Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ENGEL ANLAGEN TECHNIK PHILS., INC.

Itinerary Week 17 April 20 - 24,2020


Sales & Technical Adviser J.G.Talusan

DATE CUSTOMER / PLACE Name of Contact Contact Number REMARKS / STATUS Time Contacted
04/20/20 KEPCO SPC Ms. Jean Clair Lamdag (032) -5505-4065 Project :Annual Elevator Preventive Maintenance 8:30am
Engr. Emmanuel Ylaya Activity : Revision of BOM and Quotation
SLTEC Mr. Danny Panganiban Project: Boiler Scaffolding , Boiler Refractory , Boiler Tube Repair for Unit 2 Shutdown 9:20am
Engr. Jopex Abanes
Engr. Jacob Aguado
SCPC Performance (02)- 88883624 Regarding Coal Conduit COCA/PRM
Safety
04/21/20 SCPC / SLPGC Maintenance (02)- 88883624 * Sales Call / Update / Follow up Proposals
Procurement
SLTEC Project: Boiler Scaffolding
Activity: BOM and Quotation
04/22/20 SLTEC Project: Boiler Refractory
Activity: BOM and Quotation
Taiheiyo Cement Projerct: Electric Winch
Activity: BOM and Quotation
04/23/20 SCPC Engr. Rene Romero Project: SCPC - Unit 2 ESP Gas Flow Distribution System
Activity: Revision of Report and Improvement Proposal (waiting for Sir Rene advised)
GBP Head Office Procurement * Sales Call / Update

04/24/20 SCPC Procurement Project: Sem Calaca Induction Motor


Activity : BOM and Quotation (waiting for JGV suppliers proposal)
URC Balayan Procuurement * Sales Call

You might also like