PR808-8-J1 Pump Install Process SHT - 1
PR808-8-J1 Pump Install Process SHT - 1
MANUFACTURER DESCRIPTION No
SUBCONTRACTOR
DESCRIPTION SIGNATURE & DATE
SUBCONTR. CONTRACTOR COMPANY
1 FOUNDATION COMPLETE, LEVEL & ACCEPTED
2 PUMP & DRIVER SET
3 BASE ANCHOR BOLTS TIGHT
4 GROUTED
5 COUPLING SET SCREWS TIGHT & JACKING SCREWS REMOVED
PIPING CONNECTIONS COMPLETE WITH NO OBJECTIONABLE LOADS
6
OR STRAINS ON THE FLANGES
VERIFY PIPING PRESSURE TEST ACCEPTANCE BEFORE FINAL
7
ALIGNMENT
8 *COUPLING CHECK *
9 ROTATE DRIVER & PUMP WITH COUPLING OPEN
10 *ALIGNMENT COMPLETE*
11 JACKING SCREWS REMOVED
12 MECHANICAL SEALS OR PACKING INSTALLED
13 *SHAFTS TURN FREELY, BY HAND*
14 COUPLING LUBED & CLOSED
ACCESSORIES INSTALLED & READY FOR SERVICE (GAUGES,
15
GUARDS, VENTS, DRAINS, SAMPLE CONNECTION, STRAINERS, etc.).
16 OIL RINGS IN & FREE
AUXILIARY SYSTEMS COMPLETE (SEAL FLUSH, WATER COOLING,
17
etc.).
18 TEMPORARY SUCTION SCREENS IN PLACE
19 *CLEANLINESS CHECKED*
20 COUPLING GUARD SECURE
21 GROUNDING STRAP INSTALLED
22 INSULATION COMPLETE
REMARKS :
SIGNED :
SUBCONTRACTOR NAME DATE:
SIGNED :
CONTRACTOR NAME DATE:
SIGNED :
VSM (IF NOT APPLICABLE Mark N/A) NAME DATE:
SIGNED :
COMPANY NAME DATE:
JP 1000 NLG
Attachment PR 808-08-J3 (08/03)
/conversion/tmp/scratch/475265654.doc