9 9

0,00053229 0,00053229
11 32,4477 0,0459573 0,0459573 32,4477 0,0459573
3 3

0,00053235 0,00053235
12 32,4359 0,0459355 0,0459355 32,4359 0,0459355
2 2

0,00053241 0,00053241
13 32,423 0,0459115 0,0459115 32,423 0,0459115
8 8

0,00053249 0,00053249
14 32,4087 0,045885 0,045885 32,4087 0,045885
1 1

0,00053257 0,00053257
15 32,3929 0,0458557 0,0458557 32,3929 0,0458557
1 1

0,00053266 0,00053266
16 32,3754 0,0458233 0,0458233 32,3754 0,0458233
1 1

17 32,356 0,00053276 0,0457872 0,0457872 32,356 0,00053276 0,0457872

0,00053287 0,00053287
18 32,3344 0,0457471 0,0457471 32,3344 0,0457471
1 1

0,00053299 0,00053299
19 32,3103 0,0457023 0,0457023 32,3103 0,0457023
6 6

0,00053313 0,00053313
20 32,2832 0,0456521 0,0456521 32,2832 0,0456521
5 5

0,00053329 0,00053329
21 32,2528 0,0455956 0,0455956 32,2528 0,0455956
3 3

22 32,2185 0,00053347 0,0455318 0,0455318 32,2185 0,00053347 0,0455318

Page 16 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Center Center Center Off-center Off-center


Center Off-center
downcomer downcomer downcomer downcomer downcomer
Stage downcomer downcomer
residence time velocity from velocity from residence time velocity from
volume (l) volume (l)
(hr) top (m/sec) bottom (m/sec) (hr) top (m/sec)
2 2

0,00053367 0,00053367
23 32,1795 0,0454594 0,0454594 32,1795 0,0454594
6 6

0,00053390 0,00053390
24 32,1351 0,0453767 0,0453767 32,1351 0,0453767
9 9

0,00053417 0,00053417
25 32,0842 0,0452819 0,0452819 32,0842 0,0452819
9 9

0,00053449 0,00053449
26 32,0253 0,0451724 0,0451724 32,0253 0,0451724
2 2

27 31,9568 0,00053486 0,0450447 0,0450447 31,9568 0,00053486 0,0450447

0,00053529 0,00053529
28 31,8759 0,044894 0,044894 31,8759 0,044894
8 8

29 31,7786 0,00053583 0,0447125 0,0447125 31,7786 0,00053583 0,0447125

0,00053650 0,00053650
30 31,6554 0,0444832 0,0444832 31,6554 0,0444832
5 5

0,00053746 0,00053746
31 31,4785 0,0441556 0,0441556 31,4785 0,0441556
4 4

0,00053923 0,00053923
32 31,1444 0,0435434 0,0435434 31,1444 0,0435434
5 5

CS-1 Hydraulic results (6)

Stage Off-center downcomer velocity from bottom (m/sec)

2 0,0460849

3 0,0460752

4 0,0460646

5 0,0460531

6 0,0460405

7 0,0460267

8 0,0460116

Page 17 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Stage Off-center downcomer velocity from bottom (m/sec)

9 0,0459952

10 0,0459771

11 0,0459573

12 0,0459355

13 0,0459115

14 0,045885

15 0,0458557

16 0,0458233

17 0,0457872

18 0,0457471

19 0,0457023

20 0,0456521

21 0,0455956

22 0,0455318

23 0,0454594

24 0,0453767

25 0,0452819

26 0,0451724

27 0,0450447

28 0,044894

29 0,0447125

30 0,0444832

31 0,0441556

32 0,0435434

Page 18 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

3.4.2. State Conditions


CS-1 State conditions

Liquid Vapor Liquid mass flow Vapor mass flow Liquid volume Vapor volume
Stage
temperature (C) temperature (C) (kg/hr) (kg/hr) flow (l/min) flow (l/min)

2 85,2175 85,2202 87163 92630 2037,59 289987

3 85,2202 85,2232 87144,5 92611,5 2037,16 289967

4 85,2232 85,2264 87124,3 92591,3 2036,69 289945

5 85,2264 85,23 87102,3 92569,3 2036,18 289920

6 85,23 85,2339 87078,4 92545,4 2035,62 289894

7 85,2339 85,2382 87052,2 92519,2 2035,01 289865

8 85,2382 85,2429 87023,5 92490,5 2034,35 289833

9 85,2429 85,2481 86992,1 92459,1 2033,62 289798

10 85,2481 85,2538 86957,8 92424,8 2032,82 289760

11 85,2538 85,2601 86920 92387 2031,94 289718

12 85,2601 85,267 86878,5 92345,5 2030,98 289672

13 85,267 85,2748 86832,8 92299,8 2029,92 289621

14 85,2748 85,2833 86782,3 92249,3 2028,75 289564

15 85,2833 85,2929 86726,6 92193,6 2027,45 289502

16 85,2929 85,3036 86664,8 92131,8 2026,02 289433

17 85,3036 85,3157 86596,2 92063,2 2024,43 289356

18 85,3157 85,3292 86519,7 91986,7 2022,65 289270

19 85,3292 85,3445 86434,3 91901,3 2020,67 289175

20 85,3445 85,3619 86338,6 91805,6 2018,45 289067

21 85,3619 85,3817 86231 91698 2015,95 288945

22 85,3817 85,4045 86109,3 91576,3 2013,13 288808

23 85,4045 85,4308 85971,2 91438,2 2009,93 288651

24 85,4308 85,4615 85813,7 91280,7 2006,28 288472

25 85,4615 85,4977 85632,8 91099,8 2002,09 288266

26 85,4977 85,5407 85423,8 90890,8 1997,24 288026

27 85,5407 85,5931 85180 90647 1991,6 287745

Page 19 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Liquid Vapor Liquid mass flow Vapor mass flow Liquid volume Vapor volume
Stage
temperature (C) temperature (C) (kg/hr) (kg/hr) flow (l/min) flow (l/min)

