HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

6 Excavation & Shocked due to Work to be supervised by experienced & IECCL


Trenching underground electrical High responsible personnel. Excavation Low
cable (if any) Sup. / foreman
Cordoning the work area by cordoning / Engineer
Falling of object on tape and appropriate signboards.
head or body
Excavation equipments to be well
Collapse of trench insulated.

traffic hazards / Required persons are present at site.


vehicle movement
Use of PPE’s like safety shoe, hardhat
Fall of person in The etc.
trench
Trench to be excavated in V shape.

Vehicle traffic to be diverted if required.

Reflective jackets to be worn at heavy


traffic road and all persons should work /
stand with in cordoned area.

Continuous dewatering is required in


high seepages area.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

1 Loading/ Roll of pipes Work to be supervised by experienced & IECCL Piping


Unloading of Fall of pipe from slings. High responsible personnel. Sup. / foreman Low
pipe Breakage of lifting / Engineer
accessories like rope Cordoning the work area by cordoning
and slings tape and appropriate signboards.
Electric shock due to
touch of boom to Experienced working crew.
overhead electrical
cables Ensure proper use of slings and ropes
after balancing before lifting the pipes.

Obvious hazards at work place and


surroundings must be observed.

Ensure lifting equipments/device are in


safe condition and follow safe working
load.

In case of using two equipments for lifting


pipe section proper balancing and proper
signal by authorized person is essential.

Use of PPE,s –safety shoe, safety


helmet.

Restrict the personnel movement under


the lifted load.

Crane/lifting equipments to be operated


by authorize person.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

2 Transportation Roll/ fall of pipes Load the pipes considering the load IECCL Piping
of pipe Road traffic hazard Medium carrying capacity of trailer. Sup. / Low
foreman/
Pipes to be arranged and tightened well Engineer/trailer
in the trailer. driver

Warning flag/sign/light to be displayed.

Follow the traffic rules.


HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

3 Material handling- Fall of object on leg Use of PPEs i.e. safety shoe, hardhat, IECCL area
manual Injury in hand due Medium hand gloves etc. incharge Low
to sharp edge of
object. .Proper communication required when
the object is lifted by more than one
Cuts, abrasion person.
Slips, Trips & Falls
hazard. Persons are trained for safe lifting
Back injury procedure and aware of hazards.

Good housekeeping

Proper supervision.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

4. Route Survey Snack / Insect bite Extra care shall be taken during line IECCL
Medium survey. Survey Low
Cut injury incharge
Use of PPE’s like Gumboot, safety
shoe, hard hat and hand gloves etc.

First aid kit kept with survey team.

Only experienced personnel shall be


deployed.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

5. ROU & Grading Snack / Insect bite Extra care shall be taken for snake / IECCL Job
Medium insect bite. supervisor. Low
Overhead utilities.
Use of PPE’s like Gumboot, safety
Equipments may shoe, hard hat and hand gloves etc.
stick in marshy land.
First aid kit kept with crew member.
Cutting tree or its
branch may fall on Only experienced personnel shall be
the machinery like deployed as a operator.
Grader, Dozer etc
Avoid go inside the marshy land with
machinery.

Extra care shall be taken to prevent


overhead utilities.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
6 Excavation & Shocked due to Work to be supervised by experienced & IECCL
Trenching underground electrical High responsible personnel. Excavation Low
cable (if any) Sup. / foreman
Cordoning the work area by cordoning / Engineer
Falling of object on tape and appropriate signboards.
head or body
Excavation equipments to be well
Collapse of trench insulated.

traffic hazards / Required persons are present at site.


vehicle movement
Use of PPE’s like safety shoe, hardhat
Fall of person in The etc.
trench
Trench to be excavated in V shape.

Vehicle traffic to be diverted if required.

Reflective jackets to be worn at heavy


traffic road and all persons should work /
stand with in cordoned area.

Continuous dewatering is required in


high seepages area.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

7. Stringing Roll / Fall of pipe Periodic inspection of slings/wire ropes. IECCL


High stringing Low
Crush of Use of proper capacity slings/ wire incharge/
finger/hand. ropes. supervisor &
maintenance
Equipments Signal to be given by trained person to incharge.
breakdown. hydra/crane operator.
Swim of pipe and
hit to other adjusting Restricted the personnel movement
under the lifted pipe.

Use adequate sand bags with proper


wooden supports.

Guide line shall be used for control of


pipes.

Only one pipe shall be lifted at a time.

Use of PPE’s like hand gloves, safety


shoe, hardhat etc.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

8. Cutting / Welding Flying of foreign Minimum person to be kept near work IECCL
particles. High place. Mainline Low
incharge/
Welding flash. Use of welding helmet, hand sleeve, foreman& HSE
hand gloves, safety shoe by welder. personnel.
Burn injury due to
gas cutting/ welding. Use of PPE’s like hand gloves, helmet,
safety shoe, goggles by helper and near
Electric shock. persons.

