SAUDI ARAMCO ID/PIEU -7-July-2018 -REV.2018.04.00(Standards Cutoff -April 30, 2018) Rev. 2018.04.

00 30-Apr-18

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Shop Fabrication - Piping & Miscellaneous Steel Structures SATIP-L-350-08 3-Jul-18 MECHANICAL
PROJECT TITLE: CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW


Fabrication Shop - any facility outside or within
Fabrication Shop Qualification &
1.1 SAIC-L-2031 SAIC-L-2031 H H the project site subject to controlled conditions per
Approval (QA/QC Mgr. Checklist)
SAES-W-011 & PID approval. Summary list!
NDE Procedures (Service Provider Refer to applicable SATIP for NDE; SATIP-NDE-
1.2
Co) & NDE Process Control Procedure LPT-01, NDE-MPT-01, NDE-RT-01, NDE-UT-01
1.3 Positive Material Identification (PMI) SAIC-L-2004 SAIC-L-2004 HR HR
1.4 Pipe Bending* Procedure (if required) SAIC-L-2033 SAIC-L-2033 H R Includes any Ovality Repair Procedures
MATERIAL
2.0
RECEIVING
Verification of Pipe & Fittings (Visual SA to witness the initial delivery and perform
2.1 SAIC-L-2005 SAIC-L-2005 H W
Inspection & Document verification) random inspection thereafter.
SA to witness the initial delivery and perform
2.2 Structural Steel & Plates SAIC-M-2003 SAIC-M-2003 H W
random inspection thereafter.
2.3 Material Storage & Handling SAIC-L-2034 SAIC-L-2034 I S One RFI every week for PID verification
Use SATR-A-2012 & SATR-A-2013
2.4 PMI of Alloyed Materials SAIC-L-2010 SAIC-L-2010 H W See Note 1 and random inspection
thereafter.
3.0 FABRICATION
NOTE: Depending on QC Organization, this is
usually assigned to Piping Inspector, if such an
3.1 Cutting & Assembly fit-up SAIC-L-2035 SAIC-L-2035 W W inspector exists or the Welding inspector.
See Note 1 and random inspection
thereafter.
Refer to applicable welding SATIP: SATIP-W-011-
3.2 Welding Inspection
01, W-012-01, W-016-01, W-014-01,& M-001-04
3.3 Cold Bending SAIC-L-2036 SAIC-L-2036 H W Includes any Ovality Repair Procedures

3.4 Hot bending SAIC-L-2037 SAIC-L-2037 H W Shop Approval by CSD required


Refer to the applicable SATIP for NDE; SATIP-
NDE Performance Verification using
3.5 NDE-LPT-01, NDE-MPI-01, NDE-RT-01, NDE-
Process Control Procedure
UT-01.
3.6 Pressure Testing (when required) Refer to SATIP-A-004-02 or A-004-01

3.7 Coatings Application Refer to applicable Coating SATIP (H-100-01, etc)

RELEASE FOR
4.0
SHIPMENT
Visual inspection of completed pipe
4.1 SAIC-L-2038 SAIC-L-2038 H W
spools or assembly
Visual inspection of completed Refer to SATIP-M-001-01 for Specific
4.2 SAIC-M-2011 SAIC-M-2011 H W
structural components or assembly Requirements related to Welding & NDE

GENERAL NOTES

Saudi Aramco: Company General Use


SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Shop Fabrication - Piping & Miscellaneous Steel Structures SATIP-L-350-08 3-Jul-18 MECHANICAL
PROJECT TITLE: CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1
adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3
organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative
4
in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -7-July-2018 -REV.2018.04.00(Standards Cutoff -April 30, 2018)

Saudi Aramco: Company General Use


Rev. 2018.04.00

###

Saudi Aramco: Company General Use


30-Apr-18

Saudi Aramco: Company General Use


3-Jul-18 3-Jul-18

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -7-July-2018 -REV.2018.04.00(Standards Cutoff -April 30, 2018)

Saudi Aramco: Company General Use


Rev. 2018.04.00

###

Saudi Aramco: Company General Use


30-Apr-18

Saudi Aramco: Company General Use


3-Jul-18 3-Jul-18

Saudi Aramco: Company General Use

You might also like