28 85,5931 85,6599 84892,4 90359,4 1984,93 287411

29 85,6599 85,7554 84546,1 90013,1 1976,91 287005

30 85,7554 85,9313 84109,6 89576,6 1966,77 286479

31 85,9313 86,4011 83491,3 88958,3 1952,29 285694

32 86,4011 88,0975 82356,5 87823,5 1925,22 284099

Page 20 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

3.4.3. Physical Properties


CS-1 Physical properties

Liquid Vapor Surface


Liquid mass Vapor mass Liquid viscosity Vapor viscosity
Stage molecular molecular tension
density (gm/cc) density (gm/cc) (cP) (cP)
weight weight (dyne/cm)

2 58,0364 58,0367 0,712959 0,00532379 0,192446 0,0091834 15,7648

3 58,0301 58,0308 0,712958 0,00532311 0,192516 0,00918423 15,765

4 58,0232 58,0243 0,712957 0,00532236 0,192592 0,00918514 15,7652

5 58,0157 58,0173 0,712956 0,00532154 0,192675 0,00918613 15,7654

6 58,0075 58,0096 0,712954 0,00532065 0,192766 0,00918722 15,7656

7 57,9986 58,0012 0,712953 0,00531968 0,192865 0,0091884 15,7659

8 57,9888 57,992 0,712952 0,00531861 0,192974 0,00918969 15,7662

9 57,9781 57,9819 0,71295 0,00531745 0,193092 0,00919111 15,7665

10 57,9664 57,9709 0,712948 0,00531617 0,193222 0,00919266 15,7669

11 57,9536 57,9588 0,712946 0,00531477 0,193365 0,00919437 15,7673

12 57,9394 57,9455 0,712944 0,00531323 0,193522 0,00919624 15,7677

13 57,9239 57,9309 0,712941 0,00531153 0,193695 0,00919831 15,7681

14 57,9067 57,9147 0,712938 0,00530966 0,193885 0,00920059 15,7686

15 57,8878 57,8969 0,712935 0,00530759 0,194096 0,00920311 15,7692

16 57,8668 57,8772 0,712932 0,0053053 0,194329 0,0092059 15,7698

17 57,8435 57,8553 0,712928 0,00530276 0,194589 0,00920901 15,7704

18 57,8176 57,8309 0,712923 0,00529993 0,194877 0,00921247 15,7711

19 57,7887 57,8037 0,712918 0,00529676 0,1952 0,00921633 15,7719

20 57,7564 57,7733 0,712912 0,00529322 0,195561 0,00922067 15,7728

21 57,72 57,7391 0,712905 0,00528923 0,195967 0,00922555 15,7737

22 57,679 57,7005 0,712897 0,00528473 0,196426 0,00923106 15,7748

23 57,6325 57,6568 0,712887 0,00527962 0,196947 0,00923733 15,7759

24 57,5795 57,607 0,712876 0,0052738 0,19754 0,00924448 15,7772

25 57,5189 57,55 0,712863 0,00526712 0,198222 0,0092527 15,7786

26 57,449 57,4844 0,712848 0,00525941 0,199009 0,00926222 15,7802

Page 21 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Liquid Vapor Surface


Liquid mass Vapor mass Liquid viscosity Vapor viscosity
Stage molecular molecular tension
density (gm/cc) density (gm/cc) (cP) (cP)
weight weight (dyne/cm)

27 57,368 57,4082 0,712829 0,00525042 0,199926 0,00927333 15,7819

28 57,2734 57,3193 0,712806 0,00523984 0,201009 0,00928649 15,7838

29 57,1631 57,2157 0,71278 0,00522715 0,202316 0,00930246 15,7858

30 57,0375 57,0978 0,712756 0,00521135 0,20398 0,00932309 15,788

31 56,9135 56,9816 0,712766 0,00518961 0,206416 0,00935432 15,7903

32 56,8873 56,9578 0,712962 0,00515217 0,211232 0,00941948 15,7928

Page 22 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

3.5. Hydraulic Plots

Page 23 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 24 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 25 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 26 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 27 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 28 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 29 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 30 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 31 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 32 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 33 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 34 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 35 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 36 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 37 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 38 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 39 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 40 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 41 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 42 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 43 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 44 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 45 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 46 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 47 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 48 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 49 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 50 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 51 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 52 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 53 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

4. CS-2
4.1. Tray Geometry
Section

Property Value Unit

Tray type SIEVE

Diameter 3,01559 meter

Tray spacing 0,3 meter

Number of passes 4

Hole diameter 0,0127 meter

Hole area / Active area 0,1

Number of Holes 4511

Deck gauge thickness 10 GAUGE

Deck gauge thickness value 3,4 mm

Cross-sectional area 7,14225 sqm

Active area 5,7138 sqm

Net area 6,42803 sqm

Downcomer geometry

Property Side Off-center Center Unit

Downcomer clearance 18,75 18,75 18,75 mm

Downcomer width top 183,439 133,348 118,453 mm

Downcomer width bottom 183,439 133,348 118,453 mm

Downcomer area top 0,178556 0,357113 0,357113 sqm

Downcomer area bottom 0,178556 0,357113 0,357113 sqm

Downcomer location (dist.


691,792 mm
from ctr.)

