Process Industry Practices


Process Control

PIP PCIPR000
Pressure Installation Details
PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES

In an effort to minimize the cost of process industry facilities, this Practice has
 been prepared
prepared from the technica
technicall requireme
requirements
nts in the existing
existing standards
standards of major 
major 
industrial users, contractors, or standards organizations. By harmonizing these technical
requirements into a single set of Practices, administrative, application, and engineering
costs to both the purchaser and the manufacturer should be reduced. While this Practice
is expected to incorporate the majority of requirements of most users, individual
applications may involve requirements that will be appended to and take precedence over 
this Practice. Determinations concerning fitness for purpose and particular matters or 
application of the Practice to particular project or engineering situations should not be
made solely on information contained in these materials. The use of trade names from
time to time should not be viewed as an expression of preference but rather recognized
recognized as
normal usage in the trade. Other brands having the same specifications are equally
correct and may be substituted for those named. All practices or guidelines are intended
to be consistent with applicable laws and regulations including OSHA requirements. To
the extent these practices or guidelines should conflict with OSHA or other applicable
laws or regulations, such laws or regulations must be followed. Consult an appropriate
 professiona
 professionall before applying
applying or acting
acting on any material
material contained
contained in or suggested
suggested by the
Practice.

©Process Industry Practices (PIP), Construction Industry Institute, The


University of Texas at Austin, 3208 Red River Street, Suite 300, Austin,
Texas 78705. PIP member companies may copy this practice for their internal
use.

 Not printed with State funds


funds
 April 1999
1999

Process Industry Practices


Process Control

PIP PCIPR000
Pressure Installation Details

Table of Contents

1. Introduction ..................................2
..................................2
1.1 Purpose..............................................2
1.2 Scope.................................................2

2. Index ..............................................2
..............................................2

Process Industry Practices Page 1 of 5  


PIP PCIPR000 
Pressure Installation Details April 1999

1. Introduction

1.1 Purpose
The purpose of this Practice is to provide pressure installation details.

1.2 Scope
This Practice includes an index for the pressure installation details. PCIPR100 series
details are 3/8" tubing impulse lines, PCIPR200 series details are 1/2" tubing impulse
lines, and PCIPR300 series details are 1/2" pipe impulse lines.

2. Index

Detail #   Title

PCIPR101 Below Tap, 1/2" Connection, 3/8" Impulse

PCIPR102 Below Tap, 3/4" Connection, 3/8" Impulse

PCIPR103 Below Tap, Electric Traced Bundle, 1/2" Connection, 3/8" Impulse

PCIPR104 Below Tap, Electric Traced Bundle, 3/4" Connection, 3/8" Impulse

PCIPR105 Below Tap, Steam Traced Bundle, 1/2" Connection, 3/8" Impulse

PCIPR106 Below Tap, Steam Traced Bundle, 3/4" Connection, 3/8" Impulse

PCIPR107 Above Tap, 1/2" Connection, 3/8" Impulse

PCIPR108 Above Tap, 3/4" Connection, 3/8" Impulse

PCIPR109 Above Tap, Electric Traced Bundle, 1/2" Connection, 3/8" Impulse

PCIPR110 Above Tap, Electric Traced Bundle, 3/4" Connection, 3/8" Impulse

PCIPR111 Above Tap, Steam Traced Bundle, 1/2" Connection, 3/8" Impulse

PCIPR112 Above Tap, Steam Traced Bundle, 3/4" Connection, 3/8" Impulse

PCIPR113 Steam Service, Insulated Bundle, 1/2" Connection, 3/8" Impulse

PCIPR114 Steam Service Insulated Bundle, 3/4" Connection, 3/8" Impulse

PCIPR115 Steam Service, Electric Traced Bundle, 1/2" Connection, 3/8" Impulse

PCIPR116 Steam Service, Electric Traced Bundle, 3/4" Connection, 3/8" Impulse

Page 2 of 5 Process Industry Practices


PIP PCIPR000 
 April 1999 Pressure Installation Details

Detail #   Title

PCIPR117 Steam Service, Steam Traced Bundle, 1/2" Connection, 3/8" Impulse

PCIPR118 Steam Service, Steam Traced Bundle, 3/4" Connection, 3/8" Impulse

PCIPR119 Steam Service, Insulated Bundle, 1/2" Connection, 3/8" Impulse


w/Blowdown

PCIPR120 Steam Service, Insulated Bundle, 3/4" Connection, 3/8" Impulse


w/Blowdown

PCIPR121 Steam Service, Electric Traced Bundle, 1/2" Connection, 3/8" Impulse
w/Blowdown

PCIPR122 Steam Service, Electric Traced Bundle, 3/4" Connection, 3/8" Impulse
w/Blowdown

PCIPR123 Steam Service, Steam Traced Bundle, 1/2" Connection, 3/8" Impulse
w/Blowdown

PCIPR124 Steam Service, Steam Traced Bundle, 3/4" Connection, 3/8" Impulse
w/Blowdown

PCIPR201 Below Tap, 1/2" Connection, 1/2" Impulse

PCIPR202 Below Tap, 3/4" Connection, 1/2" Impulse

PCIPR203 Below Tap, Electric Traced /Bundle, 1/2" Connection, 1/2" Impulse

PCIPR204 Below Tap, Electric Traced Bundle, 3/4" Connection, 1/2" Impulse

PCIPR205 Below Tap, Steam Traced Bundle, 1/2" Connection, 1/2" Impulse

PCIPR206 Below Tap, Steam Traced Bundle, 3/4" Connection, 1/2" Impulse

PCIPR207 Above Tap, 1/2" Connection, 1/2" Impulse

PCIPR208 Above Tap, 3/4" Connection, 1/2" Impulse

PCIPR209 Above Tap, Electric Traced Bundle, 1/2" Connection, 1/2" Impulse

PCIPR210 Above Tap, Electric Traced Bundle, 3/4" Connection, 1/2" Impulse

PCIPR211 Above Tap, Steam Traced Bundle, 1/2" Connection, 1/2" Impulse

PCIPR212 Above Tap, Steam Traced Bundle, 3/4" Connection, 1/2" Impulse