Fire hazard. Inspection of hose connection, flash


back arrestor of gas cutting set.
Health hazard
Ensure electric cables, extension
boards; machines are free from electric
shock hazard.

Flammable materials shall not be


nearby welding & cutting operations.

Earthing shall be checked before starting


the activity.

Suitable fire extinguishers shall be kept


ready.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

9. Grinding Entry of flying Ensure guard on grinding machine. IECCL Job


particles in eye & High supervisor & Low
ear Use of PPE’s like, safety shoe, face HSE
shield, grinding goggles, hand gloves etc.
Cut injury(in personnel.
overhead grinding). Special care shall be taken during
overhead grinding.
Electric shock.
Breaking of Work area to be cordoned.
grinding wheel/
brush. Minimum required persons to be kept
Fire hazard. near and eye protection goggles to be
Noise & health used by them.
hazard
Trained and qualified personnel shall be
deployed in such kind of operation.

Flammable materials shall not be


nearby such operations.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

10. Lowering Collapse of lifted Proper balancing to be done, if pipe is IECCL


operation / pipe pipe section. High lifted by two slings / wire ropes. LOWERING Low
laying
INCHARGE
Collapse of lifting Keep safe distance near trench while
equipment. locating the crane, lifting equipment. & HSE
personnel.
Overhead electric Ensure single authorized person gives
lines- contact with signal to lift/lower the pipe section by
crane, lifting observing safety with all respect.
equipment.
Collapse of wooden Wooden planks having enough strength
planks kept on to be placed properly on the trench.
trench for sectional
lowering may cause Special care shall be taken while
injury. overhead live cables are there during
Cut, crush, such activity.
abrasion injury Use of PPE’s like safety shoe, hardhat
Road traffic hazard. etc
Work area to be cordoned by cordoning
tape and signboard, if such work is being
carried out on/ near road.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

11. Tie- in-joints Collapse of trench. Proper balancing to be done, if pipe is IECCL Job
High lifted by two slings / wire ropes. supervisor & Low
Fall of object. HSE
Keep safe distance near trench while
Cut, crush, locating the crane, lifting equipment. personnel.
abrasion injury.
Ensure single authorized person gives
Road traffic hazard. signal to lift/lower the pipe section by
observing safety with all respect.

Wooden planks having enough strength


to be placed properly on the trench.

Special care shall be taken while


overhead live cables are there during
such activity.
Use of PPE’s like safety shoe, hardhat
etc
Work area to be cordoned by cordoning
tape and signboard, if such work is being
carried out on/ near road.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

12. Holiday test. Electric shock. Trained and experienced person shall IECCL Job
High do this work. supervisor & Low
HSE
Use of appropriate PPE’s.
personnel.
No one allowed sitting, crossing or
touching the pipe section during test.

Ensure power supply of instrument is off


/ isolated before removing / refitting the
test ring.

Ensure provision of earthing to objects &


instrument..
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

13. Radiography / X- Ionizing radiation. Ensure safety regulations as per BARC IECCL NDT
Ray. High before commencement of job. team & Low
Radiation may QA/QC
react with the skin Affected area to be cordoned off,
and can cause radiation warning symbols/ signboards to engineer.
cancer, skin be displayed.
irritation, dermatitis,
etc. Avoid radiography in daytime.
Wear appropriate PPE’s and film badges
issued by BARC.

Radiation effect to be measured with


dosimeter before starting the radiography.

Working crew at site must be informed


regarding such activity.

Stay away from radiation sources.

Use the exact source of radiation and


avoid more powerful source.

Experienced and trained persons shall


be deployed.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

14. Pipe bending. Personal injury. Use of proper PPE’s like safety shoe, IECCL
Medium hard hat, hand gloves, ear plug etc. Bending Low
Breaking hydraulic incharge.
hoses. Care shall be taken that no sharp edge
shall be contact with hydraulic hoses.
Overhead electric
line. Working surface shall be even and well
maintained.
Uneven surface.
Good housekeeping shall be maintained
Obstruction in free at work place.
movement of
machinery and Only trained and authorized personnel
manpower. shall be deployed.

Pipe bending machine shall not be kept


under the overhead electrical cable.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

15. Horizontal Misuse / abuse of Daily user inspection and periodical IECCL HDD
Direction Drilling equipment. Medium checking / recording of equipment to be Incharge / Low
(HDD). ensured. The equipment should be
operated by qualified operator only.
Job
Fall hazard.
supervisor.
Underground Ensure that a walkover excavation
electrical cable, technique, but still it should be ensured
pipeline damage. that the area under which the HDD is
being done should be barricaded.
Failure of rig to pill
the pipe section. Higher capacity rig shall be used then
. required capacity.