Weir geometry

Off-center
Property Side Off-center Inside Center Unit
Outside

Weir height 0,025 0,025 0,025 0,025 meter

Page 54 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Off-center
Property Side Off-center Inside Center Unit
Outside

Weir length 1,44157 2,60628 2,74421 3,01327 meter

Panels

Property A B C D Unit

Flow path length 0,565892 0,565892 0,565892 0,565892 meter

Page 55 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

4.2. Design Parameters


Design Parameters

Property Value Unit

% Jet flood and downcomer choke flood for


80
design

Minimum downcomer area / Total tray area 0,1

Maximum acceptable pressure drop 0,025 bar

Maximum % jet flood 100

Maximum % downcomer backup 100

Maximum % liquid entrainment 10

Minimum weir loading 4,47098 cum/hr-meter

Maximum weir loading 28,7653 cum/hr-meter

Warning status (% to limit) 10

System foaming factor 1

Aeration factor multiplier 1

Over design factor 1

Weep method Hsieh

Jet flood method Glitsch6

Maximum downcomer loading method Glitsch

Page 56 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

4.3. Results Summary


Summary

Property Value Unit

Section starting stage 33

Section ending stage 56

Calculation Mode Sizing

Tray type SIEVE

Number of passes 4

Tray spacing 0,3 meter

Section Diameter 3,01559 meter

Section height 7,2 meter

Section pressure drop 0,104178 bar

Section head loss (Hot liquid height) 1,49206 meter

Trays with weeping None

Limiting conditions

Property Value Unit Tray Location

Maximum % jet flood 80,0003 33

Maximum % downcomer
45,9984 33
backup (aerated)

Maximum downcomer
190,381 cum/hr/sqm 33 Side
loading

Maximum % downcomer
45,4177 33 Side
choke flood

Maximum weir loading 23,5811 cum/hr-meter 33 Side

Maximum aerated height


0,0450826 meter 33
over weir

Maximum % approach to
38,8892 33
system limit

Maximum Cs based on
0,0705465 m/sec 33
bubbling area

Messages Summary

Page 57 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Messages

The length of the side weir is less than 50% of the column diameter. We recommend increasing downcomer widths
or using swept back weirs.

Tray spacing is less than 0,3048 meter.

Page 58 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

4.4. By Tray Results


4.4.1. Hydraulic Results
CS-2 Hydraulic results (1)
Dry pressure Total pressure Downcomer
% Downcomer
Total pressure Dry pressure drop (Hot drop (Hot backup
Stage % Jet flood backup
drop (bar) drop (bar) liquid height) liquid height) (Aerated)
(Aerated)
(meter) (meter) (meter)
33 80,0003 0,00482597 45,9984 0,00325363 0,0464694 0,0689261 0,149495

34 79,987 0,00482493 45,99 0,00325257 0,0464544 0,0689114 0,149467

35 79,9681 0,00482346 45,978 0,00325106 0,046433 0,0688905 0,149428

36 79,941 0,00482135 45,9608 0,0032489 0,0464023 0,0688607 0,149373

37 79,9024 0,00481834 45,9364 0,00324583 0,0463587 0,0688181 0,149293

38 79,8472 0,00481405 45,9015 0,00324144 0,0462963 0,0687574 0,14918

39 79,7683 0,00480792 45,8516 0,00323517 0,0462073 0,0686706 0,149018

40 79,6554 0,00479914 45,7804 0,00322619 0,0460799 0,0685464 0,148786

41 79,4932 0,00478657 45,6783 0,00321333 0,0458972 0,0683684 0,148454

42 79,2595 0,00476848 45,5315 0,00319483 0,0456347 0,0681126 0,147977

43 78,921 0,00474238 45,3199 0,00316813 0,0452557 0,0677434 0,14729

44 78,4276 0,00470451 45,0134 0,00312939 0,044706 0,0672079 0,146294

45 77,7027 0,00464926 44,5672 0,00307287 0,0439042 0,0664273 0,144843

46 76,6291 0,00456831 43,9155 0,00299003 0,0427296 0,0652844 0,142725

47 75,0355 0,00445007 42,9684 0,00286898 0,0410143 0,0636171 0,139647

48 72,7126 0,00428176 41,6313 0,0026966 0,0385741 0,0612494 0,135302

49 69,5602 0,00406086 39,9006 0,00247025 0,0353768 0,0581561 0,129677

50 65,9462 0,0038174 38,0358 0,00222113 0,0318733 0,05478 0,123616

51 62,769 0,00361029 36,5019 0,00201059 0,0289373 0,0519609 0,118631

52 60,6576 0,00347469 35,5375 0,00187447 0,0270611 0,0501631 0,115497

53 59,5534 0,00340377 35,052 0,00180413 0,0261025 0,0492465 0,113919

54 59,2101 0,00338169 34,9103 0,00178189 0,0258022 0,0489678 0,113459

55 59,6817 0,00341211 35,1449 0,00180959 0,0261834 0,0493708 0,114221

56 61,5929 0,00353068 36,103 0,00192171 0,027774 0,0510279 0,117335

CS-2 Hydraulic results (2)

Page 59 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Downcomer Liquid mass Liquid volume


% Downcomer Fs (bubbling
backup rate / Column rate / Column Fs (net area) Cs (net area)
Stage backup area)
(Unaerated) area area (sqrt(atm)) (m/sec)
(Unaerated) (sqrt(atm))
(meter) (kg/hr-sqm) (cum/hr/sqm)
33 0,0905656 27,8663 13592,7 19,0381 0,00524484 0,00590045 0,062708

