HIRA (Pipeline Construction Work)
HIRA (Pipeline Construction Work)
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
2 Transportation Roll/ fall of pipes Load the pipes considering the load IECCL Piping
of pipe Road traffic hazard Medium carrying capacity of trailer. Sup. / Low
foreman/
Pipes to be arranged and tightened well Engineer/trailer
in the trailer. driver
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
3 Material handling- Fall of object on leg Use of PPEs i.e. safety shoe, hardhat, IECCL area
manual Injury in hand due Medium hand gloves etc. incharge Low
to sharp edge of
object. .Proper communication required when
the object is lifted by more than one
Cuts, abrasion person.
Slips, Trips & Falls
hazard. Persons are trained for safe lifting
Back injury procedure and aware of hazards.
Good housekeeping
Proper supervision.
HALOL DAHOD PIPELINE PROJECT
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
4. Route Survey Snack / Insect bite Extra care shall be taken during line IECCL
Medium survey. Survey Low
Cut injury incharge
Use of PPE’s like Gumboot, safety
shoe, hard hat and hand gloves etc.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
5. ROU & Grading Snack / Insect bite Extra care shall be taken for snake / IECCL Job
Medium insect bite. supervisor. Low
Overhead utilities.
Use of PPE’s like Gumboot, safety
Equipments may shoe, hard hat and hand gloves etc.
stick in marshy land.
First aid kit kept with crew member.
Cutting tree or its
branch may fall on Only experienced personnel shall be
the machinery like deployed as a operator.
Grader, Dozer etc
Avoid go inside the marshy land with
machinery.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
6 Excavation & Shocked due to Work to be supervised by experienced & IECCL
Trenching underground electrical High responsible personnel. Excavation Low
cable (if any) Sup. / foreman
Cordoning the work area by cordoning / Engineer
Falling of object on tape and appropriate signboards.
head or body
Excavation equipments to be well
Collapse of trench insulated.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
8. Cutting / Welding Flying of foreign Minimum person to be kept near work IECCL
particles. High place. Mainline Low
incharge/
Welding flash. Use of welding helmet, hand sleeve, foreman& HSE
hand gloves, safety shoe by welder. personnel.
Burn injury due to
gas cutting/ welding. Use of PPE’s like hand gloves, helmet,
safety shoe, goggles by helper and near
Electric shock. persons.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
11. Tie- in-joints Collapse of trench. Proper balancing to be done, if pipe is IECCL Job
High lifted by two slings / wire ropes. supervisor & Low
Fall of object. HSE
Keep safe distance near trench while
Cut, crush, locating the crane, lifting equipment. personnel.
abrasion injury.
Ensure single authorized person gives
Road traffic hazard. signal to lift/lower the pipe section by
observing safety with all respect.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
12. Holiday test. Electric shock. Trained and experienced person shall IECCL Job
High do this work. supervisor & Low
HSE
Use of appropriate PPE’s.
personnel.
No one allowed sitting, crossing or
touching the pipe section during test.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
13. Radiography / X- Ionizing radiation. Ensure safety regulations as per BARC IECCL NDT
Ray. High before commencement of job. team & Low
Radiation may QA/QC
react with the skin Affected area to be cordoned off,
and can cause radiation warning symbols/ signboards to engineer.
cancer, skin be displayed.
irritation, dermatitis,
etc. Avoid radiography in daytime.
Wear appropriate PPE’s and film badges
issued by BARC.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
14. Pipe bending. Personal injury. Use of proper PPE’s like safety shoe, IECCL
Medium hard hat, hand gloves, ear plug etc. Bending Low
Breaking hydraulic incharge.
hoses. Care shall be taken that no sharp edge
shall be contact with hydraulic hoses.
Overhead electric
line. Working surface shall be even and well
maintained.
Uneven surface.
Good housekeeping shall be maintained
Obstruction in free at work place.
movement of
machinery and Only trained and authorized personnel
manpower. shall be deployed.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
15. Horizontal Misuse / abuse of Daily user inspection and periodical IECCL HDD
Direction Drilling equipment. Medium checking / recording of equipment to be Incharge / Low
(HDD). ensured. The equipment should be
operated by qualified operator only.