Ensure that no underground utilities


there, if there first conform that the Dept.
of utilities.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

16. Sand Blasting. Health hazard i.e. Proper PPE’s shall be worn like Dust IECCL Job
lung dieses, silicosis Medium mask, ear plug and mandatory PPE’s. supervisor. Low
etc.
. Area to appropriately cover to avoid the
Asphyxiation due spreading of dust in surrounding area.
to lack of air supply.
Minimum person shall be deployed and
Body injury movement of vehicle shall be prohibited
where sand blasting carried out.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

17. Concrete coating Flying of cement All persons shall be wear proper PPE’s IECCL Job
of pipe. mixture. Medium like safety shoe, gum boot, rubber gloves, supervisor. Low
ear plug, dust mask etc.
Health hazard due
to cement dust.
Experienced & trained person shall be
Brusting of hoses. deployed.

Roll of pipes.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

18. Civil work/ Fall of bricks on Use of PPE’s like safety shoe, gum IECCL Job
working with person. Medium boot, rubber gloves, ear plug, dust mask supervisor. Low
cement, sand & etc.
bricks. Health hazard.

Dusty atmosphere. Experienced & trained person shall be


deployed.
Cut and wound
injury Good housekeeping shall be maintained
at work location.

Throwing of bricks shall be prohibited.

Work supervision shall be done by only


experienced and trained person only.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

19 Removal of pipe Burn hazard. Proper PPE’s i.e. heat retardant hand IECCL Job
coating. High gloves, safety goggles, face shield etc. supervisor. Low
Fire / explosion shall be used.
hazard
Use only approved commercial LPG
cylinders.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

19 Removal of pipe Burn hazard. Proper PPE’s i.e. heat retardant hand IECCL Job
coating. High gloves, safety goggles, face shield etc. supervisor. Low
Fire / explosion shall be used.
hazard
Use only approved commercial LPG
cylinders.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

20. Working at Height Fall of personnel All personnel shall wear safety harness IECCL Job
High if fixed access cannot be provided. supervisor & Low
Fall of HSE
material/tools and/or Safety Net shall be provided if required.
equipment. personnel.
Scaffolders shall ensure that access
Dizziness-Vertigo platforms are constructed in line with all
Unsafe scaffolding relevant codes.
Damage or
improper use of Suitable barriers shall be erected below
ladders. the work area and signs displayed to
. advise personnel of the potential hazards.

Personnel shall ensure that all


materials/tools and /or equipment kept
secure at all times.

Report any sign of dizziness-vertigo,


immediately to the supervisor .

Ensure that damaged ladder shall not


be used.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

21. Use of lifting Damage of lifting Check crane/sling/chain pulley IECCL Job
equipments equipments due to High certification for their SWL and testing supervisor. Low
overload or work in date.
over SWL.
SWL must mention on each lifting
Sling / chain devices.
damage.
Balancing may fall. Dual lifting shall be utilized whenever
Person may possible.
electrocute due to
crane’s boom Better communication between crane
. touching with high operator and foreman.
tension line.
Due to lack of Use only tested lifting tools & tackles.
knowledge of load
chart, man may lift Use of PPE’s like safety shoe, hard hat,
things in wrong hand gloves etc
radius that may
cause tilt. Only trained and experienced operator
shall be operating lifting equipments.

No one shall be passing and stay under


the lifted load and booms.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

22 Working with Electrical shock All equipment being used complies with IECCL
Electrical High all relevant safety standards. Electrical Low
Equipment Electrical burn incharge &
All equipment is given through visual
Electrical fire/short inspection prior to use. HSE
circuit. personnel.
Maintenance schedule is place.

Persons are aware of procedure to use


the equipment.

.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

23 Working near Cut injury. Guarding on moving parts. IECCL Job


object that may High supervisor. Low
move/slide. Body part caught Compressor to be grounded.
between moving
objects. Proper lubrication to be done.

Use of PPE’s.

.
HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

24 Pneumatic/ Bursting of Work to be supervised by experienced IECCL


Hydraulic testing. discharge hose/tube. High & responsible personnel. Engineer/ Low
HSE
Bursting of pipe to Cordoning the work area by cordoning
be tested. tape and appropriate signboards. personnel.

Heavy leakage Minimum required persons to be kept at


from valve body/ site.
valve passing.
Avoid such testing in heavy populated
Slipping of area.
. spanners.
Periodic inspection / testing of discharge
hose / tube to be carried out.

Skilled workers to be allowed to do so.

Use of PPE’s.

Use standard fitting and calibrated


pressure gauges.

Ensure that no loose fitting placed.


HALOL DAHOD PIPELINE PROJECT

HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION

Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control

25 Commissioning Fire due to Obtain work permit. IECCL


uncontrolled gas High Engineer/ Low
venting. Continuous venting of gas to be HSE
avoided and safe venting procedure to be
Road traffic followed. personnel
hazards.
CH4 to be monitored during venting in
the atmosphere.
.
Fire fighting equipments to be kept
ready.

Vehicular movement to be stopped /


diverted during venting is carried out very
close to the road.

Use of PPE’s.