34 0,0905491 27,8612 13589,8 19,0342 0,00524399 0,00589949 0,0626979

35 0,0905254 27,854 13585,8 19,0287 0,00524277 0,00589812 0,0626833

36 0,0904916 27,8436 13580,1 19,0207 0,00524103 0,00589616 0,0626626

37 0,0904435 27,8288 13572 19,0095 0,00523855 0,00589337 0,062633

38 0,0903748 27,8076 13560,4 18,9933 0,00523501 0,00588938 0,0625908

39 0,0902766 27,7774 13543,8 18,9703 0,00522994 0,00588368 0,0625304

40 0,0901363 27,7342 13520 18,9373 0,00522268 0,00587552 0,0624439

41 0,0899352 27,6724 13485,8 18,8899 0,00521226 0,00586379 0,0623197

42 0,0896462 27,5835 13436,7 18,8217 0,00519723 0,00584689 0,0621406

43 0,0892295 27,4552 13365,5 18,723 0,00517547 0,0058224 0,0618813

44 0,0886259 27,2695 13261,8 18,5793 0,00514373 0,0057867 0,0615033

45 0,087747 26,9991 13109,7 18,3685 0,00509706 0,0057342 0,0609476

46 0,0864635 26,6041 12884,9 18,0574 0,00502789 0,00565638 0,0601245

47 0,0845979 26,0301 12552,6 17,598 0,00492507 0,0055407 0,058902

48 0,081964 25,2197 12071,4 16,9339 0,00477481 0,00537167 0,057118

49 0,0785535 24,1703 11424,8 16,0452 0,00457003 0,00514128 0,0546933

50 0,0748768 23,039 10691,6 15,0458 0,00433346 0,00487514 0,0519075

51 0,0718492 22,1074 10050,3 14,1852 0,00412297 0,00463834 0,0494531

52 0,0699422 21,5207 9622,91 13,6237 0,00398095 0,00447857 0,0478192

53 0,0689803 21,2247 9400,04 13,3372 0,00390555 0,00439374 0,0469627

54 0,0686989 21,1381 9341,19 13,2648 0,0038814 0,00436658 0,0466916

55 0,0691624 21,2808 9481,67 13,454 0,00391145 0,00440038 0,0470378

56 0,0710503 21,8616 10001,4 14,1753 0,00403081 0,00453466 0,0484545

CS-2 Hydraulic results (3)

Page 60 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Side Center Off-center


Approach to % Side % Center
Cs (bubbling downcomer downcomer downcomer
Stage system limit Downcomer Downcomer
area) (m/sec) exit velocity exit velocity exit velocity
(%) Choke Flood Choke Flood
(m/sec) (m/sec) (m/sec)
33 0,0705465 0,34935 0,167131 0,188248 38,8892 45,4177 45,4177

34 0,0705351 0,349279 0,167097 0,18821 38,8827 45,4084 45,4084

35 0,0705188 0,349177 0,167049 0,188155 38,8733 45,3952 45,3952

36 0,0704955 0,349032 0,166979 0,188077 38,86 45,3763 45,3763

37 0,0704622 0,348824 0,16688 0,187965 38,841 45,3495 45,3495

38 0,0704146 0,348528 0,166738 0,187806 38,8139 45,3111 45,3111

39 0,0703467 0,348106 0,166536 0,187578 38,7751 45,2562 45,2562

40 0,0702494 0,3475 0,166246 0,187251 38,7196 45,1777 45,1777

41 0,0701096 0,346631 0,165831 0,186783 38,6399 45,065 45,065

42 0,0699082 0,345379 0,165232 0,186109 38,525 44,9027 44,9027

43 0,0696165 0,343568 0,164365 0,185133 38,3589 44,6679 44,6679

44 0,0691912 0,340931 0,163103 0,183711 38,1168 44,326 44,326

45 0,0685661 0,337063 0,161253 0,181628 37,7616 43,8249 43,8249

46 0,0676401 0,331354 0,158522 0,178551 37,2366 43,0855 43,0855

47 0,0662647 0,322923 0,154489 0,174008 36,4593 41,9943 41,9943

48 0,0642578 0,310738 0,148659 0,167442 35,3303 40,4189 40,4189

49 0,0615299 0,294431 0,140858 0,158655 33,8068 38,3152 38,3152

50 0,0583959 0,276091 0,132084 0,148773 32,076 35,96 35,96

51 0,0556347 0,260298 0,124528 0,140263 30,5758 33,949 33,949

52 0,0537966 0,249995 0,119599 0,134711 29,5976 32,6528 32,6528

53 0,052833 0,244738 0,117084 0,131878 29,0977 31,9997 31,9997

54 0,052528 0,243409 0,116448 0,131162 28,9544 31,839 31,839

55 0,0529175 0,246882 0,11811 0,133033 29,2008 32,2828 32,2828

56 0,0545113 0,260118 0,124442 0,140165 30,1463 34,0004 34,0004

CS-2 Hydraulic results (4)

Page 61 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Height over Side Side Side


% Offcenter Height over Side
weir downcomer downcomer downcomer
Stage Downcomer weir (Aerated) downcomer
(Unaerated) residence time velocity from velocity from
Choke Flood (meter) volume (l)
(meter) (hr) top (m/sec) bottom (m/sec)
0,00047570
33 45,4177 0,0450826 0,00990264 16,1711 0,0528837 0,0528837
7