Job
Fall hazard.
supervisor.
Underground Ensure that a walkover excavation
electrical cable, technique, but still it should be ensured
pipeline damage. that the area under which the HDD is
being done should be barricaded.
Failure of rig to pill
the pipe section. Higher capacity rig shall be used then
. required capacity.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
16. Sand Blasting. Health hazard i.e. Proper PPE’s shall be worn like Dust IECCL Job
lung dieses, silicosis Medium mask, ear plug and mandatory PPE’s. supervisor. Low
etc.
. Area to appropriately cover to avoid the
Asphyxiation due spreading of dust in surrounding area.
to lack of air supply.
Minimum person shall be deployed and
Body injury movement of vehicle shall be prohibited
where sand blasting carried out.
HALOL DAHOD PIPELINE PROJECT
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
17. Concrete coating Flying of cement All persons shall be wear proper PPE’s IECCL Job
of pipe. mixture. Medium like safety shoe, gum boot, rubber gloves, supervisor. Low
ear plug, dust mask etc.
Health hazard due
to cement dust.
Experienced & trained person shall be
Brusting of hoses. deployed.
Roll of pipes.
HALOL DAHOD PIPELINE PROJECT
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
18. Civil work/ Fall of bricks on Use of PPE’s like safety shoe, gum IECCL Job
working with person. Medium boot, rubber gloves, ear plug, dust mask supervisor. Low
cement, sand & etc.
bricks. Health hazard.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
19 Removal of pipe Burn hazard. Proper PPE’s i.e. heat retardant hand IECCL Job
coating. High gloves, safety goggles, face shield etc. supervisor. Low
Fire / explosion shall be used.
hazard
Use only approved commercial LPG
cylinders.
HALOL DAHOD PIPELINE PROJECT
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
19 Removal of pipe Burn hazard. Proper PPE’s i.e. heat retardant hand IECCL Job
coating. High gloves, safety goggles, face shield etc. supervisor. Low
Fire / explosion shall be used.
hazard
Use only approved commercial LPG
cylinders.
HALOL DAHOD PIPELINE PROJECT
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
20. Working at Height Fall of personnel All personnel shall wear safety harness IECCL Job
High if fixed access cannot be provided. supervisor & Low
Fall of HSE
material/tools and/or Safety Net shall be provided if required.
equipment. personnel.
Scaffolders shall ensure that access
Dizziness-Vertigo platforms are constructed in line with all
Unsafe scaffolding relevant codes.
Damage or
improper use of Suitable barriers shall be erected below
ladders. the work area and signs displayed to
. advise personnel of the potential hazards.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
21. Use of lifting Damage of lifting Check crane/sling/chain pulley IECCL Job
equipments equipments due to High certification for their SWL and testing supervisor. Low
overload or work in date.
over SWL.
SWL must mention on each lifting
Sling / chain devices.
damage.
Balancing may fall. Dual lifting shall be utilized whenever
Person may possible.
electrocute due to
crane’s boom Better communication between crane
. touching with high operator and foreman.
tension line.
Due to lack of Use only tested lifting tools & tackles.
knowledge of load
chart, man may lift Use of PPE’s like safety shoe, hard hat,
things in wrong hand gloves etc
radius that may
cause tilt. Only trained and experienced operator
shall be operating lifting equipments.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
22 Working with Electrical shock All equipment being used complies with IECCL
Electrical High all relevant safety standards. Electrical Low
Equipment Electrical burn incharge &
All equipment is given through visual
Electrical fire/short inspection prior to use. HSE
circuit. personnel.
Maintenance schedule is place.
.
HALOL DAHOD PIPELINE PROJECT
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
Use of PPE’s.
.
HALOL DAHOD PIPELINE PROJECT
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
Use of PPE’s.
Sr. Activity Hazard & risk Risk Level Control Measures Action Risk level
No. Identified Before control taken by After control
Use of PPE’s.