0,00047571
34 45,4084 0,0450732 0,00990164 16,1681 0,0528729 0,0528729
7

0,00047573
35 45,3952 0,0450596 0,00990022 16,1639 0,0528574 0,0528574
1

0,00047575
36 45,3763 0,0450403 0,00989819 16,1579 0,0528355 0,0528355
2

0,00047578
37 45,3495 0,0450128 0,00989529 16,1493 0,0528041 0,0528041
1

0,00047582
38 45,3111 0,0449735 0,00989115 16,137 0,0527593 0,0527593
4

0,00047588
39 45,2562 0,0449173 0,00988524 16,1195 0,0526953 0,0526953
4

0,00047597
40 45,1777 0,0448368 0,00987677 16,0944 0,0526036 0,0526036
3

0,00047610
41 45,065 0,0447212 0,00986461 16,0585 0,052472 0,052472
1

0,00047629
42 44,9027 0,0445547 0,00984707 16,0069 0,0522825 0,0522825
2

0,00047657
43 44,6679 0,0443136 0,00982167 15,9325 0,0520083 0,0520083
7

0,00047701
44 44,326 0,0439622 0,0097846 15,8247 0,0516091 0,0516091
4

0,00047770
45 43,8249 0,0434462 0,0097301 15,6678 0,0510237 0,0510237
3

0,00047882
46 43,0855 0,0426827 0,00964928 15,4386 0,0501595 0,0501595
5

0,00048072
47 41,9943 0,0415519 0,00952916 15,1055 0,0488832 0,0488832
5

0,00048402
48 40,4189 0,0399102 0,00935384 14,6352 0,0470387 0,0470387
2

0,00048957
49 38,3152 0,0376996 0,00911589 14,0262 0,0445701 0,0445701
5

Page 62 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Height over Side Side Side


% Offcenter Height over Side
weir downcomer downcomer downcomer
Stage Downcomer weir (Aerated) downcomer
(Unaerated) residence time velocity from velocity from
Choke Flood (meter) volume (l)
(meter) (hr) top (m/sec) bottom (m/sec)
0,00049765
50 35,96 0,0351953 0,00884345 13,3697 0,0417939 0,0417939
9

0,00050650
51 33,949 0,0330229 0,00860451 12,8291 0,0394032 0,0394032
9

0,00051338
52 32,6528 0,0315954 0,00844665 12,4886 0,0378436 0,0378436
6

0,00051720
53 31,9997 0,0308587 0,00836618 12,3169 0,0370478 0,0370478
2

0,00051790
54 31,839 0,0306531 0,00834832 12,2666 0,0368466 0,0368466
5

0,00051406
55 32,2828 0,0310622 0,00841204 12,3494 0,0373723 0,0373723
5

0,00050122
56 34,0004 0,0326441 0,00864777 12,6865 0,0393759 0,0393759
6

CS-2 Hydraulic results (5)


Center Center Center Off-center Off-center
Center Off-center
downcomer downcomer downcomer downcomer downcomer
Stage downcomer downcomer
residence time velocity from velocity from residence time velocity from
volume (l) volume (l)
(hr) top (m/sec) bottom (m/sec) (hr) top (m/sec)
0,00047570 0,00047570
33 32,3421 0,0528837 0,0528837 32,3421 0,0528837
7 7

0,00047571 0,00047571
34 32,3362 0,0528729 0,0528729 32,3362 0,0528729
7 7

0,00047573 0,00047573
35 32,3278 0,0528574 0,0528574 32,3278 0,0528574
1 1

0,00047575 0,00047575
36 32,3157 0,0528355 0,0528355 32,3157 0,0528355
2 2

0,00047578 0,00047578
37 32,2985 0,0528041 0,0528041 32,2985 0,0528041
1 1

0,00047582 0,00047582
38 32,274 0,0527593 0,0527593 32,274 0,0527593
4 4

0,00047588 0,00047588
39 32,2389 0,0526953 0,0526953 32,2389 0,0526953
4 4

0,00047597 0,00047597
40 32,1888 0,0526036 0,0526036 32,1888 0,0526036
3 3

Page 63 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Center Center Center Off-center Off-center


Center Off-center
downcomer downcomer downcomer downcomer downcomer
Stage downcomer downcomer
residence time velocity from velocity from residence time velocity from
volume (l) volume (l)
(hr) top (m/sec) bottom (m/sec) (hr) top (m/sec)
0,00047610 0,00047610
41 32,117 0,052472 0,052472 32,117 0,052472
1 1

0,00047629 0,00047629
42 32,0138 0,0522825 0,0522825 32,0138 0,0522825
2 2

0,00047657 0,00047657
43 31,865 0,0520083 0,0520083 31,865 0,0520083
7 7

0,00047701 0,00047701
44 31,6494 0,0516091 0,0516091 31,6494 0,0516091
4 4

0,00047770 0,00047770
45 31,3356 0,0510237 0,0510237 31,3356 0,0510237
3 3

0,00047882 0,00047882
46 30,8772 0,0501595 0,0501595 30,8772 0,0501595
5 5

0,00048072 0,00048072
47 30,211 0,0488832 0,0488832 30,211 0,0488832
5 5

0,00048402 0,00048402
48 29,2704 0,0470387 0,0470387 29,2704 0,0470387
2 2

0,00048957 0,00048957
49 28,0525 0,0445701 0,0445701 28,0525 0,0445701
5 5

0,00049765 0,00049765
50 26,7395 0,0417939 0,0417939 26,7395 0,0417939
9 9

0,00050650 0,00050650
51 25,6583 0,0394032 0,0394032 25,6583 0,0394032
9 9

0,00051338 0,00051338
52 24,9772 0,0378436 0,0378436 24,9772 0,0378436
6 6

0,00051720 0,00051720
53 24,6337 0,0370478 0,0370478 24,6337 0,0370478
2 2

0,00051790 0,00051790
54 24,5333 0,0368466 0,0368466 24,5333 0,0368466
5 5

0,00051406 0,00051406
55 24,6988 0,0373723 0,0373723 24,6988 0,0373723
5 5

0,00050122 0,00050122
56 25,373 0,0393759 0,0393759 25,373 0,0393759
6 6

CS-2 Hydraulic results (6)

Page 64 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Stage Off-center downcomer velocity from bottom (m/sec)

33 0,0528837

34 0,0528729

35 0,0528574

36 0,0528355

37 0,0528041

38 0,0527593

39 0,0526953

40 0,0526036

41 0,052472

42 0,0522825

43 0,0520083

44 0,0516091

45 0,0510237

46 0,0501595

47 0,0488832

48 0,0470387

49 0,0445701

50 0,0417939

51 0,0394032

52 0,0378436

53 0,0370478

54 0,0368466

55 0,0373723

56 0,0393759

Page 65 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

4.4.2. State Conditions


CS-2 State conditions

Liquid Vapor Liquid mass flow Vapor mass flow Liquid volume Vapor volume
Stage
temperature (C) temperature (C) (kg/hr) (kg/hr) flow (l/min) flow (l/min)

33 88,0975 88,1012 97082,2 87689,2 2266,25 283691

34 88,1012 88,1064 97062,2 87669,2 2265,79 283663

35 88,1064 88,1139 97033,6 87640,6 2265,13 283624

36 88,1139 88,1246 96992,8 87599,8 2264,19 283567

37 88,1246 88,14 96934,7 87541,7 2262,84 283487

38 88,14 88,162 96851,7 87458,7 2260,92 283372

39 88,162 88,1938 96733,1 87340,1 2258,18 283208

40 88,1938 88,2401 96563,2 87170,2 2254,25 282973

41 88,2401 88,3078 96319,3 86926,3 2248,61 282635

42 88,3078 88,4082 95968,1 86575,1 2240,49 282149

43 88,4082 88,5595 95459,6 86066,6 2228,74 281443

44 88,5595 88,7926 94719,1 85326,1 2211,63 280415

45 88,7926 89,1615 93632,6 84239,6 2186,55 278901

46 89,1615 89,7638 92027,4 82634,4 2149,51 276654

47 89,7638 90,7712 89654 80261 2094,82 273304

48 90,7712 92,443 86217 76824 2015,77 268375

49 92,443 94,9876 81598,8 72205,8 1909,99 261573

50 94,9876 98,1473 76361,8 66968,8 1791,02 253585

51 98,1473 101,096 71781,9 62388,9 1688,57 246399

52 101,096 103,259 68729,3 59336,3 1621,73 241535

53 103,259 104,877 67137,5 57744,5 1587,63 238880

54 104,877 106,959 66717,2 57324,2 1579,01 237665

55 106,959 111,574 67720,5 58327,5 1601,54 237208

56 111,574 121,074 71432,7 62039,7 1687,4 236832

Page 66 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

4.4.3. Physical Properties


CS-2 Physical properties

Liquid Vapor Surface


Liquid mass Vapor mass Liquid viscosity Vapor viscosity
Stage molecular molecular tension
density (gm/cc) density (gm/cc) (cP) (cP)
weight weight (dyne/cm)

33 57,432 56,9538 0,71397 0,00515169 0,225262 0,00942008 15,798

34 57,4269 56,9482 0,713969 0,00515101 0,225324 0,00942094 15,798

35 57,4196 56,9401 0,713967 0,00515005 0,225413 0,00942216 15,7981

36 57,4092 56,9286 0,713964 0,00514868 0,225539 0,0094239 15,7982

37 57,3944 56,9121 0,71396 0,00514672 0,225719 0,00942639 15,7983

38 57,3733 56,8887 0,713955 0,00514392 0,225976 0,00942994 15,7985

39 57,3432 56,8552 0,713946 0,00513992 0,226344 0,00943503 15,7988

40 57,3 56,8073 0,713935 0,00513419 0,226871 0,00944233 15,7992

41 57,2381 56,7385 0,713917 0,00512594 0,227628 0,00945285 15,7996

42 57,1491 56,6395 0,713892 0,00511403 0,228722 0,00946809 15,8002

43 57,0203 56,4963 0,713853 0,00509674 0,230309 0,00949033 15,8009

44 56,8331 56,2879 0,713795 0,00507143 0,232632 0,00952309 15,8016

45 56,559 55,9823 0,713702 0,00503402 0,236061 0,00957197 15,8017

46 56,1552 55,5311 0,713553 0,0049782 0,241172 0,00964594 15,8

47 55,5588 54,8626 0,7133 0,00489449 0,248821 0,00975917 15,7936

48 54,69 53,8838 0,712853 0,00477093 0,260068 0,0099312 15,7751

49 53,4943 52,527 0,712037 0,00460075 0,275334 0,0101771 15,7284

50 52,066 50,8919 0,7106 0,00440147 0,292142 0,0104767 15,6297

51 50,7249 49,3431 0,708508 0,00422004 0,304809 0,010759 15,4751

52 49,7853 48,2494 0,706336 0,00409439 0,310732 0,0109607 15,3108

53 49,3544 47,7391 0,704798 0,00402884 0,312632 0,0110757 15,189

54 49,5554 47,9466 0,704211 0,00401996 0,313669 0,0111247 15,1216

55 51,0007 49,5518 0,704746 0,00409821 0,315785 0,0111073 15,0982

56 55,1367 54,1915 0,705552 0,00436594 0,318585 0,0109529 15,0888

Page 67 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

4.5. Hydraulic Plots

Page 68 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 69 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 70 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 71 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 72 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 73 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 74 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 75 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 76 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 77 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 78 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 79 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 80 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 81 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 82 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 83 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 84 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 85 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 86 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 87 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 88 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 89 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Page 90 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

5. Column Profile
B4 Profile (1)

Liquid temperature Vapor temperature Liquid mass flow Vapor mass flow Liquid volume flow
Tray/Stage
(C) (C) (kg/hr) (kg/hr) (l/min)

1 85,215 85,2175 92647 92647 2165,78

2 85,2175 85,2202 87163 92630 2037,59

3 85,2202 85,2232 87144,5 92611,5 2037,16

4 85,2232 85,2264 87124,3 92591,3 2036,69

5 85,2264 85,23 87102,3 92569,3 2036,18

Page 91 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Liquid temperature Vapor temperature Liquid mass flow Vapor mass flow Liquid volume flow
Tray/Stage
(C) (C) (kg/hr) (kg/hr) (l/min)

6 85,23 85,2339 87078,4 92545,4 2035,62

7 85,2339 85,2382 87052,2 92519,2 2035,01

8 85,2382 85,2429 87023,5 92490,5 2034,35

9 85,2429 85,2481 86992,1 92459,1 2033,62

10 85,2481 85,2538 86957,8 92424,8 2032,82

11 85,2538 85,2601 86920 92387 2031,94

12 85,2601 85,267 86878,5 92345,5 2030,98

13 85,267 85,2748 86832,8 92299,8 2029,92

14 85,2748 85,2833 86782,3 92249,3 2028,75

15 85,2833 85,2929 86726,6 92193,6 2027,45

16 85,2929 85,3036 86664,8 92131,8 2026,02

17 85,3036 85,3157 86596,2 92063,2 2024,43

18 85,3157 85,3292 86519,7 91986,7 2022,65

19 85,3292 85,3445 86434,3 91901,3 2020,67

20 85,3445 85,3619 86338,6 91805,6 2018,45

21 85,3619 85,3817 86231 91698 2015,95

22 85,3817 85,4045 86109,3 91576,3 2013,13

23 85,4045 85,4308 85971,2 91438,2 2009,93

24 85,4308 85,4615 85813,7 91280,7 2006,28

25 85,4615 85,4977 85632,8 91099,8 2002,09

26 85,4977 85,5407 85423,8 90890,8 1997,24

27 85,5407 85,5931 85180 90647 1991,6

28 85,5931 85,6599 84892,4 90359,4 1984,93

29 85,6599 85,7554 84546,1 90013,1 1976,91

30 85,7554 85,9313 84109,6 89576,6 1966,77

31 85,9313 86,4011 83491,3 88958,3 1952,29

32 86,4011 88,0975 82356,5 87823,5 1925,22

Page 92 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Liquid temperature Vapor temperature Liquid mass flow Vapor mass flow Liquid volume flow
Tray/Stage
(C) (C) (kg/hr) (kg/hr) (l/min)

33 88,0975 88,1012 97082,2 87689,2 2266,25

34 88,1012 88,1064 97062,2 87669,2 2265,79

35 88,1064 88,1139 97033,6 87640,6 2265,13

36 88,1139 88,1246 96992,8 87599,8 2264,19

37 88,1246 88,14 96934,7 87541,7 2262,84

38 88,14 88,162 96851,7 87458,7 2260,92

39 88,162 88,1938 96733,1 87340,1 2258,18

40 88,1938 88,2401 96563,2 87170,2 2254,25

41 88,2401 88,3078 96319,3 86926,3 2248,61

42 88,3078 88,4082 95968,1 86575,1 2240,49

43 88,4082 88,5595 95459,6 86066,6 2228,74

44 88,5595 88,7926 94719,1 85326,1 2211,63

45 88,7926 89,1615 93632,6 84239,6 2186,55

46 89,1615 89,7638 92027,4 82634,4 2149,51

47 89,7638 90,7712 89654 80261 2094,82

48 90,7712 92,443 86217 76824 2015,77

49 92,443 94,9876 81598,8 72205,8 1909,99

50 94,9876 98,1473 76361,8 66968,8 1791,02

51 98,1473 101,096 71781,9 62388,9 1688,57

52 101,096 103,259 68729,3 59336,3 1621,73

53 103,259 104,877 67137,5 57744,5 1587,63

54 104,877 106,959 66717,2 57324,2 1579,01

55 106,959 111,574 67720,5 58327,5 1601,54

56 111,574 121,074 71432,7 62039,7 1687,4

57 121,074 121,074 9393 0 223,198

B4 Profile (2)

Page 93 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Vapor volume flow Liquid molecular Vapor molecular Liquid mass density Vapor mass density
Tray/Stage
(l/min) weight (kg/kmol) weight (kg/kmol) (gm/cc) (gm/cc)

1 290006 58,0422 58,0422 0,71296 0,00532443

2 289987 58,0364 58,0367 0,712959 0,00532379

3 289967 58,0301 58,0308 0,712958 0,00532311

4 289945 58,0232 58,0243 0,712957 0,00532236

5 289920 58,0157 58,0173 0,712956 0,00532154

6 289894 58,0075 58,0096 0,712954 0,00532065

7 289865 57,9986 58,0012 0,712953 0,00531968

8 289833 57,9888 57,992 0,712952 0,00531861

9 289798 57,9781 57,9819 0,71295 0,00531745

10 289760 57,9664 57,9709 0,712948 0,00531617

11 289718 57,9536 57,9588 0,712946 0,00531477

12 289672 57,9394 57,9455 0,712944 0,00531323

13 289621 57,9239 57,9309 0,712941 0,00531153

14 289564 57,9067 57,9147 0,712938 0,00530966

15 289502 57,8878 57,8969 0,712935 0,00530759

16 289433 57,8668 57,8772 0,712932 0,0053053

17 289356 57,8435 57,8553 0,712928 0,00530276

18 289270 57,8176 57,8309 0,712923 0,00529993

19 289175 57,7887 57,8037 0,712918 0,00529676

20 289067 57,7564 57,7733 0,712912 0,00529322

21 288945 57,72 57,7391 0,712905 0,00528923

22 288808 57,679 57,7005 0,712897 0,00528473

23 288651 57,6325 57,6568 0,712887 0,00527962

24 288472 57,5795 57,607 0,712876 0,0052738

25 288266 57,5189 57,55 0,712863 0,00526712

26 288026 57,449 57,4844 0,712848 0,00525941

27 287745 57,368 57,4082 0,712829 0,00525042

Page 94 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Vapor volume flow Liquid molecular Vapor molecular Liquid mass density Vapor mass density
Tray/Stage
(l/min) weight (kg/kmol) weight (kg/kmol) (gm/cc) (gm/cc)

28 287411 57,2734 57,3193 0,712806 0,00523984

29 287005 57,1631 57,2157 0,71278 0,00522715

30 286479 57,0375 57,0978 0,712756 0,00521135

31 285694 56,9135 56,9816 0,712766 0,00518961

32 284099 56,8873 56,9578 0,712962 0,00515217

33 283691 57,432 56,9538 0,71397 0,00515169

34 283663 57,4269 56,9482 0,713969 0,00515101

35 283624 57,4196 56,9401 0,713967 0,00515005

36 283567 57,4092 56,9286 0,713964 0,00514868

37 283487 57,3944 56,9121 0,71396 0,00514672

38 283372 57,3733 56,8887 0,713955 0,00514392

39 283208 57,3432 56,8552 0,713946 0,00513992

40 282973 57,3 56,8073 0,713935 0,00513419

41 282635 57,2381 56,7385 0,713917 0,00512594

42 282149 57,1491 56,6395 0,713892 0,00511403

43 281443 57,0203 56,4963 0,713853 0,00509674

44 280415 56,8331 56,2879 0,713795 0,00507143

45 278901 56,559 55,9823 0,713702 0,00503402

46 276654 56,1552 55,5311 0,713553 0,0049782

47 273304 55,5588 54,8626 0,7133 0,00489449

48 268375 54,69 53,8838 0,712853 0,00477093

49 261573 53,4943 52,527 0,712037 0,00460075

50 253585 52,066 50,8919 0,7106 0,00440147

51 246399 50,7249 49,3431 0,708508 0,00422004

52 241535 49,7853 48,2494 0,706336 0,00409439

53 238880 49,3544 47,7391 0,704798 0,00402884

54 237665 49,5554 47,9466 0,704211 0,00401996

Page 95 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Vapor volume flow Liquid molecular Vapor molecular Liquid mass density Vapor mass density
Tray/Stage
(l/min) weight (kg/kmol) weight (kg/kmol) (gm/cc) (gm/cc)

55 237208 51,0007 49,5518 0,704746 0,00409821

56 236832 55,1367 54,1915 0,705552 0,00436594

57 0 62,316 0,701396

B4 Profile (3)

Tray/Stage Liquid viscosity (cP) Vapor viscosity (cP) Surface tension (dyne/cm)

1 0,192382 0,00918263 15,7646

2 0,192446 0,0091834 15,7648

3 0,192516 0,00918423 15,765

4 0,192592 0,00918514 15,7652

5 0,192675 0,00918613 15,7654

6 0,192766 0,00918722 15,7656

7 0,192865 0,0091884 15,7659

8 0,192974 0,00918969 15,7662

9 0,193092 0,00919111 15,7665

10 0,193222 0,00919266 15,7669

11 0,193365 0,00919437 15,7673

12 0,193522 0,00919624 15,7677

13 0,193695 0,00919831 15,7681

14 0,193885 0,00920059 15,7686

15 0,194096 0,00920311 15,7692

16 0,194329 0,0092059 15,7698

17 0,194589 0,00920901 15,7704

18 0,194877 0,00921247 15,7711

19 0,1952 0,00921633 15,7719

20 0,195561 0,00922067 15,7728

Page 96 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Tray/Stage Liquid viscosity (cP) Vapor viscosity (cP) Surface tension (dyne/cm)

21 0,195967 0,00922555 15,7737

22 0,196426 0,00923106 15,7748

23 0,196947 0,00923733 15,7759

24 0,19754 0,00924448 15,7772

25 0,198222 0,0092527 15,7786

26 0,199009 0,00926222 15,7802

27 0,199926 0,00927333 15,7819

28 0,201009 0,00928649 15,7838

29 0,202316 0,00930246 15,7858

30 0,20398 0,00932309 15,788

31 0,206416 0,00935432 15,7903

32 0,211232 0,00941948 15,7928

33 0,225262 0,00942008 15,798

34 0,225324 0,00942094 15,798

35 0,225413 0,00942216 15,7981

36 0,225539 0,0094239 15,7982

37 0,225719 0,00942639 15,7983

38 0,225976 0,00942994 15,7985

39 0,226344 0,00943503 15,7988

40 0,226871 0,00944233 15,7992

41 0,227628 0,00945285 15,7996

42 0,228722 0,00946809 15,8002

43 0,230309 0,00949033 15,8009

44 0,232632 0,00952309 15,8016

45 0,236061 0,00957197 15,8017

46 0,241172 0,00964594 15,8

47 0,248821 0,00975917 15,7936

Page 97 of 98 20/03/2020
Hydraulic Analysis Report - B4 : INT-1

User Name: Job Code:

Project: Plantas Description:

Tray/Stage Liquid viscosity (cP) Vapor viscosity (cP) Surface tension (dyne/cm)

48 0,260068 0,0099312 15,7751

49 0,275334 0,0101771 15,7284

50 0,292142 0,0104767 15,6297

51 0,304809 0,010759 15,4751

52 0,310732 0,0109607 15,3108

53 0,312632 0,0110757 15,189

54 0,313669 0,0111247 15,1216

55 0,315785 0,0111073 15,0982

56 0,318585 0,0109529 15,0888

57 0,31053 14,9539

Page 98 of 98 20/03/2020